0% found this document useful (0 votes)
3 views5 pages

Bill of Quantity Template

boq

Uploaded by

Gaurav Singh
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
3 views5 pages

Bill of Quantity Template

boq

Uploaded by

Gaurav Singh
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 5

Sector Group Sub - Group

Provisional Sum #[XXX0001]


engineering work Building construction work
Construction work #[45000000] #[45200000] #[45210000]
Title First Custom Level(optional) Second Custom Level(optional)
(Provide Description) (Provide Description)
Third Custom Level(optional) Item Name & Description Unit
(Provide Description)

party Insurance against damage


to other persons
materials andas
and works property.
required Ps
and instructed by the engineer.
boundary as instruction of site Ps
incharge all complete.
1.5 m, disposed earth to be Ls
levelled and neatly dressed.
drawing, compactioning, curing m3
etc. all complete.
specification,drawing and m2
instruction of Project Manager.
specification,drawing and m3
instruction
laying, curingof Project Manager.in m3
etc all complete
approval of site
laying, curing etcengineer.
all complete in m3
approval of site engineer.
binding wire as per drawing, m3
design & instruction
and cutting holes forall complete.
utilization till kgs
the
joint,support
wettingif of
fully unyielding
surfaces net. m2
& curing
the work painting
Exterior all complete.
over a coat of m2
primer
B. Two coat enamel painting over m2
one coat of primer
as instruction of siteworks.
incharge all m2
complete.
fitting as instruction of site kgs.
incharge
Providingall andcomplete.
installing barbet kgs.
wire fencing all complete.
with watering & proper manual Rm
compaction. m3
Site Clearance works. LS
Quantity Bidder's Rate

1 6000
1 10000
1 9990
37.9900016784668 400
39.5299987792969 950
36.9500007629395 9990
24.6399993896484 9990
2.97000002861023 9900
16.1200008392334 9990
1898.13000488281 140
99.5800018310547 950
198.5 350
198.5 250
9.89999961853027 250
400 190
72.1999969482422 190
178.5 90
466.200012207031 350
1 2490
BOQ ID
11900035
11900036
11900037
11900038
11900039
11900040
11900041
11900042
11900043
11900044
11900045
11900046
11900047
11900048
11900049
11900050
11900051
11900052
11900053

You might also like