ASCP Workbench Rev 04
ASCP Workbench Rev 04
For
ASCP Work-Bench
Version - 04
Page 1 of 136
DOCUMENT RELEASE NOTICE
Change History –
Page 2 of 136
Table of Contents
11. Method to check schedule from Standard Workbench & Excel Export of Prod. Plan……..................39-53
20. DS Release from ASCP for wires and RM Items after Purchase Plan Run………………………………………..….…103-110
21. PR Release from ASCP for MSEW/SMIEL/APD and SPO Creation & Approval………………………………..….…110-136
Page 3 of 136
Protocol of ASCP Run:-
Page 4 of 136
Steps for Plan Run
Page 5 of 136
Set Ups for ASCP Run:
Routings of the FG/SUBA.
Step-1:- Go to design Responsibility and Click on Routings.
Page 6 of 136
Step-3:- Routing Screen will appear.
Enter Item Code and Then as department for the item If FG then Assembly for SUBA it will be LPC
Page 7 of 136
Step-4:- Click on Operation Resources to define Cluster and Standard time for harness which comes from Interface
Automatically. If we have to change we can change It for example if hourly Output for harness is 4.7 in One Hour
then we have to enter 4.7 in Inverse Column.
Harness qty completed
in 1 Hour
Click here to add
Cluster
Basis Should be
Item
Page 8 of 136
Step-6:- In Completion Sub Inventor y Enter the Sub inventory in which after Completion Item Will be Transfer.
Enter completion
Sub inventory
Page 9 of 136
Step-2:- Then go to “MSSL Cluster Priority” option to change Cluster priority.
Page 10 of 136
Step-3:- In the below window press F11 and Ctrl+F11 to get data.
FG Code
Suba Code
Cluster Description Harness
Unit Code Cluster Code
Cluster Priority
Priority
Page 11 of 136
Step-5:- Fill the details as per below instructions.
Enter Cluster
Priority here
Page 12 of 136
Step-7:- Fill th e FG Code as per instructions.
Enter FG Code
here
Enter FG priority
here
Page 13 of 136
Step-9:- Now, Save the details.
Click on SAVE
option
Defining Fixed Days Supply (CLUB days) and safety Stock % (Buffer Days):
Step-1:- Select Custom Resp. from resp. menu.
Page 14 of 136
Step-2:- Select Item Inventory Info from resp. menu.
Click Here
Step-3:- Below screen will be appeared. Find button to To define MRP To Consider pack
get detail planned or Not size of RM Item
Enter FG (Item
Code) here
Description of
Item
As per Login
Org Code will
come
Page 15 of 136
Step-4:- Fill the FG Code as per below instruction.
Page 16 of 136
Step-6:-Details will be populated automatically.
Page 17 of 136
Step-2:- Select Workbench option from ASCP module resp. menu.
Click on
“Workbench”
Step-3:- Below screen will appear, and show the Plans. Select Assembly Plan to view or to change and save.
Right click on
“Assembly Plan”
Page 18 of 136
Step-4:- Below window will appears, Go to Custom PWB, and then Custom Planning Workbench.
Custom PWB
Custom Planning Workbench
SAVE Button
Page 19 of 136
Step-6:- Fill the req. details (Only I.O. code) & Press Query button to retrieve plan.
Page 20 of 136
Step-7:- Plan will be received in below format.
Demand Row, System Suggested Plan Row, User Editable Plan Row.
Page 21 of 136
Assembly Workbench Parameter Details:-
6 8 12
5 9 3 4 13 14
2 7 15
1
16
17
18
11 10 19
20
21
22
23
24
25
26 28
27
Page 22 of 136
S. No. Parameter Details
1 Inventory Organization This shows Inventory Org. for which work bench is opened
2 Plan Type This shows the plan type i.e. Assembly plan or LPC plan
3 Start Date This shows the date on which plan is run
4 Due Date This shows the last date of plan
This will show total demand for the bal. month. (It Works on
5 Bal. Month Demand weekdays from 1st day to last day)
6 Next Month Demand This will show total demand for the next month.
This will show harness buffer days which was defined in
7 Buffer Days source.
This will show Harness Club Days which was defined in
8 Club Days source
9 FG Assy Capacity This will show the harness output in an hour for Assembly.
10 FG LPC Capacity This will show the harness output in an hour for LPC.
11 Alternate Cluster This will show the alternate cluster if defined
12 FG Stock This will show the stock for the particular FG Code.
13 Pre FG Stock This will show the Pre FG stock for the particular FG Code
14 Open Job Order qty. LPC This will show open work order qty. for LPC.
15 Open Job Order qty. Assy This will show open work order qty. for Assembly.
16 Harness Cluster This will show the Harness Cluster
17 Cluster Priority This will show the Cluster Priority
18 FG Priority This will show the Harness (FG) Priority
19 No. of Ckts This will show details of Harness Ckts
20 Total Demand Load (Ckts) This will show total Ckt load as per demand
21 Total Demand Load (C/O) This will show total Change Over (C/O) load as per demand
22 Total Suggested Load (Ckts) This will show total system suggested Ckt load
23 Total Suggested Load (C/O) This will show total system suggested Change Over load
24 Total Actual Plan (Ckts) This will show total actual planned Ckts
25 Total Actual Plan (C/O) This will show total actual planned Change Over
26 FG Code This will show End FG Code (Harness Code)
27 SUBA Code This will show SUBA Code w.r.t. FG Code (Harness Code)
This will show the qty. which is not produced before the
28 Backlog Qty. plan run date.
Page 23 of 136
Color Code Details:-
Step-8:- User can edit/modify the system suggested plan if req. User can change the qty., pre pone or
Postpone the system suggested plan in white colored line and then after modification press the
Save button and this plan will be saved as a final actual plan. On the basis of this final actual
Plan LPC Plan will be run next day of Assembly Plan.
Page 24 of 136
Validation Test Cases
Page 25 of 136
Page 26 of 136
Case-1: System Suggested plan as per club days.
Page 27 of 136
Case-2: System Suggested plan as per buffer days.
Page 28 of 136
Case-4: Harness Cluster, Cluster Priority, FG priority and number of CKT coming as defined in System.
Page 29 of 136
No. of CKT (Harness)
Case-5: Balance Month demand considering backlog and balance days demand.
Page 30 of 136
Case-6: System suggested after considering On hand and Backlog.
Case-7: SYSTEM NOT ALLOWED changing less than 100 % of the system suggested plan. (Showing by POP UP window)
Page 31 of 136
Case-8: Validation Cases system not allowed before n days (n=3).
Case-9: System not allowed saving more than system suggested plan.
Page 32 of 136
Case-10:- Steps for checking the over-loading in Workbench during plan run. (Shown by RED Color in WB).
Page 33 of 136
Step-3: - GANTT Chart For Resource In which FG is Overloaded.
Open the ORACLE Login window & click on “Work-bench”:
Page 34 of 136
Right Click on Assembly Plan, below window appears then click on “Resources”;
After filling all details (Criteria, Condition, from, etc) & click on FIND button:
Click on “FIND”
button.
Page 35 of 136
Below screen appears, and then click on Gantt chart button to see GANTT Charts:
(Here one thing to remember we have to select particular cluster to see Gantt chart, as Gantt charts used to see
the cluster’s over-loading.)
Click Here
Below is the screen of GANTT CHART: Then click on VIEW button, and select Resource – HOURS:
Page 36 of 136
In Below Screen Resource Overload on 29 September for Resource CV35.
Page 37 of 136
Step-5:- To check Exception on FG coming on the 29th September 2014.
For FG YP532603 showing Exception that’s why Overload Red color is coming for FG on 29th September in Custom WB.
Step : 6: As there is no Overloading YP552603 so There is no exception for Part in Std WB and Also there is no Over
load red color in Custom WB.
Page 38 of 136
To See Demand against planned order by Supply & Demand:
Click on
“Workbench”.
Right click on
MSSL_Prod (Assembly
Plan)
Page 39 of 136
Step-2:- RIGHT CLICK ON PLAN, BELOW WINDOW WILL COME.
Click on “Supply
and Demand”.
Click on “Supply
and Demand”.
Click on “Supply
and Demand”.
Page 40 of 136
Step-4:- Below window will appear after clicking on supply and Demand.
Page 41 of 136
Step-6:- Here in second column select “EQUALS” from LOV.
Step-7:- Then in third column fill the Item for which you have to check Supply & Demand.
Page 42 of 136
Step-8:- Below reduction window will appear. Put the item code in reduction window.
Page 43 of 136
Step-10:- After filling all details, click on FIND button.
Page 44 of 136
Step-11:- BELOW WINDOW WILL APPEAR (showing all details), we can export schedule to excel also.
Page 45 of 136
Step-12:- To export in excel click on FILE & select EXPORT.
Page 46 of 136
EXCEL Exporting is in progress:
Page 47 of 136
Exporting is done in NOTEPAD, Select all and copy to excel for any editing and working:
EXCEL EXPORT OF PRODUCTION PLAN FROM CUSTOM WORKBENCH IN ASCP through EXPORT button:
Step 1 : In the CWB of PROD Plan shown below click on EXPORT button.
Page 48 of 136
Step-2 : After click on EXPORT radio button, below message appears to save the changes if any.
Step-3 : Then after click on OK in above, a request ID generates for the request done.
Page 49 of 136
Step-4 : Then to see the output, go to VIEW and click requests as shown below.
Page 50 of 136
Here in the below screen, the request ID status will appears for all requests done then after request phase –
completed shown here, click on View Output button.
Page 51 of 136
Step-5 : After clicking on view output, below screen appears showing the output on Notepad.
This output form need to be change in CSV format to export in excel. Below steps to be followed.
Page 52 of 136
After assigning file name followed by “.CSV”, click on SAVE.
Page 53 of 136
Step – 6: Below is the output of Production Plan (ASCP) in excel format.
Page 54 of 136
To see the Supply and Demand Pegging:
Login to the ASCP (8002) Instance and right click on MSSL_PUR (Purchase) Plan from Plans:
Page 55 of 136
Again click on Supply and Demand:
Below screen will appear, fill the required data in the blanks:
Page 56 of 136
Below screen will appear, fill the Item Code in the reduction criteria window and press OK:
Below screen showing the reduction window for Item Code – HSAB0502, and press OK:
Page 57 of 136
Below screen will appear, Click on FIND button & press OK:
Click on FIND
Button.
Below screen will appear, showing the Supply & Demand for the entered Item – HSAB0502:
Page 58 of 136
To see the pegging for the child items under the entered Item – ZHSAB0502, Click on “Hide Dependent Demands” first.
Page 59 of 136
Then click on “Supply Pegging” button:
Click Here
on “+” sign.
Page 60 of 136
Let us take another example for checking pegging:
Below report is showing the immediate parent of 12961533 is PIGSR000048; then we check pegging for Assembly –
12961533.
For checking the pegging of 12961533 we have to Check Pegging of Its Immediate Parent i.e PIGSR000048 under
SUBA ZHSAB0502 and then we have to go under pegging of immediate Parent.
In Below Screen pegging of Immediate Parent of 12961533 i.e PIGSR000048 is shown Under Suba Code
ZHSAB0502.
Page 61 of 136
Now For Pegging of 12961533 we have to drill down the pegging of immediate Parent i.e PIGSR000048(As shown
in Below Screen).
There are Two Planned Order of 12961533 are pegged under one planned order of immediate Parent i.e.
PIGSR000048 in below Screen.
There is one Planned Order of 12961533 are pegged under one planned order of immediate Parent i.e.
PIGSR000048 in below Screen.
Page 62 of 136
There is one Planned Order of 12961533 are pegged under one planned order of immediate Parent i.e.
PIGSR000048 in below Screen.
There is one Planned Order of 12961533 are pegged under one planned order of immediate Parent i.e.
PIGSR000048 in below Screen.
{Note: - After checking the pegging of 12961533 under immediate parent i.e., PIGDR000048; for all 4 ckts as
shown above; The BOM qty. of 12961533 is 18080.44656 which is equal to the sum of planned order qty. of
12961533 in all 4 ckts. (i.e., 2565.839886+1615.867674+4858.51572+4326.73788+4713.4854= 18080.44656), that
means this is OK.}
Page 63 of 136
GANTT CHART
Open the ORACLE Login window & click on “Work-bench”:
Click Here
Select Unit
from here
Page 64 of 136
Below window will appear, from this window select plans (Assembly / LPC):
Right Click on Assembly Plan, below window appears then click on “Resources”;
Page 65 of 136
Below screen appears, fill the Yellow fields in below window (Yellow fields are mandatory):-
After filling all details (Criteria, Condition, from, etc) & click on FIND button:
Click on “FIND”
button.
Page 66 of 136
Below screen appears, and then click on Gantt chart button to see GANTT Charts:
(Here one thing to remember we have to select particular cluster to see Gantt chart, as Gantt charts used to see
the cluster’s over-loading.)
Click
Here
Page 67 of 136
Then click on VIEW button, and select Resource – HOURS:
Below is the result, here it is showing 3.1 HRS over-loading in Cluster CV00:
Page 68 of 136
LPC Work bench
Option Selection
Step-1:- Select Workbench option from ASCP module resp. menu.
Step-2:- Below screen will appear, and show the Plans. Select LPC Plan to view or to change and save.
Page 69 of 136
Step-3:- Right Click on LPC Plan (MSSL_MFG), Go to Custom PWB, Custom Planning Workbench.
Page 70 of 136
Fill the req. details (Only I.O. code) & Press Query button.
Select
I.O.
(Unit)
from
here.
After filling the relevant data in blanks, below window will appear.
Page 71 of 136
Step-5:- Plan will be received in below format.
Parameter Details
Inventory Organization This shows Inventory Org. for which work bench is opened
Plan Type This shows the plan type i.e. Assembly plan or LPC plan
Start Date This shows the date on which plan is run
Due Date This shows the last date of plan
Bal. Month Demand This will show total demand for the bal. month. (It Works on weekdays from 1st day
to last day)
Next Month Demand This will show total demand for the next month.
Buffer Days This will show harness buffer days which was defined in source.
Club Days This will show Harness Club Days which was defined in source
FG Assy Capacity This will show the time in which one harness can processed in Assembly
FG LPC Capacity This will show the time in which one harness can processed in LPC
Alternate Cluster This will show the alternate cluster if defined
FG Stock This will show the stock for the particular FG Code.
Pre FG Stock This will show the Pre FG stock for the particular FG Code
Open Job Order qty. LPC This will show open work order qty. for LPC.
Open Job Order qty. Assy This will show open work order qty. for LPC.
Harness Cluster This will show the Harness Cluster
Page 72 of 136
Cluster Priority This will show the Cluster Priority
FG Priority This will show the Harness (FG) Priority
No. of Ckts This will show details of Harness Ckts
Total Demand Load (Ckts) This will show total Ckt load as per demand
Total Demand Load (C/O) This will show total Change Over (C/O) load as per demand
Total Suggested Load (Ckts) This will show total system suggested Ckt load
Total Suggested Load (C/O) This will show total system suggested Change Over load
Total Actual Plan (Ckts) This will show total actual planned Ckts
Total Actual Plan (C/O) This will show total actual planned Change Over
FG Code This will show End FG Code (Harness Code)
SUBA Code This will show SUBA Code w.r.t. FG Code (Harness Code)
Backlog Qty. This will show the qty. which is not produced before the plan run date.
Page 73 of 136
WORK ORDER CREATION THROUGH ASCP INSTANCE (Custom Release Set) :-
Step-1:- Login to the ASCP Instance & select workbench from Supply Chain Plan.
Click on workbench.
Step-2:- After selecting Workbench in ASCP Instance, Run a request. Click on “VIEW” and go to Requests.
Page 74 of 136
Click on Submit a New
Request button – to
submit a new request.
Click on “OK”
button
Page 75 of 136
Step-3:- From request select “Custom Release with Parent Update” option and press OK.
Page 76 of 136
Step-4:- After selecting “Custom Release With Parent Update” option from request window; below screen appears
and here fill all details and press OK.
Page 77 of 136
Zoom view of window, fill all the entries and press OK.
Enter Org. (Unit)
Enter Date as
per format.
Page 78 of 136
By this program we can create WO for single FG code OR for all FG for that particular Unit. ORG. Name
SUBA Code
Date Format.
Below is the print screen for Creating WO for All FG for that particular Unit:-
Note: In date Format month should be first three letters and Letters Should be in Capital letters otherwise the
request will not be completed.
ORG. Name
Do not enter
SUBA Code.
Date Format.
Page 79 of 136
Step-4:- After selecting the one from above two options of WO create press OK.
Step-5 :- After click on Submit button, below window will appear and a request ID Number generated for that
submission in Decision window.
Click on “NO”
Page 80 of 136
After click on “No” in Decision window, we have to press FIND button :-
Click on FIND
Button for seeing
the output.
Below Window is showing that the Output request is running for “Custom Release with Parent Update”.
Page 81 of 136
The output of this request is ZERO and this is because this shows the data has been shifted in Other instance
(Source – SIT), then we have to login in Source Instance (8000) and just after completion of WO Creation program
in ASCP Instance there is another request will RUN in SIT Instance i.e., WIP Mass Load.
Page 82 of 136
Below screen showing the LOG File for a request through VIEW LOG option.
Page 83 of 136
Step-6:- LOGIN TO PRODUCTION INSTANCE
Step-7:- After LOGIN to Source (8000) Instance, view the request which is automatically runs after Custom Release
Set request completed in ASCP (8002) Instance.
Click on
Request
in View
option
Page 84 of 136
Step-8:- After click on request, below window will appear.
Step-9:- Below is the screen showing WIP Mass Load Completed in Source Instance.
To View Output,
click here.
Page 85 of 136
Step-10:- Below screen is showing the output of WIP Mass Load. Here it is showing the Job Orders Created
Successfully for FG with SUBA and Childs automatically according to the date selected in Custom Release Set in AS
FG WO
created
SUBA
WO
created
Page 86 of 136
Sub-Inventory Transfer
Below screen showing On-Hand stock for FG Code – JD130200, Qty. = 100 in PF001.
Page 87 of 136
Select ORG from LOV:
Page 88 of 136
Click on Transact Lines:
Page 89 of 136
After transferring stock from PF001 to FG001 (i.e., Production Slip)
Stock will transferred, we can check the transferred stock from POH (Physical on-hand details option):
As shown in below screens – Before POH details & After POH details.
Before After
Page 90 of 136
IR (Internal Requisition) Steps:-
Step-1:- Select Prod (Assembly Plan) from resp. menu.
Step-2:- Below screen will be appeared, and shows the ASCP IR suggestion. Select the FG Code for which IR need to
be created.
Page 91 of 136
To Check Source Unit Click on Sourcing It will show from Which Unit Item Will be Buy.
Page 92 of 136
Step-4:- Below screen will be appeared, Press ok button.
Page 93 of 136
Check the Release IR from ASCP.
Step-6:- Select Purchasing PR Creator User resp. from resp. menu in source instance.
Page 94 of 136
Step-8:- Below screen will be appeared.
Page 95 of 136
Step-10:- Select MSC from LOV.
Page 96 of 136
Step-12:- All Released IR will be appeared in below screen. Click on line for which details need to be checked.
Page 97 of 136
Create Internal Order:-
Step-14:- Run the new request to create internal orders for any approved IR.
Page 98 of 136
Step-16:- Press Ok button.
Production Responsibility
Page 99 of 136
Click on View Discrete Job
Click on FIND
Click on OPEN
button.
Parent Job
Code
MRS Qty.
After updating DFF click on OK.
We can release demand for wire through ASCP instance in Oracle after Purchase Plan completed. First login to ASCP
window and then follow the below steps.
Step – 1: After login in ASCP click on Workbench from Planner User responsibility, then select Purchase Plan from Plans, then
right click then go to supply and demand.
Below screen showing reduction criteria selected to release DS for Group Company(MSEW) recommended by ASCP
Purchase Plan:- Here date range will be selected as per agreed rules.
Below screen is showing all information related to wires demand from Supplier Named - MSEW.
Step – 5: If we want to release DS for wire then click on For Release then save. After save that particular planned order we
have released and Action Change to from release to none.
We can also release DS for RM Items likewise. (After PURCHASE PLAN RUN COMPLETES).
Below are the steps shown, here we select Asian Rubber as Supplier.
PR Release from ASCP for MSEW/SMIEL/APD and SPO Creation & Approval
Step-1: Below screen showing the selection criterial for MSEW in ASCP Standard Workbench.
Step-3: Below screen appears showing all selected RM’s with PINK color. Click at OK at pop up note.
Below screen showing Requisition Number that fire from ASCP to Production Instance.
Note: Now ACSP Instance work finish. User has to login in PRODUCTION Instance.
Step-9: Below screen appears, showing Requisition Import status came from ASCP to Production Instance in MSC
Table. Here request import showing the same number that showed in ASCP.
Note: Above steps are just to check whether request fire from ASCP will Imported to Production Instance.
Step-10: Then select Requisition Summary option under Requisition under Oracle Purchasing in Purchase User
Responsibility.
Click on LOV in
Import Source
Date range to
be enter here
Then Click
Here
Step-14: Below screen appears, showing PR number. PR released from ASCP is always in Approved status.
PR Number
Step-15: By sliding to the right side, user can get showing PO number against PR number.
PO Number
Step-16: For SPO creations go to “PO Summary (Localized)” option under Purchase User Resp.
Step-17: Below screen appears. Now enter PO Number or select from LOV.
Enter PO number
here.
Click on
FIND
Click on
OPEN
Step-21: After pressing Open button, below screen appears. Here in SPO form all fields filled automatically. No
need to fill any data. Only we need to press Approve button to send this SPO to next level of Approval (i.e. Process
Owner).
Click on
Approve
Select
Forward
Step-23: Below screen appears, and then select SPO Hierarchy of your respective Org. from LOV.
Click OK
Notification mail fires as soon as SPO Approve by Unit Buyer, and showing Action required by Process Owner.
LOGIN to Approver
Step-27: Below screen appears, here Worklist is showing SPO submitted by Unit Buyer for PO Approval.
SPO is Approve by
Approver by
clicking here
Step-30: Mail Notification shows for SPO number – 1004001666 in below screen.
Step 31: After SPO is approved by Process Owner, Unit Buyer has to run a request from Purchase User
Responsibility, Request name as “XXMSSL: PO Communicate to Supplier (Forecast for Weekly Schedule) - CEMLI
17”.
Note: The purpose of this request is to send Data file through system at Supplier’s system. This is mandatory to
RUN this request in case of Manual DS and Auto DS Release (From ASCP_Purchase Plan) for Group Companies
(MSEW/SMIEL/APD), otherwise supplier will not be able to upload SPO information at their end.
Steps to Run “XXMSSL: PO Communicate to Supplier (Forecast for Weekly Schedule) - CEMLI 17” are as follows:
Step A: Click on “View” from Purchase User Responsibility. And then select Request, as shown below.
Click here
Click here
Click here
Step E: Below screen appears. Now enter Input Parameters to run the request.
Below screen showing Supplier’s LOV. Select Supplier Name from here.
Then click
“NO”
First click on
“SUBMIT”
Step G: Below screen appears. Then click on “FIND” button to see submit request status.
First click on
“FIND”