DT DripTech GravityKit
DT DripTech GravityKit
1 Driptech 5
2 Components of DT-GravityKit 7
3 Design 9
7 Operational Guidelines 39
8 Fertigation system 41
10 Troubleshooting 47
11 Opportunities 49
(4)
Driptech
Driptech specialises in Drip Irrigation solution for small ‘DT- Gravity Kit’ - An unique offer from Driptech for
farm plots. We bring the benefit of Drip Irrigation small plots:
technology used in large sophisticated farms to small a They contain all components of drip irrigation
farm holders. system in handy boxes.
Driptech is the ‘Best Value Drip Irrigation’ company. It a Works without pumps on gravity pressure. Saves
offers ‘affordable drip irrigation solutions’ - innovative electricity
novel high performance drip irrigation system at affordable
cost. a Ideal for small plots.
a Simple and quick to install.
The company’s unique innovation of Laser punched
Dripline delivers the benefit of drip irrigation technology a Easy to transport and handle.
at a cost which is much lower than the traditional drip a Easy to install with the help of user friendly manual
system. a Easy to operate and maintain.
The company founded in USA, is now a subsidiary of one a Affordable cost – quick pay back
of the global leaders in micro irrigation based in India.
‘DT- Gravity Kit’ is available for plot sizes:
‘DT – Gravity Kit’ 2000 m², 1000 m², 500 m², 250 m², 100 m², 30 m²
Welcome to the world of Gravity Drip Irrigation Kits -
ready to use semi assembled drip irrigation system. The Applications
products come in convenient ready to use Kit form which Mainly suitable for cultivation of vegetables. Can
can be easily installed and used by everyone. They operate be used for cereals, pulses, cotton and other closely
under gravity pressure without any pump. spaced crops.
Drip irrigation saves water, increases yield, saves Can be used for irrigation in open fields, Green house /
fertilisers, and reduces weeds etc. With our Kits, even Net house and nurseries.
smallest of the small landholders can use this technology.
Suitable for Kitchen Gardens and also Hilly (Terrains)
This enables the small land holders to adopt drip
where land holding is very small.
technology and empowers them to:
Useful as a survival irrigation tool in rainfed area of
a Cultivate high value cash crop and improve their
water scarcity region or when there is a prolonged gap
income.
between rains & / or electricity is not available
a Grow their own nutrition. Fight lack of nutrition.
a Increase the quality and quantity of the produce.
ly
a Save water and fertiliser. Helps fight drought. a l s o supp f
an it o
a It can be powerful tool for a nation to improve the We c tomised K your
us et
lot of its small and marginal farmers you c size to me ent.
lot rem
any p ific requi
spec
(5)
(6)
Components of DT-GravityKit
Driplines
Driplines are the heart of the Kit. They form the major part
of the Kit. The following driplines are used:
n Finest dripper
Applications
n Green House and Nursery
n Cotton
n Chilies
n Cotton
(7)
Specifications
Specification DT-GravityKit
1000 2000
Area in M² 30 100 250 500
(¼ acre) (½ acre)
Type of Dripline DT-Thin Wall
Discharge at 1 bar in LPH 0.96 0.96 1.6 1.6 1.6 1.6
Dripper spacing in cm 30 30 30 30 30 30
Lateral length in m 15 10 12.5 25 25 40
No. of lateral 2 10 20 20 34 42
Lateral Spacing in m 1 1 1 1 1.2 1.2
Sub-main size in mm 8 16 25 25 25 32
Sub-main length in m 2.5 10 20 20 40 50
Filter in inch 16 mm 16 mm ¾” 1” 1” 1”
Operating head in m 1.5 1.5 2 2 2.5 3
Components
PVC Single union Super Flow filter Rainport Fittings Unique adaptor Used to Quick
Valve used to control used to prevent allows connection & to connect Connect DT-Thin
the flow of water clogging of emitters easy dismantling of DT-GravityKit Wall Dripline to
into the system or thinner passages Mainline & Submain components to Submain
storage tank.
Combination tool to Used to make hole For easy closing of For closing of Used to hold the
make hole on Tank , on Submain to 25mm Submain DT-Thin Wall & drip line in place so
Submain & to Push install DT-Thin Wall (in operation) & opening during that water emission
Rainport adaptor. adaptor. opening during flushing. is done within root
flushing. zone.
(8)
Design
(9)
Design a DripKit for 250 m² area with Step 5
tank height of 2.5 m for vegetables. Time for refilling the tank
Time to refill = Size of the tank / Water flow.
Design Input If we are using a tank of 1000 litre, time to refill will be
1) Crop - Vegetable 3 x 3 x 3 = 1000 / 1250 = 0.80 hour
2) DT-ThinWall - 250 m²
Step 6
Solution Considring the losses in tubing & fitting as Lm;
Tank height = 2.5m (operating head) + 1 m (losses) = 3.5 m
Step 1
Emitter discharge at 2.5 m head = 0.75 lph (refer Table 3) Remarks : This means that, user need to irrigate his 250
m² area for 3 hrs, 12 min daily to complete PWR of vegetables
Step 2
Note: These calculations are considered for peak water
Peak water requirement of vegetable at 3’ x 3’ x 3’ is requirement, at early stage of vegetable may need less
8lph/m/day (refer table) water.
These calculation may change according to site conditions.
Step 3
From this we can calculate flow irrigated per meter to
fulfill peak water requirement of crop is
Irrigation by present emitter
= (Emitter discharge at 2.5 m head in lph)/(emitter spacing in m)
= 0.75/0.3
= 2.5 lph/m
Step 4
Time for which the irrigation system is to be run.
Time depends on water required by the crop and flow rate
of water from the system.
Time;
= Water requirement of Crop/ Flow rate of water from the
system
= PWR in mm x area of the plot / Flow rate of water from
the system
Example;
= For 500 m2 plot of vegetable: Peak water requirement
is 8 mm. (see the table no 1)
If you are using the GravityKit, tank height is 2.5 m, the
water flow is 1250 lph (see the table no 3)
So, the irrigation time will be
8x500/1250 = 3.2Hour
( 10 )
Installation of DT-GravityKit System
( 11 )
DT-GravityKit - 30 m²
CutCut
the the
holehole
of dia
of25mm
dia 25mm
11 at the bottom of bucket
at the bottom of bucket
1
1
2
2
5 4
5
6
6
Tighten the female adaptor on
3 male adaptor from bottom 7
( 12 )
30m²
Unscrew the cap of connector
6 push the drip tape & tighten the cap.
b) Squeeze it lengthwise.
Minimum
1.5 Meter
Maintain height
of bucket at lest
1.5 meter
from the ground.
( 13 )
30m²
DT-GravityKit - 100 m²
Drip tape
Cut two pieces of poly tube Insert barbed portion of poly take off
8 in the hole made on submain tube
(minimum length 6”)
5 & connect barbed ends of
Filter with poly adaptor &
poly tee
( 14 )
100m²
DT-Thinwall
( 15 )
100m²
‘DT- Gravity Kit’ - 250m²
Bill of Materials
Sr. Product Description Code Qty Sr. Product Description Code Qty
‘DT- Thin Wall’
DripKit / ‘Laser Drip’
1 JDKA1 1 13 250
Adapter 1”
(in meter)
Lateral
Reducer
2 R134 1 14 Straight STP 1
1” x ¾” punch
Rainport Tee
7 RPT25 1
25mm
Tool for
DripKit
8 TDK3275 1
32mm x
7.5mm
Lateral
End Stop
9 ESO825 2
“8” Shape
25mm
Tube hold
stake “C” Clip
10 LTHS12/ LTHS16 22
12 mm or
16mm
11 Teflon Tape TT 1
Rubber
12 Washer 44 x ORSS 1
27 x 5.5mm
( 16 )
250 m²
‘DT-Gravity Kit’ Possible Layouts - 250 m²
Tank Tank
12.5 m
12.5 m
Recommended
1m 0.5 m 1m 0.5 m
20 m 20 m
Tank Tank
12.5 m
10 Drip Lines
25 m
25 m
12.5 m
10 Drip Lines
( 17 )
250 m²
Installation guidelines for DT-Gravitykit 250m²
Step 1 Step 3
Push Centering Point of tool on plastic drum Assemble all the components as shown. Use Teflon tape
& Rotate the tool TDK 3275 to cut the hole. Hole shall be at threaded joint.
approx. 1” above the bottom of the Plastic Drum.
12
1
4 2
5 3
6
Step 2
From in side the Drum insert adaptor with washer
through hole .
Insert washer from outside of drum. Tighten the
Reducer on adopter for proper sealing.
11
Apply teflon tape (11)
on male threaded portion
for leak proof joint 12
1
2
5 3
( 18 )
250 m²
Step 4 - Laying the submain Pipe
Important :
Lay Drip line Tube with emitter facing upward
as shown, with 1 meter Spacing between each row.
( 19 )
250 m²
Step 5 - Connection of drip tubes & Flushing the system
For DT-ThinWall
Step 5 A
1 me
ter
14
15
(DLTOP1608)
Step 5 C
15
Important
After Installation, flush the entire system to
remove dirt/ debires
( 20 )
250 m²
Step 6 - Plugging the submain ends
For DT-ThinWall
Step 6 A
9 After flushing,
use ES0825 to close the submain
9
7
Step 6 B
After flushing,
use TSS75L
to close the drip tape
16
Step 6 C
16
10
( 21 )
250 m²
DT-GravityKit - 500m²
Bill of Materials
Sr. Product Description Code Qty Sr. Product Description Code Qty
‘DT- Thin Wall’
DT-GravityKit 13 / ‘Laser Drip’ 500
1 JDKA1 1
Adapter 1” (in meter)
Lateral
Female 14 Straight STP 1
2 Threaded FTC100 1 punch
Coupler 1”
Tape lock by
Single Union 15 Poly take off DLTOP1608 42
3 Valve (32mm SUV32HFM 1 16x8 mm
x 1” DT Thin Wall
Sleeve 75
Super Flow 16 mm length TSS75L 42
4 Filter 7m³/ JPSF07SC 1
/DT Sleeve
hr 1”
Rainport Tee
7 RPT25 1
25mm
Tool for
DripKit
8 TDK3275 1
32mm x
7.5mm
Lateral
End Stop
9 ESO825 2
“8” Shape
25mm
Tube hold
stake “C” LTHS12 /
10 42
Clip 12mm/ LTHS16
16mm
11 Teflon Tape TT 1
Rubber
12 Washer 44 x ORSS 1
27 x 5.5mm
( 22 )
500m²
DT-GravityKit Possible Layouts - 500 m²
Tank
0.75 m
12.5 m
12 Drip Lines 12 Drip Lines
1m
20 m 20 m
40 m
Tank Tank
25 m
25 m
20 Drip Lines 20 Drip Lines
1m 0.5 m 1m 0.5 m
20 m 20 m
12.5 m
20 Drip Lines
25 m
Tank
12.5 m
20 Drip Lines
1m 0.5 m
20 m Note : Layout Sample Not to Scale
( 23 )
500m²
Installation guidelines for DT-Gravitykit 500m²
Step 1 Step 3
Push Centering Point of tool on plastic drum Assemble all the components as shown. Use Teflon tape
& Rotate the tool TDK 3275 to cut the hole, approx. 1” at threaded joint.
above the bottom of the Plastic Drum
2 12
4 1
5 3
9
Step 2 6
From in side the Drum insert adaptor with washer
through hole .
Insert washer from outside of drum.
Tighten the Reducer on adopter for proper sealing.
11
Apply teflon tape (11)
on male threaded portion
for leak proof joint 12
1
5 2
3
6 4
( 24 )
500m²
Step 4 - Laying the submain Pipe
Important :
Lay Drip line Tube with emitter facing upward
as shown, with 1 meter Spacing between each row.
( 25 )
500m²
Step 5 - Connection of drip tubes & Flushing the system
For DT-ThinWall
Step 5 A
1 me
ter
14
15
(DLTOP1608)
Step 5 C
15
Important
After Installation, flush the entire system to
remove dirt/ debires
( 26 )
500m²
Step 6 - Plugging the submain ends
For DT-ThinWall
Step 6 A
9 After flushing,
use ES0825 to close the submain
9
7
Step 6 B
After flushing,
use TSS75L
to close the drip tape
16
Step 6 C
16
10
( 27 )
500m²
DT-GravityKit - 1000m²
Bill of Materials
Sr. Product Description Code Qty Sr. Product Description Code Qty
‘DT- Thin Wall’
DT-GravityKit / ‘Laser Drip’
1 JDKA1 1 14 850
Adapter 1”
(in meter)
Female Lateral
2 Threaded FTC100 1 15 Straight STP 1
Coupler 1” punch
Rainport Single
8 Union Valve SUV25FRP 2
25mm x ¾”
Tool for DripKit
9 32mm x TDK3275 1
7.5mm
Lateral
End Stop
10 ESO825 2
“8” Shape
25mm
Tube hold
stake “C” Clip LTHS12/
11 65
12 mm or LTHS16
16mm
12 Teflon Tape TT 1
Rubber
13 Washer 44 x ORSS 1
27 x 5.5mm
( 28 )
1000m²
DT-GravityKit Possible Layouts - 1000m²
Tank
25 Meter
0.6 1.2
40 Meter
Note : You can lay DripKit 1000m² in different manner also but for better result refer above mentioned layout.
Tank
20 Meter
0.6 1.2
50 Meter
Note : You can lay DripKit 1000m² in different manner also but for better result refer above mentioned layout.
( 29 )
1000m²
Installation guidelines for DT-GravityKit 1000m²
Step 1 Step 3
Push centering point on Plastic drum Assemble all the components as shown. Use Teflon tape
& rotate the tool TDK 3275, to cut the hole at threaded joint.
approx.1” above the bottom of the plastic drum.
13
2
1
9
4
3
Step 2 5
From in side the Drum insert adaptor
with washer through hole .
Insert washer on adoptor form outside the drum
tighten the coupler
on adaptor
for proper sealing.
13
1
2
12
Apply teflon tape (12)
on male threaded portion
13
for leak proof joint
1
2
4
3
( 30 )
1000m²
Step 4 - Laying the submain Pipe
1.2
m
8
Unscrew the cap, push the
25 mm Submain on barbed
portion & tighten the cap.
Important
Lay Drip line Tube with emitter facing upwardas shown
with 1.2 meter Spacing between each row.
( 31 )
1000m²
Step 5 - Connection of drip tubes & Flushing the system
Step 5 A
1 me
ter
15
Step 5 B
16
14
(DLTOP1608)
Step 5 C
Important
After Installation, flush the entire system to
remove dirt/ debires
( 32 )
1000m²
Step 6 - Plugging the submain ends
Step 6 A
After flushing,
10
use ESO825
to close the submain
8
7
8
10
Step 6 B
After flushing,
17
use TSS75L
to close the drip tape
Step 6 C
17
( 33 )
1000m²
DT-GravityKit - 2000m²
Bill of Materials
Sr. Product Description Code Qty Sr. Product Description Code Qty
( 34 )
2000m²
Installation guidelines for DT-Gravitykit 2000m²
Step 1 Step 3
Assemble all the components as shown. Use Teflon tape
Push centering point of tool on plastic drum
at threaded joint.
& rotate the tool TDK 3275 to cut the hole , approx. 1”
above the bottom of the plastic drum.
13
1
4 2
9
3
Step 2
5
From in side the Drum insert adaptor
with washer through hole .
Insert washer on adoptor from
outside the drum
tighten the coupler
on adaptor
for proper sealing.
2
1
12
13
Apply teflon tape (12)
on male threaded portion 1
for leak proof joint 2
4
3
( 35 )
2000m²
Step 4 - Laying the submain Pipe
Important
Lay Drip line Tube with emitter facing upward
as shown with 1.2 meter Spacing between each row.
( 36 )
2000m²
Step 5 - Connection of drip tubes & Flushing the system
For DT-ThinWall
Step 5 A
1.2 m
eter
15
Use tool STP to
punch the hole on
32mm Submain
Step 5 B
16
14 (DLTOP1608)
Step 5 C
Important
After Installation, flush the entire system to
remove dirt/ debires
( 37 )
2000m²
Step 6 - Plugging the submain ends
For DT-ThinWall
Step 6 A
After flushing,
10 use OHI052051M137
to close the submain
8
7
8
10
Step 6 B
After flushing,
17 use TSS75L
to close the drip tape
Step 6 C
17
( 38 )
2000m²
Operational Guidelines
Guidelines for proper usage of 7. Use takeoff plugs to plug undesired holes on submain
DT-GravityKit and use joiners for any undesired cutting on lateral.
8. Collect lateral from the area before any interculturing
1. Keep the submain straight & maintain laterals with of area.
proper straight alignment. 9. Do proper maintenance of system for better outcome.
2. Always use proper tools / products for installation /
maintenance of DripKit.
4. It is always recommended to flush total system
including filter before start of irrigation. This is to
avoid entrance of dirt / sand / silt in emitters.
5. Check the emitter discharge at start of lateral and at
the end of lateral. It shall not vary more than 10%.
6. You can irrigate total system at a time only for 30 m²,
100 m², 250 m² & 500 m² areas. For 1000 m² & 2000
m² area it is always recommended to operate one
valve at time for better performance.
( 39 )
( 40 )
Fertigation system
Fertigation System & Chemigation equipment is a need for today’s irrigation system. Optimum and efficient use of
fertilizers is one of the major advantages of drip irrigation systems. We are well aware that success of micro irrigation
system lies in precise application of fertilizers.
Fertilization via drip irrigation system besides irrigation is the most important management factor through which
farmers control plant development, fruit yield and quality. The introduction of simultaneous irrigation and fertilization
(Fertigation) opened up new possibilities for controlling water and nutrient supplies to crops and maintaining the desired
concentration and distribution of ions and water in the soil.
1. Take recommended /
necessary water soluble
fertilizer.
1 2. Dissolve fertilizers in
bucket of water.
2
3. Keep the solution as it is for 15
minutes so that the precipitation
(if any) settles at bottom.
Note:
Fertilizers used for fertigation should be water soluble and
should not have any effect on Tank material or tube material. 5
( 41 )
( 42 )
Maintenance of DT-GravityKit system
Fortnightly Maintenance
Screen Filter
In order to get maximum efficiency and optimum results it is necessary Figure 3
to prevent clogging of emitters. Properly maintained filters will ensure
maximum efficiency of DripKit systems, by avoiding clogging. Hence,
filtration unit is the heart of irrigation system.
The fine particles and dirt are arrested on the filtering element of screen
filter. This affects the filtering process. Therefore, it is essential to clean the
filtering element every 15 days. For this, open the lid of screen filter and take
out the filtering element. Rinse the element. Do not use wired brush, as it
may damage the screen.
Monthly Maintenance
If the salts, algae and other impurities present in water enter into the
drip irrigation system, then the laterals and drippers get clogged and may
stop emitting water. Therefore, it is necessary to apply acid and chlorine
treatments once in a month or as recommended in the water quality analysis
report.
Do not perform both acid and chlorine treatment simultaneously.
Apart from physical impurities that can be separated by using a screen filter,
there are dissolved chemical (mainly salts) impurities and also biological
impurities like algae, bacteria, etc. present in some water sources. If the
dissolved salts are more concentrated, they can accumulate and clog the
emitters. Hydrochloric acid can be applied to the emitters to flush the salts.
If bacteria or algae clogs the system, chlorine treatment in the form of
bleaching powder (20 mg per liter) can be added to clean the emitters and
inhibit slime growth.
( 43 )
Acid Treatment
Precipitation of salts such as calcium carbonate, magnesium carbonate or
ferric (iron) oxide can cause either partial or complete blockage of the Drip
Systems. Acid treatment is applied to prevent precipitation of such salts in
the drip system. Acid is also effective in cleaning systems which are already
partially blocked with precipitates of salts.
For Acid treatment any one of the following acids can be used.
1. Hydrochloric Acid.
2. Sulfuric Acid. Figure 4
3. Nitric Acid and
4. Phosphoric Acid
Solution
We can add this Acid solution / Bleaching solution directly in water tank
Calculations for Acid Treatment for DT-GravityKit is as mentioned below:
( 44 )
Step 2. Injection procedure
1. Take 103 liters of water in water tank, add 206 ml of acid in water tank. And ON system valve.
2. Check the pH of water at the nearest dripper of the section as well as last end of dripper.
3. After 24 hours open the submain flush valve and the ends of all laterals. Start the pump and flush out the entire
system so that all acid and dissolved the salts are driven out of the system.
Just for understanding of farmers we have calculated quantity of acid required for particular area, you can refer following
table for Acid Treatment Calculation:
Area (m²) 30 100 250 500 1000 2000
Total Flow (lph) 50.7 169.1 550.2 1100.4 1244.0 2750.5
Operating Head (m) 1.5 1.5 2 2 2.5 3
Qty. of water for treatment (lph) 4 23 92 275 415 1375
HCL Acid (ml) 4 22 91 275 414 1375
Note: 1. If acid (ml)/ water (lit) proportion is 1:1 for pH = 4
2. Acid requirement may changes according to field conditions.
Chlorine Treatment
Bacterial and organic growth can be controlled by injecting chlorine into the
drip irrigation system. Chlorine when dissolved in water acts as a powerful
oxidizing agent and vigorously attacks microorganisms such as algae,
fungi and bacteria. The quantity of chlorine required and the frequency
of treatment depends on the amount of organic matter (i.e. level of
contaminants) present in water.
Generally a chlorine concentration of 10-20 ppm is required to control the
growth of biological matter in the system. The efficiency of chlorination will
be more, if the pH of source water is less than 7. The maximum chlorine Figure 9
concentration injected should not exceed 20 ppm, otherwise it may
precipitate solids that could clog the drippers.
It is very important to treat the system regularly to prevent blockage.
Treatment on a 15 day cycle with chlorine injection at the end of irrigation is
a good practice. If no organic matter is built up, this period can be extended.
System should be chlorinated at the end of a crop season and prior to use in
the next season to keep laterals / Inlines sterilized.
( 45 )
Procedure for Treatment
1. Note the time required for chlorine solution to reach the last dripper of
section to be chlorinated, after starting the pump.
2. Note the flow rate for the section to be treated from as mentioned in
chapter “Tank Size determination as per height of tank & type of tube”.
Flow of system for 10 min = Total System flow (lph)*10/(60) = 103 liters
3. Calculate the quantity of bleaching powder required for chlorination:
If a farmer wants to apply 20 ppm chlorine through a drip system having
flow rate of 103 lph. Bleaching powder will be mixed at the rate of 100gm
/ liter. Figure 12
1 ppm = 1 mg/liter
20 ppm = 20 mg/liter
Now Bleaching Powder required for 103 liters of water = 103 * 20 *2
= 4.2 gm
4. Add 4 gm of Bleaching Powder for 103 liters of water.
5. Mix the powder in water by stirring the solution with a stick to break the
lumps.
6. Keep the solution as it is for 15 minutes so that the powder settles at the
bottom of container.
7. Filter the solution through a fine cloth to remove the settled precipitate.
8. Add this bleaching solution in tank (with 103 lit of water)
9. Check chlorine content of water at the first dripper of the system using a
“Chlorine Paper”.
10. Keep the system closed for 24 hours, as it takes 18 to 24 hours for the
chlorine to destroy the bacterial, slime, algae etc. in the pipe line, laterals
and drippers.
11. After 24 hours open the ends of all laterals / In lines and flush valve of
the submain. Start the pump and flush the system to drive out the water
containing algae, bacterial slime and other trash.
Just for understanding of farmers we have calculated quantity of acid required
for particular area, you can refer following table for Acid Treatment Calculation:
Area (m²) 30 100 250 500 1000 2000
Total Flow (lph) 50.7 169.1 550.2 1100.4 1244.0 2750.5
Operating Head (m) 1.5 1.5 2 2 2.5 3
Qty. of water for treatment (lph) 4 23 92 275 415 1375
Bleaching Powder (gm) 0.2 0.9 3.7 11.0 16.6 55.0
Note: 1. If acid (ml)/ water (lit) proportion is 1:1 for pH = 4
2. Acid requirement may changes according to field conditions.
( 46 )
Troubleshooting
Damaged Pipe
Joiner
CJ16 (d)
( 47 )
( 48 )
Opportunities
Best valve Drip Irrigation low cost - low risk “DT- GravityKit”
By helping start a use of drip kits in your area , you can help one or more families grow enough food for themselves
and some extra to sell. As you are aware recently food and vegetable prices are on their peak and have become almost
unaffordable and beyond the reach of middle and poor class people
If you are an individual, or connected with a school, civic organization, mission group, co operative society or an NGO,
Come join us in spreading this message of saving limited resources and growing more.
If you know of anyone who you believe may be interested, please forward this information to them!
Driptech Irrigation Systems “Helping people grow vegetables when there is little or no rain”
How we can help you!
An Agricultural Research Organization Use the latest technology for growing vegetables in a garden
A Civic Organization
Zilla Parishad, Gram Panchayat Be a part of a program to train trainers to be able to teach
others to grow vegetables when there is less or no rain.
Municipal Corporation
Use your funds wisely in helping feed the hungry during their
A Funding Organization / Donar
dry season.
An Individual with Agricultural or Irrigation Have a short term mission to use your ability to teach others
experience simple growing techniques
We not only sell "Drip Kits" but support the users and retailers to popularize this innovative concept for good cause of
harvesting vegetables / fruits and save resources such as water, labour, fertilizer, soil, electricity
( 49 )
DRIPTECH INDIA PVT. LTD.
B-2/46, 2nd floor, Sangam Project, Dr.Ambedkar Road, Near RTO office, Shivaji Nagar, Pune-01.
Ph No. 8007978080 [email protected] ; www.driptech.com