QVT Testing Documentaion - Original
QVT Testing Documentaion - Original
Testing Document
Reviewed by
Version: Date: Author:
Testing Procedures
1.0 Sumalatha V
Version 1 © This is the exclusive property of ROBERT BOSCH ENGINEERING AND BUSINESS SOLUTIONS LIMITED. Without their consent, it may not be reproduced or given to third parties.
If printed, this document is an uncontrolled copy.
RBEI Internal
Te
sting Process
Status:
Testing Document
Reviewed by
Version: Date: Author:
Testing Procedures
1.0 Sumalatha V
Contents
1 Introduction....................................................................................................................................3
2 Hardware Required........................................................................................................................3
3 Software Required..........................................................................................................................4
4 QVT Functionality..........................................................................................................................4
4.1 Flashing......................................................................................................................................5
4.2 Logging.......................................................................................................................................6
4.3 CANoe - CAN compatibility......................................................................................................8
4.4 Power Management....................................................................................................................9
4.5 Display......................................................................................................................................10
4.6 Home Screen.............................................................................................................................11
4.7 Navigation................................................................................................................................11
4.8 Media........................................................................................................................................11
4.8.1 USB.................................................................................................................................11
4.8.2 IPod..................................................................................................................................12
4.8.3 Bluetooth.........................................................................................................................12
4.8.4 AUX.................................................................................................................................12
4.8.5 Android Auto...................................................................................................................12
4.8.6 Carplay.............................................................................................................................13
4.8.7 Wireless Carplay..............................................................................................................13
4.9 System......................................................................................................................................13
4.10 HMI........................................................................................................................................13
4.11 Sensor.....................................................................................................................................14
Version 1 © This is the exclusive property of ROBERT BOSCH ENGINEERING AND BUSINESS SOLUTIONS LIMITED. Without their consent, it may not be reproduced or given to third parties.
If printed, this document is an uncontrolled copy.
RBEI Internal
Te
sting Process
Status:
Testing Document
Reviewed by
Version: Date: Author:
Testing Procedures
1.0 Sumalatha V
1 Introduction
This document specifies the Quick Verification Test (QVT) procedure, where the software
testing of end user functionalities like Startup shutdown, Touch, Audio, Voice Recognition,
Smartphone and IPhone connections with the target are carried out. It also tests some functionalities
like CAN compatibility, TTFis and putty connection which are used for debugging the issue by the
project team. The result of this testing is used to decide if a build is stable enough to proceed with
further testing.
2 Hardware Required
AIVI2 / PIVI3.1 Target
HMI Display
Debug board
Speaker
Mic
Molex hub
Regulated DC Power supply
Patch antenna with receiver
iPhone
Android Phone
USB Pendrive
AUX media source
Version 1 © This is the exclusive property of ROBERT BOSCH ENGINEERING AND BUSINESS SOLUTIONS LIMITED. Without their consent, it may not be reproduced or given to third parties.
If printed, this document is an uncontrolled copy.
RBEI Internal
Te
sting Process
Status:
Testing Document
Reviewed by
Version: Date: Author:
Testing Procedures
1.0 Sumalatha V
Serial Cables
Display Cable
CAN Case
Flashing Cable
3 Software Required
Putty
Console
CANoe
DL Tool
WinSCP
4 QVT Functionality
Target connected with the Ignition, ACC and Bat to +VE and GND cable to –VE to power supply.
Version 1 © This is the exclusive property of ROBERT BOSCH ENGINEERING AND BUSINESS SOLUTIONS LIMITED. Without their consent, it may not be reproduced or given to third parties.
If printed, this document is an uncontrolled copy.
RBEI Internal
Te
sting Process
Status:
Testing Document
Reviewed by
Version: Date: Author:
Testing Procedures
1.0 Sumalatha V
4.1 Flashing
Version 1 © This is the exclusive property of ROBERT BOSCH ENGINEERING AND BUSINESS SOLUTIONS LIMITED. Without their consent, it may not be reproduced or given to third parties.
If printed, this document is an uncontrolled copy.
RBEI Internal
Te
sting Process
Status:
Testing Document
Reviewed by
Version: Date: Author:
Testing Procedures
1.0 Sumalatha V
4.2 Logging
Copy the .trc files of AUTOSAR and Full Project with the version specified in the mail
request to the PC.
AUTOSAR .trc
Ex: AUTOSAR: 20.1S2021.05.1
Full Project .trc
Ex: PROJECT VIEW: AI_PRJ_RN_AIVI_21.0V08
Version 1 © This is the exclusive property of ROBERT BOSCH ENGINEERING AND BUSINESS SOLUTIONS LIMITED. Without their consent, it may not be reproduced or given to third parties.
If printed, this document is an uncontrolled copy.
RBEI Internal
Te
sting Process
Status:
Testing Document
Reviewed by
Version: Date: Author:
Testing Procedures
1.0 Sumalatha V
o AUTOSAR
Select – GEN3FLEX@COM1 – Load aivi2_cfg04_board.trc file for specified AUTOSAR version.
o DLT
Select – GEN3FLEX@DLT – Load aivi2_cfg04_board.trc and prj_overall_a.trc files for specified
AUTOSAR and Full Project version.
Once the TTIF’s connection established with AUTOSAR and DLT the traces are observed
and click on User Log ON/OFF.
For Putty connection
Connect serial cable to UART uP port of GEN4 debug board
Open Putty and establish a serial connection via COMX port with speed=115200
Test Cases:
Version 1 © This is the exclusive property of ROBERT BOSCH ENGINEERING AND BUSINESS SOLUTIONS LIMITED. Without their consent, it may not be reproduced or given to third parties.
If printed, this document is an uncontrolled copy.
RBEI Internal
Te
sting Process
Status:
Testing Document
Reviewed by
Version: Date: Author:
Testing Procedures
1.0 Sumalatha V
Copy the .odx-e files from the Full Project release mail for the AIVI/PIVI target to the PC.
Click on UDT Signal (VCAN/MCAN) – Unit Power State (ON) – Power Signal
Transmission (Start) – VCAN and MCAN (Start) - VCAN (Start) – MCAN (Start).
Test Cases:
A. Switch ON the Nissan Head Unit from SYSTEM_OFF to SYSTEM_ON state 1 to 2 times
via CAN, no resets should be observed.
B. Target should be stable, within 60 Seconds using CAN.
C. Click on Customer Configuration which will be seen at the bottom of the screen Execute:
Default session start, Extended Diagnostic session start and KeyOffOnReset Reset, for
which observe the positive response.
D. Click on Target Configuration which will be seen at the bottom of the screen.
Browse for the path for a) PD, b) CD DEF, and c) CD which is saved on the desktop
Select Scope 2.X
Version 1 © This is the exclusive property of ROBERT BOSCH ENGINEERING AND BUSINESS SOLUTIONS LIMITED. Without their consent, it may not be reproduced or given to third parties.
If printed, this document is an uncontrolled copy.
RBEI Internal
Te
sting Process
Status:
Testing Document
Reviewed by
Version: Date: Author:
Testing Procedures
1.0 Sumalatha V
Connect Battery, Ground, and Ignition and Auto ACC cable to the power supply.
Test Cases:
RBEI Internal
Te
sting Process
Status:
Testing Document
Reviewed by
Version: Date: Author:
Testing Procedures
1.0 Sumalatha V
4.5 Display
Note: If the touch response not working change the Byte 57 to 0XCO in CAN simulation.
Test Cases:
A. Display screen should be available without any blank screen or flickering
B. Basic Touch behaviour should work. Example: Touching on Navigation icon from home
screen should open the Maps
Version 1 © This is the exclusive property of ROBERT BOSCH ENGINEERING AND BUSINESS SOLUTIONS LIMITED. Without their consent, it may not be reproduced or given to third parties.
If printed, this document is an uncontrolled copy.
RBEI Internal
Te
sting Process
Status:
Testing Document
Reviewed by
Version: Date: Author:
Testing Procedures
1.0 Sumalatha V
Test Cases:
A. Default gadgets should be available on Home Screen.
B. In Home Screen swiping and page indicator should be visible.
C. Respective screen should be updated when a gadget is selected in home screen.
D. Home page is customization :
o Select settings – Customise menus – Customise Home menu – Delete / Add Widget – Save
E. Widget deletion on Home Page
F. Audio Source Customization :
o Select settings – Customise menus – Customise Audio Source – Save
G. Lower Menu Bar and Destination Menu Customization :
o Select settings – Customise menus – Customise Audio Source – Save
4.7 Navigation
4.8.1 USB
Note: If the video not playing when selected the execute "VEDA_HandBrake_Input ON" command
in Gen3flex@DLT
Test Cases:
Version 1 © This is the exclusive property of ROBERT BOSCH ENGINEERING AND BUSINESS SOLUTIONS LIMITED. Without their consent, it may not be reproduced or given to third parties.
If printed, this document is an uncontrolled copy.
RBEI Internal
Te
sting Process
Status:
Testing Document
Reviewed by
Version: Date: Author:
Testing Procedures
1.0 Sumalatha V
Note: Conversion of iPhone to iPod through CAN by disabling the bit Connectivity.
Carplay
Test Cases:
A. iPod media track should be played
B. Repeat and Random option should work
C. Switching of Sources should be successful , from USB/IPod to FM
D. Ejected Media device source should be updated to Radio.
4.8.3 Bluetooth
Test Cases:
A. Bluetooth should be established with Test Phone(Android / iPhone)
B. Call Features should be successful- Incoming call, Outgoing call, Ringtone and Audio.
C. Phonebook and Call History should be updated.
D. Music should be heard in speaker- Display of Artist name, album name and track name on
screen.
E. Wi-Fi connection should be established – Settings – Connection – Wi-Fi.
F. Hotspot connection should be established – Settings – Connection – Vehicle Wi- Fi.
4.8.4 AUX
Test Cases:
A. Connect the Phone to the target with the AUX cable.
Version 1 © This is the exclusive property of ROBERT BOSCH ENGINEERING AND BUSINESS SOLUTIONS LIMITED. Without their consent, it may not be reproduced or given to third parties.
If printed, this document is an uncontrolled copy.
RBEI Internal
Te
sting Process
Status:
Testing Document
Reviewed by
Version: Date: Author:
Testing Procedures
1.0 Sumalatha V
Test Cases:
A. Connect Android Phone to target with the USB cable.
B. Call Features should be successful- Incoming call, Outgoing call, Ringtone and Audio.
C. Phonebook and Call History should be updated.
D. Music should be heard in speaker- Display of Artist name, album name and track name on
screen.
E. Map functionalities with POI guideline and audio for the route, hear over speaker.
F. Open PCTS application in Android mobile and find Car infoTests - C8 test case, check for
development or Production Certificate in the device.
4.8.6 Carplay
Test Cases:
A. Connect iPhone to target with the USB cable.
B. Call Features should be successful- Incoming call, Outgoing call, Ringtone and Audio.
C. Phonebook and Call History should be updated.
D. Messages list should be seen on Carplay screen.
E. Music should be heard in speaker- Display of Artist name, album name and track name on
screen.
F. Map functionalities with POI guideline and audio for the route, hear over speaker.
4.8.7 Wireless Carplay
Test Cases:
A. Pair the iPhone through Bluetooth of the target.
B. Turn on Carplay in iPhone.
C. Icon accessibility should be successful and with the Call Features, Music and Map.
4.9 System
Test Cases:
A. Date and time Update: Settings-> Clock -> Offset (hour) -> Offset (min) -> Clock Format ->
Date Format.
Version 1 © This is the exclusive property of ROBERT BOSCH ENGINEERING AND BUSINESS SOLUTIONS LIMITED. Without their consent, it may not be reproduced or given to third parties.
If printed, this document is an uncontrolled copy.
RBEI Internal
Te
sting Process
Status:
Testing Document
Reviewed by
Version: Date: Author:
Testing Procedures
1.0 Sumalatha V
Test Cases:
A. Day/Night Feature Update: Settings -> System Settings -> Display
B. Brightness Update: Settings -> System Settings -> Display -> Brightness
C. There should be expected response for the touch on the display.
D. Display should be on once connected to the target.
E. Basic parameters should be available on the display.
4.11 Sensor
Test Cases:
Version 1 © This is the exclusive property of ROBERT BOSCH ENGINEERING AND BUSINESS SOLUTIONS LIMITED. Without their consent, it may not be reproduced or given to third parties.
If printed, this document is an uncontrolled copy.
RBEI Internal
Te
sting Process