0% found this document useful (0 votes)
34 views1 page

Material List

Uploaded by

jayanatha
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
34 views1 page

Material List

Uploaded by

jayanatha
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

Copper Pipe units qty Rate Taka

Liquid Pipe ∅12mm (hard copper) Feet 228 135.00 30,780.00


Gas Pipe ∅19mm (hard copper) Feet 228 203.00 46,284.00
Elbow ∅12mm no's 28 35.00 980.00
Elbow ∅19mm nos 28 60.00 1,680.00
Socket ∅12mm nos 10 28.00 280.00
Socket ∅19mm nos 10 40.00 400.00

Insulations
∅12mm ,19mm Thick NRB Insulation Pcs 38 195.00 7,410.00
∅19mm ,19mm Thick NRB Insulation Pcs 38 255.00 9,690.00
∅12mm ,13mm Thick NRB Insulation Pcs 19 120.00 2,280.00

Other Items
Brazing Rod (USA) nos 50 38.00 1,900.00
Welding Gas Can Sun nos 15 130.00 1,950.00
Wrapping Tape nos 40 70.00 2,800.00
Nitrogen Gas nos 1 1,800.00 1,800.00
Refrigerant Gas R407c (12.5kg Cylinder) nos 1 15,000.00 15,000.00
PVC Pipe Glue 250g nos 1 380.00 380.00
Box Bars 50x75mm ft 164 170.00 27,880.00
Drain PVC pipe 1/2'' m 115 35.00 4,025.00
Drain PVC pipe elbow 1/2'' nos 20 13.00 260.00
Drain PVC pipe Socket 1/2'' nos 18 10.00 180.00
Royal Bult 12mmx 6 '' nos 30 25.00 750.00
PVC Flexible Conduit 1'' Coil 1 550.00 550.00
Cable 2.5rm 2Core Coil 1 15,500.00 15,500.00
Cable 2.5rm 4Core Coil 1 25,500.00 25,500.00
Cable 0.5rm 4Core ft 90 55.00 4,950.00
Welding Rod Packs 1 1,300.00 1,300.00
Cutting Wheel Box 1 450.00 450.00
Anticorrosive Paint (zinc phosphate) l 1 1,600.00 1,600.00
Brush 2'' nos 2 40.00 80.00
Thinner l 2 450.00 900.00
Amari Peppers Nos 5 20.00 100.00
Tube Cutter Nos 1 1,500.00 1,500.00
Total Material Cost 209,139.00

Installation Chargers (2 Technician ) 20,000.00


Welding Structure Labor 10,000.00
30,000.00

Hotel Chargers (3 people x 10 Days) 20,000.00


Foods 3 meal (3 people x 10 Days) 15,000.00
Internal Transport 9,000.00
Dhaka to Cumilla Material Transport (Lorry) 7,000.00
51,000.00

Extra Key Money (only provide Bill) 18,500.00

Total Budget 308,639.00