0% found this document useful (0 votes)
13 views

IC Simple Scope of Work Template With Example Data 11502 - PDF

Uploaded by

greatestadeoye
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
13 views

IC Simple Scope of Work Template With Example Data 11502 - PDF

Uploaded by

greatestadeoye
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 7

SIMPLE SCOPE OF WORK TEMPLATE

WITH EXAMPLE DATA


Electric Vehicle-Charging Station Installations
PROJECT NAME

Positive Charge
COMPANY NAME

Wendy Williams
POINT OF CONTACT

765-876-9876
PHONE

[email protected]
EMAIL

9016 NE 186th, Boswell, WA 98011


COMPANY MAILING ADDRESS

(various) U.S., Mexico, Canada


PROJECT LOCATION

Jane Matthews
AUTHOR

XX/XX/XX
DATE

SCOPE OF WORK

What does the project entail? What are the delivery methods?

Installation of 1,125 EV charging stations at 116 locations across the US, Mexico and Canada to accommodate malls' and service
stations' EV-charging needs. Full details of the scope of this work are included in the attached documents, but, broadly, this project will
entail the following for 17 unique sites in 3 different countries, and will include: Site Analysis; Infrastructural Planning; Utility Assessment;
Integration; Final Prep; and Installation.

PROJECT DELIVERABLES

Note the tangible products / services resulting from this project.

Installations of 1,125 fully functional and licensed EV charging stations at 116 locations across the US, Mexico and Canada - 1,000 EV
charging station in S. California - 100 in Canada - 25 in Mexico (see attached spec for geo-specific locations).
EXCLUSIONS

Positive Charge is not responsible for third-party / client locations preparatory work (e.g., permits for digging, city region
electricity-availability logistics, etc.).

However, Positive Charge project managers can provide clients with a checklist to ensure their locations are adequately prepared for
the installation of our EV charging stations.

MILESTONES

DELIVERY DATE TASK GOODS REQUIRED SERVICES REQUIRED

XX/XX/XX Form Project Team / Preliminary


Review / Scope

XX/XX/XX Analysis Phase

XX/XX/XX Control Phase

XX/XX/XX Project Summary Report and Close


Out

STAKEHOLDERS

ID NUMBER NAME & TITLE ROLE / RESPONSIBILITY

78979687 Janine Remagio – Project Manager

8542342 David Coen – Chief Engineer

5672334 Rita Preze – CEO

98712376 Donald Smythe – Field Engineer


ESTIMATED COST

EXPENSE DESCRIPTION COST

INTERNAL LABOR Electro Charge Logistics $68,768

EXTERNAL LABOR Level 1 EVS $68,768

MATERIALS EVS Fast Chargers $68,768

SERVICES Power Conversion System Vendor $68,768

OTHER Third-Party Software $68,768

TOTAL

PAYMENT TERMS & CONDITIONS

Next 30 upon project completion. 10% retainage fee.

APPROVAL & COMMENTS


Steph Arjuna
PROJECT OWNER

SIGNATURE

XX/XX/XX
DATE

PROJECT MANAGER

Rita Stevens
SIGNATURE

XX/XX/XX
DATE

COMMENTS
SIMPLE SCOPE OF WORK TEMPLATE
PROJECT NAME

COMPANY NAME

POINT OF CONTACT

PHONE

EMAIL

COMPANY MAILING ADDRESS

PROJECT LOCATION

AUTHOR

DATE

SCOPE OF WORK

What does the project entail? What are the delivery methods?

PROJECT DELIVERABLES

Note the tangible products / services resulting from this project.


EXCLUSIONS

MILESTONES

DELIVERY DATE TASK GOODS REQUIRED SERVICES REQUIRED

STAKEHOLDERS

ID NUMBER NAME & TITLE ROLE / RESPONSIBILITY


ESTIMATED COST

EXPENSE DESCRIPTION COST

TOTAL

PAYMENT TERMS & CONDITIONS

APPROVAL & COMMENTS

PROJECT OWNER

SIGNATURE

DATE

PROJECT MANAGER

SIGNATURE

DATE

COMMENTS
DISCLAIMER

Any articles, templates, or information provided by Smartsheet on the website are for
reference only. While we strive to keep the information up to date and correct, we
make no representations or warranties of any kind, express or implied, about the
completeness, accuracy, reliability, suitability, or availability with respect to the website
or the information, articles, templates, or related graphics contained on the website.
Any reliance you place on such information is therefore strictly at your own risk.

You might also like