0% found this document useful (0 votes)
41 views

DSR Sheet

Uploaded by

Giggetts Eger
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
41 views

DSR Sheet

Uploaded by

Giggetts Eger
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

7 NO'S OF 12 MM Ø BEAM SCHEDULE

ANCHO R BAR
8 MM Ø STIRRUPS @ 300 MM C/C 7 NO'S OF 12 MM Ø BAR PROVIDED BEAM
BEAM NO BEAM SIZE (B X D) NO. OF BARS MAIN BAR DIA. STIRRUPS
REINFORCEMENT
7 NO'S OF 12 MM Ø
ANCHOR BAR
8 MM Ø 450
STIRRUPS
8 MM Ø 8 MM Ø @ 300 MM
B1 300 X 450 MM STIRRUPS 7 12 MM Ø
C/C
7 NO'S OF 12 MM Ø
MAIN BAR 4.23 7 NO'S OF 12 MM Ø
MAIN BAR

C/S OF BEAM 400 DETAILS OF BEAM (B 1) 400

FOOTING SCHEDULE
EFFECTIVE DEPTH OVERALL DEPTH - FOOTING REINFORCEMENT
FOOTING TYPE LENGTH - L (MM) WIDTH - B (MM) NO OF BARS
- d (MM) D (MM)
AST 1 AST 2
100 2100 100 16 MM Ø @ 170 MM 16 MM Ø @ 170
F8 2100 2100 450 500 6 C/C MM C/C

100
400

400
COLUMN SCHEDULE

2100
COLUMN SIZE COLUMN
COLUMN NO (B X D) NO. OF BARS MAIN BAR DIA. LATERAL TIES
REINFORCEMENT
400

100
6 MM Ø @ 250 MM
C8 400 X 400 MM 8 16 MM Ø

400
C/C

PLAN OF COLUMN AND FOOTING

GENERAL NOTES:-
• FOUNDATION UP TO HARD STRATA, MIN DEPTH OF EXCAVATION IN STRATA = 300 MM
• CONCRETE MIX TO 1:1.5:3 (M-20) {UNLESS SPECIFIED}.
• Ø DENOTES TOR STEEL BARS. {IS-1786}
6 MM Ø LATERAL TIES
@ 250 MM C/C
• # DENOTES MILD STEEL BARS GRADE 1 {IS-432}.
• LAPS FOR BEAM = 60 X D AND FOR COLUMNS = 50 X D, D = DIAMETER OF BAR.
PLINTH / TI E BEAM 8 NO'S OF 16 MM Ø
LONGI TUDINAL STEEL
• MINIMUM CONCRETE COVERING = 50 MM, COLUMNS = 40 MM AND BEAMS = 25 MM.
• THIS DRAWING IS TO BE READ IN CONJUNCTION WITH RELEVANT ARCHITECTS DRAWINGS.
FLOORING • DO NO SCALE THE DRAWING.
• CONCRETE MIX QUALITY, SHUTTERING, CURING IS CONTRACTOR'S RESPONSIBILITY.
0.10 M THK P.C.C
• WHILE WORKING ON THE SITE ABUTTING TO ADJUSTMENT BUILDING SHALL BE DONE PROPERLY BY CONTRACTOR
0.3 M RUBBLE SOLING AND FOR ANY DAMAGE DUE TO SAME WE SHALL NOT BE HELD RESPONSIBLE.
• DESHUTTERING PERIOD SHALL NOT BE LESS THAN SPECIFIED BELOW -
0.15 M MURUM FILLING 1. BEAMS
A. SPANNING UP TO 6 M = 14 DAYS.
40 MM COVER TO COLUMN B. SPANNING OVER 6 M = 21 DAYS.
2. VERTICAL FACES OF COLUMNS, BEAMS AND R.C.C WALLS = 16 - 24 HOURS.

400 MM 400 MM 16 MM Ø @ 170 MM C/C IN


BOTH X AND Y DIRECTION
50 MM CLEAR COVER
TO FOOTING JALI 0.26 M ( DEPTH OF FOOTING)
DESIGN OF BEAM, COLUMN AND FOOTING
0.15 M THK P.C.C (1:3:5)

100 2100 100 NAME :-


SHEET NO :- 02 ROLL NO :-
SECTION THROUGH FOOTING
DATE OF PERFORMANCE :- DATE OF SUBMISSION :-

DETAILS OF COLUMN (C16) AND FOOTING MARKS :- SIGN :-


COLLEGE :- K. K. WAGH POLYTECHNIC, NASHIK.