Net Metring
Net Metring
No.___________________
2. The applicant shall abide by the provision under the A&RE Regulations during the currency of
the Generation Approval.
3. The technical parameters of Net Metering arrangements are shown here under:-
NO_______________ DATED_________________
To,
Documents for self-purchased Bi-directional whole current Green meter for Net
metering in R/O Muhammad Zaman Amjid resident of Irum Colony Mardan is
forwarded herewith to your good self office for issuance of N.O.C to purchase
the NET METERING SYSTEM from PESCO approved manufacturers.
No.DGL/26311/10/2022
1. PESCO here grants Generation Approval to Mr. Saeed Ullah, for 20 KW Photovoltaic solar
based distributed generation facility, Having Consumer reference number 30-26311-0035607-
06, located at Nowshera Road Mardan
Under the National Electric Power Regulatory Authority (Alternative & Renewable Energy)
Distributed Generation and Net Metering Regulations, 2015 (the “A&RE Regulations”) for period
of seven (07) years. This License is Valid Up to 31 day of 10/2029.
2. The applicant shall abide by the provision under the A&RE Regulations during the currency of
the Generation Approval.
3. The technical parameters of Net Metering arrangements are shown here under:-
NO_______________ DATED_________________
Address: __________________________________
Contract No:________________________________
No.DGL/26311/10/2022
5. PESCO here grants Generation Approval to Mr. Muhammad Zaman Amjid, for 11.8 KW
Photovoltaic solar based distributed generation facility, Having Consumer reference number
02-26311-0036901-03, located at Irum colony mardan
Under the National Electric Power Regulatory Authority (Alternative & Renewable Energy)
Distributed Generation and Net Metering Regulations, 2015 (the “A&RE Regulations”) for period
of seven (07) years. This License is Valid Up to 31 day of 10/2029.
6. The applicant shall abide by the provision under the A&RE Regulations during the currency of
the Generation Approval.
7. The technical parameters of Net Metering arrangements are shown here under:-
NO_______________ DATED_________________
Contract No.03468304860
To,
Documents for self-purchased Bi-directional whole current Green meter for Net
metering in R/O Saeed Ullah resident of Nowshera Road Mardan is forwarded
herewith to your good self office for issuance of N.O.C to purchase the CT
Operated Bi-Directional meter for NET METERING SYSTEM from PESCO approved
manufacturers.
No.___________________
5. PESCO here grants Generation Approval to Mr/Mrs/Miss/MS ROOH ULLAH, for 13.500KW
Photovoltaic solar based distributed generation facility, Having Consumer reference number
41263110534901, located at SHAHEEN MARKET MARDAN
Under the National Electric Power Regulatory Authority (Alternative & Renewable Energy)
Distributed Generation and Net Metering Regulations, 2015 (the “A&RE Regulations”) for period
of seven (07) years. This License is Valid Up to ________day of _____20_____.
6. The applicant shall abide by the provision under the A&RE Regulations during the currency of
the Generation Approval.
7. The technical parameters of Net Metering arrangements are shown here under:-
NO_______________ DATED_________________
Contract No.03318821698
Please quote above mentioned Generation Approval No. DGL/26311/ /2022 dated. -10-2022
for future correspondence.
To,
Documents for self-purchased Bi-directional whole current Green meter for Net
metering in R/O Saeed Ullah resident of Nowshera Road Mardan is forwarded
herewith to your good self office for issuance of N.O.C to purchase the 3-phase
whole current meter for NET METERING SYSTEM from PESCO approved
manufacturers.
To,
PESCO Mardan.
Enclosed find herewith a photo copy of invoice of “three phase whole current Bi-
directional meter” vide Serial No.879247 Make KBK (Pvt.) Ltd. Along with copy of
NOC granted by SE Mardan Circle Mardan is hereby submitted for necessary
testing and inspection of Bi-directional meter (net metering system) in R/O
Muhammad Zaman Amjid Irum Colony Mardan Distribution Generation License
No. DGL/26311/10/2022 photo voltaic Solar Generation capacity=11.88KW
under A/C No.02-26311-0036901-03.
To,
It is submitted for your kind information that 1 No Bi-directional meter No 879193 make
KBK under A/c No 04-26311-0101607-03 is here by sent to your office for testing/checking
Please.
To,
The XEN PESCO
Mardan-I
Enclosed please find herewith net metering system case in r/o Mr. Muhammad Tariq
Khan under A/C No.30-26311-0206201-06 sent to your office for approval of
Distribution of Generation license please.
To,
Please.