0% found this document useful (0 votes)
40 views

Net Metring

Uploaded by

Tahir
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
40 views

Net Metring

Uploaded by

Tahir
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 15

Schedule –VII: Generation Approval (5KW to 25KW)

PESHAWAR ELECTRIC SUPPLY COMPANY


PESCO
Peshawar - Pakistan
Generation Approval

No.___________________

1. PESCO here grants Generation Approval to Mr/Mrs/Miss/MS __________________, for


____________KW Photovoltaic solar based distributed generation facility, Having Consumer
reference number ________________________, located at __________________________
Under the National Electric Power Regulatory Authority (Alternative & Renewable Energy)
Distributed Generation and Net Metering Regulations, 2015 (the “A&RE Regulations”) for period
of seven (07) years. This License is Valid Up to ________day of _____20_____.

2. The applicant shall abide by the provision under the A&RE Regulations during the currency of
the Generation Approval.

3. The technical parameters of Net Metering arrangements are shown here under:-

1. Primary Energy Source


2. Size of the Distribution Generation facility
3. Generation inverter information
a) Manufacturer
b) Model:
4. Vendor/Installer
5. Generation Type

4. This Approval may be renewed subject to A&RE Regulations.


The Approval is given under my hand on _______ day of ________ Tow thousand and Twenty
Tow.

SDO PESCO City-I Mardan


PESHAWAR ELECTRIC SUPPLY COMPANY
Office of the SDO City-I
PESCO Mardan

NO_______________ DATED_________________

Applicant Name: Muhammad Zaman Amjid

Address: Irum Colony Mardan

Contract No: 03165930202

Subject: Distributed Generation Approval with respect to your application

Reference: Your application on dated 28/09/2022

Enclosed please find herewith Approval of Distribution Generation having


No.DGL/26311/10/2022 dated.10/2022 granted by this office of PESCO for 11.8 KW photo
voltaic solar based distribution generation facility located at Irum Colony Mardan, pursuant to
NEPRA (Alternative & Renewable Energy) Distributed Generation and Net Metering
Regulations, 2015.

Please quote above mentioned Generation Approval No.DGL/26311/10/2022 dated.10/2022


for future correspondence.

Enclosure: Generation Approval No:

CC to, SDO PESCO City-I Mardan

1). DG MIRAD PESCO Peshawar for information please

2). XEN PESCO Mardan-I for information please

3). DM (CMO) PESCO H/Q Peshawar for information please

4). DM Planning PESCO H/Q Peshawar for information please


No_____________ Dated_______________

To,

The XEN PESCO


Mardan-I

Subject: N.O.C FOR SELF PURCHASED OF GREEN WHOLE CURRENT BI-DIRECTIONAL


METER BEARING A/C NO.02-26311-0036901-03 IN R/O MUHAMMAD ZAMAN
AMJID IRUM COLONY MARDAN.

Documents for self-purchased Bi-directional whole current Green meter for Net
metering in R/O Muhammad Zaman Amjid resident of Irum Colony Mardan is
forwarded herewith to your good self office for issuance of N.O.C to purchase
the NET METERING SYSTEM from PESCO approved manufacturers.

Sr.# Name and Address A/C No NEPRA/License No Type of Meter


01 Muhammad 02-26311- DGL/ Bi-Directional
Zaman Amjid, Irum 0036901-03 26311/10/2022 whole current
Colony Mardan meter

SDO PESCO City-I Mardan


Schedule –VII: Generation Approval (5KW to 25KW)

PESHAWAR ELECTRIC SUPPLY COMPANY


PESCO
Peshawar - Pakistan
Generation Approval

No.DGL/26311/10/2022

1. PESCO here grants Generation Approval to Mr. Saeed Ullah, for 20 KW Photovoltaic solar
based distributed generation facility, Having Consumer reference number 30-26311-0035607-
06, located at Nowshera Road Mardan
Under the National Electric Power Regulatory Authority (Alternative & Renewable Energy)
Distributed Generation and Net Metering Regulations, 2015 (the “A&RE Regulations”) for period
of seven (07) years. This License is Valid Up to 31 day of 10/2029.

2. The applicant shall abide by the provision under the A&RE Regulations during the currency of
the Generation Approval.

3. The technical parameters of Net Metering arrangements are shown here under:-

6. Primary Energy Source


7. Size of the Distribution Generation facility
8. Generation inverter information
c) Manufacturer
d) Model:
9. Vendor/Installer
10. Generation Type

4. This Approval may be renewed subject to A&RE Regulations.


The Approval is given under my hand on 10/2022

SDO PESCO City-I Mardan


PESHAWAR ELECTRIC SUPPLY COMPANY
Office of the _____________officer
PESCO___________________

NO_______________ DATED_________________

Applicant Name: ___________________________

Address: __________________________________

Contract No:________________________________

Subject: Distributed Generation Approval with respect to your application

Reference: Your application No______ dated________________

Enclosed please find herewith Approval of Distribution Generation having


No__________________ dated_________________ granted by this office of PESCO for
_________KW photo voltaic solar based distribution generation facility located at
____________________, pursuant to NEPRA (Alternative & Renewable Energy) Distributed
Generation and Net Metering Regulations, 2015.

Please quote above mentioned Generation Approval No._______________


dated_______________ for future correspondence.

Enclosure: Generation Approval No:

CC to, SDO PESCO City-I Mardan

1). DG MIRAD PESCO Peshawar for information please

2). XEN PESCO Mardan-I for information please

3). DM (CMO) PESCO H/Q Peshawar for information please

4). DM Planning PESCO H/Q Peshawar for information please


Schedule –VII: Generation Approval (5KW to 25KW)

PESHAWAR ELECTRIC SUPPLY COMPANY


PESCO
Peshawar - Pakistan
Generation Approval

No.DGL/26311/10/2022

5. PESCO here grants Generation Approval to Mr. Muhammad Zaman Amjid, for 11.8 KW
Photovoltaic solar based distributed generation facility, Having Consumer reference number
02-26311-0036901-03, located at Irum colony mardan
Under the National Electric Power Regulatory Authority (Alternative & Renewable Energy)
Distributed Generation and Net Metering Regulations, 2015 (the “A&RE Regulations”) for period
of seven (07) years. This License is Valid Up to 31 day of 10/2029.

6. The applicant shall abide by the provision under the A&RE Regulations during the currency of
the Generation Approval.

7. The technical parameters of Net Metering arrangements are shown here under:-

11. Primary Energy Source


12. Size of the Distribution Generation facility
13. Generation inverter information
e) Manufacturer
f) Model:
14. Vendor/Installer
15. Generation Type

8. This Approval may be renewed subject to A&RE Regulations.


The Approval is given under my hand on 10/2022

SDO PESCO City-I Mardan


PESHAWAR ELECTRIC SUPPLY COMPANY
Office of the SDO City-I
PESCO Mardan

NO_______________ DATED_________________

Applicant Name: Saeed Ullah

Address: Nowshera Road Mardan

Contract No.03468304860

Subject: Distributed Generation Approval with respect to your application

Reference: Your application dated.05-10-2022

Enclosed please find herewith Approval of Distribution Generation having No.


DGL/26311/10/2022 dated.06-10-2022 granted by this office of PESCO for 20 KW photo voltaic
solar based distribution generation facility located at Nowshera Road Mardan, pursuant to
NEPRA (Alternative & Renewable Energy) Distributed Generation and Net Metering
Regulations, 2015.

Please quote above mentioned Generation Approval No. DGL/26311/10/2022 dated.06-10-


2022 for future correspondence.

Enclosure: Generation Approval No:

CC to, SDO PESCO City-I Mardan

1). DG MIRAD PESCO Peshawar for information please

2). XEN PESCO Mardan-I for information please

3). DM (CMO) PESCO H/Q Peshawar for information please

4). DM Planning PESCO H/Q Peshawar for information please


No_____________ Dated_______________

To,

The XEN PESCO


Mardan-I

Subject: N.O.C FOR SELF PURCHASED OF GREEN CT OPEARATED BI-DIRECTIONAL METER


BEARING A/C NO.30-26311-0035607-06 IN R/O SAEED ULLAH, NOWSHERA
ROAD MARDAN.

Documents for self-purchased Bi-directional whole current Green meter for Net
metering in R/O Saeed Ullah resident of Nowshera Road Mardan is forwarded
herewith to your good self office for issuance of N.O.C to purchase the CT
Operated Bi-Directional meter for NET METERING SYSTEM from PESCO approved
manufacturers.

Sr.# Name and A/C No NEPRA/License No Type of Meter


Address
01 Saeed Ullah, 30-26311- DGL/26311/10/2022 Bi-Directional
Nowshera Road 0035607-06 CT opeerated
MArdan meter

SDO PESCO City-I Mardan


Schedule –VII: Generation Approval (5KW to 25KW)

PESHAWAR ELECTRIC SUPPLY COMPANY


PESCO
Peshawar - Pakistan
Generation Approval

No.___________________

5. PESCO here grants Generation Approval to Mr/Mrs/Miss/MS ROOH ULLAH, for 13.500KW
Photovoltaic solar based distributed generation facility, Having Consumer reference number
41263110534901, located at SHAHEEN MARKET MARDAN
Under the National Electric Power Regulatory Authority (Alternative & Renewable Energy)
Distributed Generation and Net Metering Regulations, 2015 (the “A&RE Regulations”) for period
of seven (07) years. This License is Valid Up to ________day of _____20_____.

6. The applicant shall abide by the provision under the A&RE Regulations during the currency of
the Generation Approval.

7. The technical parameters of Net Metering arrangements are shown here under:-

16. Primary Energy Source PV SOLAR


17. Size of the Distribution Generation facility 13.500
18. Generation inverter information
g) Manufacturer FRONOUS
h) Model: FRONOUS 10KW
19. Vendor/Installer Enabling Solution(SMC-PVT) Limited
20. Generation Type SOLAR

8. This Approval may be renewed subject to A&RE Regulations.


The Approval is given under my hand on _______ day of ________ Tow thousand and Twenty
Tow.

SDO PESCO City-I Mardan


PESHAWAR ELECTRIC SUPPLY COMPANY
Office of the SDO City-I
PESCO Mardan

NO_______________ DATED_________________

Applicant Name: ROOH ULLAH

Address: SHAHEEN MARKET MARDAN

Contract No.03318821698

Subject: Distributed Generation Approval with respect to your application

Reference: Your application dated.10-10-2022

Enclosed please find herewith Approval of Distribution Generation having No.


DGL/26311/ /2022 dated. -10-2022 granted by this office of PESCO for 13.500 KW photo voltaic
solar based distribution generation facility located at SHAHEEN MARKET MARDAN, pursuant to
NEPRA (Alternative & Renewable Energy) Distributed Generation and Net Metering
Regulations, 2015.

Please quote above mentioned Generation Approval No. DGL/26311/ /2022 dated. -10-2022
for future correspondence.

Enclosure: Generation Approval No:

CC to, SDO PESCO City-I Mardan

1). DG MIRAD PESCO Peshawar for information please

2). XEN PESCO Mardan-I for information please

3). DM (CMO) PESCO H/Q Peshawar for information please

4). DM Planning PESCO H/Q Peshawar for information please


No_____________ Dated_______________

To,

The XEN PESCO


Mardan-I

Subject: N.O.C FOR SELF PURCHASED OF GREEN CT OPEARATED BI-DIRECTIONAL METER


BEARING A/C NO.41-26311-0534901 IN R/O SHAHEEN MARKET, MARDAN.

Documents for self-purchased Bi-directional whole current Green meter for Net
metering in R/O Saeed Ullah resident of Nowshera Road Mardan is forwarded
herewith to your good self office for issuance of N.O.C to purchase the 3-phase
whole current meter for NET METERING SYSTEM from PESCO approved
manufacturers.

Sr.# Name and Address A/C No NEPRA/License Type of Meter


No
01 ROOH ULLAH 41-26311-0534901 DGL/26311/ Bi-Directional
SHAHEEN MARKET /2022 3-phase whole
MARDAN current meter

SDO PESCO City-I Mardan


No____________________ Dated___________________

To,

The XEN (M&T)

PESCO Mardan.

Subject: TESTING/CHECKING AND INSPECTION OF WHOLE CURRENT BI-DIRECTIONAL


METER.

Enclosed find herewith a photo copy of invoice of “three phase whole current Bi-
directional meter” vide Serial No.879247 Make KBK (Pvt.) Ltd. Along with copy of
NOC granted by SE Mardan Circle Mardan is hereby submitted for necessary
testing and inspection of Bi-directional meter (net metering system) in R/O
Muhammad Zaman Amjid Irum Colony Mardan Distribution Generation License
No. DGL/26311/10/2022 photo voltaic Solar Generation capacity=11.88KW
under A/C No.02-26311-0036901-03.

CC to, SDO PESCO City-I Mardan

XEN PESCO Mardan-I for information w/r to above please.


No_______________ Date_______________

To,

XEN M&T Mardan

Subject : Testing of Bi -Directional Meter

It is submitted for your kind information that 1 No Bi-directional meter No 879193 make

KBK under A/c No 04-26311-0101607-03 is here by sent to your office for testing/checking

Please.

SDO PESCO CITY-1


SUB-DIVISION
No___________________ Dated____________________

To,
The XEN PESCO
Mardan-I

Subject: DISTRIBUTION GENERATION APPROVAL IN MUHAMMAD TARIQ KHAN UNDER A/C


NO.30-26311-0206201-06.

Enclosed please find herewith net metering system case in r/o Mr. Muhammad Tariq
Khan under A/C No.30-26311-0206201-06 sent to your office for approval of
Distribution of Generation license please.

SDO PESCO City-I Mardan


No_______________ Date_______________

To,

XEN M&T Mardan

Subject : Testing of Bi -Directional Meter

It is submitted for your kind information that 1 No Bi-directional meter No make

under A/c No 01-26315-0002915-01 is here by sent to your office for testing/checking

Please.

SDO PESCO TORU