Required Background Knowledge
• The ability to use a computer
and understand the
fundamentals of the operating
system.
www.linkedin.com/in/younis-mukhtar-088799309
Project Management
www.linkedin.com/in/younis-mukhtar-088799309
Knowledge Areas
1. Project Integration Management
2. Project Scope Management
3. Project Time Management
4. Project Cost Management
5. Project Quality Management
6. Project Human Resource Management
7. Project Communication Management
8. Project Risk Management
9. Project Procurement Management
10. Project Stakeholder Management
www.linkedin.com/in/younis-mukhtar-088799309
Processes
1. Initiation
2. Planning
3. Execution
4. Monitoring & Controlling
5. Closing
www.linkedin.com/in/younis-mukhtar-088799309
Project Life Cycle
www.linkedin.com/in/younis-mukhtar-088799309
Process Group Interaction
www.linkedin.com/in/younis-mukhtar-088799309
Planning Cycle
www.linkedin.com/in/younis-mukhtar-088799309
Introduction to Primavera Enterprise
Project Management
www.linkedin.com/in/younis-mukhtar-088799309
History
• In 1983, Primavera Systems was founded by Joel Koppelman and Dick Faris in
Philadelphia, USA. The company was quite successful and eventually P3 became
the leading scheduling product in the Engineering & Construction Industries.
• In 1999, Primavera acquired Eagle Ray Software which had created a product
named Eagle Ray 1000 Project Management Suit in 1998. Primavera released two
products in 1999: P3 E/C for Engineering & Construction and TeamPlay for IT and
Financial services.
www.linkedin.com/in/younis-mukhtar-088799309
Introduction
• Oracle’s P6 gives today’s project mangers and schedulers the one
thing they value most: CONTROL
www.linkedin.com/in/younis-mukhtar-088799309
Primavera Softwares Available
• Primavera Contractor
• Primavera Enterprise Project Management P6
• Primavera Risk Analysis
• Primavera Portfolio Management
www.linkedin.com/in/younis-mukhtar-088799309
Primavera P6 EPM VS Contractor
The major functional differences of these two products are as follows:
• Primavera Contractor is a standalone solution that connects to its own instance of a locally
installed Microsoft SQL Server 2005 database. It cannot be connected to remote SQL Server or
Oracle databases.
• Microsoft Project XML file import is not supported. You can only import using the MPP format and
Microsoft Project must be installed on the same machine for this to work.
• There is no Enterprise Project Structure (EPS). You open projects via the File | Open menu option.
• The Enterprise and Admin menus are not present in Primavera Contractor.
www.linkedin.com/in/younis-mukhtar-088799309
Primavera P6 EPM VS MS Project
Function Primavera P6 MS Project
Multiple User Access Yes No
Baselines Unlimited 11
Expenses Yes No
Columns 200 40
Multiple Activity Relationships Multiple Single
for two similar activities.
External Relationship Yes No
Multiple Project Tracking Yes No
Steps Weightages can be assigned Not available
Issues and Risks Can record issues and risks Not available
against a project, wbs element
or activity.
www.linkedin.com/in/younis-mukhtar-088799309
Steps for Scheduling with P6
• Installation
• Create Enterprise Project Structure (EPS)
• Create a Project
• Create Work Breakdown Structure (WBS)
• Add Activities and Relationships
• Assign and Maintain Baseline
• Create and Assign Resources
• Generate Reports and S-Curves
www.linkedin.com/in/younis-mukhtar-088799309
Benefits of CPM in Claims
A CPM schedule can affect the schedule in two ways:
www.linkedin.com/in/younis-mukhtar-088799309
Scheduling Mistakes in relation to
Delay Claims
1. Erasing the footprint of the baseline schedule.
www.linkedin.com/in/younis-mukhtar-088799309