FAT SAT Testing Checklist
FAT SAT Testing Checklist
CHECKLIST
FOR EFFICIENT
FAT and SAT
TESTING
AUTOMATION SYSTEMS
APPROVAL
Date
Manufacturer
Machine Description
Machine Number
VISION
Scrap%
Prin Date
t
Dat Signature
e
SPECIAL NOTES
SAFET
All safety circuits are wired where if failure occurs machine will not start
Y
All e-stops work when pressed and machine stops immediately upon pressed
MACHI
Tooling is Everything that is adjustable deemed not necessary should be
NE acceptable doweled
MACHI
Camera bracket(s) supplied are PLC is programmed for trigger, reject, and
NE acceptable inputs
Machine has spots on terminal strip for wire connections for vision