Project Monitoring

Uploaded by

www.4utool.com
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
6 views

Project Monitoring

Uploaded by

www.4utool.com
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 3

PROJECT MONITORING

Project Name: EMARATI SCHOOL AT AL RAGAYEB - AJMAN


Client: PRESIDENTIAL COURT – MUBADARAT THE PRESIDENT’S INITIATIVES
PMC : NA
Consultant: MAKAN CONSULTING ENGINEERS
Contractor: NATIONAL CONTRACTING AND TRANSPORT CO.
Report Date: 25-September-2024

PROJECT KEY PERFORMANCE INDEX (PKPI): OVERALL SUCCESS= 72.5 %


%of Success exceed %of Success range between 70%.and 84% %of Success below 70%.
85%.
Monitoring Parameters details see below 8 sections.

1. Project Risk Assessment:


No. Item Description Total Total Total % Success Comments Color
Recorded Active Closed Code
No. Risk Monitoring Status
A. Nomination of provisional sum items 1  0% Success = (Total Closed/ Total
B. Delay of Electrical IFC Municipality Approval 1 1 100 % Recorded) * 100%
Delay of Long Lead Items Approval & delivery 0% Avg. = 33.3%
C.
to site
1 

2. Project Schedule Monitoring:


Actual Progress Variance (+/-) Color
No. Milestone Planed Progress (%) SPI *100 Comment Code
(%) %
Avg =
A. Project Progress % 13.74 % 15.92 % +2.18 % 1.58 * 100 = 100%
100 %

Page 1 of 3
3. Project Cost Monitoring:
No. Milestone Contract Value Actual value Variance (+/-) CPI Color
*100 Code
A. Total contract project 150,955,045.00 150,955,045.00 0.0
B.
C.
Planned Financial Actual Financial Variance (+/-)
D.. 20,741,223.18 24,032,043.16 + 100 %
Total Amount 3,290,819.98
E.
F.

4. Project EHS Assessment:


Total Total Total Total % Color
No. Item Description Comments Code
Issued Opened Closed Critical Success
Success = (total Closed / total Issued) * 100%
A. EHS Monitoring Status 4 3 1 1 25 %
AVG = 25 %

5. Project Quality Status:


No. Item Description Total Raised Total Total % Success Comments Color
Closed Open Code
A. Non-Compliance Report (NCR) 9 4 5 60 % Success= (total Closed / Total
B. Site Observation Report (SOR) 8 3 5 66.6 % Raised)*100%
C. Quality Site Walks Findings 64 64 0 100% Avg = 75.5%
D. Quality Audit Findings NA NA NA NA

Page 2 of 3
6. Project Material Testing:
Item Description Total Total Total Negative % Comments Color
Required Conducted Failed Variance success Code
Success= (Total Conducted/ Total
A. Material Testing 1029 1029 0 0 100% Required ) *100%
AVG = 100 %

7. Project Submittals Status:


No. Item Description Total Total Total Total % Success Comments Color
Required Submitted Replied Approved Code
A. Shop Drawings 451 369 202 95 52.9 % Success= (total Approved /
B. Method Statement 30 2 2 2 100 % total Submitted) *100%.
C. Material Submittal 248 246 196 145 36.5 %
D. Pre-Qualifications 50 50 47 45 71.4 % Average = 73.9%
E. RFIA NA 534 501 474 82.6 %
F. MIR NA 34 24 10 100 %

8. Comments/Conclusion:

Page 3 of 3