0% found this document useful (0 votes)
39 views

Schedule of Footing Tie Beams (FTB) : Roof Framing Diagram Truss Diagram

Uploaded by

Engr. Louie
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
39 views

Schedule of Footing Tie Beams (FTB) : Roof Framing Diagram Truss Diagram

Uploaded by

Engr. Louie
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

SCHEDULE OF FOOTING TIE BEAMS (FTB) 150mm THK.

CHB PARAPET WALL with 12mm Ø VERTICAL


BARS @ 250mm O.C. with 10mm Ø HORIZONTAL BARS @
EVERY 2 LAYERS OF CHB. PROVIDE VERTICAL STIFFENER
600 6.38
600 (SC-1) ON BOTH ENDS
REINFORCING BARS BAR ARRANGEMENT

HT-1

HT-1

HT-1

HT-1
TOP LN. of RB

0.52
ROOF LEVEL COLUMN

50
MARK SIZES AT SUPPORT AT MID - SPAN AT AT AT STIRRUPS REMARKS
EXT. MID INT.

50
TOP BOTTOM TOP BOTTOM SUPP. SPAN SUPP.

10mm Ø TIES; 1 @ 50, 6 @ 100, 4 @ 150, REST @ 250mm O.C.


0.82 1.53 1.00 1.00 1.00 1.00
1@50,8@100, 10mm Ø JOINT REINF., @ 100mm O.C.
FTB - 2 3-16mmØ 3-16mmØ

TOWARDS THE CENTER FROM TOP OF


200 x 300 3-16mmØ 3-16mmØ REST@250 O.C.

3rd FLR. BEAM & BOTTOM OF RB


FTB - 1 200 x 300 4-16mmØ 4-16mmØ 3-16mmØ 3-16mmØ
1@50,8@100, HT-1
REST@250 O.C.
1 ROOF FRAMING DIAGRAM 2 TRUSS DIAGRAM
S-3 SCALE 1:100 M S-3 SCALE 1:100 M

SECOND F. L.

50
10mmØ SAG ROD W/
W STANDARD NUT &
SCHEDULE OF FOOTING

10mm Ø TIES; 1 @ 50, 6 @100, 4 @ 150, REST @ 250mm O.C.

50
WASHER ( STAGGERED )
GRID
10mm Ø JOINT REINF., @ 100mm O.C.
DIMENSION DEPTH REINFORCING BARS LC - 75 x 50 x 18 x 3.0mm
FROM N.G.L. PURLINS @ 700mm O.C.

TOWARDS THE CENTER FROM FFL. &


MARK REMARKS BAR - X
WIDTH LENGTH THICKNESS 'D' BAR - X BAR - Y FTB

75mm, clr.
(W) (L) (t)

BOTTOM OF 2nd FLR. BEAM


SQUARE
F-1 3000 4200 770 2000 42 - 25 mm Ø 32 - 25 mm Ø
FOOTING
COLUMN Re-BARS, See Schedule of Columns

L/2
BAR - Y

25 25 PC 1 : PURLIN
GROUND F. L. CONNECTOR
TOP CHORD

10mm Ø TIES; 1 @ 50, REST @ 100mm O.C.


500
COLUMN

L
GRID

FTB

FTB
FINISH G. L.

varies
650
NATURAL G. L.
PC 1 : PURLIN CONNECTOR BENT PLATE -
SCHEDULE OF COLUMNS FTB FTB
4mm x 125 x 125 (LEG) x 50mm (LEG) WITH
FTB 4-12mm Ø A-307 BOLTS WITH STD. NUTS
FROM FOUNDATION TO FROM GROUND FLOOR FROM SECOND FLOOR FROM THIRD FLOOR TO FROM FOURTH FLOOR 400, typ. AND WASHERS
MARK
GROUND FLOOR TO SECOND FLOOR TO THIRD FLOOR FOURTH FLOOR TO ROOF BEAM FOOTING Re-BARS, Each Way

1500
0.45 0.45 0.45 0.45 0.45

t
0.35

0.35

0.35

0.35

0.35

75mm, clr.
C
100mm THK. WELL-COMPACTED GRAVEL FILL, Typical
W
12-20mm Ø VERT. BARS W/
10mm Ø TIES, 1@ 50,6@ 100,
5@ 150, REST @250mm O.C.
12-20mm Ø VERT. BARS W/
10mm Ø TIES, 1@ 50,6@ 100,
5@ 150, REST @250mm O.C.
12-20mm Ø VERT. BARS W/
10mm Ø TIES, 1@ 50,6@ 100,
5@ 150, REST @250mm O.C.
12-20mm Ø VERT. BARS W/
10mm Ø TIES, 1@ 50,6@ 100,
5@ 150, REST @250mm O.C.
12-20mm Ø VERT. BARS W/
10mm Ø TIES, 1@ 50,6@ 100,
5@ 150, REST @250mm O.C. ELEVATION
P L A N 2 TRUSS-PURLIN-ROOF CONN. DETAIL
3 TIES / SET 3 TIES / SET 3 TIES / SET 3 TIES / SET 3 TIES / SET S-3 SCALE 1:100 M

REFERENCE COLUMN-FOOTING
N. T. S.

12mmØ @225 mm O.C.


BOTTOM BARS (ALONG
12 mmØ @ 225 mm O.C. BOTTOM BARS
LONG SPAN) BENT-UP
BENT-UP ALTERNATE BARS
SCHEDULE OF SLABS ALTERNATE BARS @ L/4
@ L/4 ( ALONG LONG SPAN )
12mmØ TOP BARS @ 150 mm O.C.
( ALONG LONG SPAN ) 10mmØ TEMP BARS @ 300 mm O.C.
REINFORCING BARS
MARK THICKNESS REMARKS
PARALLEL TO PARALLEL TO

0.12
LONG SPAN SHORT SPAN
12mmØ @100mm O.C. BENT- 12mmØ @100mm O.C. BENT-
UP ALTERNATE @ L/4 FROM UP ALTERNATE @ L/4 FROM TWO WAY
S-3 - S-7 125mm+FIN.
FACE OF SUPPORT FACE OF SUPPORT SLAB
SHORT SPAN ( S ) SHORT SPAN ( S )
LONG SPAN ( L ) LONG SPAN ( L )
S-1, S-2, ONE WAY SLAB
-DO-
S-8
TYPICAL DETAIL OF SUSPENDED SLABS
SCALE : 1 : 20 M.

FRANCIS JAMES PARIÑAS MENDOZA R.A. 9266 APPROVED BY: PROJECT TITLE: SHEET CONTENTS: REVISIONS: CHECKED BY: SHEET NUMBER
REGISTERED ARCHITECT & REGISTERED MASTER PLUMBER SECTION 20
SCHEDULE OF FOOTING TIE BEAM
DESIGN AND BUILD
Drawings and specifications duly signed, stamped
or sealed, as instruments of service, are the intellectual RACHO'S RESIDENCE SCHEDULE OF FOOTING
DATE:
properties and documents of the architect , whether the
3
CONTACT # :
object for which they are made is executed or not. It shall
be unlawful for any person, without the consent of the
(THREE STOREY WITH ROOF DECK) SCHEDULE OF SLAB CAD BY: S
0917-137-9868 architect or author of said documents, to duplicate or to PRC NO.: PLACE ISSUED: MR. AND MRS. ANGELITO RACHO 3
EMAIL: make copies of said documents for use in the repetition of
DATE ISSUED: LOCATION: BEL AIR STREET ST. BENEDICT STREET CORNER, NANGKA, SCHEDULE OF COLUMNS
[email protected] and for other projects or buildings, whether partly or in PTR NO.: OWNER DATE:
AR. AMES whole. MARIKINA, METRO MANILA TYPICAL DETAILS

You might also like