Schedule of Footing Tie Beams (FTB) : Roof Framing Diagram Truss Diagram
Schedule of Footing Tie Beams (FTB) : Roof Framing Diagram Truss Diagram
HT-1
HT-1
HT-1
HT-1
TOP LN. of RB
0.52
ROOF LEVEL COLUMN
50
MARK SIZES AT SUPPORT AT MID - SPAN AT AT AT STIRRUPS REMARKS
EXT. MID INT.
50
TOP BOTTOM TOP BOTTOM SUPP. SPAN SUPP.
SECOND F. L.
50
10mmØ SAG ROD W/
W STANDARD NUT &
SCHEDULE OF FOOTING
50
WASHER ( STAGGERED )
GRID
10mm Ø JOINT REINF., @ 100mm O.C.
DIMENSION DEPTH REINFORCING BARS LC - 75 x 50 x 18 x 3.0mm
FROM N.G.L. PURLINS @ 700mm O.C.
75mm, clr.
(W) (L) (t)
L/2
BAR - Y
25 25 PC 1 : PURLIN
GROUND F. L. CONNECTOR
TOP CHORD
L
GRID
FTB
FTB
FINISH G. L.
varies
650
NATURAL G. L.
PC 1 : PURLIN CONNECTOR BENT PLATE -
SCHEDULE OF COLUMNS FTB FTB
4mm x 125 x 125 (LEG) x 50mm (LEG) WITH
FTB 4-12mm Ø A-307 BOLTS WITH STD. NUTS
FROM FOUNDATION TO FROM GROUND FLOOR FROM SECOND FLOOR FROM THIRD FLOOR TO FROM FOURTH FLOOR 400, typ. AND WASHERS
MARK
GROUND FLOOR TO SECOND FLOOR TO THIRD FLOOR FOURTH FLOOR TO ROOF BEAM FOOTING Re-BARS, Each Way
1500
0.45 0.45 0.45 0.45 0.45
t
0.35
0.35
0.35
0.35
0.35
75mm, clr.
C
100mm THK. WELL-COMPACTED GRAVEL FILL, Typical
W
12-20mm Ø VERT. BARS W/
10mm Ø TIES, 1@ 50,6@ 100,
5@ 150, REST @250mm O.C.
12-20mm Ø VERT. BARS W/
10mm Ø TIES, 1@ 50,6@ 100,
5@ 150, REST @250mm O.C.
12-20mm Ø VERT. BARS W/
10mm Ø TIES, 1@ 50,6@ 100,
5@ 150, REST @250mm O.C.
12-20mm Ø VERT. BARS W/
10mm Ø TIES, 1@ 50,6@ 100,
5@ 150, REST @250mm O.C.
12-20mm Ø VERT. BARS W/
10mm Ø TIES, 1@ 50,6@ 100,
5@ 150, REST @250mm O.C. ELEVATION
P L A N 2 TRUSS-PURLIN-ROOF CONN. DETAIL
3 TIES / SET 3 TIES / SET 3 TIES / SET 3 TIES / SET 3 TIES / SET S-3 SCALE 1:100 M
REFERENCE COLUMN-FOOTING
N. T. S.
0.12
LONG SPAN SHORT SPAN
12mmØ @100mm O.C. BENT- 12mmØ @100mm O.C. BENT-
UP ALTERNATE @ L/4 FROM UP ALTERNATE @ L/4 FROM TWO WAY
S-3 - S-7 125mm+FIN.
FACE OF SUPPORT FACE OF SUPPORT SLAB
SHORT SPAN ( S ) SHORT SPAN ( S )
LONG SPAN ( L ) LONG SPAN ( L )
S-1, S-2, ONE WAY SLAB
-DO-
S-8
TYPICAL DETAIL OF SUSPENDED SLABS
SCALE : 1 : 20 M.
FRANCIS JAMES PARIÑAS MENDOZA R.A. 9266 APPROVED BY: PROJECT TITLE: SHEET CONTENTS: REVISIONS: CHECKED BY: SHEET NUMBER
REGISTERED ARCHITECT & REGISTERED MASTER PLUMBER SECTION 20
SCHEDULE OF FOOTING TIE BEAM
DESIGN AND BUILD
Drawings and specifications duly signed, stamped
or sealed, as instruments of service, are the intellectual RACHO'S RESIDENCE SCHEDULE OF FOOTING
DATE:
properties and documents of the architect , whether the
3
CONTACT # :
object for which they are made is executed or not. It shall
be unlawful for any person, without the consent of the
(THREE STOREY WITH ROOF DECK) SCHEDULE OF SLAB CAD BY: S
0917-137-9868 architect or author of said documents, to duplicate or to PRC NO.: PLACE ISSUED: MR. AND MRS. ANGELITO RACHO 3
EMAIL: make copies of said documents for use in the repetition of
DATE ISSUED: LOCATION: BEL AIR STREET ST. BENEDICT STREET CORNER, NANGKA, SCHEDULE OF COLUMNS
[email protected] and for other projects or buildings, whether partly or in PTR NO.: OWNER DATE:
AR. AMES whole. MARIKINA, METRO MANILA TYPICAL DETAILS