0% found this document useful (0 votes)
52 views2 pages

DG Set - Electical Details - 3 Stage (C106, GP220, B7150DD) - V2-1

U

Uploaded by

yash.tarle9
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
52 views2 pages

DG Set - Electical Details - 3 Stage (C106, GP220, B7150DD) - V2-1

U

Uploaded by

yash.tarle9
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 2

METSO MINERALS (INDIA) PRIVATE LIMITED

1st Floor, DLF Building No. 10, Tower A, DLF Cyber City,
DLF Phase-II, Gurgaon-122 002, Haryana, India.
PROJECT: 3 Stage Crushing and Screening plant. PREPARED BY: LK
PROJECT No.: - CHECKED BY: JS
CUSTOMER: - APPROVED BY: -
DOCUMENT: DOC. NO.: -
DATE -
POWER DEMAND & DG SET RATING CALCULATION. REV: -

S OUTPUT MOTOR TOTAL OPERATING DEMAND/ POWER


EQUIPMENT QTY. STARTING METHOD REMARKS
no. POWER EFFICIENCY INPUT LOAD LOAD FACTOR DEMAND
(Kw) (η) (Kw) (Kw) (Kw)

Primary section
2 x 4 kW
1 Grizzly feeder, TK 11-42-2V 1 0.7 11.43 0.80 9.14 VFD
8

2 Jaw crusher, C106 1 110 0.93 118.28 0.65 76.88 STAR-DELTA

3 CONV.100 1 5.5 0.87 6.32 0.80 5.06 DOL

4 CONV.110 1 18.4 0.87 21.15 0.80 16.92 DOL

Power Demand in kW:- 108.00 kW.


Power factor 0.8
Power demand in kVA:- 135.00 kVA

Secondary section
2 x 1.8 kW
1 Surge Hopper-1 TK10/20 1 0.7 5.14 0.80 4.11 VFD
3.6

2 CONV.200 1 18.4 0.87 21.15 0.80 16.92 DOL

3 CONV.RBC 1 9.2 0.87 10.57 0.80 8.46 DOL

4 Cone crusher-GP220 1 200 0.93 215.05 0.65 139.78 Star Delta

5 CONV.210 1 9.2 0.87 10.57 0.80 8.46 DOL

6 Screen-1, DS18x55 1 15 0.87 17.24 0.80 13.79 DOL

7 CONV.220 1 18.4 0.87 21.15 0.80 16.92 DOL

8 CONV.230 1 9.2 0.87 10.57 0.80 8.46 DOL

9 CONV.240 1 9.2 0.87 10.57 0.80 8.46 DOL

Power Demand in kW:- 225.37 kW.


Power factor 0.8
Power demand in kVA:- 281.71 kVA

Tertiary section
2 x 1.8 kW
1 Surge Hopper-2 TK10/20 1 0.7 5.14 0.80 4.11 VFD
3.6

2 CONV.300 1 9.2 0.87 10.57 0.80 8.46 DOL

2x150KW One with Star Delta


3 Barmac Crusher-B7150 1 0.93 322.58 0.65 209.68
300 One with DOL

4 Screen-2, DS18x55 1 15 0.87 17.24 0.80 13.79 DOL

5 CONV.310 1 18.4 0.87 21.15 0.80 16.92 DOL

6 CONV.320 1 9.2 0.87 10.57 0.80 8.46 DOL

7 CONV.330 1 5.5 0.87 6.32 0.80 5.06 DOL

8 CONV.340 1 5.5 0.87 6.32 0.80 5.06 DOL

9 CONV.350 1 5.5 0.87 6.32 0.80 5.06 DOL

10 CONV.360 1 9.2 0.87 10.57 0.80 8.46 DOL

Power Demand in kW:- 285.06 kW.


Power factor 0.8
Power demand in kVA:- 356.32 kVA

CONCLUSION

Page 1 of 2
1 For Primary, Secondary section combined
Total KVA required to run the Two sections :- 416.72 kVA
Proposed Min DG set rating :- 500 kVA
DG Loading During Pant Running 83% %
Checking for starting current consistency.
Peak surge/inrush current capacity of 500 DG set is :- 1045 Amps.
Starting current peak surge due to motor starting :-
C106 + Starting current GP220 1030 Amps.
Which is less then the DG set current carrying capacity, hence the DG selection is correct.
CONCLUSION
3 For Primary, Secondary and Tertiary section combined (COMPLETE PLANT)
Total KVA required to run the Three sections :- 773.04 kVA
Proposed Min DG set rating :- 850 kVA
DG Loading During Pant Running 91% %
Checking for starting current consistency.
Peak surge/inrush current capacity of 850 DG set is :- 1776 Amps.
Starting current peak surge due to motor starting :-
Full load Current of B7150 + C106 + Starting current of GP220 1565 Amps.
Which is less then the DG set current carrying capacity, hence the DG selection is correct.