METSO MINERALS (INDIA) PRIVATE LIMITED
1st Floor, DLF Building No. 10, Tower A, DLF Cyber City,
DLF Phase-II, Gurgaon-122 002, Haryana, India.
PROJECT: 3 Stage Crushing and Screening plant. PREPARED BY: LK
PROJECT No.: - CHECKED BY: JS
CUSTOMER: - APPROVED BY: -
DOCUMENT: DOC. NO.: -
DATE -
POWER DEMAND & DG SET RATING CALCULATION. REV: -
S OUTPUT MOTOR TOTAL OPERATING DEMAND/ POWER
EQUIPMENT QTY. STARTING METHOD REMARKS
no. POWER EFFICIENCY INPUT LOAD LOAD FACTOR DEMAND
(Kw) (η) (Kw) (Kw) (Kw)
Primary section
2 x 4 kW
1 Grizzly feeder, TK 11-42-2V 1 0.7 11.43 0.80 9.14 VFD
8
2 Jaw crusher, C106 1 110 0.93 118.28 0.65 76.88 STAR-DELTA
3 CONV.100 1 5.5 0.87 6.32 0.80 5.06 DOL
4 CONV.110 1 18.4 0.87 21.15 0.80 16.92 DOL
Power Demand in kW:- 108.00 kW.
Power factor 0.8
Power demand in kVA:- 135.00 kVA
Secondary section
2 x 1.8 kW
1 Surge Hopper-1 TK10/20 1 0.7 5.14 0.80 4.11 VFD
3.6
2 CONV.200 1 18.4 0.87 21.15 0.80 16.92 DOL
3 CONV.RBC 1 9.2 0.87 10.57 0.80 8.46 DOL
4 Cone crusher-GP220 1 200 0.93 215.05 0.65 139.78 Star Delta
5 CONV.210 1 9.2 0.87 10.57 0.80 8.46 DOL
6 Screen-1, DS18x55 1 15 0.87 17.24 0.80 13.79 DOL
7 CONV.220 1 18.4 0.87 21.15 0.80 16.92 DOL
8 CONV.230 1 9.2 0.87 10.57 0.80 8.46 DOL
9 CONV.240 1 9.2 0.87 10.57 0.80 8.46 DOL
Power Demand in kW:- 225.37 kW.
Power factor 0.8
Power demand in kVA:- 281.71 kVA
Tertiary section
2 x 1.8 kW
1 Surge Hopper-2 TK10/20 1 0.7 5.14 0.80 4.11 VFD
3.6
2 CONV.300 1 9.2 0.87 10.57 0.80 8.46 DOL
2x150KW One with Star Delta
3 Barmac Crusher-B7150 1 0.93 322.58 0.65 209.68
300 One with DOL
4 Screen-2, DS18x55 1 15 0.87 17.24 0.80 13.79 DOL
5 CONV.310 1 18.4 0.87 21.15 0.80 16.92 DOL
6 CONV.320 1 9.2 0.87 10.57 0.80 8.46 DOL
7 CONV.330 1 5.5 0.87 6.32 0.80 5.06 DOL
8 CONV.340 1 5.5 0.87 6.32 0.80 5.06 DOL
9 CONV.350 1 5.5 0.87 6.32 0.80 5.06 DOL
10 CONV.360 1 9.2 0.87 10.57 0.80 8.46 DOL
Power Demand in kW:- 285.06 kW.
Power factor 0.8
Power demand in kVA:- 356.32 kVA
CONCLUSION
Page 1 of 2
1 For Primary, Secondary section combined
Total KVA required to run the Two sections :- 416.72 kVA
Proposed Min DG set rating :- 500 kVA
DG Loading During Pant Running 83% %
Checking for starting current consistency.
Peak surge/inrush current capacity of 500 DG set is :- 1045 Amps.
Starting current peak surge due to motor starting :-
C106 + Starting current GP220 1030 Amps.
Which is less then the DG set current carrying capacity, hence the DG selection is correct.
CONCLUSION
3 For Primary, Secondary and Tertiary section combined (COMPLETE PLANT)
Total KVA required to run the Three sections :- 773.04 kVA
Proposed Min DG set rating :- 850 kVA
DG Loading During Pant Running 91% %
Checking for starting current consistency.
Peak surge/inrush current capacity of 850 DG set is :- 1776 Amps.
Starting current peak surge due to motor starting :-
Full load Current of B7150 + C106 + Starting current of GP220 1565 Amps.
Which is less then the DG set current carrying capacity, hence the DG selection is correct.
Page 2 of 2