Performance Test Method For Intensive Use Chairs
Performance Test Method For Intensive Use Chairs
net/publication/237627535
CITATIONS READS
6 1,066
2 authors, including:
SEE PROFILE
All content following this page was uploaded by Yusuf Ziya Erdil on 07 January 2016.
1. Introduction information both about the test method and the construc-
tion of the equipment needed to carry out the tests. This
In 1978-79, the Wood Research Laboratory, a part of document was prepared in order to make this information
the Department of Forestry and Natural Resources of readily available to the furniture industry, and, in particu-
Purdue University, was asked by the General Services lar, to provide detailed drawings of the test equipment.
Administration of the Federal Government to develop
performance tests for intensive use task chairs. At the 2. Overview of Test Method
time, these tests were to be used by the General Service
Administration in its furniture procurement programs to This test method describes procedures for evaluating
qualify chairs that were to be used by air traffic control- performance characteristics of intensive use chairs.
lers. The resulting standard, FNEW83-269, has been in Intensive use chairs are designed to be used 24 hours per
use since the early1980’s. Although its purpose was to day in a severe use environment.
evaluate the fitness for use of what were essentially very A chair is subjected to one or more loads that are
heavy-duty office chairs in specified use environments, applied to the seat, back, arms, or legs at selected
the method of test has also proven to be a valuable aid in positions at a rate of twenty cycles per minute. The test
the engineering design of general purpose office chairs. is continued at this load level until 25,000 cycles have
It has, for example, been used for such wide-ranging been completed. Loads are then increased by a given
purposes as evaluating new tilt mechanism designs; load increment and the test continued for another 25,000
evaluating new joint constructions and new fasteners; and cycles. This process is repeated until some part of the
evaluating new materials of construction. Most impor- chair suffers disabling damage or a desired level of
tantly, it has provided a method of test that yields performance has been achieved. The performance rating
information that can be incorporated into the product of the chair is taken as the highest load level it was able
engineering process. to successfully complete 25,000 cycles.
4.1.3 Procedures
The tilt mechanism shall be
adjusted so that the top of the back
moves 4 inches +/-1 inch rearward
under the action of a 40-pound load.
The test is carried out at a 50-pound
load level at 20 cycles per minute and
is continued until the back or tilt
mechanism suffers disabling damage
or until the required acceptance level
is achieved.
2
FNR-179
3
FNR-179
shown in Figure 4. The chair is secured to the test point of support for the cylinder in much the same
platform with a length of chain looped twice around the manner as an arm provides support.
base. A small chain binder is used to provide sufficient
tension on the chain to hold the chair in place. Front to 4.3.3 Procedures
back loads are applied to the back of the chair by means If a chair has a pneumatic back tilt or pneumatic seat
of an air cylinder. Front to back loads are applied at a inclination adjustment mechanism, each is tested. The
point 16 inches above the seat, or, to the top of the back if test uses a four-part cycle as follows:
the back is lower than 16 inches. The load is applied in A. A 50-pound load is applied to the seat (seat inclina-
such a manner that it is normal to the plane of the back tion test) or back (back inclination test) normal to the
when the back is at its most rearward position. A length plane of the seat, or, to the plane of the back. The load is
of strap (a chain or rope may also be used) is looped applied to the seat or back at that location that will most
around the backrest of the chair to provide a point of easily cause the seat or back to tilt when the tilt activator
attachment for the rod end of the air cylinder on the chair. is operated.
The rod end of the air cylinder is then attached to the
B. The load is removed.
strap by means of a small clevis. The air cylinder itself is
attached to the main testing machine frame by means of C. The load is reapplied and the adjustment mechanism
an air cylinder attachment assembly. is activated while the chair is under load.
A small cylinder is then clamped in a vertical position D. The load is removed—while the adjustment
to the arm of the chair, Figure 4. The rod end of this mechanism remains activated—until the seat or back
cylinder is attached to the back inclination adjustment mechanism returns to its normal position. Once the
lever by means of a length of small chain. This cylinder normal position is reached, the adjustment mechanism is
is used to activate the back inclination adjustment deactivated.
mechanism. In those cases where the chair has no arm, a The complete cycle is repeated at a rate of 5 cycles per
bracket must be clamped to the seat that will provide a minute. The test is continued until some part of the
adjustment system malfunctions or the
chair meets the required acceptance
level.
4
FNR-179
in place. Vertical loads are applied at the approximate 4.5.1 Summary of Method
center or front edge of either arm by means of an air This test is used to evaluate the strength of the chair
cylinder. A length of strap or chain is looped around the when side thrust loads are applied to an arm. Such loads
arm and then attached to the rod-end of the air cylinder occur when the user sits down or gets up from the chair,
by means of a clevis, Figure 5. The air cylinder itself is or when the chair is pulled or pushed sideways.
attached, in a vertical position, to a cross pipe in the
main frame by means of an air cylinder attachment 4.5.2 Test Set-Up
assembly. Details of the strap or chain attachment and The test is carried out in the testing machine frame as
cylinder attachment assembly are shown in Figure 28 shown in Figure 6. The chair is secured to the test
and Figure 29, respectively. platform with a length of chain looped twice around the
base. A small chain binder is used to provide sufficient
4.4.3 Procedures tension on the chain to hold the chair in place. A length
A vertical downward load is applied at the approxi- of chain or strap is looped around each arm in such a
mate center of one armrest of a chair at a cyclic rate of manner that the loads are applied at the center of the
20 cycles per minute. The test is begun at a load level of armrests. On one arm, the strap or chain is attached to
100 pounds and increased in increments of 50 pounds the rod end of the air cylinder by means of a clevis; the
after 25,000 cycles have been completed at the preceding strap on the other arm is attached to the main frame by
load level. Loads are increased every 25,000 cycles until means of a clevis that is secured by a cylinder attachment
the chair suffers disabling damage or meets desired assembly. It should be noted that the loaded arm and
acceptance level. reaction arm are in line so that both arms are, in effect,
loaded identically. Presumably, therefore, the weaker of
4.5 Cyclic Side Thrust Load Test the two arms will fail in the test.
on Arms
4.5.3 Procedures
A cyclic outward side thrust load is
applied to an arm of the chair at a rate
of 20 cycles per minute. The load is
applied to the approximate midpoint
along the length of the arm normal to
the vertical plane of the arm. The test
is begun at the 50-pound load level.
Loads are increased in increments of
25 pounds after 25,000 cycles have
been completed at each preceding load
level. Loads are increased every
25,000 cycles until the chair suffers
disabling damage or meets the desired
acceptance level.
5
FNR-179
4.6.2 Test Set-Up disabling damage occurs or the chair meets the desired
The test is carried out in the testing machine frame as acceptance level.
shown in Figure 7. The chair is secured to the test
platform with a length of chain looped twice around the
4.7 Cyclic Fatigue Test of Swivel
base. A small chain binder is used to provide sufficient Bearings
tension on the chain to hold the chair in place. In
4.7.1 Summary of Method
addition to chains, small squares of plywood with holes
cut in them may be attached to the face of the platform to This test evaluates the endurance of the swivel system
contain the casters and keep the chair from rolling. The to cyclic rotating actions. It consists of fully rotating the
load frame is attached to a cross pipe at the top of the base 360 degrees in alternate directions while keeping
main testing frame by means of a scaffolding clamp. the seat fixed in position.
The load frame is equipped with a dual wheel load head 4.7.2 Test Set-Up
in order to distribute the load over a portion of the seat
corresponding to the area normally occupied by a human The test set-up is shown in Figure 8. An exploded
subject. view of the test platform is shown in Figure 9. The
platform is rotated by means of a 20-inch diameter
4.6.3 Procedures pulley and belt, driven by an air gear motor or a revers-
Vertical loads are applied to the seat at a rate of 20 ible electric gear motor equipped with a 2-inch diameter
cycles per minute at a point 2 inches in front of the drive pulley. The motor is secured to a base plate that is
longitudinal axis of the spindle. The test is started at the connected to two 1-1/2 inch upright pipes by means of
200-pound load level; loads are increased in increments U-bolts. One end of the plate is mounted to a length of
of 100 pounds after 25,000 cycles have been completed 2-inch diameter pipe that fits over one of the two 1-1/2
at each preceding load level. The casters are turned at inch uprights and is free to rotate. The bottom of this
right angles to the legs so that all legs are subjected to pipe rests on the floor flange used to connect the 1-1/2
torsional forces. Testing continues until some type of inch upright to the platform on which the complete
assembly rests. The other end of the
plate is attached to the other 1-1/2-
inch upright by means of a single U-
bolt. The nuts on this U-bolt are
tightened, or adjusted, in order to
obtain the desired belt tension.
The rotating platform sits on four
casters that support the platform on its
undersides. Small squares of plywood
with holes cut into them are attached
to the face of the rotating platform to
contain the casters and keep the chair
from rolling out of the testing plat-
form. Straps are looped around the
arms and then attached to the pipes to
keep the seat from rotating during the
test. An air cylinder is used to lift the
load off the seat when the chair is
being inserted or removed from the
test jig. This cylinder is attached to an
overhead crossbar of the testing
machine frame by means of a cylinder
attachment assembly, Figure 28.
4.7.3 Procedures
The chair is secured to a platform
Figure 5. Test set-up for cyclic vertical load test on one arm. that is rotated a full 360 degrees in
6
FNR-179
each direction at a rate of 10 times per minute. A static platform with a length of chain looped twice around the
load of 200 pounds is placed on the chair with its center base. A small chain binder is used to provide sufficient
of gravity located 4 inches in front of the longitudinal tension on the chain to hold the chair in place. An air
axis of the spindle. The load is increased every 25,000 cylinder is attached in a vertical position to a crossbar of
cycles by 25 pounds. The rotating platform—with the the main testing machine frame by means of a cylinder
chair base attached—is rotated beneath the chair while attachment assembly, Figure 28. The rod end of the
the loaded seat is prevented from rotating. The amount of cylinder is attached to a short length of chain that, in
torque required to cause the chair to rotate from a turn, is attached to the dead weights that are used to load
stopped position is measured every 25,000 cycles. The the seat of the chair.
200-pound load is left in place while the torque measure- A small cylinder is then clamped in a vertical position
ment is taken. Testing is continued until the torque rises to the arm of the chair. The rod end of this cylinder is
above the acceptance level or the chair completes the attached to the seat height adjustment lever by means of
desired number of test cycles. a length of small chain. This cylinder is used to activate
the seat height adjustment mechanism. In those cases
4.8 Cyclic Pneumatic Height Adjustment where the chair has no arm, a bracket must be clamped to
Durability Test the seat that will provide a point of support for the
cylinder in much the same manner as an arm provides
4.8.1 Summary of Method
support.
This test determines the durability of the seat height
adjustment mechanism. It consists of applying loads to 4.8.3 Procedures
the seat of the chair in a prescribed sequence both while The test is begun with the seat in its highest position
the adjustment mechanism is activated and deactivated. and the seat adjustment deactivated. The height adjust-
ment mechanism is tested using a four-part cycle as
4.8.2 Test Set-Up
follows:
The test is carried out in the testing machine frame as
shown in Figure 10. The chair is secured to the test A. Seat is loaded with 250 pounds.
B. Load is removed.
C. Load is reapplied and adjust-
ment mechanism is activated.
D. Load is removed and adjustment
mechanism remains activated until
seat ascends to highest position,
whereupon it is inactivated.
The entire cycle is repeated at a rate
of 5 cycles per minute. The test is
continued until some part of the
adjustment system malfunctions or
the chair meets a desired acceptance
level.
7
FNR-179
4.10.3 Procedures
Figure 7. Set-up for cyclic vertical load test on seats, bases, The back stability test is conducted as follows:
and casters.
8
FNR-179
A. The chair is placed on a level test platform at the casters, in turn, run in two tracks constructed of 4-inch
lowest seat height setting. wide channel iron. Obstacles are mounted on the surface
B. The base and casters are placed in their most of the test platform in accordance with the diagram given
unstable position. in Figure 15.
C. A 1-inch high obstruction is placed behind the two The chair is held in place by a U-bolt that passes
rearward casters. around the stem of the chair and is secured in turn to a
metal plate that is welded to the end of a 2-inch pipe.
D. The front edge of the seat is loaded with 50 pounds This pipe is then attached to two vertical pipes, which
applied in a manner similar to that used in the front are parts of the main testing machine frame, by means of
stability test. scaffolding clamps. The function of these two vertical
E. A horizontal front-to-back load is applied to the top pipes is to keep the chair from moving from side to side
of the backrest. The force required to overturn the chair as the test platform rolls back and forth.
multiplied by the height from the platform to the top of The back and forth motion of the platform is provided
the backrest is recorded as the measure of back stability. by a crank arm system (for purposes of safety, a disk
should be used—at least 30 inches in diameter) and push
4.11 Caster and Base Durability Test rod. The crank arm is attached to a gear reducer unit that
4.11.1 Summary of Method in turn is driven by an electric motor. A 3/4 inch steel
The objective of the test is to evaluate the durability of push rod equipped with rod ends on both ends is then
the chair base and casters in response to the forces and attached to the crank arm and to the test platform as
wear caused by the user moving the chair backward and shown in Figure 13.
forward. An air cylinder is attached to an overhead crossbar of
the testing machine frame by means of a cylinder
4.11.2 Test Set-Up attachment assembly, Figure 28. This cylinder is used to
The chair is placed on the test platform as shown in lift the load off the seat when the chair is being inserted
Figure 13 and Figure 14. The test vehicle consists of a or removed from the test jig.
movable platform mounted on 4-inch casters. The
4.11.3 Procedures
A chair with casters is mounted on
the moveable platform as shown in
Figure 13. A 300-pound load is
applied to the chair seat with the chair
spindle fully extended. The base is
attached to a mechanical device that
exerts a horizontal push and pull of
from 30 inches to 34 inches as
illustrated in the figure. The base and
casters are free to rotate and swivel.
The machine operates continuously at
a rate of 8 to 10 cycles per minute
with a maximum speed of 50 feet per
minute. One cycle consists of a
forward and backward stroke of the
mechanical device. Testing continues
until the base or a caster suffers
structural breakage, loss of service-
ability, or a failure that would in any
way cause personal injury to the
occupant or bystanders, or, the
desired acceptance level is met.
9
FNR-179
4.13.3 Procedures
The control and spindle shall be
detached from the chair and tested as
follows:
Test A) Apply a torque of 100 foot-
pounds to turn or displace the spindle
from the control by use of a tool such as a
torque-wrench.
Test B). Apply a force of 1,500 pounds
to the spindle in the direction of its
Figure 10. Cyclic pneumatic height adjustment durability test set-up.
10
FNR-179
removal from the control at the rate of 0.100 to 0.125 attached to the free ends of the nipples. Finally, two
inch per minute. short extension shafts are attached to each elbow to make
When a free swiveling fitting is used to attach the the tire-head unit complete. These extension shafts are
spindle to the control, Test A may be disregarded. made to fit into mating 2-inch diameter extension shafts
on the lower ends of the internal load frame. The load
5. Acceptance Levels head frame and the internal load frame are then joined
together by means of bolts as shown in Figure 17.
The acceptance levels given below are those specified
in FNEW 83-269, “Performance Tests for Intensive Use The external load frame consists of two vertical
Chairs.” extension shaft sleeve bearings that are joined together at
one end by two tees and a crossbar to
form a second U-shaped frame. Diameter
Test Acceptance Level of the pipe used in the internal frame is 1-
4.1 Cyclic Back and Back Tilt 1,000,000 cycles 1/2 inch, whereas the diameter of the pipe
Mechanism Fatigue Test used in the external frame is 2 inches.
4.2 Cyclic Increasing Back Load Test Complete 175 lb load level These frames are adjusted during con-
4.3 Cyclic Pneumatic Back Tilt or Not Specified struction so that the internal extension
Seat Inclination Adjustment Test frame is free to slide up and down inside
4.4 Cyclic Vertical Load Test on One Arm Complete 250 lb load level
the external frame.
4.5 Cyclic Side Thrust Load Test on Arms Complete 200 lb load level The center crossbar of the internal
frame has two holes drilled into it so that
4.6 Cyclic Vertical Load Test Complete 1300 lb load level
two clevises can be attached to it. These
on Seats, Bases, and Casters
clevises provide points of attachment for
4.7 Cyclic Fatigue Test of Swivel Bearings Max. 150 lb-in at 300 lb load on seat the rod ends of the cylinders.
4.8 Cyclic Pneumatic Height 125,000 cycles
The crossbar of the external frame is
Adjustment Durability Test
just long enough to accommodate three
4.9 Front Stability Test Min. 125 lbs scaffolding clamps, Figure 18. The center
4.10 Back Stability Test Min. 1450 lb.-in. scaffolding clamp is used to attach the
4.11 Caster and Base Durability Test 36000 Cycles complete load frame to the testing ma-
chine frame. Short lengths of pipe (4
4.12 Fabric Durability Test
inches long) are attached with scaffolding
4.13 Spindle Attachment Tests Spindle shall remain unmoved after clamps on either side. These pipes are a
completion of Test A or Test B.
part of the cylinder attachment assemblies,
Figure 28, and serve as points of attach-
6. Specific Test Equipment ment for the air cylinders. The air cylinders are aligned
parallel to the longitudinal axis of the load frame. As the
6.1 Vertical Load Frame cylinders extend and retract in operation, the internal
An exploded view of the construction of a typical load frame necessarily follows. The action of the air
vertical load frame used in the vertical load test on seats cylinders is thereby transmitted to the load frame that, in
(4.6) is shown in Figure 16. The load frame consists of turn, transmits it in a controlled and directed manner to
three basic units—an internal and an external load frame the seat of the chair. Length of retraction of the internal
and tire load head. The internal frame consists of two frame in an upward vertical direction is controlled by the
vertical extension shafts that are joined together at one air pressure supplied to the cylinders, the length of the
end by two reducing tees and a crossbar to form a U- cylinders, or by stop collars on the shafts of the internal
shaped frame. frame. The extension movement is limited by the
resistance provided by the seat or by the length of stroke
The tire load head is constructed as follows. A pair of
of the cylinder. Side and front views of the vertical load
pipe flanges is bolted to the rim of each tire. The two 11
head are given in Figure 19. A bill of materials for each
x 4 smooth tread tires are then joined to each other by
of the seat load frames is given below.
means of a 1-1/2-inch diameter pipe nipple screwed into
the pipe flanges. Another nipple is then screwed into the
pipe flanges on the outside of each tire. Elbows are next
11
FNR-179
6.1.1 Bill of Materials for Vertical Load Frame: a crossbar to form a U-shaped frame. The external frame
Internal Load Frame consists of two extension shafts (sleeve bearings) joined
2 extension shafts, 1-1/2 inch x 44 inches together at one end by a crossbar to form a second U-
2 reducing tees, 1-1/2 inch x 1-1/2 inch x 2 inches shaped frame. These pipes are 1-1/4 inches in diameter,
1 crossbar 1-1/2 inch x 10 inches however, so that the internal frame is free to slide within
2 extension shafts, 2 inches x 4 inches it. Crossed tees, attached to the two free ends of the
2 ells, 1-1/2 inch extension shaft sleeve bearings of the external frame act
2 extension shafts, 1-1/2 inch x 4 inches as bearings for a shaft inserted through them. These two
2 crossbars, 1-1/2 inch x 2 inches bearings together with the 1-inch diameter pipe inserted
1 center crossbar, 1-1/2 inch x 4 inches through them form part of a hinge that allows the
4 pipe flanges, 1-1/2 inch backrest load frame to pivot up and down and thereby
2 pneumatic tires, 4.10 - 5HNS follow the natural movement of the backrest as the load
head pushes against it.
External Load Frame
2 extension shaft sleeve bearings, 2 inches x 16 inches, The other half of the hinge is formed by a tee attached
heavy wall to the end of the 1-1/2 inch diameter pipe that acts as a
2 tees, 2 inches x 2 inches x 2 inches vertical load frame swivel column. This pipe, or swivel
1 crossbar, 1-1/2 inch x 5 inches support column, in turn, fits inside of a two-inch diam-
1 crossbar, 2 inches x 10 inches eter heavy wall sleeve (swivel sleeve bearing - schedule
80 pipe), Figure 21. This two-inch sleeve is firmly
6.2 Backrest Load Frames attached to the testing machine frame in a vertical
The load frames for testing the backrests are similar to position by means of scaffolding clamps; the 1-1/2 inch
those for testing seats, but important differences do exist, diameter pipe is free to rotate within it so that the load
Figure 20. Again, each load frame consists of two basic frame and the load head attached to it are free to swing
units—an internal and an external frame. The internal from side to side. The 1-1/2 inch diameter pipe is
frame consists of two extension shafts constructed of 1- prevented from sliding out of the two-inch diameter
inch diameter pipes that are joined together at one end by sleeve by means of a pin, which passes through the inner
pipe near its upper end, Figure 22. This
pin rides on the upper end of the sleeve
and carries the full weight of the load
frame apparatus. A shallow V-groove is
cut into the top of the sleeve so that the
weight of the backrest load frame acting
on the pin causes the pin to index into the
bottom of the groove in the same location
each time the cylinder retracts. This
arrangement allows the load frame and
load head to follow any side to side
movement of the backrest during a load
cycle and then return and index in the
proper starting position automatically on
the unload cycle.
The head of the air cylinder is sup-
ported by means of a small chain that is
looped over the hinge pin and the body of
the cylinder. Ends of the chain are joined
together by means of a spring that allows
some movement of the cylinder and
thereby avoids binding. The cylinder
should be positioned in the frame so that
the rod-end of the piston rod fits into the
eye of the clevis without applying
Figure 11. Front stability test set-up.
12
FNR-179
sidethrust force to the piston rod. If a clevis with a however, the weight at the rear of the external load frame
slightly oversized opening is used to attach the rod-end- causes the entire load frame to return to its original
bearing to the load frame, and if it is turned so that the starting position. Normally, the weight of the air cylin-
pin is in a vertical position, it will allow the rod-end der is sufficient to cause this action without the addition
bearing to slide up and down on the pin slightly and thus of external weights.
relieve any accompanying side thrust forces on the piston The load head is attached to the end of the load frame
rod as the load frame extends and retracts as it deflects by means of a rod-end and bracket, Figures 21 and 22.
under load. Clearances between the bracket, the rod-end, and the end
The rear end of the air cylinder, which is equipped of the load frame are such that the load head itself is free
with a clevis, is attached to the external load frame by to pivot both up and down and rotate from side to side
means of a male rod-end-bearing. The body of the predetermined amounts about the rod-end. This freedom
bearing passes through the crossbar of the external load of movement allows the load head to adjust to local
frame and is secured with a nut on the opposite side. changes in the shape and angle of the backrest.
A 1/4-inch or 5/16-inch diameter U-bolt is attached to 6.2.1 Bill of Materials for Backrest Load
the crossbar of the load frame as shown in Figure 21—a
Frame:
slightly modified U-bolt system is shown in Figure 20.
This U-bolt provides a point of attachment for the Internal Load Frame
turnbuckle/chain linkage that controls the angle of the 2 Ells, 1 inch
load frame with respect to the horizontal. 2 extension shafts, 1 inch x 48 inches
1 crossbar, 1 inch x 6 inches
The complete linkage is shown in Figure 20. The rear External Load Frame
of the external load frame should be weighted so that the 2 reducing tees, 1 inch x 1-1/4 inches
total load frame is just balanced when the internal load 1 crossbar, 1 inch x 5-1/2 inches
frame is fully extended. If the backrest deflects down- 2 extension shaft sleeve bearings,
ward as it is loaded, the load head and load frame are 1-1/4 inch x 16 inches
free to follow. When the internal load frame retracts, 4 tees, 1-1/4 inch
2 close nipples, 1-1/4 inch (to form
crossed tees)
4 close nipples, 1-1/4 inch (for bearings
in crossed tees)
1 cross pin, 1 inch x 12 inches
2 end caps, 1 inch (for cross pin)
Swivel Support Column
1 tee, 1-1/4 inch
1 close nipple, 1-1/4 inch
1 reducing coupling, 1-1/2 to 2 inch
1 swivel column, 1-1/2 inch x 20 inches
1 swivel column sleeve bearing, 2
inches x 18 inches (heavy-wall pipe)
13
FNR-179
Articulation of the load head is governed by the opening the testing machine. An extra cylinder is required, of
width of the clevis and by the location of the hole. Some course, if this latter procedure is followed.
experimentation may be necessary to determine the When calibrating cylinders at high pressure levels, the
optimum location for the specific rod-end used. In cylinders may cause near impact loading on the force
general, however, the load head should have sufficient dynamometer that may damage the interior force-
freedom of movement to follow the deflection of the indicating mechanism. Speed control valves should be
backrest without binding. used to reduce the rate of loading.
6.3 Load Calibration 6.4 Testing Machine Frame
A force dynamometer may be used to calibrate and The external testing machine frames previously shown
periodically monitor the force exerted by the air cylin- consist of a rectangular skeletal steel framework fabri-
ders on the furniture. One such force dynamometer and cated from pipe and scaffolding clamps. This framework
an accompanying load frame are shown in Figure 24. provides points of attachment for the various devices that
This dynamometer has a 1000-pound load capacity and are used to apply loads to the furniture, and it also
an 8-inch diameter face that has been divided into 5- provides a means of supporting and holding the furniture
pound increments for easy reading. A frame constructed in place while it is being tested. Overall size of the
from pipe and scaffolding clamps in which the dyna- testing machine is not critical, but it must provide
mometer and an air cylinder can be placed for calibration sufficient space for the chair and loading apparatus to be
is also shown. Desired force levels are obtained by mounted properly as well as sufficient space for servic-
adjusting the air regulator while the air valve is operating ing the equipment. A typical testing machine framework
at its normal cyclic rate. Design of the testing equipment is shown in Figure 25. Corner posts about 9-feet high
is such that a cylinder can readily be detached from the are anchored to the floor.
testing machine and inserted in the calibration frame.
When matched cylinders are used, however, a spare Crossbars are attached to these posts to form the frame
cylinder mounted in the calibration frame can be used to of the machine. All of the frame members are con-
calibrate identical cylinders without removing them from structed of nominal 2-inch diameter pipe. Lightly loaded
members, and in particular, columns may
be constructed of schedule 40 pipe;
heavily loaded crossbars, on the other
hand should be constructed of schedule
80 pipe. Scaffolding clamps, Figure 26,
are used to join the members together to
form a rigid frame. The frame is attached
to the floor by means of special floor
flanges, Figure 27. These flanges are
particularly useful for attaching the frame
corners to anchor bolts set in concrete
floors. Standard floor flanges may be
used for attaching the frame corners to
wooden or similar floors.
The scaffolding clamps provide
considerable rigidity to the frame, and it
should not be necessary to brace the
frame in any way. Should this prove
necessary, however, additional pipes and
clamps may be used to insert diagonals in
the side frames.
The frame should be given regular
maintenance while testing; specifically,
the setscrews in the scaffolding clamps
should be regularly inspected and tight-
Figure 13. Caster and base durability test set-up, front perspective. ened if necessary. Scaffolding clamps
14
FNR-179
Figure 15. Obstacle layout for caster and base durability test.
15
FNR-179
6.5.1 Cylinder length of chain or a strap, and a spring. One leg of the
Attachment Assembly cylinder support assembly is inserted into the top end of
The air cylinders are an upright to which a cylinder attachment assembly is
attached to the main frame of connected. The chain is then looped over the horizontal
the testing machine by means arm of the cylinder support frame, around the barrel of
of a male rod-end and a short the air cylinder, and connected to itself by means of a
length (4-inch long) of 2-inch small spring. The strap or chain and spring should be
diameter pipe, Figure 28, adjusted so that no side thrust forces are applied to the
which will be called a shaft of the cylinder.
cylinder attachment assem-
bly. The 4-inch long pipe has
a 1/2-inch diameter hole
drilled through it crossways
at mid length that receives
the threaded portion of a rod-
end. After the rod-end is
inserted in the hole, it is held
in place by external and
internal nuts, Figure 28. An
attachment of a cylinder to
the testing machine frame is
shown in Figure 29.
16
FNR-179
Figure 22. Exploded view of backrest frame hinge. Figure 23. Configuration of backrest foundation load
head.
17
FNR-179
18
FNR-179
19
FNR-179
NEW 9/01
It is the policy of the Purdue University Cooperative Extension Service, David C. Petritz, Director,
that all persons shall have equal opportunity and access to the programs and facilities without regard to race, color, sex, religion, national
origin, age, marital status, parental status, sexual orientation, or disability.
Purdue University is an Affirmative Action employer.
This material may be available in alternative formats.
1-888-EXT-INFO
http://www.fnr.purdue.edu http://www.agcom.purdue.edu/AgCom/Pubs
20