0% found this document useful (0 votes)
151 views

Bill of Quantities - Pile Work

Uploaded by

VIVEK KUMAR
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
151 views

Bill of Quantities - Pile Work

Uploaded by

VIVEK KUMAR
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 2

Pile Foundation Works

Bill of Quantities Price Schedule


Reach Airia at Sector 68,
Gurgaon
ABSTRACT SHEET

Pile Works at __________ Mall, Sector 68, Gurugram

Item Previous This Bill Cummulativ Previous This Bill Cummulative Remark
Description of Item Unit Quantity Rate
No. Quantity Quantity e Quantity Amount Amount Amount s

Reinforcement Sreel will be supplied by Client free of cost.


Part 1 - Pile Work

1 CONSTRUCTION OF PILES
BORED CAST-IN SITU PILES
Construction of Piles (Boring, Placing, casting and installing) cast in situ under
reamed single bulb piles of specified diameter and length below pile cap in M-25
cement concrete (ready mix concrete), to carry a safe working load not less than
specified, excluding the cost of steel reinforcement but including the cost of
boring, admixture as approved, single bulb, bentonite solution and the length of
the pile to be embedded in pile cap etc. all complete.
(Length of pile for payment shall be measured upto to the bottom of pile cap).
Nothing extra will be paid for dismatling of pile over pile cap.
Contractor to do with TMR Method for pile boring and making of bulb's
method can do with Augar & Pouring of concrete through Tremie Pipe.

1. Placing & Filling of Pile Concrete work shall be as per IS-456 (latest edition)
characteristic strength (28 days) shall be 25 N/Sq mm as may be specified on
drawings.
Note : All arrangement or cordination, handling of RMC (Supplied by
Client free of Cost) for casting of pile, and supplier of concrete, cube
testing, documents, reports, should be arranged by the contractor at
specified lab as instruction by Site Incharge.

1.1 400 mm dia piles Rmt 990 825 50 50 - 41,250 41,250

Providing additional bulb in under reamed piles, under specified dia meter (Only
the quantity of extra bulbs are to be paid).
1.2 Nos 66 825 5 5 - 4,125 4,125
Pile Bulb Size - 40% Extra or (as per IS standrad) of Pile Dia & Depth of
Bulb approximate 1.0 M.
2 Providing & fixing in position DEFORMED STEEL BAR REINFORCEMENT
(Reinforcement conforming to have minimum yeild strength f = 415M/mm2 ) with
helical ties, including straightening, cleaning, decoiling, cutting, bending &
binding to required shapes and lengths as per desing and details, binding it by
Galvanised binding wire (16 SWG) at every intersection, supplying and placing
with proper cover blocks as per drawing and specifications, supports, overlaps,
inner rings welding to main longitudinal rods to form a rigid cage, providing guide
bar, ensuring exposed reinforcement to be kept clean & intact with cement wash
etc. for basic pile length.The laps of main vertical reinforcement bars shall be fillet
welded.The welding length & welding electrode & welding method shall be as per
the drawing, specification and conforming to IS/American Welding Society (AWS)
standard, labours, tools & tackles etc., for all heights and depths, etc.
complete as per the specifications and directions of Engineer-in-Charge.
(Note: Reinforcemnt Steel will be supplied by Client free of cost.)

2.1 Thermo Mechanically Treated all dia bars - Main Civil Works MT R/O 4600 4.5 4.5 - 20,700 20,700
2.2 Thermo Mechanically Treated all dia bars - Pile Cage Steel Works MT 9.0 4600 0 - - -
PILE TESTING
3.1 Carrying out specified INITIAL cyclic load test on test piles as specified in IS
2911 / American Standards, including all plant, equipment, machinery, jacks,
instruments, measuring devices, finishing pile head, structural frame for platforms
and Kentledge, pile caps, dismantling and carting away entire set-up,
labour, compaction,excavation and back-filling and dewatering etc., all
complete as per the specifications and directions of Engineer-in-Charge, analysing
the results, making the report and submitting the same in 3 copies (Excluding cost
of pile).

i) 400 mm dia. - 20 MT Ultimate Load Capecity Nos 1 55,000 0 - - -


Part 01 - Total For Pile Work : - 66,075 66,075
Goods & Service Tax - GST@ 18% - 11,894 11,894
Part 01 - Total For Pile Work : - 77,969 77,969

3
Pile Foundation Works
Bill of Quantities Price Schedule
Reach Airia at Sector 68,
Gurgaon
ABSTRACT SHEET

Pile Works at __________ Mall, Sector 68, Gurugram

Item Previous This Bill Cummulativ Previous This Bill Cummulative Remark
Description of Item Unit Quantity Rate
No. Quantity Quantity e Quantity Amount Amount Amount s

Reinforcement Sreel will be supplied by Client free of cost.


Part 1 - Pile Work

1 CONSTRUCTION OF PILES
BORED CAST-IN SITU PILES
Construction of Piles (Boring, Placing, casting and installing) cast in situ under
reamed single bulb piles of specified diameter and length below pile cap in M-25
cement concrete (ready mix concrete), to carry a safe working load not less than
specified, excluding the cost of steel reinforcement but including the cost of
boring, admixture as approved, single bulb, bentonite solution and the length of
the pile to be embedded in pile cap etc. all complete.
(Length of pile for payment shall be measured upto to the bottom of pile cap).
Nothing extra will be paid for dismatling of pile over pile cap.
Contractor to do with TMR Method for pile boring and making of bulb's
method can do with Augar & Pouring of concrete through Tremie Pipe.

1. Placing & Filling of Pile Concrete work shall be as per IS-456 (latest edition)
characteristic strength (28 days) shall be 25 N/Sq mm as may be specified on
drawings.
Note : All arrangement or cordination, handling of RMC (Supplied by
Client free of Cost) for casting of pile, and supplier of concrete, cube
testing, documents, reports, should be arranged by the contractor at
specified lab as instruction by Site Incharge.

1.1 400 mm dia piles Rmt 990 825 50 20 70 41,250 16,500 57,750

Providing additional bulb in under reamed piles, under specified dia meter (Only
the quantity of extra bulbs are to be paid).
1.2 Nos 66 825 5 2 7 4,125 1,650 5,775
Pile Bulb Size - 40% Extra or (as per IS standrad) of Pile Dia & Depth of
Bulb approximate 1.0 M.
2 Providing & fixing in position DEFORMED STEEL BAR REINFORCEMENT
(Reinforcement conforming to have minimum yeild strength f = 415M/mm2 ) with
helical ties, including straightening, cleaning, decoiling, cutting, bending &
binding to required shapes and lengths as per desing and details, binding it by
Galvanised binding wire (16 SWG) at every intersection, supplying and placing
with proper cover blocks as per drawing and specifications, supports, overlaps,
inner rings welding to main longitudinal rods to form a rigid cage, providing guide
bar, ensuring exposed reinforcement to be kept clean & intact with cement wash
etc. for basic pile length.The laps of main vertical reinforcement bars shall be fillet
welded.The welding length & welding electrode & welding method shall be as per
the drawing, specification and conforming to IS/American Welding Society (AWS)
standard, labours, tools & tackles etc., for all heights and depths, etc.
complete as per the specifications and directions of Engineer-in-Charge.
(Note: Reinforcemnt Steel will be supplied by Client free of cost.)

2.1 Thermo Mechanically Treated all dia bars - Main Civil Works MT R/O 4600 4.5 3.5 8 20,700 16,100 36,800
2.2 Thermo Mechanically Treated all dia bars - Pile Cage Steel Works MT 9.0 4600 0 - - -
PILE TESTING
3.1 Carrying out specified INITIAL cyclic load test on test piles as specified in IS
2911 / American Standards, including all plant, equipment, machinery, jacks,
instruments, measuring devices, finishing pile head, structural frame for platforms
and Kentledge, pile caps, dismantling and carting away entire set-up,
labour, compaction,excavation and back-filling and dewatering etc., all
complete as per the specifications and directions of Engineer-in-Charge, analysing
the results, making the report and submitting the same in 3 copies (Excluding cost
of pile).

i) 400 mm dia. - 20 MT Ultimate Load Capecity Nos 1 55,000 0 - - -


Part 01 - Total For Pile Work : 66,075.00 34,250 100,325
Goods & Service Tax - GST@ 18% 11,893.50 6,165 18,059
Part 01 - Total For Pile Work : 77,968.50 40,415 118,384

You might also like