Aladin Ka Chirag 2.0

price escalation
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
50 views58 pages

Aladin Ka Chirag 2.0

price escalation
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 58

INPUT DATA SHEET

Name of Work : XYZ


Engineer's Name : ABC

S.NO. NAMES NO. LENGTH WIDTH HEIGHT

1 SIZE OF PLOT 1 5.80 m 18.00 m https://bit.ly/3iNSNBW


2 BUILT UP AREA 97.00 sqm Civil GurujiCivil Guruji
3 EXCAVATION 1.20 m Civil GurujiCivil Guruji
4 SAND FILLING 0.10 m Civil GurujiCivil Guruji
5 PCC 0.10 m Civil GurujiCivil Guruji
6 PLINTH LEVEL 0.60 m
7 Ground FLOOR HT 3.20 m
8 PARAPET HT 1.00 m For Civil Guruji Website
9 FOOTING F1
RECTANGLE 12 1.60 m 1.60 m 0.20 m For Civil Guruji Application
TRAPEZOIDAL 12 0.45 m 0.65 m 0.15 m
FOOTING F2 Civil Guruji
RECTANGLE 4 1.50 m 1.50 m 0.20 m Civil Guruji
TRAPEZOIDAL 4 0.60 m 0.45 m 0.10 m Civil Guruji
Footing = Column ok Civil Guruji
10 COLUMN C1 12 0.25 m 0.45 m Civil Guruji
COLUMN C2 4 0.40 m 0.25 m Civil Guruji
11 GROUND BEAM 0.25 m 0.35 m
12 GROUND BEAM LENGTH
OUTER 45.00 m
INNER 28.00 m
13 DPC 0.05 m
14 FLOOR PCC 0.10 m
15 SILL BAND 0.10 m
16 LINTEL BEAM 0.20 m
17 SLAB BEAM 0.25 m 0.35 m
18 SLAB 0.13 m
19 Stair Case 1.175 m
20 Door Type 1 4
Door Type 2 2
21 Aluminumn Windoow W1 2 1.50 m 1.20 m
Aluminumn Windoow W2 2 1.50 m 1.20 m
22 No. of Floors G + 03
23 Different floors Beam Length
OUTER 45.00 m
INNER 40.00 m
24 Door Type 1 4
Door Type 2 2
25 Aluminumn Windoow W1 2 1.50 m 1.20 m
Aluminumn Windoow W2 2 1.50 m 1.20 m
26 FLOOR HT 3.00 m
27 COLUMN C1 14 0.25 m 0.45 m
COLUMN C2 2 0.40 m 0.25 m
28 PARAPET COLUMN 6 0.25 m 0.45 m 1.00 m
29 PARAPET WALL 45.00 m 0.10 m 1.00 m
DETAILED ESTIMATION
S.NO. DESCRIPTION/ITEMS NO. OF ITEMSLENGTH WIDTH HEIGHT AREA VOLUME Weight Unit REMARK

1 SITE CLEANING 1 7.8 20 19.00 Sqm


2 EXCAVATION
F1 12 2.2 2.2 1.2 69.70 300 mm Extra
F2 4 2.1 2.1 1.2 21.17 300 mm Extra
TOTAL EXCAVATION 90.86 Cum
3 SAND FILLING
F1 12 2.2 2.2 0.1 5.81
F2 4 2.1 2.1 0.1 1.76
TOTAL SAND FILLING 7.57 Cum
4 PCC
F1 12 2.2 2.2 0.1 5.81
F2 4 2.1 2.1 0.1 1.76
TOTAL PCC 7.57 Cum
5 FOOTING
F1
CONCRETE ( Rectangle ) 12 1.6 1.6 0.2 6.14
CONCRETE ( Trapizidal part ) 12 0.45 0.65 0.15 2.23
F2
CONCRETE ( Rectangle ) 4 1.5 1.5 0.2 1.80
CONCRETE ( Trapizidal part ) 4 0.6 0.45 0.1 0.44
TOTAL CONCRETE QUANTITY 10.61 Cum
SHUTTERING F1 12 6.4 0.2 15.36
SHUTTERING F2 4 6 0.2 4.80
TOTAL SHUTTERING QUANTITY 20.16 Sqm
STEEL 666.60 KG
6 COLUMN UPTO GF
SUB - STRUCTURE
CONCRETE C1 (FICI) 12 0.25 0.45 1.25 1.69
CONCRETE C2 (F2C2) 4 0.4 0.25 1.3 0.52
TOTAL CONCRETE QUANTITY 2.21 Cum
SHUTTERING C1 12 1.4 1.25 21.00
SHUTTERING C2 4 1.3 1.3 6.76
TOTAL SHUTTERING QUANTITY 27.76 Sqm
STEEL 346.58 KG
SUPER - STRUCTURE UPTO GF
CONCRETE C1 (FICI) 12 0.25 0.1 3.2 0.96
CONCRETE C2 (F2C2) 4 0.4 0.25 3.2 1.28
TOTAL CONCRETE QUANTITY 2.24 Cum
SHUTTERING C1 12 1.4 3.2 53.76
SHUTTERING C2 4 1.3 3.2 16.64
TOTAL SHUTTERING QUANTITY 70.40 Sqm
STEEL 351.68 KG
7 BACKFILLING 86.33 Cum 35 % extra
8 B/W FOR SUB-STRUCTURE PART (ONE LINE + UPTO DPC)
OUTER 45 0.2 0.2 1.80
INNER 28 0.1 0.2 0.56
2.36 Cum
9 GROUND BEAM
CONCRETE 73 0.25 0.35 6.39 Cum
SHUTTERING 146 0.35 51.10 Sqm
STEEL 732.97 KG
10 DPC ( Sub Strucutre ) 73 0.25 18.25 Sqm
11 BITUMIN COAT 73 0.25 18.25 Sqm
12 PLINTH FILLING 0.5 39.75 Cum
13 FLOOR PCC 0.1 7.95 Cum
14 B/W UPTO SUPER-STRUCTURE
OUTER 45 0.2 2.5 18.00
INNER 28 0.1 2.5 6.09
24.09 Cum
15 SILL BAND
CONCRETE ( OUTER ) 36 0.2 0.1 0.72 80%
CONCRETE ( INNER ) 22.4 0.1 0.1 0.22 80%
TOTAL QUANTITY 0.94 Cum
STEEL 40.12 KG
16 LINTEL BEAM
CONCRETE ( OUTER ) 45 0.2 0.2 1.80
CONCRETE ( INNER ) 28 0.1 0.2 0.56
2.36 Cum
SHUTTERING
a) OUTER 90 0.2 18.00 2 Side
b) INNER 56 0.2 11.20
29.20 Sqm
STEEL 270.81 KG
17 DPC ( Super Structure ) 9.64 Sqm
18 SLAB BEAM
CONCRETE 73 0.25 0.35 6.39 Cum
SHUTTERING ( SIDE ) Inner Beam 28 0.45 12.60 H = both side adding
SHUTTERING ( SIDE ) Outer Beam 45 0.575 25.87 H = both side adding
SHUTTERING ( BOTTOM ) 73 0.25 18.25
SHUTTERING 56.72 Framed Structure type
STEEL 958.12 KG
19 SLAB
CONCRETE 0.125 9.94 Cum
SHUTTERING 79.51 Sqm
STEEL 993.81 KG
20 STAIR CASE
CONCRETE 2.35 Cum Approimation
SHUTTERING 15.86 Sqm Approimation
STEEL 352.50 KG
21 PLASTER 386.30
SLAB PLASTER 79.51
465.81 Sqm
22 PAINTING
DETAILED ESTIMATION
S.NO. DESCRIPTION/ITEMS NO. OF ITEMSLENGTH WIDTH HEIGHT AREA VOLUME Weight Unit REMARK

WHITEWASH 465.81 Sqm


PUTTY 465.81 Sqm
PAINTING 465.81 Sqm
23 FLOORING 79.51
SKIRTING 10.10
89.60 Sqm
24 DOOR
DOOR FRAME 1 4 4.00 No.
DOOR FRAME 2 2 2.00 No.
DOOR SHUTTER 1 4 4.00 No.
DOOR SHUTTER 2 2 2.00 No.
25 DOOR FITTING ITEMS
L-Drop 6 6.00 No.
Latch 6 6.00 No.
Handle 12 12.00 No.
Door Stopper 6 6.00 No.
Tower Bolt 6 6.00 No.
Hinges 18 18.00 No.
26 ALUMINIUM WIDOW
W1 2 1.5 1.2 3.60
W2 2 1.5 1.2 3.60
7.20 SQM

2 ALL FLOORS ABOVE GROUND FLOOR 3


1 COLUMN
CONCRETE C1 (FICI) 14 0.25 0.45 3 14.18
CONCRETE C2 (F2C2) 2 0.4 0.25 3 1.80
TOTAL CONCRETE QUANTITY 15.98 Cum
SHUTTERING C1 14 1.4 3 176.40
SHUTTERING C2 2 1.3 3 23.40
TOTAL SHUTTERING QUANTITY 199.80 Sqm
STEEL 2508.08 KG
3 DPC ( Super Strucutre ) 39.00 Sqm
4 BITUMIN COAT 39.00 Sqm
5 B/W UPTO NEXT FLOOR
OUTER 45.00 0.2 2.3 49.68
INNER 40.00 0.1 2.3 24.01
73.69 Cum
6 SILL BAND
CONCRETE ( OUTER ) 36.00 0.2 0.1 2.16 80%
CONCRETE ( INNER ) 32.00 0.1 0.1 0.96 80%
TOTAL QUANTITY 3.12 Cum
STEEL 132.60 KG
7 LINTEL BEAM
CONCRETE ( OUTER ) 45 0.2 0.2 5.40
CONCRETE ( INNER ) 40 0.1 0.2 2.40
7.80 Cum
SHUTTERING
a) OUTER 90 0.2 54.00
b) INNER 80 0.2 48.00
102.00 Sqm
STEEL 895.05 KG
9 SLAB BEAM
CONCRETE 85 0.25 0.35 19.16 Cum
SHUTTERING ( SIDE ) Inner Beam 40 0.45 18.00
SHUTTERING ( SIDE ) Outer Beam 45 3.225 145.13
SHUTTERING ( BOTTOM ) 85 0.25 21.25
SHUTTERING 553.13 Sqm
STEEL 2874.37 KG
10 SLAB
CONCRETE 0.125 34.72 Cum Approx
SHUTTERING 277.72 Sqm Approx
STEEL 3471.54 KG
11 STAIR CASE
CONCRETE 7.05 Cum
SHUTTERING 47.59 Sqm
STEEL 1057.50 KG
12 PLASTER 1359.36
SLAB PLASTER 277.72
1637.08 Sqm
13 PAINTING
WHITEWASH 1637.08 Sqm
PUTTY 1637.08 Sqm
PAINTING 1637.08 Sqm
14 FLOORING 238.52
SKIRTING 30.30
268.82 Sqm
15 DOOR
DOOR FRAME 1 4 12.00 No.
DOOR FRAME 2 2 6.00 No.
DOOR SHUTTER 1 4 12.00 No.
DOOR SHUTTER 2 2 6.00 No.
16 DOOR FITTING ITEMS
L-Drop 6 18.00 No.
Latch 6 18.00 No.
Handle 12 36.00 No.
Door Stopper 6 18.00 No.
Tower Bolt 6 18.00 No.
Hinges 18 54.00 No.
17 ALUMINIUM WIDOW
W1 2 1.5 1.2 10.80
W2 2 1.5 1.2 10.80
21.60 Sqm
DETAILED ESTIMATION
S.NO. DESCRIPTION/ITEMS NO. OF ITEMSLENGTH WIDTH HEIGHT AREA VOLUME Weight Unit REMARK

3 18 PARAPET COLUMN
CONCRETE 6 0.25 0.45 1 0.68 Cum
SHUTTERING 6 1.4 1 8.40 Sqm
STEEL 105.98 Kg
19 B/W FOR PARAPET WALL
OUTER 45 0.1 1 4.50 Cum
ABSTRACT SHEET
S.No. Description Unit Quantity Remark
1 GROUND FLOOR
1 EarthWork https://bit.ly/3iNSNBW
Site Cleaning sqm 156.00 Civil Guruji Civil Guruji
Excavation cum 90.86 Civil Guruji Civil Guruji

Sand Filling + Backfilling +plinth filling cum 133.65 Civil Guruji Civil Guruji
2 Cement Concrete Civil Guruji Civil Guruji
P.C.C (M-15) cum 15.52
R.C.C (M-25) ( Sub - Structure ) cum 19.21
R.C.C (M-25) ( Super - Structure ) cum 24.22 For Civil Guruji Website
D.P.C Sqm 27.89
Bitumin Coat Sqm 18.25 For Civil Guruji Application
3 Reinforcement
Reinforcement kg 4361.51
4 BrickWork
Total Brick Work Cum 26.45
5 Plastering Work
Wall plaster sqm 386.30
Slab Plaster sqm 79.51
6 Painting Work
White Wash sqm 465.81
Putty sqm 465.81
Paint sqm 465.81
7 Flooring
Flooring sqm 79.51
Skirting sqm 10.10
8 Door Work
DOOR FRAME 1 No. 4
DOOR FRAME 2 No. 2
DOOR SHUTTER 1 No. 4
DOOR SHUTTER 2 No. 2
9 Door Fitting Items
L-Drop No. 6
Latch No. 6
Handle No. 12
Door Stopper No. 6
Tower Bolt No. 6
Hinges No. 18
10 Aluminum work
ALUMINIUM FIXED FRAME Sft 77.47
11 Formwork
Up To Plinth Level (Footing, Column, Sqm
Ground beam) 99.02
Lintels + Slab beams Sqm 85.93
Column for Super- Structure Sqm 70.4
Slab Sqm 79.51
Staircase Sqm 15.86
2 ABOVE GROUND FLOOR
12 Cement Concrete
R.C.C (M-25) cum 88.50
D.P.C Sqm 39.00
Bitumin Coat Sqm 39.00
13 Reinforcement
Reinforcement kg 11045.11
14 BrickWork
Total Brick Work Cum 78.19
15 Plastering Work
Wall plaster sqm 1359.36
Slab Plaster sqm 277.72
16 Painting Work
White Wash sqm 1637.08
Putty sqm 1637.08
Paint sqm 1637.08
17 Flooring
Flooring sqm 238.52
Skirting sqm 30.30
18 Door Work
DOOR FRAME 1 No. 12
DOOR FRAME 2 No. 6
DOOR SHUTTER 1 No. 12
DOOR SHUTTER 2 No. 6
19 Door Fitting Items
L-Drop No. 18
Latch No. 18
Handle No. 36
Door Stopper No. 18
Tower Bolt No. 18
Hinges No. 54
ABSTRACT SHEET
S.No. Description Unit Quantity Remark
20 Aluminum work
ALUMINIUM FIXED FRAME Sft 232.42
21 Formwork
Lintels + Slab beams Sqm 655.13
Column for Super- Structure Sqm 208.20
Slab Sqm 277.72
Staircase Sqm 47.59
ABSTRACT SHEET
S.No. Description Unit Quantity Remark
ALL FLOOR
1 EarthWork
Site Cleaning sqm 156.00 https://bit.ly/3iNSNBW
Excavation cum 90.86 Civil Guruji

Sand Filling + Backfilling + plinth filling cum 133.65 Civil Guruji


2 Cement Concrete Civil Guruji
P.C.C (M-15) cum 15.52 Civil Guruji
R.C.C (M-25) ( Sub - Structure ) cum 19.21
R.C.C (M-25) ( Super - Structure ) cum 112.72
D.P.C Sqm 66.89 For Civil Guruji Website
Bitumin Coat Sqm 57.25
3 Reinforcement For Civil Guruji Application
Reinforcement kg 15406.62
4 BrickWork
Total Brick Work Cum 104.64
5 Plastering Work
Wall plaster sqm 1745.66
Slab Plaster sqm 357.23
6 Painting Work
White Wash sqm 2102.89
Putty sqm 2102.89
Paint sqm 2102.89
7 Flooring
Flooring sqm 318.02
Skirting sqm 40.40
8 Door Work
DOOR FRAME 1 No. 16
DOOR FRAME 2 No. 8
DOOR SHUTTER 1 No. 16
DOOR SHUTTER 2 No. 8
9 Door Fitting Items
L-Drop No. 24
Latch No. 24
Handle No. 48
Door Stopper No. 24
Tower Bolt No. 24
Hinges No. 72
10 Aluminum work
ALUMINIUM FIXED FRAME Sft 309.89
11 Formwork
Up To Plinth Level (Footing, Column, Sqm
Ground beam) 754.15
Lintels + Slab beams Sqm 294.13
Column for Super- Structure Sqm 278.60
Slab Sqm 357.23
Staircase Sqm 63.45
S.No. STRUCTURAL MEMBER Kg / Cum
1 FOOTING 62.8
2 COLUMN 157
3 GROUND BEAM 114.75
4 SILL BAND 42.5
5 LINTEL BEAM 114.75
6 SLAB BEAM 150
7 SLAB 100
8 STAIR CASE 150
9 A) ALUMINIUM FIXED FRAME
10 BOTTOM 1.037
11 TOP 0.855
12 LEFT & RIGHT 0.825
13 B) ALUMINIUM SLIDING FRAME
14 TOP & BOTTOM 0.557
15 LOCK RAIL 0.566
16 VERTICAL PORTION 0.557
Market Rate Sheet
S.No. Items Unit Rate Remarks
1 Cement Bag 230
2 Sand Cft 30
3 Aggregate
40mm Cft 38
20mm Cft 38
10mm Cft 38
4 Plasticizer Kg 25
5 Formwork Sft 30
6 Steel Quintal 4000
7 Brick Each 4.5
9 Tiles Sft 3
10 Door
Type 1
Frame Each 1000
Panel Each 7000
Type 2
Frame Each 600
Panel Each 3000
11 Door Fitting Cost in Persentag Persentage 22
12 Aluminium Window Sft 200
13 Plaster of Paris Kg 6
14 Primer Litre 50
15 Dry Distemper Kg 20
16 Exterior Paint Litre 230
17 Kerosene Litre 50
18 Coal Quintal 400
19 Earth work equipments
21 Hydraulic Excavator Hrs. 800
22 Loader Hrs. 600
24 Concreting Equipments Day
Market Rate Sheet
S.No. Items Unit Rate Remarks
25 Mixer Day 500
26 Vibrator Day 370
Labour
27 Mason Day 600
28 Bhisti Day 500
29 Beldar Day 350
30 Coolie Day 400
31 Painter Day 600
32 Blacksmith Day 500
33 Fitter Day 500
34 Carpenter Day 500
35 White Washer Day 600
36 Bandhai Day 600
Other Charges
37 Add Water charges Percentage 1%
38 Add C.P & O.H. Percentage 15%
S.No. Item Qty Unit Tiles * No. Of tiles in a bag PCC C S A RCC C
1 Bricks 53054 Nos. L W Number* M5 1 5 10 M20 1
2 Tiles 367 Nos. 0.30 m 0.30 m 5 M7.5 1 4 8 M25 1
3 Tiles (Bags) 74 Bags M10 1 3 6 M - mix 1
4 White Wash 736.01 Kg M15 1 2 4
5 Putty 4808.98 Kg
6 Paint 689.75 Litre
Grade C S A
7 PCC 15.52 cum M15 1 2 4
8 RCC 131.93 cum M20 1 1.5 3 M - mix 1 0.8 1.5

Item Qty Unit Cement


Cement 9%
4% 8%

PCC 98.35 Bags 8% PCC


2% RCC
RCC 870.72 Bags 6 mm Plaster
6 mm Plaster 26.44 Bags 12 mm Plaster
15 mm Plaster
12 mm Plaster 97.01 Bags 69% Tiles
15 mm Plaster 116.21 Bags
Tiles 53.07 Bags
G. Total 1262 Bags
Sand 4%
Sand
PCC 241.16 Cft 8%
13% PCC
RCC 1969.21 Cft RCC
10%
6 mm Plaster 58.40 Cft 2% 6 mm Plaster
12 mm Plaster
12 mm Plaster 324.86 Cft 15 mm Plaster
64%
15 mm Plaster 389.16 Cft Tiles

Tiles 117.18 Cft


G. Total 3099.98 Cft
Aggregate Aggregate
PCC 29%
10mm 57.88 Cft 7% 10mm
20mm 120.58 Cft 20mm
40mm
40mm 303.87 Cft 10mm
3%
RCC 60% 20mm

10mm 1299.68 Cft 1%

20mm 2638.74 Cft


G. Total 4420.75 Cft
S A
1.5 3
1 2
0.8 1.5
Bill Of Quantity
Name of Work : XYZ
Engineer's Name : ABC
S.No. Code No. Description of work Quantity Unit Rate Amount
Surface dressing of the ground including removing
vegetation and inequalities not exceeding 15 cm
deep and disposal of rubbish, lead up to 50 m and
lift up to 1.5 m. (Site Cleaning)
1
All kinds of soil 156.00 SQM 14.00 2184.29

Earth work in excavation by mechanical means


(Hydraulic excavator) /
manual means in foundation trenches or drains (not
exceeding 1.5 m in
width or 10 sqm on plan), including dressing of
sides and ramming of
bottoms, lift upto 1.5 m, including getting out the
excavated soil and
disposal of surplus excavated soil as directed,
within a lead of 50 m.
2
All kinds of soil 113.58 Cum 165.10 18752.09

Supplying and filling in plinth with sand under


floors, including watering, 7.57 cum 2304.62 17450.59
3 ramming, consolidating and dressing complete

Filling available excavated earth (excluding rock)


in trenches, plinth,
sides of foundations etc. in layers not exceeding
20cm in depth, 86.33 Cum 135.90 11731.81
consolidating each deposited layer by ramming and
watering, lead up
to 50 m and lift upto 1.5 m.
4

Providing and laying in position cement concrete


of specified grade
excluding the cost of centering and shuttering - All
work up to plinth
5 level
1:2:4 (1 Cement : 2 coarse sand (zone-III) : 4
graded stone 15.52 Cum 5042.51 78272.35
aggregate 40 mm nominal size)

Providing and laying damp-proof course 50mm


thick with cement
concrete 1:2:4 (1 cement : 2 coarse sand(zone-III) : 66.89 SQM 351.74 23526.24
4 graded stone
6 aggregate 20mm nominal size).

Providing & applying a coat of residual petroleum


bitumen of grade of
VG-10 of approved quality using 1.7kg per square
metre on damp proof 57.25 SQM 89.32 5113.55
course after cleaning the surface with brushes and
finally with apiece
of cloth lightly soaked in kerosene oil.
7
Bill Of Quantity
Providing and laying in position machine batched
Name of Work : and
XYZ machine mixed
design mix M-25 grade cement concrete for
Engineer's Name : ABC
reinforced cement concrete
S.No. Code No. Description
work, using cement ofper
content as work
approved design Quantity Unit Rate Amount
mix, including
pumping of concrete to site of laying but excluding
the cost of centering,
shuttering, finishing and reinforcement, including
admixtures in
recommended proportions as per IS: 9103 to
accelerate, retard setting
of concrete, improve workability without impairing
strength and durability
8
as per direction of Engineer-in-charge.
All works
(Note upto plinth
:- Cement level
content considered in this item is 19.21 Cum 6679.91 128318.58
All330
@ works aboveExcess/
kg/cum. plinth level 112.72 Cum 7553.36 851395.78
less cement used as per design mix is
payable/recoverable separately).
Steel reinforcement for R.C.C. work including
straightening, cutting,
bending, placing in position and binding all
complete upto plinth level.
Thermo-Mechanically Treated bars of grade Fe-
1746.14 kg 61.85 107997.36
9 500D or more.

Steel reinforcement for R.C.C. work including


straightening, cutting,
bending, placing in position and binding all
complete above plinth level.
Thermo-Mechanically Treated bars of grade Fe-
14012.16 kg 61.85 866640.10
10 500D or more.

11 Formwork 350.71 Sft 371.22 130191.49

Brick work with common burnt clay modular


bricks of class designation
12 7.5 in foundation and plinth in:
Cement mortar 1:4 (1 cement : 4 coarse sand) 1.80 Cum 5066.28 9119.31

Brick work with common burnt clay machine


moulded perforated bricks of
class designation 12.5 conforming to IS: 2222 in
superstructure above plinth
level in cement mortar 1:6 (1 cement : 6 coarse
13 sand) :
With Modular bricks 67.68 Cum 5104.33 345461.36

Half brick masonry with common burnt clay F.P.S.


(non modular) bricks
of class designation 7.5 in superstructure above
plinth level
14 Cement mortar 1:3 (1 cement :3 coarse sand) 35.16 Cum 518.04 18215.28

15 6 mm cement plaster of mix :


1:3 (1 cement : 3 fine sand) 357.23 SQM 215.37 76937.84

12 mm cement plaster of mix :


16
1:4 (1 cement: 4 fine sand) 872.83 SQM 230.81 201457.20

15 mm cement plaster on the rough side of single


or half brick wall of
17 mix :
1:4 (1 cement: 4 fine sand) 872.83 SQM 263.14 229681.07

White washing with lime to give an even shade


18
New work (three or more coats) 2102.89 SQM 22.90 48146.74
Bill Of Quantity
Name of Work : XYZ
Engineer's Name : ABC
S.No. Code No. Description of work Quantity Unit Rate Amount
Providing and applying plaster of paris putty of 2
mm thickness over
2102.89 SQM 135.93 6666.00
plastered surface to prepare the surface even and
19 smooth complete.

Finishing walls with textured exterior paint of


20 required shade :
New work (Two or more coats applied @ 3.28
ltr/10 sqm)
over and including priming coat of exterior primer 2102.89 SQM 185.92 390967.53
applied
21 @ 2.20kg/10 sqm

Providing and laying Vitrified tiles in different


sizes (thickness to be
specified by the manufacturer), with water
absorption less than 0.08%
and conforming to IS: 15622, of approved brand &
manufacturer, in all
colours and shade, in skirting, riser of steps, laid
with cement based
high polymer modified quick set tile adhesive
(water based) conforming
to IS: 15477, in average 6 mm thickness, including
grouting of joints
(Payment for grouting of joints to be made
separately).
22
Size of Tile 600x600 mm 358.42 SQM 424.50 152150.85

Providing and fixing aluminium work for doors,


windows, ventilators 309.89 SFT 210.00 65076.48
23 and partition

24 Door Work(Including Panel & Frame) Type 1 16.00 SFT 9760.00 156160.00
25 Door Work(Including Panel & Frame) Type 2 8.00 SFT 4392.00 35136.00

Providing and fixing ISI marked M.S. pressed butt


hinges bright finished
26 with necessary screws etc. complete :
125x65x2.12 mm 72 EACH 68.29 4916.99

Providing and fixing ISI marked oxidised M.S.


tower bolt black finish,
(Barrel type) with necessary screws etc. complete :

27
250x10 mm 24 EACH 62.29 1494.93

Providing and fixing ISI marked oxidised M.S.


handles conforming to
28 IS:4992 with necessary screws etc. complete :
125 mm 48 EACH 29.02 1393.02

Providing and fixing bright finished brass hanging


type floor door stopper 24 EACH 91.81 2203.49
29 with necessary screws, etc. complete.

TOTAL COST OF THE BUILDING 3986759.00

INSERT 10% ELECTRIFICATION ITEMS 398676.00


Bill Of Quantity
Name of Work : XYZ
Engineer's Name : ABC
S.No. Code No. Description of work Quantity Unit Rate Amount
TOTAL 4385435.00

ADD 3% CONTINGENCY 131564.00

GRAND TOTAL 4516999.00


4
Civil Guruji
Civil Guruji

Civil Guruji
Civil Guruji

Civil Guruji
Civil Guruji

Civil Guruji
Civil Guruji

For Civil Guruji Website

For Civil Guruji Application


Surface dressing of the ground including removing vegetation and in-equalities
not exceeding 15 cm deep and disposal of rubbish, lead up to 50 m and lift up
to 1.5 m.
All kinds of soil

LABOUR

LABOUR

21
Extra for every additional lift of 1.5 m or part thereof in excavation / banking
excavated or stacked materials.

LABOUR

#DIV/0!

Filling available excavated earth (excluding rock) in trenches, plinth, sides


of
foundations etc. in layers not exceeding 20cm in depth, consolidating each
deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5
m.

LABOUR

22
Supplying and filling in plinth with sand under floors, including watering,
ramming, consolidating and dressing complete.

MATERIAL

CARRIAGE OF MATERIAL

LABOUR

23
Plasticizer / super plasticizer kilogram
0.50% of cement

Production cost of concrete by batch


mix plant.

Pumping charges of concrete


including Hire charges of pump,
piping work & accessories etc.

24
Plasticizer / super plasticizer kilogram
0.50% of cement

Production cost of concrete by batch


mix plant.

Pumping charges of concrete


including Hire charges of pump,
piping work & accessories etc.

Providing and laying damp-proof course 50mm thick with cement concrete
1:2:4 (1 cement : 2 coarse sand(zone-III) : 4 graded stone aggregate 20mm
nominal size).

25
Cement concrete 1:2:4 (1 cement 2
coarse send (zone - III) : 4 graded

Providing & applying a coat of residual petroleum bitumen of grade of


VG-10 of approved quality using 1.7kg per square metre on damp proof
course after cleaning the surface with brushes and finally with apiece
of cloth lightly soaked in kerosene oil.

Paving bitumen VG-10 of approved


quality

Coolie Spreading hot tar over damp


proof
course

Sundries (Carriage of kerosene,


steam coal, brushes, T&P etc.)

Steel reinforcement for R.C.C. work including straightening, cutting,


bending, placing
in position and binding all26complete upto plinth level.
Thermo-Mechanically Treated bars of grade Fe-500D or more.
MATERIAL

CARRIAGE OF MATERIAL

LABOURS (For straightening,


cutting, bending,
binding and placing in position)

Steel reinforcement for R.C.C. work including straightening, cutting,


bending, placing
in position and binding all complete above plinth level.

MATERIAL

CARRIAGE OF MATERIAL

LABOURS (For straightening,


cutting, bending,
binding and placing in position)

27
Brick work with Common Burnt F.P.S. (modular) bricks of class
designation 7.5 in foundation and plinth in:
Cement mortar 1:4 (1 cement : 4 coarse sand)

When different dry ingredients of mortar like cement and sand mix with by
adding water then the Calculation of dry volume of mortar.

LABOUR

Brick work with common burnt clay machine moulded perforated bricks
of class
28
designation 12.5 conforming to IS: 2222 in superstructure above plinth
level up to
Brick work with common burnt clay machine moulded perforated bricks
of class
designation 12.5 conforming to IS: 2222 in superstructure above plinth
level up to
floor five level in cement mortar 1:6 (1 cement : 6 coarse sand) :

When different dry ingredients of mortar like cement and sand mix with by adding
water then the Calculation of dry volume of mortar.

LABOUR

Half brick masonry with common burnt clay F.P.S. (non modular) bricks
of class designation 7.5 in foundations and plinth in : :
Cement mortar 1:4 (1 cement : 4 coarse sand)

When different dry ingredients of mortar like cement and sand mix with by
adding water then the Calculation of dry volume of mortar.

LABOUR

29
6 mm cement plaster of mix :
1:3 (1 cement: 3 fine sand)

When different dry ingredients of mortar like cement and sand mix
with by adding water then the Calculation of dry volume of mortar.

MATERIAL

LABOUR
For measuring, carrying, depositing and
mixing-

12 mm cement plaster of mix :


1:4 (1 cement: 4 fine sand)

When different dry ingredients of mortar like cement and sand mix
with by adding water then the Calculation of dry volume of mortar.

MATERIAL

30
LABOUR
For measuring, carrying, depositing and
mixing-

15 mm cement plaster of mix :


1:4 (1 cement: 4 fine sand)

When different dry ingredients of mortar like cement and sand mix
with by adding water then the Calculation of dry volume of mortar.

MATERIAL

LABOUR
For measuring, carrying, depositing and
mixing-

LABOUR
For measuring, carrying, depositing and
mixing-

31
32
White washing with lime to give an even shade :
New work (Three Coat)

MATERIAL

CARRIAGE OF MATERIAL

Providing and applying plaster of paris putty of 2 mm thickness over


plastered
surface to prepare the surface even and smooth complete

MATERIAL

CARRIAGE OF MATERIAL

33
Finishing walls with textured exterior paint of required shade :
13.45.1 New work (Two or more coats applied @ 3.28 ltr/10 sqm) over and
including
priming coat of exterior primer applied @ 2.20kg/10 sqm

MATERIAL

CARRIAGE OF MATERIAL

Providing and laying Vitrified tiles in different sizes (thickness to be specified


by manufacturer), with water absorption less than 0.08 % and conforming to
I.S. 15622, of approved make, in all colours & shade, in skirting, riser of steps,
over 12 mm thick bed of cement mortar 1:3 (1 cement: 3 coarse sand), jointing
with grey cement slurry @ 3.3 kg/ sqm including grouting the joint with white
cement & matching pigments etc. complete.
Size of Tile 500x500 mm.

34
Vitrified floor tiles 50 x 50 cm size =
1.00 sqm+
Add wastage & breakage @ 2.5%

Providing and fixing IS : 12817 marked stainless steel butt hinges with
stainless
steel screws etc. complete :
125x64x1.90 mm

35
Providing and fixing ISI marked oxidised M.S. tower bolt black finish,
(Barrel
type) with necessary screws etc. complete . 250x10 mm

Providing and fixing ISI marked oxidised M.S. handles conforming to


IS:4992
with necessary screws etc. complete :
125 mm

36
37
Providing and fixing bright finished brass hanging type floor door stopper
with
necessary screws, etc. complete

Providing and fixing Fiber Glass Reinforced plastic (FRP) Door Frames of crosssection 90 mm x 45 mm
having single rebate of 32 mm x 15 mm to receive shutter of
30 mm thickness. The laminate shall be moulded with fire resistant grade unsaturated
polyester resin and chopped mat. Door frame laminate shall be 2mm thick and shall
be filled with suitable wooden block in all the three legs. The frame shall be covered
with fiber glass from all sides. M.S. stay shall be provided at the bottom to steady
the frame.

Details of cost for one door


frame of
5 metre
Factory made glass reinforced plastic
door frame 90x45 mm i/c carriage.

38
39
40
41
42
Plasticizer / super plasticizer
kilogram 1.65 36.00 59.40
0.50% of cement

Production cost of concrete by


batch
mix plant.

Pumping charges of concrete


including Hire charges of pump,
piping work & accessories etc.

43
Plasticizer / super plasticizer
kilogram 1.65 36.00 59.40
0.50% of cement

Production cost of concrete by


batch
mix plant.

Pumping charges of concrete


including Hire charges of pump,
piping work & accessories etc.

44
45
46
LABOUR

47
LABOUR

LABOUR

48
49
50
51
52
53
54
55
56
Factory made glass reinforced
plastic
door frame 90x45 mm i/c carriage.

57
58