Question: 1
om
Which task should you include in your procedure while preparing for a fit-to-standard analysis in an
.c
SAP Data Warehouse Cloud project?Note: There are 2 correct answers to this question.
ps
A. Review SAP S/4HANA best practices availability for your country.
B. Review all the necessary Implementation Design Principles (IDPs).
m
C. Review available SAP S/4HANA accelerators for the Data Management workstream
du
D. Review all the necessary leading practice process diagrams.
am
Answer: B, D
Explanation:
ex
B is correct because Implementation Design Principles (IDPs) are documents that provide guidance
id
on how to configure and extend SAP Data Warehouse Cloud to meet customer-specific
al
requirements1.
D is correct because leading practice process diagrams are graphical representations of the business
.v
processes that are supported by SAP Data Warehouse Cloud and can be used as a reference for the
w
Question: 2
s:
tp
ht
What criterion does the product owner use to sequence the product backlog?
A. Business priority
B. Resource availability
C. Relative effort
D. Complexity
Answer: A
Explanation:
A is correct because the product owner is responsible for prioritizing the product backlog based on
https://www.validexamdumps.com/C_ACTIVATE22.html
Questions and Answers PDF 3/41
Question: 3
When working with an Agile approach, what is the minimum planning requirement expected at the
beginning of the Realize phase?
A. Realize phase scope, planning, and budget should be completed and final.
B. Release plan and sprint ceremony guidelines should be finalized.
C. Sprint planning and sprint durations should be defined for the first 2 to 3 sprints.
om
D. User stories on product backlog should be in ready state for the first 2 to 3 sprints.
Answer: C
.c
Explanation:
ps
C is correct because in an Agile approach, the planning is done iteratively and incrementally, so the
m
minimum requirement at the beginning of the Realize phase is to have sprint planning and sprint
du
durations defined for the first 2 to 3 sprints. Verified :
: SAP Activate Project Management Certification Guide, page 117
am
Question: 4
ex
Which of the following are workshop design principles/guidelines?Note: There are 2 correct answers
id
to this question.
al
A. Active participation
.v
B. Fit-to-standard
w
Answer: A, B
//
Explanation:
s:
tp
A is correct because active participation is a key principle for designing effective workshops, as it
ht
ensures that all stakeholders are engaged and contribute to the workshop outcomes.
B is correct because fit-to-standard is a workshop design guideline that aims to minimize
customizations and leverage the standard SAP functionality as much as possible. Verified :
: SAP Activate Project Management Certification Guide, page 123
: SAP Activate Methodology for SAP S/4HANA Cloud, page 40
Question: 5
You are implementing SAP S/4HANA Cloud, public edition for your customer.How are your customer
systems activated?
https://www.validexamdumps.com/C_ACTIVATE22.html
Questions and Answers PDF 4/41
Answer: C
Explanation:
C is correct because the Central Business Configuration System (CBC) is a tool that enables customers
to activate their SAP S/4HANA Cloud, public edition systems by following guided steps and entering
configuration data. Verified :
: Central Business Configuration Overview
om
Question: 6
.c
When applying a cloud mindset in a greenfield Implementation, which of the following should you
ps
consider?Note: There are 2 correct answers to this question.
m
A. Use supported extensibility technologies
du
B. Use quality gates
C. Apply SAP quality principles
am
D. Ensure transparency on deviations
ex
Answer: A, D
Explanation:
id
al
A is correct because a cloud mindset means embracing the cloud capabilities and avoiding
unnecessary customizations that could impact the performance, scalability, and maintainability of
.v
D is correct because a cloud mindset also means ensuring transparency on deviations from the
standard SAP functionality and documenting the rationale and impact of any customizations or
w
Question: 7
ht
Answer: A
Explanation:
https://www.validexamdumps.com/C_ACTIVATE22.html
Questions and Answers PDF 5/41
A is correct because the scrum board is a tool that helps to visualize the team progress and status of
the user stories in each sprint. It shows the movement of the user stories from the product backlog
to the done column, indicating the completion of the sprint goal. Verified :
: SAP Activate Project Management Certification Guide, page 113
Question: 8
Which of the following tools can support you in managing requirements and software development
for implementation projects? Note: There are 2 correct answers to this question
om
B. Focused Build for SAP Solution Manager
C. Focused Insights for SAP Solution Manager
D. SAP Cloud ALM
.c
ps
Answer: B, D
Explanation:
m
du
B is correct because Focused Build for SAP Solution Manager is a tool that supports the management
of requirements and software development for implementation projects. It provides features such as
am
requirements-to-deploy process, collaboration platform, quality gate management, and test
management.
ex
D is correct because SAP Cloud ALM is a tool that supports the management of requirements and
software development for implementation projects. It provides features such as project task
id
Question: 9
w
w
When performing an SAP Readiness Check in system conversion, what areas are covered within the
//
Answer: A, C, E
Explanation:
A is correct because SAP Readiness Check in system conversion covers the area of recommended SAP
Fiori apps, which are apps that are suggested by SAP based on the customer’s current usage of SAP
GUI transactions.
C is correct because SAP Readiness Check in system conversion covers the area of sizing for SAP
https://www.validexamdumps.com/C_ACTIVATE22.html
Questions and Answers PDF 6/41
S/4HANA, which is an estimation of the hardware and software resources required to run SAP
S/4HANA based on the customer’s current system data.
E is correct because SAP Readiness Check in system conversion covers the area of simplification
database, which is a collection of simplification items that describe the changes and adaptations
required for SAP S/4HANA compared to the previous SAP ERP releases. Verified :
: SAP Readiness Check 2.0 for SAP S/4HANA
Question: 10
What tool would you use for managing project tasks and Solution Documentation when
implementing SAP S/4HANA Cloud, public edition?
om
A. SAP Support Portal
B. SAP Roadmap Viewer
.c
C. SAP Transformation Navigator
ps
D. SAP Cloud ALM
m
Answer: D
du
Explanation:
am
D is correct because SAP Cloud ALM is a tool that can be used for managing project tasks and solution
documentation when implementing SAP S/4HANA Cloud, public edition. It provides features such as
ex
project task management, solution documentation, change request management, and test
management. Verified :
id
Question: 11
.v
w
B. Test Management
//
C. Integration Monitoring
s:
Answer: B
ht
Explanation:
B is correct because Focused Build provides a test management feature that supports the planning,
execution, and reporting of test activities in SAP projects. It allows the creation and assignment of
test cases, test packages, and test plans, as well as the tracking and monitoring of test results and
defects. Verified :
: Focused Build for SAP Solution Manager
Question: 12
Which of the following are used to perform configuration in SAP S/4HANA Cloud, private edition?
https://www.validexamdumps.com/C_ACTIVATE22.html
Questions and Answers PDF 7/41
(Choose Two)
Answer: BC
Explanation:
B is correct because IMG (Implementation Guide) is a tool that can be used to perform configuration
om
in SAP S/4HANA Cloud, private edition. It provides access to the configuration transactions and
activities that are relevant for the project scope.
C is correct because Self Service Configuration Uls (SSCUIs) are tools that can be used to perform
.c
configuration in SAP S/4HANA Cloud, private edition. They provide a user-friendly interface to
ps
configure the settings that are specific to the customer’s business needs. Verified :
: SAP Activate Project Management Certification Guide, page 131
m
du
Question: 13 am
In which phase do you collect the main attributes of the product as per the Agile definition?
ex
A. Deploy
B. Realize
id
C. Explore
D. Prepare
al
.v
Answer: C
w
Explanation:
w
According to the SAP Activate methodology for SAP S/4HANA Cloud, the Explore phase is where you
w
collect the main attributes of the product as per the Agile definition. The main attributes of the
//
product are the features, requirements, and user stories that describe what the product should do
s:
and how it should deliver value to the customers and stakeholders. The Explore phase involves a fit-
tp
to-standard process, where you validate the fit of your business processes to the standard SAP
solution and identify any gaps or extensions that need to be addressed. You also prioritize and refine
ht
your product backlog, which is a list of user stories that represent the work needed to achieve the
product vision1.
Question: 14
A customer with an existing SAP S/4HANA solution is exploring the best approach to move their
landscape into the cloud.Which is the most suitable option for the customer?
https://www.validexamdumps.com/C_ACTIVATE22.html
Questions and Answers PDF 8/41
Answer: D
Explanation:
D is correct because Lift and Shift is the most suitable option for a customer who wants to move their
existing SAP S/4HANA solution into the cloud. It involves moving the entire system landscape from
one environment to another without changing the system configuration or data. Verified :
: SAP Activate Project Management Certification Guide, page 128
Question: 15
om
What is the correct order of the SAP Activate methodology phases?
.c
A. Discover > Prepare > Explore > Realize > Deploy > Run
ps
B. Plan > Build > Run > Sustain
C. Plan Design > Build > Operate
m
D. Prepare > Discover > Explore > Realize > Deploy > Run
du Answer: A
am
Explanation:
ex
A is correct because Discover > Prepare > Explore > Realize > Deploy > Run is the correct order of the
SAP Activate methodology phases. The Discover phase is optional and can be used to evaluate the
id
SAP solution before starting the project. The other phases follow a sequential order that guides the
al
Question: 16
w
w
According to the Definition of Done, which activity must be completed for each Sprint?
//
B. The solution must be built and configured in the development system (DEV)
tp
Answer: B
Explanation:
B is correct because according to the Definition of Done, the solution must be built and configured in
the development system (DEV) for each Sprint. This means that all user stories in the Sprint backlog
must be completed, tested, and accepted by the product owner in the DEV system before moving to
the next Sprint. Verified :
: SAP Activate Project Management Certification Guide, page 114
https://www.validexamdumps.com/C_ACTIVATE22.html
Questions and Answers PDF 9/41
Question: 17
Answer: B
Explanation:
om
B is correct because Scrum of Scrums is an integration meeting among the various Scrum teams that
.c
are working on a large-scale project. It helps to coordinate and synchronize the work across teams,
resolve dependencies and issues, and share best practices and learnings. Verified :
ps
: SAP Activate Project Management Certification Guide, page 115
m
Question: 18
du
What is preferred when a customer wants to keep most of their original processes and migrate to
am
SAP S/4HANA Cloud, private edition?
ex
C. Shell Conversion
al
Answer: C
w
Explanation:
w
w
Shell Conversion is preferred when a customer wants to keep most of their original processes and
migrate to SAP S/4HANA Cloud, private edition. It involves creating a shell system that contains the
//
configuration and master data of the source system, and then migrating the transactional data to the
s:
Question: 19
Which activity helps the project team identify and add user stories to the backlog?
Answer: B
https://www.validexamdumps.com/C_ACTIVATE22.html
Questions and Answers PDF 10/41
Explanation:
B is correct because conducting the fit-to-standard workshop helps the project team identify and add
user stories to the backlog. The fit-to-standard workshop is a process of analyzing the gaps between
the customer’s business requirements and the standard SAP functionality, and documenting the user
stories that describe the desired outcomes and acceptance criteria. Verified :
: SAP Activate Project Management Certification Guide, page 122
Question: 20
What is the difference between the System Conversion and New Implementation transition paths to
om
SAP S/4HANA? Note: There are 2 correct answers to this question.
A. Custom code is adjusted in System Conversion and developed in New Implementation of SAP V U
.c
S/4HANA in the Realize phase.
ps
B. Data is migrated in System Conversion and converted in New Implementation of SAP □ S/4HANA
in the Realize phase.
m
C. Custom code is developed in System Conversion and adjusted in New Implementation of SAP u
du
S/4HANA in the Realize phase. 4
D. Data is converted in System Conversion and migrated in New Implementation of SAP S/4HANA in
am
the Realize phase.
Answer: A, D
ex
Explanation:
id
A is correct because custom code is adjusted in System Conversion and developed in New
al
Implementation of SAP S/4HANA in the Realize phase. In System Conversion, the existing custom
.v
code needs to be adapted to run on SAP S/4HANA. In New Implementation, new custom code needs
w
SAP S/4HANA in the Realize phase. In System Conversion, the existing data needs to be converted to
w
the new data structures and formats of SAP S/4HANA. In New Implementation, new data needs to be
//
migrated from the legacy system or other sources to SAP S/4HANA. Verified :
s:
Question: 21
ht
Which new project roles are introduced with the SAP Activate methodology for the Agile delivery
approach, compared to Waterfall?Note: There are 2 correct answers to this question.
A. Scrum master
B. Product owner
C. Design thinking coach
D. Integration lead
Answer: A, B
Explanation:
https://www.validexamdumps.com/C_ACTIVATE22.html
Questions and Answers PDF 11/41
A is correct because the scrum master is a new project role that is introduced with the SAP Activate
methodology for the Agile delivery approach, compared to Waterfall. The scrum master is
responsible for facilitating and coaching the Scrum process, removing impediments, and ensuring the
team’s adherence to the Agile principles.
B is correct because the product owner is a new project role that is introduced with the SAP Activate
methodology for the Agile delivery approach, compared to Waterfall. The product owner is
responsible for defining and prioritizing the product backlog, accepting or rejecting the user stories,
and providing feedback and guidance to the team. Verified :
: SAP Activate Project Management Certification Guide, page 111
Question: 22
om
Which additional scope option does the strategic advisory service for cloud analytics offer?Note:
.c
There are 2 correct answers to this question
ps
A. Extended package
m
B. SAP S/4HANA for central finance
du
C. Baseline package
D. SAP Activate methodology for the Intelligent Enterprise
am
Answer: AC
ex
Explanation:
id
A is correct because the extended package is an additional scope option that the strategic advisory
service for cloud analytics offers. It provides a deeper analysis of the customer’s current analytics
al
landscape and a more detailed roadmap for the cloud analytics transformation.
.v
C is correct because the baseline package is an additional scope option that the strategic advisory
w
service for cloud analytics offers. It provides a high-level assessment of the customer’s current
analytics landscape and a general roadmap for the cloud analytics transformation. Verified :
w
Question: 23
s:
tp
Which of the following characteristics are unique to SAP S/4HANA Cloud, public edition?Note:
There are
ht
Answer: A, D, E
Explanation:
https://www.validexamdumps.com/C_ACTIVATE22.html
Questions and Answers PDF 12/41
A is correct because software upgrades performed by SAP are one of the characteristics that are
unique to SAP S/4HANA Cloud, public edition. SAP takes care of the upgrade process and ensures
that the system is always up to date with the latest features and innovations.
D is correct because optional 3-system landscape is one of the characteristics that are unique to SAP
S/4HANA Cloud, public edition. Customers can choose to have a 3-system landscape (development,
quality, and production) or a 2-system landscape (quality and production) depending on their needs
and preferences.
E is correct because mandatory upgrades are one of the characteristics that are unique to SAP
S/4HANA Cloud, public edition. Customers have to accept the upgrades that are delivered by SAP on
a quarterly basis and cannot opt out or postpone them.
Question: 24
om
Which of the following are Selective Data Transition scenarios? Note: There are 3 correct answers to
.c
this question
ps
A. Migration of business units
m
B. Consolidation
du
C. Migration of selected applications
D. Migration of open items
am
E. Migration of transactional data
Answer: A, B, E
ex
Explanation:
id
A is correct because migration of business units is one of the Selective Data Transition scenarios. It
al
allows the customer to move specific business units or company codes from their source system to
.v
B is correct because consolidation is one of the Selective Data Transition scenarios. It allows the
customer to merge multiple source systems into one SAP S/4HANA system, while harmonizing and
w
E is correct because migration of transactional data is one of the Selective Data Transition scenarios.
//
It allows the customer to move selected transactional data (such as open items, balances, and
s:
documents) from their source system to SAP S/4HANA, while preserving the historical data in the
source system.
tp
Question: 25
Which accelerators support the fit-to-standard workshop in the Explore phase? Note: There are 2
correct answers to this question.
https://www.validexamdumps.com/C_ACTIVATE22.html
Questions and Answers PDF 13/41
Answer: B, D
Explanation:
B is correct because the requirements feature in SAP Cloud ALM is an accelerator that supports the
fit-to-standard workshop in the Explore phase. It allows the project team to capture and manage the
user stories that are identified during the workshop, as well as link them to the relevant scope items
and test cases.
D is correct because the Business-Driven Configuration questionnaire is an accelerator that supports
the fit-to-standard workshop in the Explore phase. It provides a set of questions that help the project
team to understand and document the customer’s business requirements and configuration settings
for each scope item. Verified :
om
: SAP Cloud ALM
: Business Driven Configuration Questionnaire
.c
Question: 26
ps
What are the responsibilities of the product owner in release and sprint planning? Note: There are 2
m
correct answers to this question
Answer: A, B
al
Explanation:
.v
A is correct because prioritizing backlog user stories by business priority is one of the responsibilities
w
of the product owner in release and sprint planning. The product owner decides which user stories
w
are more important and valuable for the customer and orders them accordingly in the product
backlog.
w
B is correct because defining objectives for each release is one of the responsibilities of the product
//
owner in release and sprint planning. The product owner sets the goals and expectations for each
s:
release, based on the customer’s vision and feedback, and communicates them to the project team
tp
Question: 27
Which of the following are cornerstones of SAP's security strategy? Note: There are 3 correct answers
to this question
A. Secure Company
B. Secure Projects
C. Secure Operations
D. Secure Infrastructure
E. Secure Products
https://www.validexamdumps.com/C_ACTIVATE22.html
Questions and Answers PDF 14/41
Answer: ACE
Explanation:
A is correct because Secure Company is one of the cornerstones of SAP’s security strategy. It means
that SAP ensures that its own organization, employees, and processes comply with the highest
security standards and regulations.
C is correct because Secure Operations is one of the cornerstones of SAP’s security strategy. It means
that SAP ensures that its cloud services are operated securely and reliably, with measures such as
data protection, encryption, backup, monitoring, and incident response.
E is correct because Secure Products is one of the cornerstones of SAP’s security strategy. It means
om
that SAP ensures that its software products are developed securely and follow best practices such as
secure coding, testing, and patching.
.c
Question: 28
ps
Which of the following are capabilities of the test automation tool for SAP S/4HANA Cloud, public
m
edition?Note: There are 2 correct answers to this question.
Answer: B, D
al
Explanation:
.v
B is correct because the test automation tool for SAP S/4HANA Cloud, public edition supports
w
recording of transaction-based processes. This means that the tool can capture the user actions and
w
inputs during a transaction and generate a test script that can be replayed later.
D is correct because the test automation tool for SAP S/4HANA Cloud, public edition supports the
w
creation of custom test automates. This means that the tool allows the user to modify the existing
//
test scripts or create new ones from scratch, using a graphical user interface or a scripting language.
s:
Verified :
tp
: Test Automation Tool for SAP S/4HANA Cloud, Public Edition – A Game Changer in the 3-System
Landscape
ht
: SAP S/4HANA Cloud Test Automation Tool – Our Approach to Test Automation
Question: 29
Which collaboration features are available in the SAP Community? Note: There are 2 correct answers
to this question.
A. Tweet questions
B. Ask questions
C. Comment on Key Deliverables
D. Update Key Deliverable wikis
https://www.validexamdumps.com/C_ACTIVATE22.html
Questions and Answers PDF 15/41
Answer: B, C
Explanation:
B is correct because asking questions is one of the collaboration features that are available in the SAP
Community. The SAP Community allows users to post questions on various topics and get answers
from other users, experts, or moderators.
C is correct because commenting on key deliverables is one of the collaboration features that are
available in the SAP Community. The SAP Community allows users to comment on the key
deliverables that are published by SAP or other users, such as blog posts, articles, videos, podcasts,
or webinars. Verified :
om
: SAP Community Home
Question: 30
.c
ps
What is the objective of a sprint retrospective meeting?
m
A. Improve the Scrum process.
du
B. Provide formal feedback to the Project Manager.
C. Define the stakeholder management approach
am
D. Review and prioritize the backlog.
ex
Answer: A
Explanation:
id
al
A is correct because improving the Scrum process is the objective of a sprint retrospective meeting.
The sprint retrospective meeting is a time for the Scrum Team to reflect on how they worked
.v
together in the last sprint and identify ways to enhance their effectiveness and efficiency. Verified :
w
Question: 31
// w
Answer: C
Explanation:
C is correct because reporting showstoppers is one of the activities that you perform during the daily
stand-up meeting. A showstopper is an issue or impediment that prevents the team from completing
their sprint goal or user story. The scrum master is responsible for resolving or escalating the
showstoppers as soon as possible. Verified :
: SAP Activate Project Management Certification Guide, page 115
https://www.validexamdumps.com/C_ACTIVATE22.html
Questions and Answers PDF 16/41
Question: 32
Which of the following considerations apply when determining the project methodology? Note:
There are 3 correct answers to this question.
A. Implementation fit
B. Project Manager fit
C. Organizational fit
D. Project fit
E. Solution fit
om
Answer: ACD
.c
Explanation:
ps
A is correct because implementation fit is one of the considerations that apply when determining the
project methodology. It means that the project methodology should match the type and scope of the
m
implementation, such as cloud, on-premise, hybrid, or mixed scenarios.
du
C is correct because organizational fit is one of the considerations that apply when determining the
project methodology. It means that the project methodology should suit the culture and maturity of
am
the organization, such as its readiness for change, agility, and innovation.
D is correct because project fit is one of the considerations that apply when determining the project
ex
methodology. It means that the project methodology should align with the characteristics and
constraints of the project, such as its size, complexity, duration, and budget. Verified :
id
Question: 33
.v
w
Your customer is using a non-SAP ERP system and decides to implement SAP S/4HAN
w
A. Which of the following options are available to your customer?Note: There are 3 correct answers
to this question.
w
Answer: B, D, E
Explanation:
B is correct because New Implementation SAP S/4HANA Cloud, public edition is one of the options
that are available to a customer who is using a non-SAP ERP system and decides to implement SAP
S/4HANA. It involves setting up a new SAP S/4HANA Cloud system with predefined configuration and
data migration from the legacy system.
D is correct because New Implementation SAP S/4HANA Cloud, private edition is one of the options
that are available to a customer who is using a non-SAP ERP system and decides to implement SAP
S/4HANA. It involves setting up a new SAP S/4HANA Cloud system with customized configuration and
https://www.validexamdumps.com/C_ACTIVATE22.html
Questions and Answers PDF 17/41
Question: 34
Which tool do you use to configure SAP S/4HANA Cloud, public edition?
om
A. IMG (Implementation Guide)
B. SAP Cloud ALM
C. SAP Central Business Configuration
.c
D. SAP Solution Manager
ps
Answer: C
m
Explanation:
du
C is correct because SAP Central Business Configuration is the tool that you use to configure SAP
am
S/4HANA Cloud, public edition. It provides a guided configuration process that helps you to activate
your system, enter configuration data, and validate your settings. Verified :
ex
Question: 35
al
Which of the following best outlines the sequence of testing in the Realize phase?
.v
w
Answer: B
tp
Explanation:
ht
B is correct because String test > Integration Test > User Acceptance Test is the best outline of the
sequence of testing in the Realize phase. The String test is performed first to verify the end-to-end
processes across the system landscape. The Integration Test is performed next to verify the
integration of the solution with other systems and interfaces. The User Acceptance Test is performed
last to verify that the solution meets the customer’s business requirements and expectations.
Verified :
: SAP Activate Project Management Certification Guide, page 120
Question: 36
https://www.validexamdumps.com/C_ACTIVATE22.html
Questions and Answers PDF 18/41
A. Data Management
B. Solution Adoption
C. Analytics
D. Application Design and Configuration
Answer: B
Explanation:
B is correct because Solution Adoption is the workstream where you execute an organizational
change impact analysis. The organizational change impact analysis is an activity that helps to assess
om
the impact of the solution on the people, processes, and technology of the organization, and identify
the change management actions that are needed to support the adoption and acceptance of the
solution. Verified :
.c
: SAP Activate Methodology for SAP S/4HANA Cloud, page 38
ps
Question: 37
m
du
For which of the following products do you find a specific set of best practices for the public sector?
am
A. SAP S/4HANA
B. SAP SuccessFactors Employee Central
ex
Answer: A
al
Explanation:
.v
w
SAP S/4HANA is one of the products for which you can find a specific set of best practices for the
w
public sector. The best practices for SAP S/4HANA for Public Sector provide guidance on how to
implement and configure SAP S/4HANA to support the business processes and requirements of
w
public sector organizations, such as budgeting, grants management, fund accounting, and tax and
//
revenue management.
s:
tp
Question: 38
ht
Which of the following Accelerators can you find in the SAP Best Practices Explorer?Note: There are 2
correct answers to this question
A. Test Strategy
B. Stakeholder Identification Guide
C. Process Diagram
D. Test Case
Answer: CD
Explanation:
https://www.validexamdumps.com/C_ACTIVATE22.html
Questions and Answers PDF 19/41
C is correct because Process Diagram is one of the accelerators that you can find in the SAP Best
Practices Explorer. A Process Diagram is a graphical representation of a business process that shows
the sequence of activities, roles, and systems involved in executing the process.
D is correct because Test Case is one of the accelerators that you can find in the SAP Best Practices
Explorer. A Test Case is a document that describes a scenario that needs to be tested, along with the
expected results and test steps.
Question: 39
What can you find in the SAP Fiori apps reference library? Note: There are 3 correct answers to this
question.
om
A. Shortcut to the Quicksizer tool to estimate hardware requirements
B. Installation and configuration requirements for selected apps
.c
C. Related app-specific SAP Fiori design guidelines
ps
D. Shortcut to the Maintenance Planner tool to establish the technical update path
E. Related app recommendations based on your usage profile
m
du
Answer: B, C, E
Explanation:
am
B is correct because installation and configuration requirements for selected apps are one of the
ex
things that you can find in the SAP Fiori apps reference library. The SAP Fiori apps reference library
provides information on how to install and configure each app, such as required software
id
can find in the SAP Fiori apps reference library. The SAP Fiori apps reference library provides links to
.v
the app-specific design guidelines that describe the user interface and interaction patterns of each
w
that you can find in the SAP Fiori apps reference library. The SAP Fiori apps reference library provides
w
suggestions on other apps that might be relevant or useful for you based on your role, industry, or
//
business area.
s:
tp
Question: 40
ht
Which systems are part of the private cloud edition landscape?Note. There are 2 correct answers to
this question.
A. Production
B. Sandbox
C. Starter
D. Evaluation
Answer: A, B
Explanation:
https://www.validexamdumps.com/C_ACTIVATE22.html
Questions and Answers PDF 20/41
A is correct because Production is one of the systems that are part of the private cloud edition
landscape. The Production system is the system where the solution is deployed and operated for the
end users. It contains the live data and processes of the customer’s business.
B is correct because Sandbox is one of the systems that are part of the private cloud edition
landscape. The Sandbox system is an optional system that can be used for testing, prototyping, or
training purposes. It is a copy of the Production system that can be refreshed on demand.
Question: 41
When does the Scrum team receive formal confirmation that the user stories are completed to the
satisfaction of the product owner?
om
A. During the user acceptance test
B. During the sprint retrospective
.c
C. During the daily Scrum meeting
ps
D. During the sprint review
m
Answer: D
du
Explanation:
am
D is correct because the sprint review is the event where the Scrum team receives formal
confirmation that the user stories are completed to the satisfaction of the product owner. The sprint
ex
review is a meeting where the Scrum team demonstrates the functionality that they have built and
configured in the sprint, and the product owner provides feedback and acceptance. Verified :
id
Question: 42
.v
w
What is the difference between the "New Implementation of SAP S/4HANA Cloud, public edition"
w
and the "New Implementation of SAP S/4HANA, private edition" transition paths? Note: There are 2
correct answers to this question
// w
A. SAP S/4HANA Cloud, public edition does NOT offer built-in capabilities for extensibility, while SAP
s:
B. —I SAP S/4HANA Cloud, private edition is only available through SAP Cloud services and with
embedded implementation services from SAP
ht
C. Upgrades of SAP S/4HANA Cloud, public edition are based on SAP timelines, and upgrades of SAP
S/4HANA Cloud private edition are based on timelines agreed between SAP and the customer
D. SAP S/4HANA Cloud, private edition uses the Implementation Guide (IMG) and SAP S/4HANA
Cloud, public edition uses SAP Central Business Configuration.
Answer: C, D
Explanation:
C is correct because upgrades of SAP S/4HANA Cloud, public edition are based on SAP timelines, and
upgrades of SAP S/4HANA Cloud, private edition are based on timelines agreed between SAP and the
customer. This is one of the differences between the two transition paths. SAP S/4HANA Cloud,
https://www.validexamdumps.com/C_ACTIVATE22.html
Questions and Answers PDF 21/41
public edition has mandatory quarterly upgrades that are performed by SAP, while SAP S/4HANA
Cloud, private edition has optional upgrades that are scheduled by the customer in coordination with
SAP.
D is correct because SAP S/4HANA Cloud, private edition uses the Implementation Guide (IMG) and
SAP S/4HANA Cloud, public edition uses SAP Central Business Configuration. This is another
difference between the two transition paths. SAP S/4HANA Cloud, private edition allows more
flexibility and customization in the configuration, while SAP S/4HANA Cloud, public edition follows a
guided and standardized configuration process. Verified :
: [SAP S/4HANA Cloud Editions]
: [Central Business Configuration Overview]
Question: 43
om
You are defining the testing strategy for your project.What would you include in a Scope of
.c
Integration test?
ps
A. The functionality of end-to-end business processes
m
B. The network communication
du
C. The functionality of modular processes
D. The connectivity between database and application servers
am
Answer: A
ex
Explanation:
id
A is correct because the functionality of end-to-end business processes is one of the things that you
would include in a Scope of Integration test. The integration test is a test that verifies that the
al
solution works as expected across different systems and interfaces, and supports the complete
.v
Question: 44
// w
In which phase do you verify that the SAP Best Practices content meets the customer's business
s:
A. Deploy
ht
B. Prepare
C. Explore
D. Realize
Answer: C
Explanation:
C is correct because in the Explore phase, you verify that the SAP Best Practices content meets the
customer’s business needs, and then capture gaps. This is done through a fit-to-standard workshop,
where you compare the customer’s business requirements with the standard SAP functionality, and
document any gaps or deviations as user stories. Verified :
https://www.validexamdumps.com/C_ACTIVATE22.html
Questions and Answers PDF 22/41
Question: 45
What tool provides sizing estimations for the "System Conversion" transition path?
om
Answer: D
Explanation:
.c
D is correct because SAP Readiness Check is the tool that provides sizing estimations for the “System
ps
Conversion” transition path. SAP Readiness Check is a tool that analyzes the readiness of a source
system for conversion to SAP S/4HANA. It provides information on various areas, such as
m
simplification items, custom code, data volume, and sizing. Verified :
du
: [SAP Readiness Check 2.0 for SAP S/4HANA]
am
Question: 46
ex
A. Planning poker
al
B. Retrospective
C. User story mapping
.v
D. Fit-gap analysis
w
w
Answer: C
w
Explanation:
//
C is correct because user story mapping is a technique that helps a Scrum team to prioritize a large,
s:
flat backlog. User story mapping is a process of creating a visual representation of the user stories,
tp
grouped by themes, epics, and features, and ordered by value and dependency. It helps the team to
ht
understand the big picture and focus on the most important user stories for each sprint. Verified :
: User Story Mapping
Question: 47
From which platform are you able to deploy a trial system within a short timeframe?
https://www.validexamdumps.com/C_ACTIVATE22.html
Questions and Answers PDF 23/41
Answer: D
Explanation:
D is correct because SAP Cloud Appliance Library is the platform from which you can deploy a trial
system within a short timeframe. SAP Cloud Appliance Library is a service that allows you to access
and provision preconfigured SAP solutions in the cloud, such as SAP S/4HANA, SAP HANA, or SAP
Business Suite. You can choose from various cloud providers, such as Amazon Web Services,
Microsoft Azure, or Google Cloud Platform, and deploy a trial system in minutes. Verified :
: SAP Cloud Appliance Library
Question: 48
om
What accelerator can help you document the configuration definition in the Explore phase?
.c
A. Data definition
ps
B. Change request template
C. Test strategy
m
D. Backlog template
du Answer: D
am
Explanation:
ex
D is correct because the backlog template is an accelerator that can help you document the
configuration definition in the Explore phase. The backlog template is a document that contains the
id
user stories that describe the configuration requirements and gaps for each scope item. It also
al
includes the acceptance criteria, priority, effort estimation, and dependencies for each user story.
Verified :
.v
Question: 49
w
Which estimation technique can you use in an Agile delivery approach to size the user stories during
//
sprint planning?
s:
tp
A. Project Manager's relative effort estimate that will be needed to implement and test the user
ht
story
B. Detailed top-down effort estimate by the Scrum Master in story points, based on the user story
complexity
C. Relative effort estimate in Ideal Person Days that reflects the best estimate by the project
D. Detailed bottom-up effort estimate by the product owner that breaks up each story into short
tasks
Answer: B
Explanation:
The team members reveal their cards simultaneously and discuss their estimates until they reach a
consensus. This technique is based on the concept of story points, which are units of measure for
https://www.validexamdumps.com/C_ACTIVATE22.html
Questions and Answers PDF 24/41
expressing the overall effort required to fully implement a user story. Story points are assigned to
user stories based on their complexity, risk, and uncertainty.
Question: 50
Which system tenants are the first to be provisioned when implementing SAP S/4HANA Cloud, public
edition? (Choose two)
om
D. SAP S/4HANA sandbox system
Answer: BC
.c
Explanation:
ps
SAP S/4HANA starter system is a system that contains the predefined configuration and sample data
m
for the selected scope items. It can be used for demonstration, exploration, and testing purposes.
du
Central Business Configuration System is a tool that enables customers to configure their SAP
S/4HANA Cloud system by following guided steps and entering configuration data.
am
These two system tenants are provisioned after the customer signs the contract and provides the
required information, such as company name, country, currency, and language. The provisioning
ex
Question: 51
al
What is the most granular level of the methodology you can view in the SAP Roadmap Viewer?
.v
w
A. Phase
w
B. Workstream
C. Task
w
D. Deliverable
//
s:
Answer: C
tp
Explanation:
ht
C is correct because task is the most granular level of the methodology that you can view in the SAP
Roadmap Viewer. A task is a specific activity that needs to be performed by a role within a
deliverable. A task has a description, an effort estimation, and a list of accelerators that support its
execution. Verified :
: [SAP Roadmap Viewer]
Question: 52
A. Realize
https://www.validexamdumps.com/C_ACTIVATE22.html
Questions and Answers PDF 25/41
B. Deploy
C. Final Preparation
D. Build and Test
Answer: A
Explanation:
A is correct because in the Realize phase, you run the User Acceptance Test. The User Acceptance
Test is a test that verifies that the solution meets the customer’s business requirements and
expectations. The User Acceptance Test is performed by the end users or key users, who provide
feedback and acceptance for the solution. Verified :
om
: SAP Activate Project Management Certification Guide, page 120
Question: 53
.c
ps
Which products are addressed in the SAP Activate methodology for the Intelligent Enterprise
roadmap? Note: There are 2 correct answers to this question.
m
du
A. SAP S/4HANA
B. SAP Fieldglass
am
C. SAP Ariba
D. SAP Concur
ex
Answer: BC
id
Explanation:
al
B is correct because SAP Fieldglass is one of the products that are addressed in the SAP Activate
.v
methodology for the Intelligent Enterprise roadmap. SAP Fieldglass is a cloud-based solution that
w
helps organizations manage their external workforce and services procurement. The SAP Activate
w
methodology for the Intelligent Enterprise roadmap provides guidance on how to implement and
integrate SAP Fieldglass with other SAP solutions, such as SAP S/4HANA, SAP SuccessFactors, or SAP
w
Ariba.
//
C is correct because SAP Ariba is one of the products that are addressed in the SAP Activate
s:
methodology for the Intelligent Enterprise roadmap. SAP Ariba is a cloud-based solution that helps
tp
organizations manage their procurement and supply chain processes. The SAP Activate methodology
for the Intelligent Enterprise roadmap provides guidance on how to implement and integrate SAP
ht
Ariba with other SAP solutions, such as SAP S/4HANA, SAP Fieldglass, or SAP Concur. Verified :
: [SAP Activate Methodology for Intelligent Spend Management Roadmap]
Question: 54
A. Waves
B. Releases
C. Sprints
D. Epics
https://www.validexamdumps.com/C_ACTIVATE22.html
Questions and Answers PDF 26/41
Answer: C
Explanation:
C is correct because in Focused Build, you use a work item in sprints. A work item is a document that
describes a configuration requirement or gap for a scope item. A work item is assigned to a sprint,
which is a time-boxed iteration where the work item is implemented and tested by the Scrum team.
Verified :
: Managing Work Items
Question: 55
om
When deploying a new implementation on-premise, which of the following is recommended when
.c
performing custom development?
ps
A. SAP Business Technology Platform
B. SAP Best Practices
m
C. SAP API Business Hub
du
D. SAP ABAP Workbench
am
Answer: D
Explanation:
ex
SAP ABAP Workbench for custom development. SAP ABAP Workbench is a tool that allows
al
developers to create, modify, and enhance ABAP programs and applications in an on-premise
system. It provides various features, such as syntax check, debugging, testing, and transport
.v
management. Verified :
w
: ABAP Workbench
w
Question: 56
// w
What transition scenarios are possible when adopting RISE with SAP? Note; There are 3 correct
s:
Answer: B, C, E
Explanation:
B is correct because Lift and Shift is one of the transition scenarios that are possible when adopting
RISE with SAP. Lift and Shift is a scenario where the customer moves their existing SAP system to the
cloud without changing the code or configuration. It is suitable for customers who want to reduce
https://www.validexamdumps.com/C_ACTIVATE22.html
Questions and Answers PDF 27/41
their infrastructure costs and complexity, and prepare for future innovation.
C is correct because New Implementation is one of the transition scenarios that are possible when
adopting RISE with SAP. New Implementation is a scenario where the customer sets up a new SAP
S/4HANA system in the cloud with predefined configuration and data migration from their legacy
system. It is suitable for customers who want to adopt the latest SAP innovations and best practices,
and simplify their business processes.
E is correct because System Conversion is one of the transition scenarios that are possible when
adopting RISE with SAP. System Conversion is a scenario where the customer converts their existing
SAP ERP system to SAP S/4HANA in the cloud, while preserving their data and customizations. It is
suitable for customers who want to leverage the benefits of SAP S/4HANA, such as improved
performance, user experience, and analytics, and retain their existing business processes. Verified :
: RISE with SAP – Business Transformation as a Service
om
: RISE with SAP – Transition Scenarios
.c
Question: 57
ps
What information does the project team need before they can correctly estimate the relative size of
m
backlog user stories?
du
A. Overall project schedule
am
B. Test strategy
C. Definition of Done
D. Available project resources
ex
id
Answer: C
Explanation:
al
.v
C is correct because Definition of Done is the information that the project team needs before they
w
can correctly estimate the relative size of backlog user stories. Definition of Done is a set of criteria
that determines when a user story is considered complete and ready for acceptance by the product
w
owner. It helps the team to align their expectations and assumptions on each user story, and provide
w
Question: 58
tp
Answer: D
Explanation:
D is correct because Iterative build with frequent inspections is a key characteristic of the Agile
project approach. The Agile project approach follows an iterative and incremental development
https://www.validexamdumps.com/C_ACTIVATE22.html
Questions and Answers PDF 28/41
process, where the solution is built and delivered in small increments called sprints. Each sprint
consists of planning, designing, building, testing, and reviewing activities, where the team inspects
the solution and adapts to changing requirements and feedback
Question: 59
Which of the following activities take place during the Discover phase in an SAP BW/4HANA
implementation?Note: There are 2 correct answers to this question.
A. Create, review, and sign off the Create Project Management Plan.
B. Discuss the Benefits of SAP Data Warehouse Cloud.
om
C. Discuss the Benefits and Functionality of SAP Analytics Cloud
D. Create, review, and sign off the Project Charter.
.c
Answer: B, C
ps
Explanation:
m
B is correct because discussing the benefits of SAP Data Warehouse Cloud is one of the activities that
du
take place during the Discover phase in an SAP BW/4HANA implementation. SAP Data Warehouse
Cloud is a cloud-based solution that enables you to create a data warehouse that integrates data
am
from various sources and provides analytics capabilities. You can discuss how SAP Data Warehouse
Cloud can complement your SAP BW/4HANA solution and provide additional value for your business
ex
scenarios.
C is correct because discussing the benefits and functionality of SAP Analytics Cloud is one of the
id
activities that take place during the Discover phase in an SAP BW/4HANA implementation. SAP
Analytics Cloud is a cloud-based solution that provides business intelligence, planning, and
al
predictive analytics capabilities. You can discuss how SAP Analytics Cloud can leverage your SAP
.v
BW/4HANA data and provide insights and visualizations for your business users. Verified :
w
Question: 60
// w
When conducting an upgrade of an SAP S/4HANA Cloud, public edition three system landscape, in
s:
A. Explore
ht
B. Realize
C. Deploy
D. Discover
Answer: A
Explanation:
A is correct because in the Explore phase, the Business Roles are updated when conducting an
upgrade of an SAP S/4HANA Cloud, public edition three system landscape. The Business Roles are
the roles that define the access rights and authorizations for the users in the system. The Business
Roles are updated to reflect the changes and enhancements that are introduced by the upgrade,
https://www.validexamdumps.com/C_ACTIVATE22.html
Questions and Answers PDF 29/41
Question: 61
When doing a new implementation on premise or private cloud, which system is recommended to
demonstrate standard functionality in the Explore phase?
A. Starter
B. Development
C. Trial
om
D. Sandbox
Answer: D
.c
Explanation:
ps
D is correct because Sandbox is the system that is recommended to demonstrate standard
m
functionality in the Explore phase when doing a new implementation on premise or private cloud.
du
The Sandbox system is a copy of the Development system that can be used for demonstration,
exploration, and testing purposes. It allows the project team to show the customer the SAP Best
am
Practices content and compare it with their business requirements. Verified :
: SAP Activate Project Management Certification Guide, page 124
ex
Question: 62
id
al
Which of the following are levels in the structure of an SAP Best Practices for SAP S/4HANA Solution
Package?Note: There are 2 correct answers to this question.
.v
w
A. Configuration Guides
w
B. Scope Items
C. Building Blocks
w
Answer: B, C
tp
Explanation:
ht
B is correct because Scope Items are one of the levels in the structure of an SAP Best Practices for
SAP S/4HANA Solution Package. A Scope Item is a unit of business functionality that covers one or
more business processes. A Scope Item has a description, a list of configuration steps, and a set of
test cases.
C is correct because Building Blocks are one of the levels in the structure of an SAP Best Practices for
SAP S/4HANA Solution Package. A Building Block is a reusable component that contains configuration
data, master data, or transactional data for a specific business area. A Building Block can be assigned
to one or more Scope Items. Verified :
: [SAP Best Practices Explorer]
Question: 63
https://www.validexamdumps.com/C_ACTIVATE22.html
Questions and Answers PDF 30/41
What criteria does the product owner use to sequence the backlog?Note: There are 2 correct
answers to this question.
A. Technical dependencies
B. Release planning schedule
C. Business priority
D. Complexity of the story
Answer: A, C
Explanation:
om
A is correct because technical dependencies are one of the criteria that the product owner uses to
sequence the backlog. Technical dependencies are the relationships between user stories that affect
.c
their order of implementation. For example, some user stories may require other user stories to be
ps
completed first, or some user stories may have a common prerequisite or constraint.
C is correct because business priority are one of the criteria that the product owner uses to sequence
m
the backlog. Business priority is the measure of how important and valuable a user story is for the
du
customer and the stakeholders. The product owner decides which user stories are more urgent and
beneficial, and places them higher in the backlog. Verified :
am
: Product Backlog
Question: 64
ex
id
Which of the following is the customer's responsibility in both on-premise and private cloud
scenarios?
al
.v
A. Database
w
B. Middleware
C. Operating system
w
D. Servers
// w
Answer: D
s:
Explanation:
tp
D is correct because servers are the customer’s responsibility in both on-premise and private cloud
ht
scenarios. Servers are the hardware devices that host the SAP system and its components. The
customer has to provide, maintain, and secure their own servers in both scenarios, as they have full
control over their infrastructure. Verified :
: [SAP S/4HANA Cloud Editions]
Question: 65
In which phase will the customer develop a preliminary strategy for building a target Operations and
Support organizational model?
A. Run phase
https://www.validexamdumps.com/C_ACTIVATE22.html
Questions and Answers PDF 31/41
B. Explore phase
C. Prepare phase
D. Discover phase
Answer: C
Explanation:
C is correct because in the Prepare phase, the customer will develop a preliminary strategy for
building a target Operations and Support organizational model. The Operations and Support
organizational model is a structure that defines the roles, responsibilities, processes, and tools for
operating and supporting the solution after go-live. The preliminary strategy helps to identify the
om
current and future state of the model, as well as the gaps and actions that need to be addressed.
Question: 66
.c
ps
Which of the following characteristics relate to the Focused Build for SAP Solution Manager
functionality? Note: There are 2 correct answers to this question.
m
du
A. SAP delivers all knowledge required with the solution.
B. SAP delivers a standard solution with its own separate license
am
C. SAP delivers a standard solution without any additional coding required
D. SAP delivers all configuration activities within your project
ex
Answer: A, C
id
Explanation:
al
A is correct because SAP delivers all knowledge required with the solution as part of the Focused
.v
Build for SAP Solution Manager functionality. Focused Build provides pre-configured standard SAP
w
Solution Manager features and processes, as well as additional build functions, such as requirements
w
management, change request management, test management, and release management. Focused
Build also provides best practices, methodologies, and templates to support the implementation of
w
SAP solutions.
//
C is correct because SAP delivers a standard solution without any additional coding required as part
s:
of the Focused Build for SAP Solution Manager functionality. Focused Build is a ready-to-run and
tp
integrated tool that enables customers to manage requirements and software development in large,
agile projects. Focused Build does not require any additional coding or customization to use its
ht
Question: 67
Which of the following is part of the Explore phase in the "New Implementation of SAP S/4HANA
Cloud, public edition" transition path?
https://www.validexamdumps.com/C_ACTIVATE22.html
Questions and Answers PDF 32/41
Answer: B
Explanation:
B is correct because Fit-to-standard is part of the Explore phase in the “New Implementation of SAP
S/4HANA Cloud, public edition” transition path. Fit-to-standard is a process where the customer
validates the fit of their business processes to the standard SAP S/4HANA Cloud solution and
identifies any gaps or extensions that need to be addressed. Fit-to-standard is performed using a
series of workshops where the customer reviews the best practice processes and scenarios provided
om
by SAP and compares them with their own requirements. Verified :
: SAP Activate Methodology for SAP S/4HANA Cloud, page 18
: SAP Activate – Explore Phase: Use Fit-to-Standard to Confirm Business Process Fit and Identify Gaps
.c
in Your SAP S/4HANA Cloud Implementation
ps
Question: 68
m
du
Which of the following tools facilitate secure communication between SAP cloud solutions and
protected on-premise networks that CANNOT be accessed directly from the Internet?
am
A. SAP Connectivity service
ex
Answer: A
.v
Explanation:
w
w
A is correct because SAP Connectivity service is one of the tools that facilitate secure communication
between SAP cloud solutions and protected on-premise networks that cannot be accessed directly
w
from the Internet. The SAP Connectivity service allows SAP cloud applications to access remote
//
services that run on the Internet or on-premise via a secure tunnel established by the Cloud
s:
Connector. The Cloud Connector acts as a reverse proxy that connects to the SAP Connectivity service
tp
Question: 69
Which of the following are SAP Activate workstreams?Note: There are 2 correct answers to this
question.
A. Change Management
B. Project Management
C. Extensibility
D. Data Migration
https://www.validexamdumps.com/C_ACTIVATE22.html
Questions and Answers PDF 33/41
Answer: B, D
Explanation:
B is correct because Project Management is one of the SAP Activate workstreams. The Project
Management workstream covers all the activities related to planning, executing, monitoring,
controlling, and closing the project. It includes tasks such as defining project scope, schedule,
budget, resources, risks, issues, quality, communication, and stakeholder management.
D is correct because Data Migration is one of the SAP Activate workstreams. The Data Migration
workstream covers all the activities related to preparing, extracting, transforming, validating, and
loading data from legacy systems to SAP systems. It includes tasks such as defining data migration
om
strategy, scope, approach, tools, roles, responsibilities, quality criteria, and testing scenarios. Verified
:
: SAP Activate Methodology Workstreams Names update
.c
: SAP Activate Testing Workstream
ps
Question: 70
m
du
Which of the following capabilities does SAP Solution Manager Test Suite support? Note: There are 2
correct answers to this question.
am
A. Multi-technology change impact analysis
ex
Answer: B, C
.v
Explanation:
w
w
B is correct because tests for SAP and non-SAP solutions are one of the capabilities that SAP Solution
Manager Test Suite supports. The Test Suite allows customers to create and execute manual and
w
automated tests for both SAP and non-SAP solutions using a single tool. The Test Suite integrates
//
with various testing tools from SAP and partners to support different types of testing scenarios.
s:
C is correct because manual and automated functional tests are one of the capabilities that SAP
tp
Solution Manager Test Suite supports. The Test Suite enables customers to perform manual testing
based on test case descriptions or automated testing using test scripts. The Test Suite supports
ht
various test automation frameworks such as Component Based Test Automation (CBTA), Tricentis
Test Automation (TTA), eCATTs, HP QuickTest Professional (QTP), Worksoft Certify, IBM Rational
Functional Tester (RFT), Selenium WebDriver, etc. Verified :
: Test Suite
: Test Management
Question: 71
What findings do you document in the Explore Phase workshops? Note: There are 3 correct answers
to this question.
https://www.validexamdumps.com/C_ACTIVATE22.html
Questions and Answers PDF 34/41
Answer: B, D, E
Explanation:
B is correct because key business decisions are one of the findings that you document in the Explore
Phase workshops. Key business decisions are the choices that the customer makes regarding their
om
business processes, such as organizational structure, master data, reporting, or integration. These
decisions affect the configuration and customization of the solution, and need to be documented and
approved by the customer.
.c
D is correct because confirmation of scope is one of the findings that you document in the Explore
ps
Phase workshops. Confirmation of scope is the validation that the customer agrees with the scope
items that are selected for their solution, and that they understand the functionality and limitations
m
of each scope item. This helps to ensure that there are no misunderstandings or misalignments
du
between the customer and the project team.
E is correct because process models are one of the findings that you document in the Explore Phase
am
workshops. Process models are graphical representations of the business processes that show the
sequence of activities, roles, and systems involved in executing the process. Process models help to
visualize and communicate the business requirements and scenarios, and identify any gaps or
ex
Question: 72
w
w
Which of the following steps are part of the fit-to-standard process? Note: There are 2 correct
w
Answer: B, D
Explanation:
B is correct because reviewing Best Practices process flow is one of the steps that are part of the fit-
to-standard process. The Best Practices process flow is a diagram that shows the standard SAP
functionality and configuration for a scope item. The project team reviews the Best Practices process
flow with the customer to demonstrate how the solution supports their business processes, and to
identify any gaps or extensions that need to be addressed.
D is correct because enabling customers on standard business processes is one of the steps that are
https://www.validexamdumps.com/C_ACTIVATE22.html
Questions and Answers PDF 35/41
part of the fit-to-standard process. The project team enables customers on standard business
processes by providing them with access to a starter system, where they can explore and test the
predefined configuration and sample data for each scope item. The project team also provides
customers with training materials and guidance on how to use the solution. Verified :
: [SAP Activate Methodology for SAP S/4HANA Cloud], page 18
: [SAP Activate – Explore Phase: Use Fit-to-Standard to Confirm Business Process Fit and Identify
Gaps in Your SAP S/4HANA Cloud Implementation]
Question: 73
Which estimation technique can you use in an Agile delivery approach to size the user stories during
om
sprint planning?
A. Detailed top-down effort estimate by the Scrum Master in story points, based on the user story
.c
complexity
ps
B. Project Manager's relative effort estimate that will be needed to implement and test the user ^
story
m
C. Detailed bottom-up effort estimate by the product owner that breaks up each story into short ^
du
tasks
D. Relative effort estimate in Ideal Person Days that reflects the best estimate by the project ^ team
am
Answer: A
ex
Explanation:
id
A is correct because Planning poker is an estimation technique that you can use in an Agile delivery
approach to size the user stories during sprint planning. Planning poker is a game where each team
al
member uses a set of cards with numbers that represent the relative effort of a user story. The team
.v
members reveal their cards simultaneously and discuss their estimates until they reach a consensus.
w
This technique is based on the concept of story points, which are units of measure for expressing the
overall effort required to fully implement a user story. Story points are assigned to user stories based
w
: Planning Poker
//
s:
Question: 74
tp
Answer: C
Explanation:
C is correct because Iterative build with frequent inspections is a key characteristic of the Agile
project approach. The Agile project approach follows an iterative and incremental development
https://www.validexamdumps.com/C_ACTIVATE22.html
Questions and Answers PDF 36/41
process, where the solution is built and delivered in small increments called sprints. Each sprint
consists of planning, designing, building, testing, and reviewing activities, where the team inspects
the solution and adapts to changing requirements and feedback. Verified :
: What is Agile Software Development?
Question: 75
What is the objective of using scaling Scrum techniques when coordinating large teams in complex
projects?
A. To bring all specialists, such as the company legal advisors, into the scrum team
om
B. To manage the flow of information between the project and stakeholders
C. To ensure alignment in architecture, configuration, and integration
D. To reallocate staff to skill-based teams such as developers in one single team
.c
ps
Answer: C
Explanation:
m
du
C is correct because ensuring alignment in architecture, configuration, and integration is one of the
objectives of using scaling Scrum techniques when coordinating large teams in complex projects.
am
Scaling Scrum techniques are methods that help to apply Scrum principles and practices across
multiple teams working on a large-scale product or program. Scaling Scrum techniques aim to ensure
ex
collaboration
al
Question: 76
.v
w
Who determines the tasks that are required to complete the committed backlog items in a Sprint?
w
A. Scrum team
w
B. Product owner
//
C. Scrum master
s:
D. Project manager
tp
Answer: A
ht
Explanation:
A is correct because the Scrum team is the one that determines the tasks that are required to
complete the committed backlog items in a Sprint. The Scrum team is a self-organizing and cross-
functional group of people who work together to deliver a potentially releasable increment of the
product at the end of each Sprint. The Scrum team breaks down the user stories into smaller and
manageable tasks, and assigns them to the team members based on their skills and availability.
Question: 77
How do you set up Scrum teams?Note: There are 2 correct answers to this question.
https://www.validexamdumps.com/C_ACTIVATE22.html
Questions and Answers PDF 37/41
Answer: A, C
Explanation:
A is correct because based on end-to-end processes like order-to-cash is one of the ways to set up
om
Scrum teams. This way, the Scrum teams are organized around the business value streams that they
support, and they have a clear understanding of the customer needs and expectations. This also
helps to reduce dependencies and handovers between teams, and to optimize the flow of work.
.c
C is correct because as a cross-functional team covering multiple functions, like configuration, data
ps
loads, and testing is one of the ways to set up Scrum teams. This way, the Scrum teams have all the
skills and competencies that they need to deliver a complete and working product increment in each
m
Sprint. This also helps to increase collaboration and communication within the team, and to foster a
du
sense of ownership and accountability. am
Question: 78
ex
Answer: C
w
Explanation:
// w
C is correct because expediting all deployment options for SAP products is the primary purpose of
s:
the SAP Activate methodology. The SAP Activate methodology is a framework that provides guidance
tp
and best practices for implementing SAP solutions in different scenarios, such as cloud, on-premise,
or hybrid. The SAP Activate methodology aims to accelerate and simplify the deployment process by
ht
Question: 79
You are transitioning to SAP S/4HANA.In which phase do you adjust custom code?
A. Realize
B. Explore
C. Discover
D. Deploy
https://www.validexamdumps.com/C_ACTIVATE22.html
Questions and Answers PDF 38/41
Answer: A
Explanation:
A is correct because in the Realize phase, you adjust custom code when transitioning to SAP
S/4HANA. Custom code is the code that was developed by the customer or a partner to extend or
modify the standard SAP functionality. Custom code needs to be adjusted to ensure compatibility
and performance with SAP S/4HANA, as well as compliance with the simplification items and coding
guidelines. Verified :
: [SAP Activate Methodology for SAP S/4HANA On Premise], page 22
om
Question: 80
.c
Which of the following tools are considered enablers for digital transformation? Note: There are 3
correct answers to this question.
ps
A. Software Logistics Toolset
m
B. SAP Product Availability Matrix
du
C. SAP Roadmap Viewer
D. SAP Best Practices Explorer
am
E. SAP Activate Community
ex
Answer: C, D, E
Explanation:
id
al
C is correct because SAP Roadmap Viewer is one of the tools that are considered enablers for digital
transformation. The SAP Roadmap Viewer is a tool that provides access to various roadmaps for SAP
.v
products and solutions, such as SAP S/4HANA, SAP SuccessFactors, or SAP Ariba. The roadmaps
w
describe the phases, deliverables, tasks, and accelerators that are required for implementing or
w
upgrading an SAP solution. The roadmaps help customers to plan and execute their digital
transformation projects with confidence and clarity.
w
D is correct because SAP Best Practices Explorer is one of the tools that are considered enablers for
//
digital transformation. The SAP Best Practices Explorer is a tool that provides access to various best
s:
practices packages for SAP products and solutions, such as SAP S/4HANA Cloud, SAP Business
tp
Technology Platform, or SAP Analytics Cloud. The best practices packages contain preconfigured
content and processes that enable customers to quickly and easily adopt SAP innovations and best
ht
practices.
E is correct because SAP Activate Community is one of the tools that are considered enablers for
digital transformation. The SAP Activate Community is an online platform that connects customers,
partners, experts, and enthusiasts who are interested in learning more about the SAP Activate
methodology and its related topics. The community provides various resources, such as blogs,
webinars, podcasts, Q&A sessions, feedback forums, etc., that help customers to get support and
guidance for their digital transformation projects. Verified :
: [SAP Roadmap Viewer]
: [SAP Best Practices Explorer]
: [SAP Activate Community]
https://www.validexamdumps.com/C_ACTIVATE22.html
Questions and Answers PDF 39/41
Question: 81
Answer: C
om
Explanation:
.c
C is correct because extensibility based on the SAP Business Technology Platform (BTP) and published
APIs is what the Side-by-Side extensibility option means. Side-by-Side extensibility is a type of
ps
extensibility that allows customers to create custom applications or extensions that run on a
separate platform, such as SAP BTP, and communicate with the SAP S/4HANA system via published
m
APIs. Side-by-Side extensibility enables customers to enhance their SAP S/4HANA solution without
du
modifying the core code or configuration, and to leverage the capabilities of SAP BTP, such as cloud
services, development tools, or integration options. Verified :
am
: [Extensibility Options for SAP S/4HANA], page 9
ex
Question: 82
id
In which workshop do you validate SAP standard functionality and collect delta requirements?
al
A. Design thinking
.v
B. Fit-to-gap
w
C. Solution validation
w
D. Fit-to-standard
w
Answer: D
//
Explanation:
s:
tp
D is correct because Fit-to-standard is the workshop where you validate SAP standard functionality
ht
and collect delta requirements. Fit-to-standard is a process where the customer validates the fit of
their business processes to the standard SAP solution and identifies any gaps or extensions that need
to be addressed. Fit-to-standard is performed using a series of workshops where the customer
reviews the best practice processes and scenarios provided by SAP and compares them with their
own requirements. Verified :
: [SAP Activate Methodology for SAP S/4HANA Cloud], page 18
: [SAP Activate – Explore Phase: Use Fit-to-Standard to Confirm Business Process Fit and Identify
Gaps in Your SAP S/4HANA Cloud Implementation]
https://www.validexamdumps.com/C_ACTIVATE22.html
Questions and Answers PDF 40/41
om
.c
ps
m
du
am
ex
id
al
.v
w
w
// w
s:
tp
ht
https://www.validexamdumps.com/C_ACTIVATE22.html
Questions and Answers PDF 41/41
om
.c
ps
m
du
am
ex
id
al
.v
w
w
// w
s:
tp
ht
https://www.validexamdumps.com/C_ACTIVATE22.html