Wire Continuity Testing and Commissioning Form

Blank Template for Copper Wire Electricity continuity testing

Uploaded by

Janiorniel
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 3

ELECTRICAL CONTINUITY TESTING / CHECKLIST

Site Location Line 1 Red


Equipment No. Line 2 Yellow
Type/ Rating Line 3 Blue
Brand Neutral White or Gray
Serial No. Ground Green or Black
Calibration Expiry PEC 2017 2.0.1.6

CIRCUIT
DESCRIPTION L1-L2 L2-L3 L3-L1 L1-N L2-N L3-N L1-G L2-G L3-G N-G WIRE SIZE REMARKS
NUMBER
1
2
3
4
5
6
7
8
9
10

DATE OF FINAL TESTING


Contractor

3rd Party Inspector

Owner
Page 2-2

C. Turns Ratio Test


Winding Tap Expected As Found Percent Remarks
Terminals Ratio Ratio Diff(%) Limits ±

Test Intrument used:


Type:
Model/S.N.:
D. Excitation Test
Winding Tap Test Exciting Current
Terminals Voltage Reading Milli-Amps Remarks

Test Intrument used:


Type:
Model/S.N.:
Limits of Excitation Test:
E. Diaelectric Breakdown Voltage Test of Insulating Oil
Trials Average Remarks
Type 1 2 3 4 5 in KV Limits > 24KV

Test Intrument used:


Type:
Model/S.N.:

Remarks: 1. The limits for the winding resistance test are ± 5% difference with the other windings or compare
the manufacturers test values
2. The insulation resistance readings are corrected to 20 degrees Celsius with a multiplier of 1.98
3. The insulation resistance readings for the secondary windings reached the equipment maximum
range at a given test voltage.
4. Test results are within the limits

Note: Date of Final Testing


Please Sign Over Printed Name Building Design Consultants
CMD/Project Director or designate
Project Manager
APMC-TSG Representative
Contractor