0% found this document useful (0 votes)
182 views4 pages

JSA Temporary Shed

JSA for store temporary shed erection

Uploaded by

NAGARJUNA
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
182 views4 pages

JSA Temporary Shed

JSA for store temporary shed erection

Uploaded by

NAGARJUNA
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 4

Job Safety Analysis & Risk Assessment

Company Name and JSA No : Scon Projects Pvt. Ltd. ISSUE DATE : 20-08-2024 1

Job Task: Temporary shed for store 3 meters

Name of Department performing Task: MEP Work

Equipment/ Tools Required: Self screwing machine,spanners ,scaffolding

PPE Required: Helmet, Reflective Jacket, Safety Shoes, Hand Gloves, Safety harness belt ,goggles,mask,Ear plugs

JOB SAFETY ANALYSIS RISK ASSESSMENT Residual Risk

FREQUENCY RISK (R= FXS) RISK (R= FXS)


Sr. No. JOB STEPS IN SEQUENCE POTENTIAL HAZARD RISK EXISTING CONTROL MEASURES
(F)
SEVERITY (S)
(Base Risk)
ADDITIONAL CONTROL MEASURES FREQUENCY (F) SEVERITY (S)
(Residual Risk)

1 2 3 4 5 6 7 8 9 10 11 12

1)Trained competant and exprience workers will be deployed at site.


2) Workers above 21 years and 50 years of age only allowed to work for height after passing vertigo test.
3) All workers shoul be well knowledge.
4) Pre entry medical check up will be done.
5) After completing induction training then only the workforce will be deployed at site to work.
6)HCCB construction Guidelines will be adhered.
7)Works related trainings TBT will be conducted before start of works.
8)All the job specific protective gears will be provided to the crew and PPE'S compliance reigister will be maintained.
9) Pre task meeting will be condcuted to the crew before commencing of the work activity like height work,hotwork.
1 Manpower Mobilization 1) Untrained/ in competant 1)Person Injury 10)Provision of drinking water and other welfare facilites shall be provided at site. 3 2 6
2) Unexperiecned workforce 2)Property damages 11)JSA will be explained to the workforce before commencing of the works to the workforce.
12)Workforce will not move to other locations at site.
13) Works will be carried out under the close supervision.

1)Incase of group liting/shiftig the material proper instruction and communication must be given by the team incharge.
2)Working area must be barricaded to prevent unathorised entry.
3)Display the caution board at workplace.
4)Mandatory protective gears will be provided to the workforce.
1)Slip,fall 5) PTW will be taken prior to start the works at site.
1)Un even gorund condition 2)Cut injury 6) Materials will be stacked at designated area provided by the PMC/CMC.
2Untrained/incompetent/ 3) Material damage 7) Ensured that the path way clear always to move the workforce freely.
Sheed materials will be unloaded unexpierence worker. 1)Dedicated supervision will be deployed while material
2 8) Wooden blocks are keept on the ground for resting the materail on it. 3 3 9 shifting activity in progress. 2 3 6
by manually. 3)unsafe/incomplete access 9) Carry up 25 kgs weight at a time by person.
4)Lack of knowledge
5) Lack of signages
6)Sharp edges

1) Area should be levelled for the men movement.


2) Ensure all workers are trained before starting the works.
3) Person must be elevation test as pet HCCB guidelines.
4) Ensure that workpermit must be obtained before starting the work.
5)One person can lift only 25 kgs.
6) Materials must be stacked up to below 1.2 meters.
7) Workplace area must be free from obstructions.
1)Un even gorund condition 8) Working are must be dry and non slippery if the area is wet barrricade the area and clean it.
2Untrained/incompetent/ 9) Do not carry the load on shoulders.
unexpierence worker. 10) Material should be stacked as per the size,shape and weight. 1) The area should be kept free of any
Shed material shifting by manually 3)unsafe/incomplete access 1)Slip,fall 11) Do not stack over weigthted material at top. liquid ,spill,especially greasy liquids.
3 to the shed construction area. 4)Lack of knowledge 2) Property damage 12)Cut resistance hand gloves to be provided to the workers. 3 3 9 1 3 3
5) Lack of signages 3) Cut injury 13)Area will be barricaded and signage boards will be displayed.
6) Sharp edges 14) Ensured the workplace area proper illumination provided.
15)Ensured works carried under the close supervision.
16)Workpermit will be obtained before commecncing of the works

1) Store area inspection will be done if applicable LOTO permit will be obtained before commencing of the works.
1)Utilities damage 1) Electricution 2)Crew will be trained on job specific safety training.
Manually excavated pit 2)Lack of knowledge 2)Utlility damage. 3) Insulated crow bar will be used whie to do excavation.
4 concreting of excavated pit with 3) sharp edges 3) Injury 4) Insulated gloves,helmet,safety shoes,refletive jacket. 3 3 9 1) Works will be carried out under the close supervision.
angle fixing(Deapth-2ft) 4)Dust 4) Respiratory issues 5) Mask and goggles will provided to the workmen.
JOB SAFETY ANALYSIS RISK ASSESSMENT Residual Risk

FREQUENCY RISK (R= FXS) RISK (R= FXS)


Sr. No. JOB STEPS IN SEQUENCE POTENTIAL HAZARD RISK EXISTING CONTROL MEASURES
(F)
SEVERITY (S)
(Base Risk)
ADDITIONAL CONTROL MEASURES FREQUENCY (F) SEVERITY (S)
(Residual Risk)

1 2 3 4 5 6 7 8 9 10 11 12

1)Scaffolding area should be free from obstruction and proper access should be provided.
2)All the scaffolding parts must be installed as per the checklist.
3)Adequate platform should be provided.
4)Scaffolding should be erected on the even surface and lock the wheels while working on it.
5) Fall protetion should be provided full body safety harness ,Helmet,Safety shoes,
6)Only trained workmen will be erected the scaffolding under the supervision.
1)Uneven ground condition 7) Vertigo test should be done for the wokforce invovled in the height work.
2)Un trained /Incompetant 1)Scaffolding collapse 8) Scaffolding midrail and top rail need to be provided.
3)Non standard scaffolding 2)Fall of person from the top 9) PPE'S must be used Helmet,safety shoes,safety harness during the work.
Mobile scaffolding erection and components 3)Personal injury 10) JSA need to be explained to the crew. 1)Scaffolding stablizer must be provided.
dismantling for the temporary 4) Unsafe incompleted access 4)Property damage 11)After erecting the scaffolding inspect it as per the checklist and implement display the green tag, 2)Before starting the wotk scaffolding TPI must be done.
shed construction purpose. 5) Lack of knowledge 5)Fall of materials from height 12) All the power tools will be inspected,ensured cable condition is good,plug top available,guard available ,ISI cutting wheel used and fit tags will 3) Safety harness ensure anchoring point must be available
5 6) Lack of signages 6)Electricution be displayed by authhorised person. 3 3 9 at work location. 1 3 3
Erection of angle nut bolting and 7)Incompleted scaffolding 7)Breathing Difficulties 13) Ensured that all the PDBS rooted with 30 mA ELCB IP 65 Type used. 4) Scaffolding toe guard must be provided.
roofing sheting will be done with 8) Lack of signages/barrication 8) Respiratory issues 14)By using the harness for the tools will be secure. 5) Job specific training will be condcuted to the crew.
the help of scaffolding. 9) Working at height 9) Cut Injury 15) All the job specific protective gears will be provided to the crew Helmet ,Safety shoes , Reflective jacket ,Mask,goggles,hand gloves.
10) Defective power tools 10)Hearing loss 16) Rigidly the angle nut bolting will be done.
11) Sharp edges 17) While sheeting self screwing will be done.
12) Noise 18) Ear plugs and goggles will be used while working.

Providing the cut resitance hand gloves to the workmen


Sharp waste Cut injury Providing the mask to the workmen
8 House keeping Dust Breathing Difficulties, lung diseases Providing training to the workforce 2 2 4
Water sprinkling will be done to control the dust

1)Keep the emergency exit area free from any obstacles.


2)Emergency lighting should be provided for that area.
3)Wokers & employees should be trained with emergency evacuation procedure & exit.
4) Incase detect any emergency situation gather in safe assembly point.
5) In case leaking the gas immediately evacuate the place.
9 Emergency evacution or exit 1)Lack of signges 1)confusion 6)Signage board should be displayed at workplace. 2 2 4
2)Limited visibility 2)limited visibility 7) Emergecny evacuation root and assembly point be aware by workman.
8).Keep emergency contact number
9.Incase of emergency don't use of elevator.
10.Communication of HCCB members
11Awarness training will be conducted to staff and workforce on site emergency evacuation root

Reviewed by Reviewed & Approved by

HCCB
Contractor EHS CMC EHS EHS
Incharge Contractor Project Manager FABS Site Incharge FABS EHS Incharge FABS Project Manager Manager HCCB Project Manager Manager HCCB EHS Manager
APPLICABLE TO PERMIT No SPECIAL PERMITS APPLICABLE o CONFINED SPACE, o HOT WORK, o WORKING AT HEIGHT, o EXCAVATION, o OTHER :________________________
PRE START JOB REVIEW
JSA BRIEFING BY Name Signature Date : Note (if any)
Internal