Company Name and JSA No : Scon Projects Pvt. Ltd. ISSUE DATE : 20-08-2024 1
PPE Required: Helmet, Reflective Jacket, Safety Shoes, Hand Gloves, Safety harness belt ,goggles,mask,Ear plugs
1 2 3 4 5 6 7 8 9 10 11 12
1)Incase of group liting/shiftig the material proper instruction and communication must be given by the team incharge.
2)Working area must be barricaded to prevent unathorised entry.
3)Display the caution board at workplace.
4)Mandatory protective gears will be provided to the workforce.
1)Slip,fall 5) PTW will be taken prior to start the works at site.
1)Un even gorund condition 2)Cut injury 6) Materials will be stacked at designated area provided by the PMC/CMC.
2Untrained/incompetent/ 3) Material damage 7) Ensured that the path way clear always to move the workforce freely.
Sheed materials will be unloaded unexpierence worker. 1)Dedicated supervision will be deployed while material
2 8) Wooden blocks are keept on the ground for resting the materail on it. 3 3 9 shifting activity in progress. 2 3 6
by manually. 3)unsafe/incomplete access 9) Carry up 25 kgs weight at a time by person.
4)Lack of knowledge
5) Lack of signages
6)Sharp edges
1) Store area inspection will be done if applicable LOTO permit will be obtained before commencing of the works.
1)Utilities damage 1) Electricution 2)Crew will be trained on job specific safety training.
Manually excavated pit 2)Lack of knowledge 2)Utlility damage. 3) Insulated crow bar will be used whie to do excavation.
4 concreting of excavated pit with 3) sharp edges 3) Injury 4) Insulated gloves,helmet,safety shoes,refletive jacket. 3 3 9 1) Works will be carried out under the close supervision.
angle fixing(Deapth-2ft) 4)Dust 4) Respiratory issues 5) Mask and goggles will provided to the workmen.
JOB SAFETY ANALYSIS RISK ASSESSMENT Residual Risk
1 2 3 4 5 6 7 8 9 10 11 12
1)Scaffolding area should be free from obstruction and proper access should be provided.
2)All the scaffolding parts must be installed as per the checklist.
3)Adequate platform should be provided.
4)Scaffolding should be erected on the even surface and lock the wheels while working on it.
5) Fall protetion should be provided full body safety harness ,Helmet,Safety shoes,
6)Only trained workmen will be erected the scaffolding under the supervision.
1)Uneven ground condition 7) Vertigo test should be done for the wokforce invovled in the height work.
2)Un trained /Incompetant 1)Scaffolding collapse 8) Scaffolding midrail and top rail need to be provided.
3)Non standard scaffolding 2)Fall of person from the top 9) PPE'S must be used Helmet,safety shoes,safety harness during the work.
Mobile scaffolding erection and components 3)Personal injury 10) JSA need to be explained to the crew. 1)Scaffolding stablizer must be provided.
dismantling for the temporary 4) Unsafe incompleted access 4)Property damage 11)After erecting the scaffolding inspect it as per the checklist and implement display the green tag, 2)Before starting the wotk scaffolding TPI must be done.
shed construction purpose. 5) Lack of knowledge 5)Fall of materials from height 12) All the power tools will be inspected,ensured cable condition is good,plug top available,guard available ,ISI cutting wheel used and fit tags will 3) Safety harness ensure anchoring point must be available
5 6) Lack of signages 6)Electricution be displayed by authhorised person. 3 3 9 at work location. 1 3 3
Erection of angle nut bolting and 7)Incompleted scaffolding 7)Breathing Difficulties 13) Ensured that all the PDBS rooted with 30 mA ELCB IP 65 Type used. 4) Scaffolding toe guard must be provided.
roofing sheting will be done with 8) Lack of signages/barrication 8) Respiratory issues 14)By using the harness for the tools will be secure. 5) Job specific training will be condcuted to the crew.
the help of scaffolding. 9) Working at height 9) Cut Injury 15) All the job specific protective gears will be provided to the crew Helmet ,Safety shoes , Reflective jacket ,Mask,goggles,hand gloves.
10) Defective power tools 10)Hearing loss 16) Rigidly the angle nut bolting will be done.
11) Sharp edges 17) While sheeting self screwing will be done.
12) Noise 18) Ear plugs and goggles will be used while working.
HCCB
Contractor EHS CMC EHS EHS
Incharge Contractor Project Manager FABS Site Incharge FABS EHS Incharge FABS Project Manager Manager HCCB Project Manager Manager HCCB EHS Manager
APPLICABLE TO PERMIT No SPECIAL PERMITS APPLICABLE o CONFINED SPACE, o HOT WORK, o WORKING AT HEIGHT, o EXCAVATION, o OTHER :________________________
PRE START JOB REVIEW
JSA BRIEFING BY Name Signature Date : Note (if any)