Rubrics-EC-782, Project - Part-I
Rubrics-EC-782, Project - Part-I
Sl.
Criteria Excellent Good Fair Poor Marks
No
Excellent,(17-20)
Job Good (13-16) Fair (5-12) Undeveloped (5-0)
Completed as per
1. Completion
task given by the
Needs minor Needs major Did not complete
(20) modification modification the project
supervisor
Fair (5-12)
Good (13-16)
Excellent,(17-20) The project work
The project work was Undeveloped (5-0)
The project work was finished in
somehow finished in Student was not
Performance was finished well in undesired manner
organised manner & involved in all
in executing time in organised & performed as a
2. the project manner & performed
performed as a team
team member
activities of project
member was in a work
(20) as a team member was not
proper manner
in excellent manner satisfactory
Fair (5-6)
Good (8-7)
The report not well Poor(5-0)
Excellent,( 9-10) The report is
presentable and The report is not
The report is neat moderately neat and
as per the neat and clean
and clean and as clean and as per the
prescribed format. and as per the
per the prescribed prescribed format. The
The bound report prescribed format.
format. The bound bound report is fairly
Project Report is not sufficiently The bound report
5. Writing (10)
report is very much presentable.
presentable. is not presentable.
presentable. All All aspects of the work
Not all aspects of All aspects of the
aspects of the work is more or less
the work is work is covered in
is covered in an covered in an
covered in an a poor manner
excellent manner excellent manner
excellent manner
Signature of project coordinator Signature of HOD Signature of principal Signature of project supervisor