0% found this document useful (0 votes)
7 views5 pages

Análisis Termoeconómico

As

Uploaded by

jonathanterang93
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
7 views5 pages

Análisis Termoeconómico

As

Uploaded by

jonathanterang93
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 5

EJERCICIO 1

COSTES DEL AÑO EN CURSO

PEC 2014 PEC 2024


Compresor $ 3,735,000.00 $ 5,156,776.60
Precalentador $ 3,738,000.00 $ 5,160,918.59
Cámara de combustión $ 338,000.00 $ 466,664.12
Turbina $ 936,000.00 $ 1,292,300.64
Generador de vapor $ 1,310,000.00 $ 1,808,668.63
PEC TOTAL $ 10,057,000.00 $ 13,885,328.59

I 2014 576.1
I 2024 795.4
TCI $ 57,762,966.93

INVERSIÓN DE CAPITAL FIJA


Costes Directos
Costes en las instalaciones
Costes de adquisición de los equipos
Otros costes
Costes fuera de las instalaciones
Costes Indirectos
Otros gastos
Costes de puesta en servicio
Capital circulante
Prestaciones por fondos utilizados durante la construcción
TOTAL (TCI)
EJERCICIO 2

n 20 años
τ 7446 kg/s
i_eff 0.1
r_OMC=r_FC 0.025
c_fuel 0.072 $/kWh
LHV 50.01 MJ/kg
Consumo 1.65 kg/s

COSTOS NIVELADOS

CRF 0.1174596247725
LHV 50010
FC_0 $ 44,238,085.85
K_FC 0.9318181818182
CELF_FC 1.214283286579
FC_L $ 53,717,568.28
CF_L $ 7,214.29
OMC_0 $ 2,777,065.72
K_OMC 0.9318181818182
CELF_OMC 1.214283286579
OMC_L $ 3,372,144.49
CC_L $ 6,784,816.42

$ 39,295,479.91
$ 31,369,401.52
$ 21,634,070.01
$ 13,885,328.59
$ 7,748,741.42
$ 9,735,331.50
$ 7,842,350.38

$ 3,829.94
$ 8,664,445.04
$ 5,894,321.99
$ 57,762,966.93
DIVISIÓN DE COSTOS ENTRE COMPONENTES

PEC 2024 Z_CI Z_OMC Z_K


Compresor $ 5,156,776.60 $ 338.41 $ 168.19 $ 506.60
Precalentador $ 5,160,918.59 $ 338.68 $ 168.33 $ 507.00
Cámara de combustión $ 466,664.12 $ 30.62 $ 15.22 $ 45.84
Turbina $ 1,292,300.64 $ 84.81 $ 42.15 $ 126.95
Generador de vapor $ 1,808,668.63 $ 118.69 $ 58.99 $ 177.68
PEC TOTAL $ 13,885,328.59