0% found this document useful (0 votes)
47 views1 page

National Portal For Rooftop Solar - Ministry of New and Renewable Energy

Thggyhhgggggggggggg
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
47 views1 page

National Portal For Rooftop Solar - Ministry of New and Renewable Energy

Thggyhhgggggggggggg
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

भारत सरकार

Government of India

नवीन और नवीकरणीय ऊजार् मंत्रालय


Ministry of New And Renewable Energy

 Logout

  

 Empanelled Vendors  Application  Download E - Submit  Feasibility Submit Installation Inspection Project Commission Help Documents Grievance Track Bank
in My Area Acknowledgement Token Bank Approval Details Status Status details Loan
Details

Current Status
 Apply for Solar Rooftop Installation
Submited on 16-03-2024
Assigned to Sub Office for Feasibility Check on 16-03-2024

 Feasibility Approval
Approved with Applied Capacity on 18-03-2024

 Submit Installation Details  Inspection Status

 Project Commissioned Status  Subsidy Request

 Subsidy Disbursal

Application Edit Request Form


Edit Request for *
Select Request Type

Reason for Edit Solar Applicaton*

Submit Request

Submitted Edit request details


S.No. Request for Reason for edit Request Request
Submission Date Status

1 Solar Application and Cancel Want to change my approved capacity to 4kw as 20-03-2024 Pending
Feasiility connection load is 4 kw 14:38:06

2 Solar Application Location 16-03-2024 Done


11:59:39

Website Content Managed by Ministry of New and Renewable Energy Designed, Developed and Hosted by National Informatics Centre (NIC) Last Updated: April 2, 2024 Total Hits: 19586344 Total Visitors: 2757937

You might also like