भारत सरकार
Government of India
नवीन और नवीकरणीय ऊजार् मंत्रालय
Ministry of New And Renewable Energy
Logout
Empanelled Vendors Application Download E - Submit Feasibility Submit Installation Inspection Project Commission Help Documents Grievance Track Bank
in My Area Acknowledgement Token Bank Approval Details Status Status details Loan
Details
Current Status
Apply for Solar Rooftop Installation
Submited on 16-03-2024
Assigned to Sub Office for Feasibility Check on 16-03-2024
Feasibility Approval
Approved with Applied Capacity on 18-03-2024
Submit Installation Details Inspection Status
Project Commissioned Status Subsidy Request
Subsidy Disbursal
Application Edit Request Form
Edit Request for *
Select Request Type
Reason for Edit Solar Applicaton*
Submit Request
Submitted Edit request details
S.No. Request for Reason for edit Request Request
Submission Date Status
1 Solar Application and Cancel Want to change my approved capacity to 4kw as 20-03-2024 Pending
Feasiility connection load is 4 kw 14:38:06
2 Solar Application Location 16-03-2024 Done
11:59:39
Website Content Managed by Ministry of New and Renewable Energy Designed, Developed and Hosted by National Informatics Centre (NIC) Last Updated: April 2, 2024 Total Hits: 19586344 Total Visitors: 2757937