Colina, Julius I.
Colina, Julius I.
DeveloperCourse
Equipment
Needed Outcome
Exercise
Exercise
Area Exercise
Code
Exercise
Title
Condition Competence Instructor's
FunctionDuration Course
Ps
U.
K. Student's /
Pre-requisite: Doc.
No.
Scope: Name: Name:
able to
demonstrate with
Simulator SWITCHBOARD
EMERGENCY
EMERGENCY
GENERATOR
TheOnline
Desktop MD73-
MD78- MD70- visit
Emergency At
damage
.3UC-MARE-EWK322-EPLAN2
Operate debriefing minutes 25 Watchkeeping
Engine
with
The and Preparation, - Maintenance
STCW (Briefing Thispassed This 3/E EC
the
auxiliary
time exercise and
different test UNIVERSITY
CEBU OF
end is is CoLINA
CONTROLLED
oCUMENT performthe accessed ELECTRIC
do run intended intended RO
- for main A- -5 EWK Document
Reviewer
prescribes. or Engine of Testing
Pilot
UC-MARE-EPLAN2
theGenerator prime the Il/1
5mins.)
in
the shall areasagain then the operation, Start MAR
Cloud task. following and Marine minutes 311 Education
Programs
Maritine
UC-METC required -Cloud exercise, for for
beRoom POWER using
or
movers auxiliary of & JULIS
criteria
out.set To They familiarization Emergency students
week MGTTAMA70
Based
accomplishedand picture
demonstrate the machinery faultengineering
exercise Simulator/ Base 4 311
-
are, conduct the and machinery
detection Resource prelim
directory
PLANT battery.associated who I
Engine Engine student
Generator have
outcome at and
test items
the Room in should and and the Management
Room planning, taken
requireperformed the runsystems and operational
necessary
associated
according
Simulator. simulator using Programmer
Final Page
Simulator be and
able
control
outcome, emergency 15 Approval 1
individually Student-equipment
requirements) ratio: Station: of
you systems:
tomeasurescontrol level minutes 3
toThe
prepare Date:
performance (as
the are
student actual per
student hydraulic
only starting system
in the to 15/2021
current |8/
the prevent
should required systems exercise
standar
shouid ERS
CMO
to oi and
be
SAM-EPE-003-00 Operational
Planning 1. Instructor's
Actions Description
Scenario
Student
Tasks Ship's
nitia!
Conditions Ship's
Briefing
Performance
Standard
Particulars
IC
exercise. commencing
exercise.
4. 3.tsystems Summer
19.07m
Breadth
30.40m
2.moulded: Length
305nm generator
OA:Type: emergency
again
emergency Shipowner. the The
At As 6. 5. he 2. 1. 4. 3.Draught: 1. Length
4. 3. 2. 1.the per 6.2 Commence Monitor 6.1 Pause Check Check
Give
Many MainShaft The UNIVERSITY machineries vessel
Maintenance
Rectify
Maintenance Normalize end Stop Remind Veryusing
CONTROLLED normal. briefing the ship BP:
the ifare active if
Battery
of e
thstudent right the Generator 295m Large should is
Generator th e
th e scenario up is
thebattery.
generator FirstFducation Program
Manitine
Test Normalize
followingthe
parameters any student enroute
checklist. exercise simulation
the instructor's in battery.
C scenario and alarms task
UC-METC d. b. a. exercise,
the andenroute. Crude be are
run Performance
Criteria alarm student enough
Cooling
(LO6873)
FW Lube Fuel DO startstart running. and
(LO6874) parameters thru and Start testAfter and is to
using not
Emergency Service oCcur using if exercise is in Carrier they its
DOCUMENT Oil Day of using the the ofthe conduct the Turbo run
time loaded station Battery maintenance repaired well
loading
hydraulic Water Tank the
Sump Tank Emergency
during
emergency student allottedinstructor Emergency Generator usingconducted
Tank battery. time to
of is ENGINE: MAIN maintained
prepare by and is
(LO6872)
Tank Emergency briefing. connected Corresponding 5L9OMC B&W
MAN the port.
Generator operation time pushing
left in Continuous emergency
(LO6871) should initial Low
starting Level
Diesel console.
and maintenance
damage
for Generator. are and New
hydraulic prior Voltage.
be conditions from
OF
the actions F1 to parallel engine
and Diesel able tO to all Service hydraulic repair,
exercise starting wire
restorestarting. run student's Engine the
Done Generator. to : not in of
simulation. are the
crew
CEBU
related ME18MWRating the from the
crew
the has the met Speed starting
Main
stations emergency the onboard
engine
system been exercise. before of
with Bus charger
74rpm and th e
Done
Not reached the and side notice
back Bar. previous
test
all diesel to of
to run the the hat
preVthe
ious
c
of
n id
othe
et i c e he rd
diesel
run
BU
SAM-EPE-003-00 Studen'
Date: s Efficiency
4. PlantMonitoring
3. Plant 2.
Condition to Rectification
De-briefing
JUL proceed
TtSOLINA
Signaúrover
of
Fauts
The
CorrectlyDiscussion
student
Printed
the
of
CONTROLLED
DOCUMENT Name
exercise will the UNIVERSITY
CEBU OF
re-do
outcome
shall the Optimum
Emergency
Generator Test Education
Piograms
Maritine
a. d. C. b. a. b. a. e. d. C. a
UC-METC exercise of a. run accumulator
Hydraulic b.
proceed the Repair No
Levels
Tank Normal starter pump
Normal NormalBattery Continuous
period
Emergency
Generator engine
fora control manual
testing
panelPress operation Continuous
Stopperiod
afterEmergency Activation Bars Excitation
pressure Switch
SwitchOn
exercise Alarms using
efficiency with
to if Malfunction of start Emergency of
assessment. the Fuel
CW LO is
and fully at the at the
Date: as of primed Voltage
Control
Instructor's critical Tank
Expansion sumptank leastrunning button
battery leastrunning
Generator
the
per Trips of use
charged
de-briefing "x" Levels
the at Generator Hydraulic of to
mark minute 1 of
minute 1 of the start hand 200
Signaturt levels for
()
is a
checklist.
not
over done.
Printed Student
Name who
perforrr.s