0% found this document useful (0 votes)
17 views1 page

PVGIS-5 OffgridPV 44.724 22.398 Undefined 10Wp 15Wh 40 30Wh 35deg 0deg

Uploaded by

CALARETZU
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
17 views1 page

PVGIS-5 OffgridPV 44.724 22.398 Undefined 10Wp 15Wh 40 30Wh 35deg 0deg

Uploaded by

CALARETZU
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

Performance of off-grid PV system

PVGIS-5 estimates of solar electricity generation


Provided inputs Outline of horizon at chosen location:
Latitude/Longitude: 44.724,22.398 Slope angle: 35 °
Horizon: Calculated Azimuth angle 0°
Database used: PVGIS-SARAH2 Simulation outputs
PV installed: 10 Wp Percentage days with full battery: 71.59 %
Battery capacity: 15 Wh Percentage days with empty battery: 100 %
Cutoff limit: 40 % Average energy not captured: 19.73 Wh
Consumption per day: 30 Wh Average energy missing: 14.48 Wh

Power production estimate for off-grid PV:

Monthly average performance


Month E_d E_l f_f f_e
January 10.7 4.7 46.8 100.0
February 12.5 7.9 54.2 100.0
March 15.6 13.9 70.8 100.0
Battery performance for off-grid PV system: April 18.0 18.3 82.9 100.0
May 19.3 19.3 88.7 100.0
June 20.2 22.5 93.8 100.0
July 20.2 23.6 96.2 100.0
August 19.2 23.0 92.1 100.0
September 16.8 16.4 80.6 100.0
October 13.4 10.1 62.7 100.0
November 9.7 4.8 41.3 100.0
December 10.3 4.6 47.6 100.0
E_d: Average energy production per day [Wh/day].
E_l: Average energy not captured per day [Wh/day].
f_f: Percentage of days when battery became full [%].
f_e: Percentage of days when battery became empty [%].

Probability of battery charge state at the end of the day: Cs Cb


40-46 53.0
46-52 4.0
52-58 4.0
58-64 2.0
64-70 2.0
70-76 4.0
76-82 3.0
82-88 3.0
88-94 4.0
94-100 22.0

Cs: Charge state at the end of each day [%].


Cb: Percentage of days with this charge state [%].

The European Commission maintains this website to enhance public access to information about its initiatives and European
Union policies in general. Our goal is to keep this information timely and accurate. If errors are brought to our attention, we will PVGIS ©European Union, 2001-2024.
try to correct them. However, the Commission accepts no responsibility or liability whatsoever with regard to the information on
this site. Reproduction is authorised, provided the source is acknowledged,
It is our goal to minimise disruption caused by technical errors. However, some data or information on this site may have been save where otherwise stated.
created or structured in files or formats that are not error-free and we cannot guarantee that our service will not be interrupted or
otherwise affected by such problems. The Commission accepts no responsibility with regard to such problems incurred as a
result of using this site or any linked external sites.
Report generated on 2024/08/07
For more information, please visit https://ec.europa.eu/info/legal-notice_en

You might also like