Method of Statment For Roof Thermal Insulation

Uploaded by

msss90023
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
45 views

Method of Statment For Roof Thermal Insulation

Uploaded by

msss90023
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 5

Rev.

: 00
Method of Statement of roof
thermal Insulation Date:21-9-2021 Page: 1 of 4

Method of Statement for


roof thermal Insulation

Issue Date Prepared Checked Approved

00 Hytham El-Nouby
Rev.: 00
Method of Statement of roof
thermal Insulation Date:21-9-2021 Page: 2 of 4

Amendment Since Last Issue

Issue Clause Changes Made

05

04

03

02

01

00 - Original Issue
Rev.: 00
Method of Statement of roof
thermal Insulation Date:21-9-2021 Page: 3 of 4

1- Scope:
The scope of this method is to define the detailed sequence of the installation of
thermal Insulation work for roof
2- Responsibilities:
2-1 Site Manager:
2-1-1 The Site Manager shall be responsible for the overall implementation of
this Method statement, and for ensuring that Site and Section Engineers
are well informed of its requirements.

2-2 Site Engineers:


2-2-1 To ensure construction of the roof insulation is carried out to the required
codes, Contract Specifications and approved shop drawings.
2-2-2 Notifying Quality Control Engineer when work is ready for inspection
2-2-3 Ensuring that notification time to QCE is sufficient to meet notification
times required by the Engineer’s Representative through the Works
Inspection Request Form.
2-2-4 Liaison with Mechanical, Electrical and Plumbing trades foremen for
marking out and installation of embedded items and cutting holes and
chases for embedded items.

2-3 Surveyors:
2-3-1 setting out and recheck the locations and elevations of MEP sleeves.

2-4 QC Manager:
2-4-1 Reviewing all relevant documentation and test reports and prepare all
handing over reports.
2-4-2 Clearing all the non-conformances relevant to the activity.
2-4-3 Ensuring that the Engineer’s Representative / Inspector clears all
discipline activities that must be inspected and tested.
2-4-4 Organizing and allocating of inspection works to Quality Control
Inspectors.
2-4-5 Ensuring that all inspection are performed and recorded as per project
specifications.
2-4-6 Ensuring inspections are carried out in a timely manner and documented
as per project inspection plan.

2-5 QC Engineers:
2-5-1 Informing Engineer’s Representative by works Inspection Request as and
when his presence is required to carry out inspections as per the approved
project inspection plan.
2-5-2 Inspect the work as per approved project inspection plan and approved
shop drawings and make sure the work is ready for Owner’s representative
inspection if required.
2-5-3 Accompanying Owner’s Representative \ Inspector to carryout
inspections and release hold points.
2-5-4 Preparing, Signing and obtain signatures from Owner’s Representative/
Inspector on the relevant External Request and ITP.
Rev.: 00
Method of Statement of roof
thermal Insulation Date:21-9-2021 Page: 4 of 4

3- Equipment:

3-1 saw cut machine


3-2 hand tools

4- Material
4-1 Chema foam thermal insulation density 29 kg/cm3 not less than 1.76 km2/w
as approved material
4-2 Polyethylene sheet 250 micron

5- Procedure:
5-1 Pre-work
5-1-1 Material receiving and storage:
5-1-1-1 Checking supplier’s certificates of compliance to
conform to specification and referenced Standards
prior to installation.

5-1-1-2 Checking supplier’s delivery tickets for compliance with


supply order and specification as thickness of sheet

5-1-1-3 Store materials at building site strictly according to


manufacturer’s instructions.

5-2 Work

5-2-1 Check the thermal proofing sheets for free of defects.

5-2-2 Putting thermal insulation foam on surface of the roof

5-2-3 covering it with polyethylene 250 micron

5-2-4 Over the approved thermal proofing sheets, lay a layer of sloped concrete.

6- Safety:
6-1 All the necessary safety rules, precautions should be followed as indicated in
project safety plan.
6-2 All the necessary safety tools and equipment should be provided as indicated in
project safety plan.

7- Reference:
7-1 Egyptian Code.
7-2 Project Specification.
7-3 Shop Drawings.
Manufactory Data Sheet