Industrial Engineering Formula (SOL

Formula

Uploaded by

alienplant501623
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
17 views5 pages

Industrial Engineering Formula (SOL

Formula

Uploaded by

alienplant501623
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 5

INDUSTRIAL ENGINEERING

FORMULA

❖ Basic MP = Total MP of 1st 8 Hours


❖ Basic WH = 8 Hours
𝑇𝑜𝑡𝑎𝑙 𝑂𝑇 𝑀𝑃 45+35+25×2
❖ OT WH = Basic MP
= 45
= 2.89H
𝑇𝑜𝑡𝑎𝑙 𝑂𝑇 𝑀𝑃
❖ Total WH = Basic WH + OT WH = 8+
Basic MP
𝑇𝑜𝑡𝑎𝑙 𝑀𝑃 8×45+45+35+25×2
❖ Total WH = = =10.89H
Basic MP 45
𝑀𝑃×𝑊𝐻×60
❖ Target = ×Efficiency
𝑆𝑀𝑉
❖ 𝑃𝑟𝑜𝑑𝑢𝑐𝑡𝑖𝑜𝑛−𝑇𝑎𝑟𝑔𝑒𝑡
Variance =
𝑇𝑎𝑟𝑔𝑒𝑡
𝑆𝑀𝑉
❖ BMV = 1.15
❖ BMV = CT × Rating
❖ Allowance = BMV × 15%
❖ SMV = CT × Rating + Allowance = BMV + Allowance
❖ SAM = SMV + Bundle & Personal Allowance
❖ TACCT SMV
BPT = =
MP MP
❖ LPT = BPT × 90% = BPT × .90 =BPT - BPT × 10%
❖ HPT = BPT × 105% =BPT × 1.05 =BPT + BPT × 5%
❖ Input Hour = MP × WH =Available Hour
❖ Input Minute = Input Hour × 60 = MP × WH × 60
❖ Output Minute = Production × SMV
❖ 𝑂𝑢𝑡𝑝𝑢𝑡 𝑀𝑖𝑛𝑢𝑡𝑒
Output Hour =
60
60
❖ Line Potential/WP =
𝐵𝑃𝑇
Total Cost
❖ CPM = Input Minute
❖ PPM = CPM + Profit %
❖ EPM = PPM – CPM
❖ PPM ×SMV
CM = = CPM × SAM
Target Efficiency
❖ PM = Production × SMV
❖ Capacity Efficiency = SMV ÷ CT
❖ Rating = Motion Efficiency × Capacity Efficiency
BMV
❖ Worker Performance = × 100
𝑇𝐴𝐶𝑇
Output
❖ Productivity = × 100
𝐼𝑛𝑝𝑢𝑡
❖ Worker Potential Pcs−Current Pcs
Productivity Gap = × 100
Current Pcs
CP−WP
❖ Capacity Gap = × 100
𝑊𝑃
MP−BNP
❖ Line Balance =
𝑀𝑃
❖ OEE = Performance × Quality × Availability
Available Minute
❖ TAKT Time =
𝐶𝑢𝑠𝑡𝑜𝑚𝑒𝑟 𝐷𝑒𝑚𝑎𝑛𝑑

 Prove It
𝑆𝑀𝑉
❖ BMV = 1.15

 SMV = BMV + BMV × .15


 SMV = BMV + .15BMV
 SMV = BMV(1+.15)
 1.15BMV = SMV
SMV
So, BMV =
1.15
❖ Line Balance

1. Same Work Calculation

Operator P Q R
Context Before After Before After Before After
Cycle Time 2.5 .89 2.61 .89 2.86 .89
Capacity 24 24 23 23 21 21

2.50 2.61 2.86 2.50+2.61+2.86 2.50+2.61+2.86 7.97


Average Cycle Time = 3 + 3 + 3 = 3 = = = .89
3 3 9 9

LP=48 SMV Cycle Time Capacity


Operator Before After Before After Before After
A .66 .83 1.0 1.25 60 48
B 1.0 .83 1.5 1.25 40 48

2. Cycle Time Balance


➢ Free Time of A = 60 – 48 * 1.0 = 12
➢ A’s Capability to Support Pcs =12 / 1.5 =8

➢ Add Support Pcs with B’s Capacity = 40 + 8 = 48


➢ Calculate % of Support Pcs = 8 / 48 = .1667
➢ Calculate Capacity Factor = .1667 * 1.5 = .25
➢ Add Capacity Factor with A’s Cycle Time = 1.0 + .25 = 1.25
➢ Subtract Capacity Factor from B’s Cycle Time = 1.5 - .25 = 1.25

3. SMV Balance
✓ Calculate SMV Factor = .1667 * 1.0 = .17
✓ Add SMV Factor with SMV of A = .66 + .17 = .83
✓ Less SMV Factor from SMV of B = 1.0 - .1667 = .83
Abbreviation

CT = Cycle Time
MP = Man Power
OT = Over Time
CF = Capacity Factor
SAM = Standard Allowed Minute
SMV = Standard Minute Value
BMV = Basic Minute Value
OCS = Organic Cotton Standard
RDS = Responsible Down Standard
5S = Sort, Set in Order, Shine, Standardize, Sustain.
6M = Man, Machine, Materials,
Money, Method, Management.
SOP = Standard Operating Procedure
TACCT = Total Average Cycle Check Time
BPT = Basic Piece Time
HPT = Higher Piece Time
LPT = Lower Piece Time
BNP = Bottle Neck Point
LB = Line Balance
CP/WP = Current Pcs / Worker Potential Pcs
CM = Cost of Manufacture
CPM = Cost Per Minute
PPM = Price Per Minute
EPM = Earnings Per Minute
PM = Profit Margin
WRAP = World-wide Responsible Accredited Production
TLS = Traffic Light System
OWE = Overall Working Efficiency
OEE = Overall Equipment Effectiveness
RACI = Responsible, Accountable, Consulted& Informed
RACCI = Reasonable Advisory Committee on Chemical Incident
BSCI = Business of Social & Compliance Initiative
GEMBA = GencyGenbustu, Engage, MudaMura Muri, Be Respectful,
Analysis
PDCA = Plan Do Check Act
KPI = Key Performance Indicator.(K PabeIncreament)
PIB = Profit Incentive Bonus
PRIDE = Prevent, Recognize, Investigate, Drive, Evaluate.
SSS = Size Set Sample
RFID = Radio Frequency Identification Data
MR = Minimum Requirement