25 1657 25 PA
757 900 25 SW25 1657 25 Rev. Date By Particulars
25 1657 25
125 900 200 CH 2500mmFFL 200 CH 2500mmFFL 500 ±203 750 ±203 - - - -
200
Mirror of
3 2 225
225
PBH-PA PBH-PA
BD-851 BD-851
1650mm from FFL
T5 T5
1200
Wall fin. Wall fin.
ID T2
ID Wall fin. ID
D3 1100mm from FFL
GD2 GD2
400 75
850mm from FFL 305
600
20 250
20
T2
SP
830mm from FFL Bench
325
325 EQ EQ 450mm from FFL 450
1000
830
810
125
Blue dashed dot line Blue dashed dot line
750
indicate damp proof indicate damp proof
membrane / water membrane / water 275 200
410
PROJECT TITLE
325
proofing proofing
FFL FFL
35
PUBLIC AREA
25
125
±203
Threshold Floor inlay C - PLAN
SW15 - ELEVATION A, B & B1
PA-BT- 170
811 ID
PA B1 B A
PA-BT- PA-BT- PA-BT- D3
SW7 810 810 810 DRAWING STATUS
PA
D LEGEND :
900
750
PA-BT- For CONSTRUCTION
ID WF T2 SW13 811 FLOOR & WALL REFERENCE
CORRIDOR
WF T5 TOILET
±1407
GD2 FF T2 175 EXAMPLE :
FF T5
S3 WALL FINISHES WF T1 Date
±1657
STEAM SHOWER CHANGING AREA 29 FEBRAUARY 2024
Issue
PA Threshold FLOOR FINISHES FF T1
SW24 Drawn
675
±203
MATERIAL YAN
By
±457
150 Hair dryer by other FINISHES CODE
Date JULY 2023
Ø1
7
150
NOTE :
±757
X Scale AS SHOWN
±632
500
100
S3
450
tiles setting out for ID's approval. Checked
Vanity top KENNY
300
By
250
℄ 2. All wall tile segments to align with floor DRAWING NO
225
25
3. All wall & floor tiles grouting colour to 00
match tile colour as specified.
200 450 750 1200 4. All corner tile termination to apply in
T2 2mm chamfer mitre joint.
PA PA PA PA PA PA 5. Wall tiles setting out from ceiling ©All rights reserved.BLU WATER DESIGN
Bench Dashed indicated vanity This drawing is copyright.
SW14 SW15 SW23 SW16 SW5 SW26 mirror cabinet above unless otherwise specified. Contractors must check all dimensions on site.
Only figured dimensions are to be worked on.
Discrepancies must be reported to the designer
before proceeding.
MT3
BT1 PLAN CHANGING ROOM Custom pull-out
stainless steel bin
PBH-PA SCALE 1 : 25 FAMALE & MALE SPA
ST-101
35
12 CH 2500mmFFL
X
27 PBH-PA
BT-811
12
25 4675 25 Rev. Date By Particulars
6 3 960 180 960 175 2400 CH 2600mmFFL
MT9 100 600
12 x12 x 3mm
thk L-angle
100
80
AL7a SP
MT9 CH 2500mmFFL
Concealed
'LED' strip light 12 x12 x 3mm
c/w aluminum thk L-angle
angle casing
MR1 profile
On marine
plywood
2400 (N.T.S.)
2382 (N.T.S.)
backing
MR1
On marine
plywood
backing
2400
T5 Wall fin.
2520
2400
ID ID
6
MT9 GD2 D3
6mm thk
1800
inlay
SP
100
T2
Wall fin.
FFL
Blue dashed dot line
1000
25 10 indicate damp proof
MT9 membrane / water PROJECT TITLE
6mm thk proofing
X SECTION inlay
300
100
BT-811 CAPSULE TRANSIT MAX,
150
KLIA2
130 drop 20
110 drop 20
C ELEVATION T2 Wall fin. T2 Wall fin.
PBH-PA SCALE 1 : 25
BT-810 3 2 27
PBH-PA PBH-PA BLU WATER DESIGN SDN BHD (1161101-D)
BD-851 BD-851 E-2-1,Block E,Second Floor,
25 4675 25 Megan Avenue 1,
189 Jalan Tun Razak,
2400 175 960 180 960 50400 Kuala Lumpur, Malaysia
CH 2600mmFFL T +60321634689 F +60321634686
25 750 1600 25 100
CH 2500mmFFL
200
Wall fin.
Concealed
75
PUBLIC AREA
'LED' strip light
MT9 MT9 c/w aluminum
BT1 - STEAM SHOWER & TOILET
Shadow gap 75 75 Metal edging angle casing
- ELEVATION C & D
at both side all around profile
1
PBH-PA Mirror washed
BD-850 out mercury w/ 200
DRAWING STATUS
MR1 MR1
frosted etching
Swing door panel for LED front lit Fixed mirror For CONSTRUCTION
(AL1)
1200
c/w metal edging
all around
Frosted Date
29 FEBRAUARY 2024
AL1 Issue
etching on
TISSUE
35
mirror T2 T2
1100mm from FFL
Drawn
Wall fin. Wall fin. YAN
75
By
250
150
Vanity top Wall fin. Scale AS SHOWN
GD2
1800
1650
Checked
20 20
SP By KENNY
830mm from FFL DRAWING NO
T2 T2 Rev.
Hair dryer by other Bench Bench 00
150
850
Blue dashed dot line
810
125
750
125
410
450
50
300
325
BT-810
SCALE 1 : 25
130
110
200
from FFL Wall fin.
WALL FINISHES WF T1
75
MT9 FLOOR FINISHES FF T1
MT9
Shadow gap at both 75 75
side Metal edging MATERIAL
all around FINISHES CODE
1
PBH-PA Mirror washed T5 Wall fin.
BD-850 NOTE :
out mercury w/
MR1 MR1 1. Contractor to submit shop drawing on
frosted etching
Fixed mirror tiles setting out for ID's approval.
Swing door panel for LED front lit
2. All wall tile segments to align with floor
c/w metal edging (AL1)
tile segments.
1200
all around 3. All wall & floor tiles grouting colour to
Frosted match tile colour as specified.
etching on AL1 4. All corner tile termination to apply in
TISSUE
35
1100mm mirror 2mm chamfer mitre joint.
2400
from FFL 5. Wall tiles setting out from ceiling
75
ID
unless otherwise specified.
S3 T5 D3
250
150
Vanity top Wall fin.
1650
SP SP
830mm
20 20
from FFL
850
damp proof indicate damp proof
810
750
membrane / membrane / water
water proofing proofing
410
50
300
300
FFL PROJECT TITLE
150
130
130
130 20
1200 750 450
CAPSULE TRANSIT MAX,
4 KLIA2
PBH-PA ELEVATION
BD-850 B
PBH-PA SCALE 1 : 25
BT-830
A ELEVATION BLU WATER DESIGN SDN BHD (1161101-D)
E-2-1,Block E,Second Floor,
PBH-PA 25 1300 25 Megan Avenue 1,
BT-830
SCALE 1 : 25 25 1300 25 189 Jalan Tun Razak,
50400 Kuala Lumpur, Malaysia
75 900 200 CH 2500mmFFL 200
T +60321634689 F +60321634686
200
Dashed indicated vanity 28
mirror cabinet above SW26 SW5 SW16 SW23 DRAWING TITLE
25 2400 25 T5
PUBLIC AREA
1200 750 450 Wall fin. Mirror of
BT3 - TOILET
3 2 225 - PLAN
225
PBH-PA PBH-PA - ELEVATION A & B
25
BD-851 BD-851
T5
S3
225
Wall fin.
1200
300
Vanity DRAWING STATUS
±325
100
top
For CONSTRUCTION
Ø1
SP
150
7
PA
0
S3 675
Threshold SW15 ID
MT3 Date
1100mm from FFL 29 FEBRAUARY 2024
A D3 Issue
2400
Custom pull-out
700
1300
PA-BT- PA
TOILET stainless steel
830 Drawn
900
bin C D SW24 400 75 YAN
By
850mm from FFL 305
CORRIDOR
PA-BT- PA-BT-
ID 830 830 Date JULY 2023
B
20 250
20
PA
1650
D3 PA-BT- Scale 1:25
830 SW13 SP
830mm from FFL
Checked
By KENNY
325
75
325 700 DRAWING NO
25
Rev.
00
830
810
before proceeding.
30
30
75 SP SP
35150 ID'S DOOR
NUMBER
305
40 450 450
MR1 LEGEND :
Mirror finish. T1 WALL REFERENCE
Tiles finish. SYMBOL DESCRIPTION
ID
Frosted fin. MT9 NEW BRICKWALL TO
D2
with LED 3mm x 25mm 'L' RECEIVE WALL TILES
1440
strip light. angle all around. FINISH
1050
X 1650mmFFL
PBH-PA
BT-840 EXISTING BRICK WALL
MT9
3mm x 25mm
'L' angle all
CH 2500
CH 2500
around.
LEGEND :
85
FLOOR & WALL REFERENCE
20 EXAMPLE :
325
200
700
25 25 WALL FINISHES WF T1
SKIRTING SK T1
30
3
FLOOR FINISHES FF T1
Blue dashed dot line
indicate damp proof MR1
300 membrane / water Mirror finish. MATERIAL
850
proofing PROJECT TITLE
750
750
FINISHES CODE
Blue dashed dot line Push up and
305
indicate damp proof Threshold in pull out the NOTE :
membrane / water China black mirror to 1. Contractor to submit shop drawing on
proofing granite finish. change the tiles setting out for ID's approval. CAPSULE TRANSIT MAX,
LED strip 2. All wall tile segments to align with floor KLIA2
from FFL
from FFL
light. tile segments.
Metal
Drop 20 mm
Drop 20 mm
3. All wall & floor tiles grouting colour to
hanger.
A ELEVATION B ELEVATION Frosted fin. match tile colour as specified.
with LED 4. All corner tile termination to apply in
PBH-PA SCALE 1 : 25 PBH-PA SCALE 1 : 25 2mm chamfer mitre joint.
BT-840 BT-840 strip light. BLU WATER DESIGN SDN BHD (1161101-D)
5. Wall tiles setting out from ceiling E-2-1,Block E,Second Floor,
Megan Avenue 1,
unless otherwise specified. 189 Jalan Tun Razak,
50400 Kuala Lumpur, Malaysia
PA 6. General Male & Female toilet floor tile
T +60321634689 F +60321634686
W SW15 finish to be T1 , unless otherwise
1650 specified.
25 50 50 40 50 25
1440 (N.T.S)
20
300 300 50 SW6 hanger. specified.
25
PA PUBLIC AREA
SW5 MT9
3 3 3mm x 25mm BT4 - OFFICE'S TOILET
150
'L' angle all - PLAN
85
50
MR1 - ELEVATION A & B
45 25
around.
ll - DETAIL X & Y
PA PA to fa Frosted fin.
d
450
Lai 600
with LED
325
SW22 SW13 DRAWING STATUS
SP strip light.
℄ For
900
CONSTRUCTION
1200
200 (N.T.S)
B WF T1
PBH-PA FF T1
BT-840
450
A ℄ Date
29 FEBRAUARY 2024
PBH-PA Issue
BT-840
25
Drawn
LM
By
150
X DETAIL Date JULY 2023
100 750 ±863
±1713 PBH-PA
27 25 Scale 1:25 / 1:10
BT-840
SCALE 1 : 10
Threshold in China Checked
black granite finish. ID PA By KENNY
℄ DRAWING NO
850 (N.T.S)
1050 (N.T.S)
D2 SW1 Rev.
PA 01
SW14
Robe hook @ T1
1650mm FFL Mirror finish. ©All rights reserved.BLU WATER DESIGN
This drawing is copyright.
Contractors must check all dimensions on site.
Only figured dimensions are to be worked on.
Discrepancies must be reported to the designer
DETAIL before proceeding.
BT4 PLAN TOILET Y
PBH-PA SCALE 1 : 25 OFFICE/STAFF ROOM PBH-PA SCALE 1 : 10
ST-101 BT-840
2400 (N.T.S)
25 750 1600 (N.T.S.) 25
25
50
Hafele Soft 20 425 20
close hinge
PA
or equivalent Opening for
45 123 SW26 AL1 Marine ply backing
±50
access pull tissue
170
75
125
c/w hardwood
200
123 20 framework support
225
175
Internal carcass
±230 in white
polykem finish
Internal carcass
75
50
in white
50
30
50 polykem finish
25
25
3 3
6
℄ ℄ ℄
3 72 35 530 35 72 3
MT9 Mirror washed out MR1 MT9 Mirror washed out MR1 MT9 MT9
Shadow gap mercury w/ frosted etching Swing door panel c/w mercury w/ frosted etching Fixed mirror c/w metal Shadow gap
for LED front lit (AL1) metal edging all around for LED front lit (AL1) edging all around
25 305
EQ Ø170 EQ
BD1 BATH DEATIL
PBH-PA SCALE 1:5
BT-811 S3
Vanity top c/w 3mm
chamfered edge
18
20
5
MT3
PROJECT TITLE
Removable stainless steel
capping for bin maintenance
& dustbin bag changing
CAPSULE TRANSIT MAX,
T2 KLIA2
MT3
Wall fin.
Custom stainless steel
350
bin with no sharp edge
Dashed dot line ±3mm grouting to BLU WATER DESIGN SDN BHD (1161101-D)
indicted dustbin bag refer ID spec sheet E-2-1,Block E,Second Floor,
Megan Avenue 1,
T2 189 Jalan Tun Razak,
50400 Kuala Lumpur, Malaysia
Bench edge c/w
T5 T +60321634689 F +60321634686
450 (Bench depth) angle mosaic &
25
On cement smooth grouting
Ø150 board
(T
T2 327 (T2 sheet size) 2 20 DRAWING TITLE
Bench siz piec
4
e) e
25
PUBLIC AREA
BATHROOM DETAIL
T2 -BD1, BD4 & BD5
830
25
810
325 Reinforce concrete ledge
75
125
AL7a
bar support
from wall MT3 T2 Date
100 25 25 29 FEBRAUARY 2024
Issue
L-angle support
275 200
Drawn
YAN
By
T2
Wall fin. Date JULY 2023
Blue dashed dot line
Steam nozzle; Scale 1:5
325
300
DRAWING NO
Rev.
Starken wall 00
Tiles bedding c/w
cement mortar
Blue dashed dot
T2 ©All rights reserved.BLU WATER DESIGN
line indicate damp Steam This drawing is copyright.
T5 Floor fin.
proof membrane / shower Contractors must check all dimensions on site.
Only figured dimensions are to be worked on.
Floor fin. water proofing FFL Discrepancies must be reported to the designer
before proceeding.
3
25
20 25
72
30 20 125 25
75
℄
35
225 out mercury w/ AL1
frosted etching
for LED front lit
20
6
(AL1) 6 Internal carcass
in white
polykem finish
MR1 MR1 MT9
225
Fixed mirror Swing door panel
c/w metal edging
all around
1150 (N.T.S.)
1200 (N.T.S.)
1200 (N.T.S.)
1110 (N.T.S.)
980 (N.T.S.)
Hafele Soft
close hinge
or equivalent
PA
SW26
20
AL1
BD2 BATH DEATIL Mirror washed
℄
35
out mercury w/
PBH-PA
75
50
BT-811
SCALE 1:5 frosted etching 50 50
for LED front lit
(AL1)
72
25 20
1100mm 1100mm
50
25
25
3
200 MT9 200 25
Metal edging
all around Opening for L1a
access pull tissue
T5
T5
BD3 BATH DEATIL Wall fin.
250
PBH-PA SCALE 1:5
270
270
Wall fin. PA
BT-811
SW5
400 75
PA
S3 SW23 PA 120
Vanity top c/w 100
850mm SW16 305
3mm chamfered 830mm from FFL
edge
20
from FFL
830mm
20
20
from FFL
5 5
S3
Vanity top c/w
3mm chamfered
edge
325
325
T5 PA T5
On cement SW24 On cement
board board
810 (N.T.S.)
810 (N.T.S.)
Cement board backing Cement board backing
c/w galvanized steel c/w galvanized steel
frameworks support frameworks support
PA
SW23
410
300
300
By
Date
By
Drawn
Issue
Date
For
Checked
Scale
Rev.
00
BATHROOM DETAIL
PUBLIC AREA
-BD2 & BD3
KLIA2
Discrepancies must be reported to the designer
KENNY
1:5
29 FEBRAUARY 2024
CONSTRUCTION
JULY 2023
YAN
Date
By
189 Jalan Tun Razak,
Megan Avenue 1,
E-2-1,Block E,Second Floor,
BLU WATER DESIGN SDN BHD
50400 Kuala Lumpur, Malaysia
T +60321634689
DRAWING NO
DRAWING STATUS
DRAWING TITLE
PROJECT TITLE
F +60321634686
Particulars
(1161101-D)