1 Submission Document - - - - - - -
Welding Procedure Specification and - R
1.1 ASME Section IX/AWS D1 .1 Submit WPS & PQR Refer to WPS H
Procedure Qualification Record
1.2 Welder Performance Qualification Test ASME Section IX/AWS D1 .1 Conduct WPQT WPQT H - R
1.4
NOE Procedure - Magnetic Particle
ASME Section V Submit Approved Procedure LOTT INSP/ CAST - MT Procedure R - R
NOE by LOTT INSP
Test or CAST
-
.
1.6 Weld repair procedure Approved Procedure Submit Approved Procedure Welding Control Procedure H R
1.7 Painting and coating procedure Approved Procedure Submit Approved Procedure PTS 15.20.03 Nov 2017 R - R
4 Fabrication control - - - -
Verified on the material spec, heat no. and size Mill Test Certificate I AFC Drawing
4.1 Fit up Approved WPS/ AFC Drawing I - H To engage PCD/3
Check weld edge preparation according to WPS Approved WPS Inspector to witness
Fit-Up & Visual
Ensure welding box/ inspection box in place - Activity
Update on weld summary (e.g. date fit up, fitter ID) Weld summary
Verified on the specific rejection area prior to excavate WPS/ Repair procedure
// :,#_
S: Surveillance Serba �mi� Sdn Bhd Serba Dinamik Sdn Bhd MLNG
I: Inspection
H: Hold Point Signature �- Signature _<r,n o� -- Signature
W: Witness Name : �HD-ROSLAN ANAN Name : M. ZAKI SAMSUDDIN Name
R: Review Date : 20.09.2019 Date : 20.09.2019 Date
SW: Spot Witness
WELDING INSPECTION CONTROL SHEET WICS
NO.
TSPG 3.3 : ATTACHMENT 3 INSPECTION SECTION (TES/3), MLNG
1.0 WORK DETAILS
1.1 WORK STATUS: 1.2 WORK CATEGORY : 1.4 ATTACHMENT CHECKLIST:
PLANNED PERMANENT ( PC# : ) WPS / PQR WELDER PASS WQT
EMERGENT ( IR# : ) WELD MAP ISOMETRIC WPS SUMMARY
TEMPORARY ( IR / NSR#: ) ASSEMBLY DWG. REPAIR PROCEDURE INSP. REPORT
1.3 WORK DESCRIPTION : PRESS. TEST CERTIFICATE INSPECTION TEST PLAN
AREA / MODULE : OTHERS (pls specify : )
EQUIPMENT / LINE ID : 1.5 SKETCH OF JOINT( optional)
DESCRIPTION :
SEE WPS
MATERIAL SPECIFICATION
BASE FILLER
NPS / OD TRADE NAME
METAL(S) METAL(S)
THICKNESS / PIPE SCH. SIZE
I.D. NO. :
WELDER(S)
EXPIRY DATE :
COMPLETION / CLOSE-OUT
ABOVE WORK IS COMPLETED AND ACCORDING TO SPECIFICATION
CONTRACTOR WORK SUPERVISOR : SIGNED : DATE :
MLNG WORK SUPERVISOR : SIGNED : DATE :
INSPECTOR IN-CHARGE : SIGNED : DATE :
Note: Distribution: Original (TES/3) - File No. : TES3/05/WICS P:\TES3\TES3 STANDARD FORM\WELDING FORMS
Copy (MLNG Work Supervisor), Copy2 (Contractor Work Supervisor) e-forms : WICS
CONTRACTOR: PROJECT TITLE: CLIENT:
PROVISION OF ENGINEERING,PROCUREMENT,CONSTRUCTION AND COMMISSIONING OF BINTULU
STABILISATION UNIT (BSTAB) 5 &6 IMPROVEMENT PROJECT AT PETRONAS LNG COMPLEX.
STEEL STRUCTURE WELD SUMMARY
SERBA DINAMIK SDN. BHD. MALAYSIA LNG SDN. BHD.
ITEM DESCRIPTION MAT'S WELD FIT-UP VISUAL WELDER TEST METHOD
NO. DRAWING REV RESULT RESULT RESULT REPORT NO. REMARKS
MARK PART-1 PART-2 GR. TYPE DATE DATE ID MPI DPI UT
Prepared By: SERBA DINAMIK SDN. BHD. Reviewed By: SERBA DINAMIK SDN. BHD. Approved By: MALAYSIA LNG SDN. BHD.