Foundation Plan Second Floor Framing Plan: Steel Section Schedule
Foundation Plan Second Floor Framing Plan: Steel Section Schedule
3
4 MARINE PLYWOOD
12000 12000
B-1 B-1
7 C1 7
C3 C3
P-1
P-3 P-3 65mm x 150mm x 2mm THK
C-PURLIN BLOCKING
A B C D E
A B C D E
6000
6000
FTB-1
B-1
P-1 P-1
6000
P-2 P-2 P-2 B-1 B-1
8 C1 8
6000
C3 C3
FTB-1
FTB-1
P-1
P-3 P-3
2-65mm x 150mm x
2mm x 6m C-PURLINS JOIST
2 SPACED @ 400mm ON
2 C1 C1 CENTER
6000
6000
P-1 P-1
6000
FTB-1
B-1
6000
FTB-1
FTB-1
3
3 C1 C1
24000
24000
P-1 P-1
6000
B-1 B-1
9 C1 9
6000
C3 C3
FTB-1
FTB-1
P-1
P-3 P-3
2-65mm x 150mm x
2mm x 6m C-PURLINS
150 MM THK SLAB ON GRADE WITH 10MMø
4
4 C1 VERT. & HOR. BARS SPACED @600mm O.C.
BOTHWAYS ON 100MM THK GRAVEL BASE ON
C1
6000
FTB-1
6000
P-1 COMPACTED SUBGRADE P-1 B-1
6000
40mm PRE PAINTED
6000
FTB-1
FTB-1
ROOF SHEETS
5
5 C1 C1
16mmø ROUND BAR
CROSS BRACING WITH
6000
P-1 P-1 B-1 B-1
20mmø TURNBUCKLES 10 C1 10
6000
C3 C3
(TYPICAL)
FTB-1
FTB-1
P-1
P-3 P-3
60000
6
60000
FTB-1
6 C1 C1
C-PURLIN AT 600mm O.C. B-1
6000
6000
(TYPICAL)
6000
P-1 P-1
6000
FTB-1
FTB-1
1
1
2
2
3
12mmø SAGROD 3
4
4
7 (TYPICAL) 5
6
5
6
7 C1 C1 FTB-1 FTB-1 13 12 11 10 9 8 7
13 12 11 10 9 8 7
6000
11 C1 11
6000
C2 C2
FTB-1
FTB-1
8
8 C1 C1
6000
P-1 P-1
OFFICE
6000
FTB-1
FTB-1
OFFICE
FOUNDATION PLAN
24000
9 3
SECOND FLOOR FRAMING PLAN
24000
9 C1 C1 SCALE 1:125MTS 4
S1
SCALE 1:125MTS
S1
6000
P-1 P-1
6000
FTB-1
FTB-1
10
10 C1 C1
w
STEEL SECTION SCHEDULE
6000
P-1 P-1
6000
FTB-1
FTB-1
tf
MARK H W tf tw
11
11 C1
FTB-1 C2 FTB-1 C2 FTB-1 C2 FTB-1
C1
P-1
P-2 P-2 P-2
P-1 C1 400 200 13 8
C2 200 150 9 6 tw
WAREHOUSE WAREHOUSE
H
1
S1
FOUNDATION PLAN
SCALE 1:250MTS
2
S1
ROOF FRAMING PLAN
SCALE 1:250MTS
C3 200 150 9 6
tf
T-2 200 150 9 6
ENGINEER PROJECT TITLE PROJECT OWNER/COMPANY SHEET CONTENTS CADD BY: CORPUZ, JV E. SHEET NO.
AS SHOWN RWADF
CONSTRUCTED WAREHOUSE DATE:
S-1
PRC: PTR: AS-BUILT PLAN DATE:
TIN: DATE: CHECKED BY:
PLACE: LOCATION: LOT 4C, TIPO PLAZA AREA, NEAR SENTRY GATE, TIPO ROAD, SBFZ