0% found this document useful (0 votes)
32 views115 pages

Rasio

Uploaded by

Danu Sutanto
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
32 views115 pages

Rasio

Uploaded by

Danu Sutanto
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 115

CALCULATION FOR EDG & TRAFO

Doc. No.: SNO-C-CC-53-017


SHELTER FOUNDATION
Page 4-3 of 20 .
Rev. B
EPC FASILITAS PENGUKURAN GAS
SENORO – PAU
Rev. Date : 18/07/2016

CALCULATION FOR EDG & TRAFO SHELTER & FOUNDATION

1. GENERAL

1.1 Quality of Material


No. Name Symbol Value Unit Remarks
1 Concrete fc' 28 MPa
Lean Concrete fc' 17.5 MPa
2 Reinforcing Deformed Bar Fy 413 MPa
Reinforcing Plain Bar Fy 275 MPa
3 Structural Steel or Pipe Fy 240 MPa
4 Anchor Bolt Fy 240 MPa
5 Coefficient Friction of soil m1 0.3

1.2 Unit Weight of Material


No. Name Symbol Value Unit Remarks
1 Structural Concrete gc 23.54 kN/m 3

2 Leveling Concrete gpc 22.54 kN/m3


3 Steel gs 77.00 kN/m3
4 Soil gso 16.39 kN/m3
5 Sand Gravel gg 17.70 kN/m3
6 Water gL 10.00 kN/m3
7 Wall gg 250.0 kg/m3

1.3 Geotechnical Data


Soil Bearing Capacity
Allowable soil bearing capacity for spread footing or mats on natural soil at depth of 1.00 m or more below
as per S-2 shall be : (Appendix-D)
No. Name Symbol Value Unit Remarks
1 Permanent condition ss-perm 0.151 MPa
2 Temporary condition ss-temp 0.201 MPa = 1.33 * ss-perm
3 Allowable settlement ds 25.00 mm
CALCULATION FOR EDG & TRAFO
Doc. No.: SNO-C-CC-53-017
SHELTER FOUNDATION
Page 5-3 of 20 .
Rev. B
EPC FASILITAS PENGUKURAN GAS
SENORO – PAU
Rev. Date : 18/07/2016

2. DESIGN CRITERIA
- Factored loading combination is used for reinforced concrete design.
- Unfactored loading combination is used for steel design, deflection and support reactions for foundation design.

No. Description Remarks


1 Earthquake Load UBC 1997 & RSNI3-03-1726-2002
2 Wind Load ASCE 7-05
3 Structure type Steel structure, moment resisting frame
4 Analysis Static
5 Concrete Design ACI 318-05 / 318R-05
6 Steel Design AISC-ASD

3. LOAD COMBINATION
3.1 Factored Load Combination
The following factored load combination is used for reinforced concrete design by Load and Resistance Factored
Design method.
LC Description Remarks
11 1.4 D Permanent
12 0.9 D + 1.6 Wx Temporary
13 0.9 D + 1.6 Wz Temporary
14 1.2 D + 1.6 L + 1.0 CR-1 Permanent
15 1.2 D + 1.6 L + 1.0 CR-2 Permanent
16 1.2 D + 1.0 L + 1.0 EQx + 0.3 EQz Temporary
17 1.2 D + 1.0 L + 1.0 EQz + 0.3 EQx Temporary
18 1.2 D + 1.0 L + 1.6 Wx + 1.0 CR-1 Temporary
19 1.2 D + 1.0 L + 1.6 Wz + 1.0 CR-2 Temporary

3.2 Unfactored Load Combination


The following unfactored loading combination is used for steel design, deflection and support reactions for
foundation design by Allowable Stress Design.
LC Description Increase in Allowable Stress Remarks
21 1.0 D 0% Permanent
22 1.0 D + 1.0 Wx 33% Temporary
23 1.0 D + 1.0 Wz 33% Temporary
24 1.0 D + 1.0 L 0% Permanent
25 1.0 D + 1.0 L + 1.0 CR-1 0% Permanent
26 1.0 D + 1.0 L + 1.0 CR-2 0% Permanent
27 1.0 D + 1.0 L + 0.714 EQx + 0.214 EQz 33% Temporary
28 1.0 D + 1.0 L + 0.714 EQz + 0.214 EQx 33% Temporary
29 1.0 D + 1.0 L + 1.0 Wx + 1.0 CR-1 33% Temporary
30 1.0 D + 1.0 L + 1.0 Wz + 1.0 CR-2 33% Temporary
CALCULATION FOR EDG & TRAFO
Doc. No.: SNO-C-CC-53-017
SHELTER FOUNDATION
Page 6-3 of 20 .
Rev. B
EPC FASILITAS PENGUKURAN GAS
SENORO – PAU
Rev. Date : 18/07/2016

4. STRUCTURE MODELING
4.1 Plan and Elevation

C1 C1 C1

Trafo 3000
EDG Foundation Foundation

C1 C1 C1

5000 5000
Column Plan

Roof Plan
CALCULATION FOR EDG & TRAFO
Doc. No.: SNO-C-CC-53-017
SHELTER FOUNDATION
Page 7-3 of 20 .
Rev. B
EPC FASILITAS PENGUKURAN GAS
SENORO – PAU
Rev. Date : 18/07/2016

15 °

R1 R1
380

B2

C1 C1
5000

700 3000 700

Portal Frame

B2 B1
B3
B1
B1
B3
B1
C1
B2

C1
C1

C1

3D Model
CALCULATION FOR EDG & TRAFO
Doc. No.: SNO-C-CC-53-017
SHELTER FOUNDATION
Page 8-3 of 20 .
Rev. B
EPC FASILITAS PENGUKURAN GAS
SENORO – PAU
Rev. Date : 18/07/2016

Material Properties
Sym. Profile Material Remarks
C1 H 200x200x8x12 Structural Steel A-36 Column
R1 H 200x100x5.5x8 Structural Steel A-36 Rafter
B1 H 200x100x5.5x8 Structural Steel A-36 Beam Span
B2 H 300x150x6.5x9 Structural Steel A-36 Run Way Beam
B3 H 350x175x7x11 Structural Steel A-36 Hoist Beam
BR1 L100x100x10 Structural Steel A-36 Bracing
TR Ø 19 bar With Turn Buckle Tie Rod

5. LOAD DESIGN
5.1 Dead Load (D)
This load is contain of main structure selfweight and secondary structure dead load such as roofing weight,
purlin and ceiling weight.
5.1.1 Structure Selfweight
The weight of beams, columns and other main structure weight are automatically calculated by STAAD
Pro. by using Selfweight Y -1.0 command.
5.1.2 Roof Dead Load
Wr, Roofing weight include ornament electrical = 15.00 kg/m2
Wp, Purlin weight for C 150 x 65 x 20 x 3.2 = 7.51 kg/m2
D, Roof dead load = Wr + Wp = 22.51 kg/m2
Lfa, Half of frame distance center = 5.00 m
Lfb, Half of frame distance edge = 3.50 m
Lp, Purlin distance = 1.00 m
D1, Load at frame = Lf * D = 112.55 kg/m (center)
= 78.79 kg/m (edge)

5.2 Roof Live Load ( L )


L, Roof live load = 20.00 kg/m2
Lfa, Half of frame distance center = 5.00 m
Lfb, Half of frame distance edge = 3.50 m
Lp, Purlin distance = 1.00 m
L1, Load at frame type 1 = Lf * L = 100.00 kg/m (center)
= 70.00 kg/m (edge)
CALCULATION FOR EDG & TRAFO
Doc. No.: SNO-C-CC-53-017
SHELTER FOUNDATION
Page 9-3 of 20 .
Rev. B
EPC FASILITAS PENGUKURAN GAS
SENORO – PAU
Rev. Date : 18/07/2016

5.3 Wind Load ( W )


This load is using wind force resisting system by ASCE 7-10 as shown as below.

Tabel Velocity Pressure, qz Pressure coefficient, Cq

Height (m) Kz qz (N/mm2) upwind downwind


-0,5 -0.5
5 0.85 521.6
+0,8
6 0.87 533.8
leeward
7 0.90 552.2 windward -0,5

8 0.93 570.6
9 0.98 601.3
10 1.00 613.6

V Basic Wind Speed = 32.00 m/sec


I Importance factor = 1.15 (Table 6-1)
Exposure Catergory = C
Kz Velocity Pressure Exposure Coefficient = 0.85 (Table, qz)
Kzt Topographic Factor = 1.00
CALCULATION FOR EDG & TRAFO
Doc. No.: SNO-C-CC-53-017
SHELTER FOUNDATION
Page 10-3 of 20 .
Rev. B
EPC FASILITAS PENGUKURAN GAS
SENORO – PAU
Rev. Date : 18/07/2016

Kd Wind Directional Factor = 0.85 (Table 6-4)

q Angle = 15.00 deg


qz Velocity Pressure
= 0.613 * Kz * Kzt * Kd * V 2 * I = 53.17 kg/m2
G Gust effect Factor = 0.85
Cf Force Coefficient = 1.80 (For Structural )
Cf Force Coefficient = 0.80 windward
= -0.50 Roof - upwind
= -0.50 Roof - down wind
= -0.50 leeward
CALCULATION FOR EDG & TRAFO
Doc. No.: SNO-C-CC-53-017
SHELTER FOUNDATION
Page 11-3 of 20 .
Rev. B
EPC FASILITAS PENGUKURAN GAS
SENORO – PAU
Rev. Date : 18/07/2016

Wind Load in Longitudinal Direction -X


COLUMN :
Width of structure Ahx = H
= 0.15 m
Horizontal Load Hwx = qz*G* Cf* Wcx
= 12.20 kg/m
WALL CLADDING :
Width of wall cladding Ahx = H
= 5.00 m
Horizontal Load Hwx = qz*G* Cf* Wcx
= 180.76 kg/m windward
= -112.98 kg/m leeward
ROOF/RAFTER :
Width of roof Ahx = H
= 5.00 m
Horizontal Load Hwx = qz*G* Cf* Wcx
= -112.98 kg/m Roof - upwind
= -112.98 kg/m Roof - down wind

Wind Load in Longitudinal Direction -Z


COLUMN :
Width of structure Ahx = H
= 0.15 m
Horizontal Load Hwx = qz*G* Cf* Wcx
= 12.20 kN/m
WALL CLADDING :
Width of wall cladding Ahx = H
= 1.50 m
Horizontal Load Hwx = qz*G* Cf* Wcx
= 54.23 kN/m windward
= -33.89 kN/m leeward
CALCULATION FOR EDG & TRAFO
Doc. No.: SNO-C-CC-53-017
SHELTER FOUNDATION
Page 12-3 of 20 .
Rev. B
EPC FASILITAS PENGUKURAN GAS
SENORO – PAU
Rev. Date : 18/07/2016

5.4 Crane Load ( CL )


Mono Rail Crane data 3 Ton Capacity (estimated) :
P HT Weight of hoist trolley = 500 kg
WH Weight of hoisted load = 3000 kg
W LT Weight of lifting tackle = 300 kg
Lb Span of runaway beam = 3.25 m
n wh Number of wheel = 1.00 ea

Wheel Load
Wheel load due to crane dead load
Ncd = P Ht = 500 kg

Wheel load due to hoisted load


Nh = W H + W LT = 3300 kg

Impact Load
fv Vertical = 25%
ft Tranversal = 30% lifted load
fl Longitudinal = 10% wheel load
CALCULATION FOR EDG & TRAFO
Doc. No.: SNO-C-CC-53-017
SHELTER FOUNDATION
Page 13-3 of 20 .
Rev. B
EPC FASILITAS PENGUKURAN GAS
SENORO – PAU
Rev. Date : 18/07/2016

Reaction Force due to crane


Vertical force  
vt.1  Ncd1  Nh1  ( 1  v)
N = 4750 kg

Transversal force vt.2 


NNtt = N
ftcd2 
( WHN+h2W (LT1 ) v) = 990 kg

Longitudinal force Nlt1  l  Nvt.1 = 475 kg

Nlt2  l  Nvt.2
Runaway
beam Nlt

Ntt.1
Nvt.1

SWL 3000 kg

5.5 Seismic load Load


Base on SNI 03-1726-2002, luwuk Sulawesi area shall be zone - 6
CALCULATION FOR EDG & TRAFO
Doc. No.: SNO-C-CC-53-017
SHELTER FOUNDATION
Page 14-3 of 20 .
Rev. B
EPC FASILITAS PENGUKURAN GAS
SENORO – PAU
Rev. Date : 18/07/2016
CALCULATION FOR EDG & TRAFO
Doc. No.: SNO-C-CC-53-017
SHELTER FOUNDATION
Page 15-3 of 20 .
Rev. B
EPC FASILITAS PENGUKURAN GAS
SENORO – PAU
Rev. Date : 18/07/2016

Soil Type (Refer to Report On-Land Geotechnical Investigation Donggi – Senoro LNG Plant
2008)
N'=
Thickness
Layer N SPT Depth (m) Thickness/ N ∑ N' N'= 30/ ∑N'
(m)
SPT
0 0 0 0 0
1 50 2,5 2,5 0,050
2 41,8 7,5 5,1 0,122
3 13,1 14,7 7,1 0,540
4 33,9 29,8 15,1 0,445 1,189 25,24
5 50 31,37 1,57 0,031

A0 = Percepatan puncak muka tanah A 0 (g)


= 0.36
CALCULATION FOR EDG & TRAFO
Doc. No.: SNO-C-CC-53-017
SHELTER FOUNDATION
Page 16-3 of 20 .
Rev. B
EPC FASILITAS PENGUKURAN GAS
SENORO – PAU
Rev. Date : 18/07/2016

T = Ct . h n x (Tabel 15)
= 0.0724 x 5.38 0.8
= 0.278
Tc = 0.600 (Refer to SNI 03-1726-2002 Section 4.7.6)
If --> T £ Tc
So, C = Am
Am = 2.5 * A0 (Refer to SNI 03-1726-2002 Section 4.7.6)
= 0.900
C = 0.900 Seismic Response Coefficient
CALCULATION FOR EDG & TRAFO
Doc. No.: SNO-C-CC-53-017
SHELTER FOUNDATION
Page 17-3 of 20 .
Rev. B
EPC FASILITAS PENGUKURAN GAS
SENORO – PAU
Rev. Date : 18/07/2016

I Importance factor = 1.60


CALCULATION FOR EDG & TRAFO
Doc. No.: SNO-C-CC-53-017
SHELTER FOUNDATION
Page 18-3 of 20 .
Rev. B
EPC FASILITAS PENGUKURAN GAS
SENORO – PAU
Rev. Date : 18/07/2016

R Response Modification factor = 4.50

C x I
V = x SWi
R
= 0.320 x SWi

Seismic load on structure will be generated in STAADpro using coefficient = 0.320

5.6 Summary Data Load


Axial Horizontal Load Horizontal Load
Load Area Load Uniform load
Loading Description Load Direction-X Direction-Z
Case
P(kg/m2) kg/m (kg) P (kg) P (kg/m') P (kg) P (kg/m')
1 Dead Load (DL) 78.79
2 Live Load (LL) 20.00 100.0
3 Wind Load (WL)
windward (column) 12.20 12.20
windward 180.76 54.23
leeward -112.98 -33.89
Roof - upwind -112.98
Roof - down wind -112.98
4 Crane Load (CR)
Vertical force 4750
Transversal force 990
Longitudinal force 475
5 Earthquake Load (EQ)
Coefficient dir-X 0.320
Coefficient dir-Z 0.320
CALCULATION FOR EDG & TRAFO
Doc. No.: SNO-C-CC-53-017
SHELTER FOUNDATION
Page 19-3 of 20 .
Rev. B
EPC FASILITAS PENGUKURAN GAS
SENORO – PAU
Rev. Date : 18/07/2016

6. CALCULATION DESIGN
6.1 Secondary Structure Calculation (Purlin Design)

Y
Purlin

Sagrod
X
Px

15 0

Py
P
P
4 Qdl +
4 Qll
m
Purlin

Sagrod

5.00 m

Fy Structural steel yield strength = 240.00 MPa


Qr Roofing weight (w= 0.15 kN/m2 ) = 0.15 kN/m'
Qp Purlin weight for = 0.07 kN/m'
Lf Frame distance = 5.00 m
Lp Purlin distance = 1.00 m
Qdl Dead load = Qr + Qp = 0.22 kN/m'
Qll Live Load = Qll * Lp = 0.20 kN/m2
= 0.20 kN/m'
P Concentrated load (worker at middle of beam) = 1.00 kN

Bending Design

q Lean angle = 15.00 deg


Lx = Lf / 2 = 2.50 m 1 sagrod at 1 span
Ly = Lf = 5.00 m
Qdl-x = Qdl * sin q = 0.06 kN/m
Qdl-y = Qdl * cos q = 0.21 kN/m
Qll-x = Qll * sin q = 0.05 kN/m
Qll-y = Qll * cos q = 0.19 kN/m
Px = P * sin q = 0.26 kN
CALCULATION FOR EDG & TRAFO
Doc. No.: SNO-C-CC-53-017
SHELTER FOUNDATION
Page 20-3 of 20 .
Rev. B
EPC FASILITAS PENGUKURAN GAS
SENORO – PAU
Rev. Date : 18/07/2016

Py = P * cos q = 0.97 kN
CALCULATION FOR EDG & TRAFO
Doc. No.: SNO-C-CC-53-017
SHELTER FOUNDATION
Page 21-3 of 20 .
Rev. B
EPC FASILITAS PENGUKURAN GAS
SENORO – PAU
Rev. Date : 18/07/2016

Dead load + concentrated live load


Mx = 1/8 * Qdl-y * Ly2 + 1/4 * Py * Ly = 1.87 kNm
My = 1/8 * Qdl-x * Lx + 1/4 * Px * Lx
2
= 0.21 kNm

Dead load + uniform live load


Mx = 1/8 * Qdl-y * Ly2 + 1/8 * Qll-y * Ly2 = 1.26 kNm
My = 1/8 * Qdl-x * Lx + 1/8 * Qll-x * Lx
2 2
= 0.08 kNm

Member Properties
C150x65x20x3.2
H Height = 150.00 mm
B Width = 65.00 mm
t Thickness = 3.20 mm
A Area = 9.57 cm2
Ix Inertia at X-axis = 332.00 cm4
Iy Inertia at Y-axis = 53.80 cm4
Sx Section modulus at X-axis = 44.30 cm3
Sy Section modulus at Y-axis = 12.20 cm3

Member Strength Check


Dead load + concentrated live load
sall Allowable bending stress = 0.6 * Fy = 144.00 MPa
s Bending stress = (Mx / Sx) + (My / Sy) = 59.20 MPa < σall OK
Rs Bending stress ratio = s / sall = 0.41 <1
Dead load + uniform live load
sall Allowable bending stress = 0.6 * Fy = 144.00 MPa
s Bending stress = (Mx / Sx) + (My / Sy) = 35.29 MPa < σall OK
Rs Bending stress ratio = s / sall = 0.25 <1
CALCULATION FOR EDG & TRAFO
Doc. No.: SNO-C-CC-53-017
SHELTER FOUNDATION
Page 22-3 of 20 .
Rev. B
EPC FASILITAS PENGUKURAN GAS
SENORO – PAU
Rev. Date : 18/07/2016

Deflection Check
E Elastic modulus = 200000 MPa
= 200000000 kN/m2
Concentrated live load
dall Allowable deflection = Lf / 360 = 13.89 mm
dx Deflection at X-axis
= (Py * Lx3) / (48 * E * Ix) = 0.47 mm < δall OK
dy Deflection at Y-axis
= (Px * Ly3) / (48 * E * Iy) = 6.26 mm < δall OK
dtotal Deflection total = Ö dx + dy
2 2
= 6.28 mm < δall OK

Uniform live load


dall Allowable deflection = Lf / 360 = 13.89 mm
dx Deflection at X-axis
= (5 * Qll-y * Lx4) / (384 * E * Ix) = 0.15 mm < δall OK
dy Deflection at Y-axis
= (5 * Qll-x * Ly4) / (384 * E * Iy) = 3.84 mm < δall OK
dtotal Deflection total = Ö dx2 + dy2 = 3.84 mm < δall OK
CALCULATION FOR EDG & TRAFO
Doc. No.: SNO-C-CC-53-017
SHELTER FOUNDATION
Page 23-3 of 20 .
Rev. B
EPC FASILITAS PENGUKURAN GAS
SENORO – PAU
Rev. Date : 18/07/2016

6.2 Main Structure Calculation


6.2.1 Loading Data
Dead Load Roofing

Roof Live Load


CALCULATION FOR EDG & TRAFO
Doc. No.: SNO-C-CC-53-017
SHELTER FOUNDATION
Page 24-3 of 20 .
Rev. B
EPC FASILITAS PENGUKURAN GAS
SENORO – PAU
Rev. Date : 18/07/2016

Wind Load at Frame (X-Dir)

Wind Load at Frame (Z-Dir)


CALCULATION FOR EDG & TRAFO
Doc. No.: SNO-C-CC-53-017
SHELTER FOUNDATION
Page 25-3 of 20 .
Rev. B
EPC FASILITAS PENGUKURAN GAS
SENORO – PAU
Rev. Date : 18/07/2016

Earthquake Load at Frame (X-Dir)


Selfwight & Roof load for seismic load will be generated in STAADpro use Coefficient = 0.320

Earthquake Load at Frame (Z-Dir)


Selfwight & Roof load for seismic load will be generated in STAADpro use Coefficient = 0.320
CALCULATION FOR EDG & TRAFO
Doc. No.: SNO-C-CC-53-017
SHELTER FOUNDATION
Page 26-3 of 20 .
Rev. B
EPC FASILITAS PENGUKURAN GAS
SENORO – PAU
Rev. Date : 18/07/2016

Crane Load (Condition-1)

Crane Load (Condition-2)


CALCULATION FOR EDG & TRAFO
Doc. No.: SNO-C-CC-53-017
SHELTER FOUNDATION
Page 27-3 of 20 .
Rev. B
EPC FASILITAS PENGUKURAN GAS
SENORO – PAU
Rev. Date : 18/07/2016

6.2.2 Analysa Result Design


Deflection
Vertical Deflection

Horizontal Deflection
CALCULATION FOR EDG & TRAFO
Doc. No.: SNO-C-CC-53-017
SHELTER FOUNDATION
Page 28-3 of 20 .
Rev. B
EPC FASILITAS PENGUKURAN GAS
SENORO – PAU
Rev. Date : 18/07/2016

Steel Stress Ratio


Permanent Condition

Temporary Condition
CALCULATION FOR EDG & TRAFO
Doc. No.: SNO-C-CC-53-017
SHELTER FOUNDATION
Page 29-3 of 20 .
Rev. B
EPC FASILITAS PENGUKURAN GAS
SENORO – PAU
Rev. Date : 18/07/2016

6.3 Steel Structure Design Result


Summary Of Maximum Deflection
LENGTH (L) δv-all DEFLECTION RESULT (mm)
TYPE ELEMENT PROFILE
(mm) (L/200) X Check Z Check Y Check
C1 Column H 200x200x8x12 5000 25.00 11.75 OK 9.32 OK N/A OK
R1 Rafter H 200x100x5.5x8 3000 15.00 N/A OK N/A OK 0.36 OK
B1 Beam Span H 200x100x5.5x8 5000 25.00 N/A OK N/A OK 0.39 OK
B2 Run Way Beam H 300x150x6.5x9 3000 15.00 N/A OK N/A OK 1.67 OK
B3 Hoist Beam H 350x175x7x11 5000 25.00 N/A OK N/A OK 4.35 OK

Summary Of maximum Stress Ratio


Permanent Ratio Temporary Ratio
TYPE ELEMENT PROFILE
Result All Check Result All Check

Column H 250x250x9x14 0.199 1.0 OK 1.180 1.33 OK


Rafter H 200x100x5.5x8 0.319 1.0 OK 0.572 1.33 OK
Beam 1 H 200x100x5.5x8 0.137 1.0 OK 0.411 1.33 OK
Beam 2 H 300x150x6.5x9 0.052 1.0 OK 0.823 1.33 OK
Beam 3 H 150x75x5.5x7 0.228 1.0 OK 1.210 1.33 OK
Beam Run way H 350x175x7x11 0.804 1.0 OK 0.836 1.33 OK
Cantilever H 150x75x5.5x7 0.065 1.0 OK 0.142 1.33 OK
Bracing L 100x100x9 0.171 1.0 OK 1.190 1.33 OK
CALCULATION FOR EDG & TRAFO
Doc. No.: SNO-C-CC-53-017
SHELTER FOUNDATION
Page 30-3 of 20 .
Rev. B
EPC FASILITAS PENGUKURAN GAS
SENORO – PAU
Rev. Date : 18/07/2016

6.4

Steel Connection Design


Connection Specification
Structural Steel ASTM A-36
Fu Structural steel ultimate tensile strength = 400 MPa
Fy Structural steel yield strength = 240 MPa
Fb Structural steel bending strength = 0.6 * Fy = 144 MPa
Ft Structural steel tension strength = 150 MPa
Fv Structural steel shear strength = 0.4 * Fy = 96 MPa
Bolt ASTM A-325
Ftb Allowable tensile stress = 300 MPa
Fvb Allowable shear stress = 145 MPa
Anchor Bolt ASTM A-307
Fya Allowable anchor bolt yield strength = 240 MPa
Fva Allowable shear stress = 0.4 * Fya = 96 MPa
Fta Allowable tensile stress = 0.5 * Fya = 120 MPa
Welding AWS D1.1, E70XX
Fuw Ultimate welding strength = 480 MPa
Fvw Allowable shear stress = 0.3 * Fuw = 144 MPa
Plate
Fyp Allowable plate yield strength = 240 MPa
Fvp Allowable shear stress = 0.4 * Fyp = 96 MPa
Fup Ultimate plate strength = 1.6 * Fyp = 384 MPa
Concrete
fc' Compressive strength for structural concrete = 28 MPa
CALCULATION FOR EDG & TRAFO
Doc. No.: SNO-C-CC-53-017
SHELTER FOUNDATION
Page 31-3 of 20 .
Rev. B
EPC FASILITAS PENGUKURAN GAS
SENORO – PAU
Rev. Date : 18/07/2016

fc' Compressive strength for leveling concrete = 17.5 MPa

6.4.1 Rafter Connection (Weld Connections)


A SH 200x100x5.5x8
END PLATE 12 mm

V V

T T

M M
A

Elevation

Rmax

n.a
c1

Section A-A b

Member properties SH 200 x 100 x 5.5 x 8


h Beam height = 200 mm
b Beam width = 100 mm
tw Web thickness = 5.5 mm
tf Flange thickness = 8 mm
Ix Inertia at X-dir = 1840 cm4
Sx Section moduly = 184 cm3

Output program
Tmax Tension force = 21.39 kN STAAD Pro Output
s3 Bolt distance = 130.00 mm
s4 Bolt distance = 70.00 mm

Endplate dimension
Lp Endplate length = 360.00 mm
bp Endplate width = 100.00 mm
CALCULATION FOR EDG & TRAFO
Doc. No.: SNO-C-CC-53-017
SHELTER FOUNDATION
Page 32-3 of 20 .
Rev. B
EPC FASILITAS PENGUKURAN GAS
SENORO – PAU
Rev. Date : 18/07/2016

Tmax(2) Tension load per 2 bolts = Ft * Ab * 2 = 20.79 kN


T Tension capacity per 2 bolts = Ftb * Ab * 2 = 120.64 kN > Tmax(2) OK
Weld Connection capacity
w = = 8 mm
te = 0.707 * w = 5.66 mm
Le = (Lp - 3 * tf) * nr + ((b - tw) / 2) * n = 955.50 mm
T Tension capacity = Le * te * Fvw = 778.22 kN > Tmax OK
Le = 2 * (h - 2 * tf) + 2 * b + 2 * (b - tw) = 767.00 mm
V Shear capacity = Le * te * Fvw = 624.69 kN > Vmax OK
Le = 2 * (b - tw) = 189.00 mm
Ff = Le * te * Fvw = 153.93 kN
M Moment capacity = Ff * (h - tf) = 29.56 kNm > Mmax OK

Endplate capacity
An = tp * [Lp - n/2 * (db + 1/16 * 25.4)] = 3,686.85 mm2
V1 Shear capacity = 2 * 0.3 * Fup * An = 849.45 kN
Ag = tp * Lp = 4,320.00 mm2
V2 Shear capacity = 0.4 * Fyp * Ag = 414.72 kN
Vall Shear capacity allowable = minimum V1 dan V2 = 414.72 kN > Vmax OK
p Tributary of each bolts = 120.00 mm
d' = db + 1/16 * 25.4 = 17.59 mm
a1 = 25.00 mm
b1 = 0.5 b - a1 - 0.5 tw = 22.25 mm
a' = a1 + db/2 = 33.00 mm
b' = b1 - db/2 = 14.25 mm
B = Ftb * Ab = 60.32 kN
tc Plate thickness to resist bolt tension capacity
= √ [(8 * B * b') / (p * Fy)] = 15.45 mm
ρ = b' / a' = 0.43
δ = 1 - d'/p = 0.85
α = {1 / [δ (1 + ρ)]}{(tc / tp) 2 - 1} = 0.54 0 < α < 1.00
T Tension capacity per 2 bolts
= B (tp / tc)^2 (1 + δ α) = 53.10 kN > Tmax(2) OK
CALCULATION FOR EDG & TRAFO
Doc. No.: SNO-C-CC-53-017
SHELTER FOUNDATION
Page 33-3 of 20 .
Rev. B
EPC FASILITAS PENGUKURAN GAS
SENORO – PAU
Rev. Date : 18/07/2016

6.4.2 Rafter to Column Connection


WH 200x200x8x12

SH 200x100x5.5x8 SH 200x100x5.5x8
A WH 200x200x8x12

V M
T

A
Plan

Elevation

bp a

s1
Rmax
s2
c
Lp
s3 M
n.a
s4 c1

Section A-A b

Output program
Tmax Tension force = 21.40 kN STAAD Pro Output
Vmax Shear force = 7.41 kN STAAD Pro Output
Mmax Moment force = 4.91 kNm STAAD Pro Output

Member properties SH 200 x 100 x 5.5 x 8


h Beam height = 200 mm
b Beam width = 100 mm
tw Web thickness = 5.5 mm
tf Flange thickness = 8 mm
Ix Inertia at X-dir = 1840 cm4
CALCULATION FOR EDG & TRAFO
Doc. No.: SNO-C-CC-53-017
SHELTER FOUNDATION
Page 34-3 of 20 .
Rev. B
EPC FASILITAS PENGUKURAN GAS
SENORO – PAU
Rev. Date : 18/07/2016

Sx Section moduly = 184 cm3

Bolt Arrangement
db Bolt diameter M16 = 16 mm
Ab Bolt area = 0.25 * p * db2 = 201.06 mm2
n Total number of bolts = 6 ea
nr Number vertical row of bolts = 2 ea
s1 Bolt distance = 60.00 mm
s2 Bolt distance = 100.00 mm
s3 Bolt distance = 130.00 mm
s4 Bolt distance = 70.00 mm

Endplate dimension
Lp Endplate length = 380.00 mm
bp Endplate width = 120.00 mm
tp Endplate thickness = 12.00 mm

Bolt capacity
T Tension capacity = Ftb * Ab * n = 361.91 kN
V Shear capacity = Fvb * Ab * n = 174.92 kN
p Bolt distance = s2 = 100.00 mm
a = (Ab * nr) / p = 4.02 mm
c1 / c = √ (a / b) = 0.20
c1 = 0.20 c
Lp = c1 + c = 1.20 c
c = Lp / 1.20 = 316.53 mm
c1 = Lp - c = 63.47 mm
I = (a * c3 + b * c13) / 3 = 5.10E+07 mm4
Ftb = Mmax * c / I = 30.45 MPa
Ftt = Tmax / (Ab * n) = 17.74 MPa
Ft = Ftb + Ftt = 48.19 MPa
Tmax(2) Tension load per 2 bolts = Ft * Ab * 2 = 19.38 kN
T Tension capacity per 2 bolts = Ftb * Ab * 2 = 120.64 kN > Tmax(2) OK

Weld capacity
w = 8 mm
te = 0.707 * w = 5.66 mm
Le = (Lp - 3 * tf) * nr + ((b - tw) / 2) * n = 995.50 mm
T Tension capacity = Le * te * Fvw = 810.80 kN > Tmax OK
Le = 2 * (h - 2 * tf) + 2 * b + 2 * (b - tw) = 767.00 mm
V Shear capacity = Le * te * Fvw = 624.69 kN > Vmax OK
Le =2*b = 200.00 mm
CALCULATION FOR EDG & TRAFO
Doc. No.: SNO-C-CC-53-017
SHELTER FOUNDATION
Page 35-3 of 20 .
Rev. B
EPC FASILITAS PENGUKURAN GAS
SENORO – PAU
Rev. Date : 18/07/2016

Ff = Le * te * Fvw = 162.89 kN
M Moment capacity = Ff * (h - tf) = 31.28 kNm > Mmax OK

Endplate capacity
An = tp * [Lp - n/2 * (db + 1/16 * 25.4)] = 3,926.85 mm2
V1 Shear capacity = 2 * 0.3 * Fup * An = 904.75 kN
Ag = tp * Lp = 4,560.00 mm2
V2 Shear capacity = 0.4 * Fyp * Ag = 437.76 kN
Vall Shear capacity allowable = minimum V1 dan V2 = 437.76 kN > Vmax OK
p Tributary of each bolts = 120.00 mm
d' = db + 1/16 * 25.4 = 17.59 mm
a1 = 25.00 mm
b1 = 0.5 b - a1 - 0.5 tw = 22.25 mm
a' = a1 + db/2 = 33.00 mm
b' = b1 - db/2 = 14.25 mm
B = Ftb * Ab = 60.32 kN
tc Plate thickness to resist bolt tension capacity
= √ [(8 * B * b') / (p * Fy)] = 15.45 mm
ρ = b' / a' = 0.43
δ = 1 - d'/p = 0.85
α = {1 / [δ (1 + ρ)]}{(tc / tp) 2 - 1} = 0.54 0 < α < 1.00
T Tension capacity per 2 bolts
= B (tp / tc)^2 (1 + δ α) = 53.10 kN > Tmax(2) OK

6.4.3 Beam to Column Connection


SH 200x100x5.5x8

A
SH 200x100x5.5x8

WH 200x200x8x12
A

WH 200x200x8x12

Elevation Section A-A


CALCULATION FOR EDG & TRAFO
Doc. No.: SNO-C-CC-53-017
SHELTER FOUNDATION
Page 36-3 of 20 .
Rev. B
EPC FASILITAS PENGUKURAN GAS
SENORO – PAU
Rev. Date : 18/07/2016

Elevation Section A-A

Member properties SH 200 x 100 x 5.5 x 8


h Beam height = 200 mm
b Beam width = 100 mm
tw Web thickness = 5.5 mm
tf Flange thickness = 8 mm
Ix Inertia at X-dir = 1840 cm4
Sx Section moduly = 184 cm3
Output program
Tmax Tension force = 6.53 kN STAAD Pro Output
Vmax Shear force = 1.17 kN STAAD Pro Output
Mmax Moment force = 1.88 kNm STAAD Pro Output
Bolt arrangement
db Bolt diameter M16 = 16 mm
Ab Bolt area = 0.25 * p * db2 = 201.06 mm2
nw Total number of web bolts = 2 ea
nf Total number of flange bolts = 4 ea
Bolt capacity
T Tension capacity = Ftb * Ab * (nw + 2 * nf) = 603.19 kN
V Shear capacity = Fvb * Ab * nw = 58.31 kN
Ff = Ftb * Ab * nf = 241.27 kN
M Moment capacity = Ff * h = 48.25 kNm
Weld capacity
- Web
s Bolt distance = 3 * db = 50.00 mm
Le = 1.5 * db = 25.00 mm
Lw = (nw - 1) * s + 2 * Le = 100.00 mm
w = = 8.00 mm
te = 0.707 * w = 5.66 mm
Tw = Lw * te * Fvw = 81.45 kN
Lw = (2 * Le) + (db + 1/16 * 25.4) = 67.59 mm
V Shear capacity = Lw * te * Fvw = 55.05 kN

- Flange
Lw =b = 100.00 mm
w = = 8.00 mm
te = 0.707 * w = 5.66 mm
Tf = Lw * te * Fvw = 81.45 kN
M Moment capacity = Tf * (h - tf) = 15.64 kNm
CALCULATION FOR EDG & TRAFO
Doc. No.: SNO-C-CC-53-017
SHELTER FOUNDATION
Page 37-3 of 20 .
Rev. B
EPC FASILITAS PENGUKURAN GAS
SENORO – PAU
Rev. Date : 18/07/2016

T Tension capacity = Tw + Tf = 162.89 kN

Gusset plate capacity


- Web
hp = Lw = 180.00 mm
tp Gusset plate thickness = 10.00 mm
Ag = hp * tp = 1,800.00 mm2
An = Ag - [nw * tp * (db + 1/16 * 25.4)] = 1,448.25 mm2
V Shear capacity = 0.3 * Fup * An = 166.84 kN
V Shear capacity = 0.4 * Fyp * Ag = 172.80 kN
Tw = 0.6 * Fyp * Ag = 259.20 kN

- Flange
tp Plate thickness = 10.00 mm
Ag = b * tp = 1,000.00 mm2
An = Ag - 2 * db * tp = 680.00 mm2
T1 = 0.5 * Fup * An = 130.56 kN
T2 = 0.6 * Fyp * Ag = 144.00 kN
Tf = 2 * min(T1,T2) = 261.12 kN
M Moment capacity = min(T1,T2) * (h - tf) = 25.07 kNm
T Tension capacity = Tw + Tf = 520.32 kN

Overall capacity
Ta Allowable tension capacity = 162.89 kN > Tmax OK
Va Allowable shear capacity = 55.05 kN > Vmax OK
Ma Allowable moment capacity = 15.64 kNm > Mmax OK
CALCULATION FOR EDG & TRAFO
Doc. No.: SNO-C-CC-53-017
SHELTER FOUNDATION
Page 38-3 of 20 .
Rev. B
EPC FASILITAS PENGUKURAN GAS
SENORO – PAU
Rev. Date : 18/07/2016

SH 300x150x6.5x9 SH 300x150x6.5x9
6.4.4 Run Way Beam to Column
A Connection (End Plate Connection)
WH 200x200x8x12

WH 200x200x8x12
V M T

Plan
A
Elevation

bp a

s1
s2
Rmax
s2 c
Lp
s3 M
n.a
s4 c1

Section A-A b

Member properties SH 300 x 150 x 6.5 x 9


h Beam height = 300 mm
b Beam width = 150 mm
tw Web thickness = 6.5 mm
tf Flange thickness = 9 mm
Ix Inertia at X-dir = 7210 cm4
Sx Section moduly = 480 cm3
Output program
Tmax Tension force = 20.62 kN STAAD Pro Output
Vmax Shear force = 28.95 kN STAAD Pro Output
Mmax Moment force = 22.63 kNm STAAD Pro Output
Bolt arrangement
db Bolt diameter M16 = 16 mm
Ab Bolt area = 0.25 * p * db2 = 201.06 mm2
n Total number of bolts = 8 ea
CALCULATION FOR EDG & TRAFO
Doc. No.: SNO-C-CC-53-017
SHELTER FOUNDATION
Page 39-3 of 20 .
Rev. B
EPC FASILITAS PENGUKURAN GAS
SENORO – PAU
Rev. Date : 18/07/2016

nr Number vertical row of bolts = 2 ea


CALCULATION FOR EDG & TRAFO
Doc. No.: SNO-C-CC-53-017
SHELTER FOUNDATION
Page 40-3 of 20 .
Rev. B
EPC FASILITAS PENGUKURAN GAS
SENORO – PAU
Rev. Date : 18/07/2016

s1 Bolt distance = 50.00 mm


s2 Bolt distance = 100.00 mm
s3 Bolt distance = 130.00 mm
s4 Bolt distance = 70.00 mm
Endplate dimension
Lp Endplate length = 500.00 mm
bp Endplate width = 170.00 mm
tp Endplate thickness = 16.00 mm

Bolt capacity
T Tension capacity = Ftb * Ab * n = 482.55 kN
V Shear capacity = Fvb * Ab * n = 233.23 kN
p Bolt distance = s2 = 100.00 mm
a = (Ab * nr) / p = 4.02 mm
c1 / c = √ (a / b) = 0.16
c1 = 0.16 c
Lp = c1 + c = 1.16 c
c = Lp / 1.16 = 429.65 mm
c1 = Lp - c = 70.35 mm
I = (a * c3 + b * c13) / 3 = 1.24E+08 mm4
Ftb = Mmax * c / I = 78.59 MPa
Ftt = Tmax / (Ab * n) = 12.82 MPa
Ft = Ftb + Ftt = 91.41 MPa
Tmax(2) Tension load per 2 bolts = Ft * Ab * 2 = 36.76 kN
T Tension capacity per 2 bolts = Ftb * Ab * 2 = 120.64 kN > Tmax(2) OK
Weld capacity
w = 8 mm
te = 0.707 * w = 5.66 mm
Le = (Lp - 3 * tf) * nr + ((b - tw) / 2) * n = 1,520.00 mm
T Tension capacity = Le * te * Fvw = 1,237.99 kN > Tmax OK
Le = 2 * (h - 2 * tf) + 2 * b + 2 * (b - tw) = 1,161.00 mm
V Shear capacity = Le * te * Fvw = 945.59 kN > Vmax OK
Le =2*b = 300.00 mm
Ff = Le * te * Fvw = 244.34 kN
M Moment capacity = Ff * (h - tf) = 71.10 kNm > Mmax OK
Endplate capacity
An = tp * [Lp - n/2 * (db + 1/16 * 25.4)] = 6,874.40 mm2
V1 Shear capacity = 2 * 0.3 * Fup * An = 1,583.86 kN
Ag = tp * Lp = 8,000.00 mm2
V2 Shear capacity = 0.4 * Fyp * Ag = 768.00 kN
Vall Shear capacity allowable = minimum V1 dan V2 = 768.00 kN > Vmax OK
p Tributary of each bolts = 120.00 mm
CALCULATION FOR EDG & TRAFO
Doc. No.: SNO-C-CC-53-017
SHELTER FOUNDATION
Page 41-3 of 20 .
Rev. B
EPC FASILITAS PENGUKURAN GAS
SENORO – PAU
Rev. Date : 18/07/2016

d' = db + 1/16 * 25.4 = 17.59 mm


CALCULATION FOR EDG & TRAFO
Doc. No.: SNO-C-CC-53-017
SHELTER FOUNDATION
Page 42-3 of 20 .
Rev. B
EPC FASILITAS PENGUKURAN GAS
SENORO – PAU
Rev. Date : 18/07/2016

a1 = 25.00 mm
b1 = 0.5 b - a1 - 0.5 tw = 46.75 mm
a' = a1 + db/2 = 33.00 mm
b' = b1 - db/2 = 38.75 mm
B = Ftb * Ab = 60.32 kN
tc Plate thickness to resist bolt tension capacity
= √ [(8 * B * b') / (p * Fy)] = 25.48 mm
ρ = b' / a' = 1.17
δ = 1 - d'/p = 0.85
α = {1 / [δ (1 + ρ)]}{(tc / tp) 2 - 1} = 0.83 0 < α < 1.00
T Tension capacity per 2 bolts
= B (tp / tc)^2 (1 + δ α) = 40.59 kN > Tmax(2) OK

6.4.5 Run Way Beam to Hoist Beam Connection


SH 300x150x6.5x9

s1

M s2
V
A A s3
T

Run Way Beam


Elevation SH 350x175x7x11

Run Way Beam


SH 300x150x6.5x9

Member properties SH 350 x 175 x 7 x 11


h Beam height = 350 mm
b Beam width = 175 mm
tw Web thickness = 7 mm
tf Flange thickness = 11 mm
Ix Inertia at X-dir = 13600 cm4
Sx Section moduly = 775 cm3
Output program
Tmax Tension force = 48.16 kN STAAD Pro Output
CALCULATION FOR EDG & TRAFO
Doc. No.: SNO-C-CC-53-017
SHELTER FOUNDATION
Page 43-3 of 20 .
Rev. B
EPC FASILITAS PENGUKURAN GAS
SENORO – PAU
Rev. Date : 18/07/2016

Vmax Shear force = 4.60 kN STAAD Pro Output


Mmax Moment force = 0.57 kNm STAAD Pro Output
Bolt arrangement
db Bolt diameter M16 = 16 mm
Ab Bolt area = 0.25 * p * db 2
= 201.06 mm2
n Total number of bolts = 4 ea
nr Number vertical row of bolts = 2 ea
s1 Bolt distance = 35.00 mm
s2 Bolt distance = 80.00 mm
s3 Bolt distance = 35.00 mm

Bolt capacity
T Tension capacity = Ftb * Ab * n = 241.27 kN
V Shear capacity = Fvb * Ab * n = 116.62 kN
p Bolt distance = s2 = 80.00 mm
a = (Ab * nr) / p = 5.03 mm
c1 / c = √ (a / b) = 0.17
c1 = 0.17 c
Lp = c1 + c = 1.17 c
c = Lp / 1.17 = 128.26 mm
c1 = Lp - c = 21.74 mm
I = (a * c3 + b * c13) / 3 = 4.13E+06 mm4
Ftb = Mmax * c / I = 17.68 MPa
Ftt = Tmax / (Ab * n) = 59.88 MPa
Ft = Ftb + Ftt = 77.56 MPa
Tmax(2) Tension load per 2 bolts = Ft * Ab * 2 = 31.19 kN
T Tension capacity per 2 bolts = Ftb * Ab * 2 = 120.64 kN > Tmax(2) OK

Weld capacity
w = 8 mm
te = 0.707 * w = 5.66 mm
Le =b*n = 300.00 mm
T Tension capacity = Le * te * Fvw = 244.34 kN > Tmax OK
Le = 2 * (h - 2 * tf) + 2 * b + 2 * (b - tw) = 1,358.00 mm
V Shear capacity = Le * te * Fvw = 1,106.04 kN > Vmax OK
Le =2*b = 350.00 mm
Ff = Le * te * Fvw = 285.06 kN
CALCULATION FOR EDG & TRAFO
Doc. No.: SNO-C-CC-53-017
SHELTER FOUNDATION
Page 44-3 of 20 .
Rev. B
EPC FASILITAS PENGUKURAN GAS
SENORO – PAU
Rev. Date : 18/07/2016

M Moment capacity = Ff * (h - tf) = 96.64 kNm > Mmax OK

6.4.6 Column Base Plate Connection


Lp

WH 200 x 200 x 8 x 12

150

N
Bp

150

50 200 50
50
B

Member properties WH 200 x 200 x 8 x 12


h Beam height = 200 mm
b Beam width = 200 mm
tw Web thickness = 8 mm
tf Flange thickness = 12 mm
Ix Inertia at X-dir = 4720 cm4
Sx Section modulus = 472 cm3
A Member section area = 63.53 cm2
Output program
Cmax Compression force = 54.78 kN STAAD Pro Output
Vmax Shear force = 10.18 kN STAAD Pro Output
Mmax Moment force = 0.00 kNm STAAD Pro Output
Anchor bolt capacity
n Total number of anchor bolts = 4 ea
db Anchor bolt diameter = 5/8 in
= 16 mm
CALCULATION FOR EDG & TRAFO
Doc. No.: SNO-C-CC-53-017
SHELTER FOUNDATION
Page 45-3 of 20 .
Rev. B
EPC FASILITAS PENGUKURAN GAS
SENORO – PAU
Rev. Date : 18/07/2016

Ab Bolt area = 0.25 * p * db2 = 197.93 mm2


V Shear capacity = n * Ab * Fva = 76.01 kN
Baseplate dimension
- Large plate behavior
Bp Pedestal width = 0.40 m
Lp Pedestal length = 0.40 m
A2 = Bp * Lp = 160000.0 mm2
A1-min Minimum baseplate area, larger value between
(1 / A2)(Cmax / 0,35 fc') 2 and Cmax / (0,3 fc') = 6521.43 mm2
Δ = (0,95 h - 0,80 b) / 2 = 15.00 mm
B Baseplate width, larger value between = 200.00 mm Needed
√A1 + Δ and b = 300.00 mm Used
N Baseplate length, larger value between = 200.00 mm Needed
A1 / B and h = 300.00 mm Used
A1 Baseplate area =B*N = 90000.0 mm2
fp Actual bearing pressure = Cmax / A1 = 0.61 MPa
m = (N - 0,95 h) / 2 = 55.00 mm
n = (B - 0,80 b) / 2 = 70.00 mm
tp1 Baseplate thickness = 7.05 mm
= (max m or n) * √[fp / (0,25 * Fyp)] =
- Small plate behavior
Fp Allowable bearing pressure, min value between = 13.07 MPa
0,35 * fc' * √ (A2 / A1) and 0,7 * fc'
Fp = Cmax / [2L (h + b - 2L)]
0 = 4 Fp L2 - 2 Fp (h + b) L + Cmax
= 52.27 L2 ### 54780
L = [10453,33 ± √ (-10453,33^2 - 4 * 52,27 * = 5.39 mm
54780)] / 2 * 52,27
tp2 Baseplate thickness = L √ (3 fp / Fb) = 0.47 mm
tp Baseplate thickness, max between tp1 and tp2 = 7.05 mm Needed
= 16.00 mm Used
Baseplate capacity
An = tp * [B - n/2 * (db + 1/16 * 25.4)] = 4,241.20 mm2
V Shear capacity = 2 * 0.3 * Fup * An = 977.17 kN
Ag = tp * B = 4,800.00 mm2
V Shear capacity = 0.4 * Fyp * Ag = 460.80 kN
Allowable capacity
Va Allowable shear capacity = 76.01 kN > Vmax OK
CALCULATION FOR EDG & TRAFO
Doc. No.: SNO-C-CC-53-017
SHELTER FOUNDATION
Page 46-3 of 20 .
Rev. B
EPC FASILITAS PENGUKURAN GAS
SENORO – PAU
Rev. Date : 18/07/2016

6.4.7 Anchor Bolt Design

Output from StaadPro Horizontal


Fz kN
Maximum Force Factored Combination Horizontal Vertical 3.11
Node L/C Fx kN Fy kN 1.68
Max Fx 5 2025 (G) 1.2DP + 1.6(0.25WZ) + CR-2 0.24 38.82 1.56
Min Fx 8 2011 (C) 1.2DP + 1.6WX + 1.6L + CR-1 15.29 15.79 1.61
Max Fy 23 2011 (C) 1.2DP + 1.6WX + 1.6L + CR-1 15.21 75.40 0.03
Min Fy 4 2011 (C) 1.2DP + 1.6WX + 1.6L + CR-1 14.04 28.65 6.94
Max Fz 19 2010 (C) 1.2DP + 1.6WX + 1.6L 8.40 8.82
Min Fz 5 2017 (D) 0.9DP + 1.43SZ 0.01 16.91

Number of Anchor bolt n = 4.00 ea


Inertia of Bolt
Z X n x Z2 n x X2 P = P1/n - (Mz1 x X) /Izz
No n
m m m 2
m 2 or
1 1 0.050 -0.075 0.00 0.01 P = P1/n - (Mx1 x Z) /Ixx
2 1 -0.050 -0.075 0.00 0.01
3 1 0.050 0.075 0.00 0.01
4 1 -0.050 0.075 0.00 0.01
4 0.05 0.08 0.01 0.02
Ixx = S(n x Z2) = 0.01 m2
Izz = S(n x X2) = 0.02 m2
Horzo
TENSION LOAD OR COMPRESION LOAD ON SINGLE ANCHOR ntal
Tension / Tension / Horzontal Load Load
No. Anchor Compression Compression (Dir-X) (Dir-
L/C Bolt Z)
(Rot Z-Z) (Rot X-X) HX1 HZ1
ea kN kN kN kN
2015 4.00 9.71 9.71 0.06 0.78
2011 4.00 3.95 3.95 3.82 0.42
2011 4.00 18.85 18.85 3.80 0.39
2011 4.00 7.16 7.16 3.51 0.40
2010 4.00 2.20 2.20 2.10 0.01
2017 4.00 4.23 4.23 0.00 1.74
CALCULATION FOR EDG & TRAFO
Doc. No.: SNO-C-CC-53-017
SHELTER FOUNDATION
Page 47-3 of 20 .
Rev. B
EPC FASILITAS PENGUKURAN GAS
SENORO – PAU
Rev. Date : 18/07/2016

Maximum 18.85 18.85 3.82 0.78

Anchor Bolt Data (Single Anchor Capacity)


Factored tension load Nu = 18.85 kN
Factored shear load Vu = 2.10 kN
Number of Anchor Bolt n = 1.00 ea
Yield strength fya = 240 MPa
Anchor bolt tensile material futa = minimum (1.9 fya,860, 400) MPa
futa = 400 MPa
Concrete design strength f'c = 28 MPa
Anchor bolt diameter da = 16 mm
Length of Anchor L = 480 mm
Area gross anchor bolt Ag = 201.06 mm2
Number of threads per inch nth = 11.00
Number of threads per mm nth = 0.43

Anchor effective section area Ase = 0.25 x p x(da-(0.9743/nth))2


= 148.49 mm2
Anchor embedment depth minimum hef (min) = 12*da mm
= 192 mm
Anchor embedment depth hef = 330 mm
Concrete thickness ha = 800 mm
Bolt edge distance c1 = 100 mm
Bolt edge distance c2 = 75 mm
Minimum edge distance cmin = min (c1,c2,)
= 75.0 mm
Maximum edge distance cmax = max (c1,c2)
= 100.0 mm

TENSION CALCULATION
Anchor Rod Tension Resistance
Reduction Factor φt,s = 0.75
Anchor Rod Tension Resistance Nsa = φt,s x n x Ase x futa
= 44548.44 N
= 44.55 kN
Nsa > Nu OK
Check Concrete Tensile Breakout Resistance
l = 1.00
CALCULATION FOR EDG & TRAFO
Doc. No.: SNO-C-CC-53-017
SHELTER FOUNDATION
Page 48-3 of 20 .
Rev. B
EPC FASILITAS PENGUKURAN GAS
SENORO – PAU
Rev. Date : 18/07/2016

Condition 1 if hef < 279.4 mm


or hef > 635 mm
Concrete Tensile Breakout Nb1 = 10*l * fc0.5 * hef1.5
Resistance = 140776.73 N
= 140.78 kN
Concrete Tensile Breakout Condition 2 if hef ≥ 279.4 mm
and hef ≤ 635 mm
Resistance Nb2 = 3.9*l * fc0.5 * hef5/3
= 325212.22 N
= 325.21 kN
hef = 330 mm
Nb = Nb2 or Nb1
= 325212.22 N Condition 2

Tension reduction factor φt,c = 0.75


Concrete Tensile Breakout Resistance Ncbg = 0.75 x n x φt,c x Nb
= 182931.9 N
= 182.9 kN
Ncbg > Nu OK

Check Pull strength of anchor in tension


Width plate W = 45.00 mm
Thicknes plate B = 6.00 mm
Net bearing area of Anchor head Abrg = [0.25*p*(F +2B)2 ] -[0.25 x p x da2]
= 1306 mm2
Net bearing area of Anchor head Abrg = [3^0.5/2*(F )2 ] -[0.25 x p x da2]
Without bearing plate
= 675 mm2
Np = 8* fc *Abrg
= 151132.2623 N
= 151.13 kN
Anchor Pullout Resistance Npn = 0.75 x φt,c x n x yc,P x NP
= 85.01 kN
Npn > Nu OK
Govern Tension Resistance Nr = min ( Nsa, Ncbg, Npn)
= 44.55 kN
CALCULATION FOR EDG & TRAFO
Doc. No.: SNO-C-CC-53-017
SHELTER FOUNDATION
Page 49-3 of 20 .
Rev. B
EPC FASILITAS PENGUKURAN GAS
SENORO – PAU
Rev. Date : 18/07/2016

Nr > Nu OK

SHEAR CALCULATION
Check Anchor Road Shear Resistance
Reduction Factor φv,s = 0.65
Anchor Rod shear resistance Vsa = φv,s x n x 0.6 x Ase x futa
= 23165.19 N
= 23.17 kN
Vsa > Vu OK
Check Concrete Pryout shear Resistance
Shear reduction factor φv,s = 0.70
Reduction Factor kcp = 2.00
for 1 for hef < 65mm and 2 for hef ≥ 65mm
Concrete Pryout shear Resistance Vcpg = 0.75 x φv,s x kcp x Ncbg
= 192078.47 N
= 192.08 kN
Vcpg > Vu OK
Check Shear breakout Resistance
l = 1.00
load bearing length of the anchor le = min (8*da, hef)
= 128 mm
Vb = 0.66*(le/da)0.2*l * da0.5 * fc0.5 * cmin1.5
= 13752.9 N
= 13.75 kN
Shear reduction factor φv,c = 0.75
Concrete Shear Breakout Resistance Vcbg = n x φv,c x Vb
= 10314.6 N
= 10.31 kN
Vcbg > Vu OK
Govern Shear Resistance Vr = min ( Vsa, Vcbg, Vcpg)
= 10.31 kN
CALCULATION FOR EDG & TRAFO
Doc. No.: SNO-C-CC-53-017
SHELTER FOUNDATION
Page 50-3 of 20 .
Rev. B
EPC FASILITAS PENGUKURAN GAS
SENORO – PAU
Rev. Date : 18/07/2016

6. Vr > Vu OK
6.1
SHELTER FOUNDATION DESIGN
Foundation Specification
Concrete
fc' Compressive strength for structural concrete = 28 MPa
fc' Compressive strength for leveling concrete = 17.5 MPa
gc Unit Weight Structural Concrete = 23.54 kN/m 3

Soil
gso Unit Weight of Soil = 16.39 kN/m
3

Reinforcing Steel Bar


ASTM A615 or JIS G3112 SR 390/40 or SII 0136-84 BJTD 40
Fy Reinforcing yield strength = 413 MPa

Soil Bearing Capacity


Allowable soil bearing capacity for spread footing or mats on natural soil at depth of 1.00 m or more below
as per S-2 shall be : (Appendix-C)
No. Name Symbol Value Unit Remarks
1 Permanent condition ss-perm 0.15 MPa
2 Temporary condition ss-temp 0.20 MPa = 1.33 * ss-perm
3 Allowable settlement ds 25.00 mm
6.2

Parameter Shelter Foundation

Trafo 3000
EDG Foundation Foundation

5000 5000
CALCULATION FOR EDG & TRAFO
Doc. No.: SNO-C-CC-53-017
SHELTER FOUNDATION
Page 51-3 of 20 .
Rev. B
EPC FASILITAS PENGUKURAN GAS
SENORO – PAU
Rev. Date : 18/07/2016

0.30

0.90
0.60

0.40

(Lp) Ft

(Bp) (Bf)

(Lf)
m
Geometry of Foundation m
Length of Footing Lf = 1.20 m
Width of footing Bf = 1.20 m
Height of footing Hf = 0.40 m
Height of pedestal Hp = 0.90 m
Length of pedestal Lp = 0.40 m
Width of pedestal Bp = 0.40
6.3 pedestal distance to the edge of the footing Ft = 0.40

Load Summary Design kg


Dead Load (Seftweight) kg
Weight of footing (B x L x H x gc) = 1382.38 kg
CALCULATION FOR EDG & TRAFO
Doc. No.: SNO-C-CC-53-017
SHELTER FOUNDATION
Page 52-3 of 20 .
Rev. B
EPC FASILITAS PENGUKURAN GAS
SENORO – PAU
Rev. Date : 18/07/2016

Weight of Pedestal (Bp x Lp x Hp x gc) x nps = 345.60 kg


CALCULATION FOR EDG & TRAFO
Doc. No.: SNO-C-CC-53-017
SHELTER FOUNDATION
Page 53-3 of 20 .
Rev. B
EPC FASILITAS PENGUKURAN GAS
SENORO – PAU
Rev. Date : 18/07/2016

Weight soil above pile cap ((B x L)-(BpxLp)) x D x gs = 1283.55


3011.52

Shelter Support Reaction Max from Staad Pro (Factored)


Horizontal Vertical Horizontal
Node L/C
Fx kN Fy kN Fz kN
Max Fx 1 2004 0.9DP + 1.6WZ 0.24 38.82 3.11
Min Fx 47 2007 1.2DP + 1.0L + 1.EQX + 0.3EQZ 12.75 9.85 1.69
Max Fy 46 2006 1.2DP + 1.6L + 1.0CR-2 12.65 69.46 1.55
Min Fy 53 2010 1.2DP + 1.0L + 1.6WZ + 1.0CR-2 9.43 22.78 1.61
Max Fz 46 2006 1.2DP + 1.6L + 1.0CR-2 8.40 8.82 0.03
Min Fz 51 2010 1.2DP + 1.0L + 1.6WZ + 1.0CR-2 0.01 16.91 6.94
6.4 Maximum 12.65 69.46 3.11

Bearing Capacity
Static Analysis
Condition 1
Direction X
qmax = P/ Af (1+ 6ex/Lf)≤ qall
qmin = P/ Af (1-6ex/Lf) ≥ 0
Direction Z
qmax = P/ Af (1+ 6ez/Bf)≤ qall
qmin = P/ Af (1-6ez/Bf) ≥ 0
the formula can be used with condition :
ex = Mz/P < Lf/6 or
ez = Mx/P < Bf/6

Condition 2
Direction X
qmax = 2P/ 3*Bf (Lf/2-ex) ≤ qall

qmin = 0
Direction Z
qmax = 2P/ 3*Lf (Bf/2-ez) ≤ qall
qmin = 0
the formula can be used with condition :
ex = Mz/P >Lf/6 or
ez = Mx/P> Bf/6

Base on Shelter Support Reaction Max from Staad Pro (Factored)


Summary Force and Moment
Horizontal (ton) Moment (ton.m)
Load Vertical (ton)
Fx Fz Mx Mz
CALCULATION FOR EDG & TRAFO
Doc. No.: SNO-C-CC-53-017
SHELTER FOUNDATION
Page 54-3 of 20 .
Rev. B
EPC FASILITAS PENGUKURAN GAS
SENORO – PAU
Rev. Date : 18/07/2016

Maximum Load 10.09 1.29 0.32 1.16 0.29

Eccentricity Af
Eccentric-X Eccentric-Z m2
LOAD TYPE eX= Mz/P Lf/6 ez= MX/P Bf/6 1.44
Condition Condition
m m m m
Maximum Load 0.03 0.20 1 0.12 0.20 1

CHECK MAXIMUM SOIL BEARING IN DIRECTION -X Criteria


Bearing Capacity qmin≥qall
LOAD TYPE qmax qall max Criteria qmin qall max PASS
ton/m 2
ton/m 2 qmax≤qall ton/m 2
ton/m 2

Maximum Load 8.00 15.10 PASS 6.02 0

CHECK MAXIMUM SOIL BEARING IN DIRECTION -Z Criteria


Bearing Capacity qmin≥qall
LOAD TYPE qmax qall max Criteria qmin qall max PASS
ton/m 2
ton/m 2 qmax≤qall ton/m 2
ton/m 2

Maximum Load 11.04 15.10 PASS 2.98 0

CHECK SLIDING IN DIRECTION -X Criteria


Coefficient Resisting Horizontal Stability
LOAD TYPE Friction force Force Ratio Safety Factor PASS
m1 HR = m1*P Hx SF=HR/Hx
Maximum Load 0.30 3.03 1.29 2.35 2.00

CHECK SLIDING IN DIRECTION -Z Criteria


Coefficient Resisting Horizontal Stability
LOAD TYPE Friction force Force Ratio Safety Factor PASS
m1 HR =m1*P Hz SF=HR/Hz
Maximum Load 0.30 3.03 0.32 9.56 2.00

CHECK OVERTURNING IN DIRECTION -X


Direct-X Criteria
Moment Moment
LOAD TYPE Lf Resisting Moment
Overturning Overturning Safety Factor PASS
m MR = 0.5*Lf*P MOz SF=MR/MOz
Maximum Load 1.20 6.06 1.161 5.22 2.00

CHECK OVERTURNING IN DIRECTION -Z


Direct-Z Criteria
Moment Moment
LOAD TYPE Bf Resisting Moment
Overturning Overturning Safety Factor PASS
CALCULATION FOR EDG & TRAFO
Doc. No.: SNO-C-CC-53-017
SHELTER FOUNDATION
Page 55-3 of 20 .
Rev. B
EPC FASILITAS PENGUKURAN GAS
SENORO – PAU
Rev. Date : 18/07/2016
LOAD TYPE
Safety Factor
m MR = 0.5*Bf*P MOx SF=MR/MOx
6.5 Maximum Load 1.20 6.06 0.285 21.24 2.00

Pedestal Design 400 x 400


Main Rebar Design : kN
Loading Foundation Data : kNm
Puk Axial force due to the load factored column, = 69.46 kNm
Mux Moment Max of pedestal dir-x = 11.39 kN
Muz Moment Max of pedestal dir-z = 2.80 kN
Hux Lateral forces Max of pedestal dir-x = 12.65 m
Huz Lateral forces Max of pedestal dir-z = 3.11 m
bx width pedestal column dir- x, = 0.40 m
bz width pedestal column dir- z, = 0.40 m
hp hight of pedestal = 0.90 kN
h Footing Thickness = 0.40 kNm
Pu Axial max = 69.46 kN
Mu Moment Max for Pedestal = 11.39 m
Hu Shear Max for Pedestal = 12.65 MPa
z Thickness soil pile cap above, = 0.60 MPa
fc' Compressive strength for structural concrete = 28.00 m
Fy Reinforcing yield strength = 413.00 m
d' Concrete cover = 0.075 MPa
d width effective (bz - d') = 0.33
Es Elastic modulus of steel, = 200000 m
b1 = 0.85
y = 0.20 inc
 600  m
Cb =   d = 0.1269
 600  f y  = 0.0032 MPa

c d '
fs' = 0.003Es  b  = 0.00
 cb  MPa
MPa
 d  cb 
fs = 0.003Es   = 59900.28 m
 cb  use fs = 413.00
a = b1 * Cb = 0.0027 cm2
m2
As practical = 0.01 x bx x bz = 16.00 m2
Ag = bx x b z = 0.16
Ac = bx x d = 0.13
rs = 1.0% = 0.01
CALCULATION FOR EDG & TRAFO
Doc. No.: SNO-C-CC-53-017
SHELTER FOUNDATION
Page 56-3 of 20 .
Rev. B
EPC FASILITAS PENGUKURAN GAS
SENORO – PAU
Rev. Date : 18/07/2016

rs = 200 / fy = 0.0033
rs = 3 fc = 0.0032
fy
CALCULATION FOR EDG & TRAFO
Doc. No.: SNO-C-CC-53-017
SHELTER FOUNDATION
Page 57-3 of 20 .
Rev. B
EPC FASILITAS PENGUKURAN GAS
SENORO – PAU
Rev. Date : 18/07/2016

3 fc
fy
rreq = = 0.0100
rmin = = 0.0100
rmax = 0.08 * Ag = 0.0128

rmin > rreg < rmax ( Not Governed!!! ) Used rmin cm2
cm²
As req = rreq.b.h = 16.00
As use = 8 D 16 = 16.09
As use ≥ As req
16.09 > 16.00 ® (OK) kN
Check Axial : kN
Pn = 0.85.fc'.b.a + As'.fs' - As.fs = 6608.03 kN
fPn = 0.65 x Pn = 4295.22
Puk = Axial force due to the load factored column, = 69.46
f Pn ≥ Puk
4295.22 > 69.46 ® (OK)

Check Moment :
f.Mn = 33.04 kNm > Mu
= 33.04 kNm > 11.39 kNm
f.Mn ≥ Mu
33.04 > 11.39 ® (OK)

Stirrups Calculation kN

Vu = Shear = H = 12.65
f Vc = Allowable shear force kN
kN
Vc1 = 1/6 x fc' x b x h = 317.49
Vc2 = 0.3 x fc' x b x h = 571.48
where m
f = reduction factor = 0.60 m
b = width of pedestal = 0.40
h = length of pedestal = 0.90 psi

fc' = 28.00 MPa = 4060.00 N


Vc = shear forces from concrete N
Vc = Take the lowest value from Vc 1 and Vc2 = 317.5
f Vc = = 190.5
Vu < f Vc
12.65 < 190.49 ® (OK)
CALCULATION FOR EDG & TRAFO
Doc. No.: SNO-C-CC-53-017
SHELTER FOUNDATION
Page 58-3 of 20 .
Rev. B
EPC FASILITAS PENGUKURAN GAS
SENORO – PAU
Rev. Date : 18/07/2016

( no need stirrups )
CALCULATION FOR EDG & TRAFO
Doc. No.: SNO-C-CC-53-017
SHELTER FOUNDATION
Page 59-3 of 20 .
Rev. B
EPC FASILITAS PENGUKURAN GAS
SENORO – PAU
Rev. Date : 18/07/2016

6.6 Use the minimum stirrups for shear reinforcement = f 10 - 150

Footing Design
Concrete Design Strength f'c = 28 MPa
Steel Design Strength fy = 413 MPa
β1 = 0.85
Reduction factor for bending f = 0.8
Concrete cover c = 0.075 m
= 75 mm
Width b = 1.00 m
= 1000 mm
Diameter of Main Bar Dx = 16 mm (X direction)
Diameter of Main Bar Dz = 16 mm (Z direction)
Thickness of footing Hf = 0.40 m
= 400 mm
Effective depth of foundation d = Hf - c- 1.5 D
= 301.00 mm
= 0.30 m
Footing Reinforcement Design Direction X
Maximum ultimate pressure quzmax = 1104.1 kN/m2
Moment Ultimate Muz max = 1/2* b* quzmax*ax12)
Muz max = 88.33 kNm
= 88329779 Nmm
Ru = Muzmax / (Φ x b x d2)
= 1.2187 MPa

m = fy / ( 0.85 x fc' )
= 17.35
ρrequired = (1/m) x (1 - (1 - 2m Ru/fy) 0.5)
= 0.0030
ρbalanced = β1 x 0.85 f'c x 600
fy 600 + fy
= 0.0290
ρmax = 0.75 ρ balanced
= 0.0218
ρmin = 0.00339 (1.4/fy if 1.33 x r required > 1.4/fy)
(0.18% if 1.33 x rrequired < 1.4/fy)
ρused = 0.0040 < 0,0218……...OK
Asreq = ρxbxd
= 1213.18 mm2
CALCULATION FOR EDG & TRAFO
Doc. No.: SNO-C-CC-53-017
SHELTER FOUNDATION
Page 60-3 of 20 .
Rev. B
EPC FASILITAS PENGUKURAN GAS
SENORO – PAU
Rev. Date : 18/07/2016

Diameter of main bar = 16 mm


As = 201.06 mm2
CALCULATION FOR EDG & TRAFO
Doc. No.: SNO-C-CC-53-017
SHELTER FOUNDATION
Page 61-3 of 20 .
Rev. B
EPC FASILITAS PENGUKURAN GAS
SENORO – PAU
Rev. Date : 18/07/2016

Number of bar per meter = As req / As


= 6.04 ≈ 7
Spacing Sreq = Width / no. of bars
= 165.56 mm
Spacing used Sused = 150 mm
Asused = As*((b/Sused)+1)
= 1541.47 mm2 OK
Use D16 - 150 for top & bottom flexural reinforcement

Footing Reinforcement Design Direction Z


Width of footing b = 1.00 m
Length of footing = 1000 mm
Maximum ultimate pressure quxmax = 1104.12 kN/m2
Moment Ultimate Mux max = 1/2* b* quxmax*az12)
Moment Ultimate Mux max = 88.33 kNm
= 88329779 Nmm
Ru = Muxmax / (Φ x b x d2)
= 1.219 MPa
m = fy / ( 0.85 x fc' )
= 17.353
ρrequired = (1/m) x (1 - (1 - 2m Ru/fy)0.5)
= 0.0030
ρbalanced = β x 0.85 f'c x 600
fy 600 + fy
= 0.0290
ρmax = 0.75 ρ balanced
= 0.0218
ρmin = 0.0034 (1.4/fy if 1.33 x r required > 1.4/fy)
(0.18% if 1.33 x rrequired < 1.4/fy)
ρused = 0.0040 < 0,0218……...OK
Asreq = ρxbxd
= 1213.2 mm2
Diameter of main bar = 16 mm
Area of main bar As = 201.06 mm2
Number of bar per meter = As req / As
= 6.04 ≈ 7
Spacing required Sreq = Width / no. of bars
= 165.56 mm
Spacing used Sused = 150 mm
CALCULATION FOR EDG & TRAFO
Doc. No.: SNO-C-CC-53-017
SHELTER FOUNDATION
Page 62-3 of 20 .
Rev. B
EPC FASILITAS PENGUKURAN GAS
SENORO – PAU
Rev. Date : 18/07/2016

Asused = As*((b/Sused)+1)
CALCULATION FOR EDG & TRAFO
Doc. No.: SNO-C-CC-53-017
SHELTER FOUNDATION
Page 63-3 of 20 .
Rev. B
EPC FASILITAS PENGUKURAN GAS
SENORO – PAU
Rev. Date : 18/07/2016

= 1541.47 mm2 OK
7. Use D16 - 150 for top & bottom flexural reinforcement

SETTLEMENT CHECKING
Immediate Settlement
Poisson Ration of Soil m = 0.30
Modulus elasticity of soil Es = 145.0 kg/cm2
(D + EO) kg/cm2
Net Pressure Applied q= = 70.10
bf x df
Width of foundation df = 1.20 m
Lenght of foundation bf = 1.20 m

Non Dimension Influence Factor :


m1 = bf/df
m1 = 1.00

]
Ip =
[ m1 x ln { ( 1 + √ m12 + 1)
m1
} + ln (m1 + √m12 + 1)

p
Ip = 0.630

q x B (1-m2) Ip
Settlement Calculation (Si) =
Es
= 3.33 mm
CALCULATION FOR EDG & TRAFO
Doc. No.: SNO-C-CC-53-017
SHELTER FOUNDATION
Page 64-3 of 20 .
Rev. B
EPC FASILITAS PENGUKURAN GAS
SENORO – PAU
Rev. Date : 18/07/2016

8. Allowable settlement dall = 25.00 mm ...OK

CONCRETE SLAB DESIGN

3000

Slab thk = 100mm Slab thk = 100mm

5000 5000

Concrete Slab
Base on " Dasar-dasar Perencanaan Beton Bertulang" by Gideon Kusuma, page 90
Dead Load (DL)
slab weight T = 100 mm = 240 kg/m2
Finishing T = 50 mm = 125 kg/m2 +
qDL = 365 kg/m2
Live Load (LL)
1. Live Load qLL = 365 kg/m2
qu = 1.2 qDL + 1.6 qLL
= 1.2 x 365 + 1.6 x 365
= 1022 kg/m2
= 1.022 T/m2
ly 5.0
= = 1.67
lx 3.0

Ly Positive Moment = 49
Mlx = 0.001 x qu x lx2 x 49
= 0.001 x 1.02 x 3.0 2
x
Mlx = 0.45 Tm
Lx 15
Mly = 0.001 x qu x lx 2
x 15
= 0.001 x 1.02 x 3.0 2
x
CALCULATION FOR EDG & TRAFO
Doc. No.: SNO-C-CC-53-017
SHELTER FOUNDATION
Page 65-3 of 20 .
Rev. B
EPC FASILITAS PENGUKURAN GAS
SENORO – PAU
Rev. Date : 18/07/2016

Mly = 0.14 Tm

Negative Moment = 78
Mtx = -0.001 x qu x lx 2
x 78
= -0.001 x 1.022 x 3.0 2
x
Mtx = -0.72 Tm 54
Mty = -0.001 x qu x lx2 x 54
= -0.001 x 1.022 x 3.0 2
x
Mty = -0.50 Tm

Reinforcement Design for dir X-X


Mu = Mx max
= 0.45 Tm
Mn = Mu 0.45
= = 0.563 Tm
0.8 0.8
Concrete Design Strength fc' = 28.00 MPa
Steel Design Strength fy = 413 MPa
h = 100 mm
d = 50 mm
b = 1000 mm

`
c Cc a=bc
d h

Cc = b.fc'.a.b
= 0.85 x 28.00 x a x 1000
= 23800 .a
Moment Mn = Cc.(d-a/2)
= 23800 .a ( 50 - a/2 )
5633775 = 1190000 a - 11900 a2
11900 a2 -1190000 a + 5633775 = 0
a = 4.983
Cc = 118583.9697 N
Balance T = Cc
T = Asxfy
As = 287.13 mm2
CALCULATION FOR EDG & TRAFO
Doc. No.: SNO-C-CC-53-017
SHELTER FOUNDATION
Page 66-3 of 20 .
Rev. B
EPC FASILITAS PENGUKURAN GAS
SENORO – PAU
Rev. Date : 18/07/2016

rmin = 0.0018
CALCULATION FOR EDG & TRAFO
Doc. No.: SNO-C-CC-53-017
SHELTER FOUNDATION
Page 67-3 of 20 .
Rev. B
EPC FASILITAS PENGUKURAN GAS
SENORO – PAU
Rev. Date : 18/07/2016

Asmin = 90.00 mm2


Asuse = 287.13 mm2
ruse = 0.0057
used, f 10 A = 78.54 mm2 or,
= 3.66
= 4 D 10 for 1000 mm
f 10 - 273.5 mm
So, Used f 10 - 150 mm

Reinforcement Design for dir Y-Y


Mu = My max
= -0.72 Tm
Mu 0.72
Mn = = = 0.90 Tm
0.8 0.8
As = 473.13 mm2
Asuse = 473.13 mm2 r = 0.0095
used, f 10 A = 78.5 mm 2
or,
= 6.03
= 7 D 10 for 1000 mm
f 10 - 165.9 mm
So, Used f 10 - 150 mm

100 mm

f 10 - 150
f 10 - 150
CALCULATION FOR EDG & TRAFO
Doc. No.: SNO-C-CC-53-017
SHELTER FOUNDATION
Page 68-3 of 20 .
Rev. B
EPC FASILITAS PENGUKURAN GAS
SENORO – PAU
Rev. Date : 18/07/2016

9.

TIE BEAM DESIGN

Tie Beam 200x300 Tie Beam 200x300


Tie Beam 200x300

Tie Beam 200x300

Tie Beam 200x300


Trafo 3000
EDG Foundation
Foundation

Tie Beam 200x300 Tie Beam 200x300

5000 5000

Tie Beam 200 x 300


- Dead Load for Slab T= 100 mm = 2.35 kN/m2
- Live load 365 kg/m2 = 3.65 kN/m2

qu = 1.2 qDL + 1.6 qLL = 8.66 kN/m2


qc = 1/2 * q * L = 14.44 kN/m'

Mu = 1/8* qu*b12 = 27.08 kN.m


Mu = 1/8* qu*b22 = 9.75 kN.m
Max = 27.08 kN.m
2.76 Tm
Mn = Mu 2.76
= = 3.45 Tm
0.8 0.8
fc' = Compressive strength for structural concrete = 28.00 MPa
b = = 0.85
fy = Reinforcing yield strength = 413 MPa
h = Height of Tie Beam = 300 mm
d = Height effective of Tie Beam = 250 mm
b = width of tie beam = 200 mm
Cc = b.fc'.a.b
= 4760 .a 2380 a2
CALCULATION FOR EDG & TRAFO
Doc. No.: SNO-C-CC-53-017
SHELTER FOUNDATION
Page 69-3 of 20 .
Rev. B
EPC FASILITAS PENGUKURAN GAS
SENORO – PAU
Rev. Date : 18/07/2016

Mn = Cc.(d-a/2)
3.45E+07 = 1190000 a-
2380 a2 -1190000 a + 34511746.5 = 0
a = 30.91
Cc = 147144.22 N
` T = Cc
Cc a=bc
c T = As*fy
d h
As = 356.28 mm2
rmin = 0.0035
T Asmin = 175 mm2
Asuse = 356.28 mm2
ruse = 0.00713
used, D 13 A = 132.73 mm2
n = 2.68
= 3 D 13
So, Used Atotal = 398.20 mm2
D 13 A = 132.73 mm2
n = 2.68
= 3 D 13
So, Used Atotal = 398.20 mm2

Stirrups Design
Vu = 1.47 Ton Vc = 1/6*(fc')0.5*bw*d
Vn = 2.45 Ton < = 4.41 Ton No Need Shear Reinforcement
Vs = Vn - Vc
= -1.96 Ton

s =
Av*d*fy f = 10 mm
Vs fy = 400 MPa
157079.63
=
-1955.42
= -80.33 cm
= -803.31 mm
-800 mm
Used, = f 10 - 150
CALCULATION FOR EDG & TRAFO
Doc. No.: SNO-C-CC-53-017
SHELTER FOUNDATION
Page 70-3 of 20 .
Rev. B
EPC FASILITAS PENGUKURAN GAS
SENORO – PAU
Rev. Date : 18/07/2016
CALCULATION FOR EDG & TRAFO
Doc. No.: SNO-C-CC-53-017
SHELTER FOUNDATION
Page 71-3 of 20 .
Rev. B
EPC FASILITAS PENGUKURAN GAS
SENORO – PAU
Rev. Date : 18/07/2016

8.

SUMMARY RESULT
Steel Structure Materials :
No Description Profile Remarks
1 Column H 200x200x8x12 Structural Steel A-36
2 Rafter H 200x100x5.5x8 Structural Steel A-36
3 Beam Span H 200x100x5.5x8 Structural Steel A-36
4 Run Way Beam H 300x150x6.5x9 Structural Steel A-36
5 Hoist Beam H 350x175x7x11 Structural Steel A-36
6 Bracing L100x100x10 Structural Steel A-36
7 Purlin C150x65x20x3.2 Structural Steel A-36
8 Tie Rod Ø 19 bar With Turn Buckle

Connection
Bolt Plate (mm)
No Description Remarks
n dia. L W thk
1 Rafter to Rafter - - 360 100 12 Weld Connection
2 Column to Rafter 6 M16 380 120 12 End Plate
3 Beam to Column 2 M16 180 100 10 Gusset Plate
4 Runway to Column 8 M16 500 170 16 End Plate
5 Runway to Runway 4 M16 - - - Hanging
6 Base Plate - - 300 300 16 End Plate
CALCULATION FOR EDG & TRAFO
Doc. No.: SNO-C-CC-53-017
SHELTER FOUNDATION
Page 72-3 of 20 .
Rev. B
EPC FASILITAS PENGUKURAN GAS
SENORO – PAU
Rev. Date : 18/07/2016

7 Anchor Bolt 4 16 - - - Anchor bolt L = 480

Concrete Result :
Pedestal dimension : Pedestal Reinforcement :
Description Unit Size Description Rebar Used
Width of Pedestal m 0.40 Vertical Rebar 8-D16
Length of Pedestal m 0.40 Stirrups f 10-150
Heigth of Pedestal m 0.90

Footing Dimension : Footing Reinforcement :


Description Unit Size Description Rebar Used
Width m 1.20 Rebar Top D16 - 150
Length m 1.20 Rebar Bottom D16 - 150
Thickness m 0.40

Slab Dimension : Slab Reinforcement :


Description Unit Size Description Rebar Used
Thickness m 0.10 Rebar Top f 10 -150
Rebar Bottom f 10 -150

Tie Beam Tie Beam Reinforcement :


Description Unit Size Description Rebar Used
Height m 0.30 Rebar Top 3 D 13
Witdh m 0.20 Rebar Bottom 3 D 13
Stirrups f 10-150
CALCULATION FOR EDG & TRAFO
Doc. No.: SNO-C-CC-53-017
SHELTER FOUNDATION
Page 4-3 of 20 .
Rev. B
EPC FASILITAS PENGUKURAN GAS
SENORO – PAU
Rev. Date : 18/07/2016

CALCULATION ENGINE GENERATOR (EDG) FOUNDATION


1. GENERAL

1.1 Quality of Material


No. Name Symbol Value Unit Remarks
1 Concrete fc' 28 MPa
Lean Concrete fc' 17.5 MPa
2 Reinforcing Deformed Bar Fy 413 MPa
Reinforcing Plain Bar Fy 275 MPa
3 Structural Steel or Pipe Fy 240 MPa
4 Anchor Bolt Fy 240 MPa
5 Coefficient Friction of soil m1 0.3

1.2 Unit Weight of Material


No. Name Symbol Value Unit Remarks
1 Structural Concrete gc 23.54 kN/m 3

2 Leveling Concrete gpc 22.54 kN/m3


3 Steel gs 77.00 kN/m3
4 Soil gso 16.39 kN/m3
5 Sand Gravel gg 17.70 kN/m3
6 Water gL 10.00 kN/m3
7 Wall gg 250.0 kg/m3

1.3 Geotechnical Data


Soil Bearing Capacity
Allowable soil bearing capacity for spread footing or mats on natural soil at depth of 1.00 m or more below
as per S-2 shall be : (Appendix-D)
No. Name Symbol Value Unit Remarks
1 Permanent condition ss-perm 0.102 MPa
2 Temporary condition ss-temp 0.136 MPa = 1.33 * ss-perm
3 Allowable settlement ds 25.00 mm

2. EQUIPMENT DATA
2.1 Equipment Data
Based on Data Sheet and GA Drawing for EDG
2.1.1 Weight & Dimension
Weight Operating (O) (estimated) = 2500.0 kg
Weight Test Load (T) (estimated) = 2500.0 kg
CALCULATION FOR EDG & TRAFO
Doc. No.: SNO-C-CC-53-017
SHELTER FOUNDATION
Page 5-3 of 20 .
Rev. B
EPC FASILITAS PENGUKURAN GAS
SENORO – PAU
Rev. Date : 18/07/2016

2.1.2 Dimension of Equipment


Length of Equipment (Le) = 4.00 m
Width of Equipment (We) = 1.90 m
Height of Equipment (He) = 2.00 m
Height from top foundation to as equipment (He/2) = 1.00 m
Height from botom foundation to as equipment (He/2) + Hf = 1.50 m
Dimension Skid Length (L) = 4.00 m
Width (W) = 1.90 m

2.2 Data Foundation


2.2.1 Vibration Check
Weight Operating (EO) = 2500.0 kg
Foundation Weight (D) (Lf * Bf * Hf * gc) = 13239.0 kg

Safety Factor SFv = D + EO


³ 3
EO
= 6.30 ³ 3
Check SFv ³ 3 ==> OK (Vibration does not affect foundation)

2.2.2 Geometry of Foundation


Length of Footing Lf = 4.50 m
Width of footing Bf = 2.50 m
Weight of foundation = 3 x E(O) = 7500 kg
3 x E(O) = 0.28 m
So, Hf =
gc x W x L
Height of footing Hf = 0.50 m OK

Trafo 3000
EDG Foundation Foundation

5000 5000
CALCULATION FOR EDG & TRAFO
Doc. No.: SNO-C-CC-53-017
SHELTER FOUNDATION
Page 6-3 of 20 .
Rev. B
EPC FASILITAS PENGUKURAN GAS
SENORO – PAU
Rev. Date : 18/07/2016

300

1900 2500
EDG Foundation

300

250 4000 250

4500

(Hv)

200
(Hf)
300

3. DESIGN LOAD
3.1 Dead Load
Weight of footing (B x L x H x gc) = 13499.81 kg
13499.81 kg

3.2 Live Load


Maintenance load on equipment (LL) = 365.00 kg/m2
LL x (Le x We) = 4106.25 kg

3.3 Operasional Load


Weight of Operasional Load on Filter = 2500.00 kg

3.4 Test Load


Weight of Operasional Load on Filter = 2500.00 kg
CALCULATION FOR EDG & TRAFO
Doc. No.: SNO-C-CC-53-017
SHELTER FOUNDATION
Page 7-3 of 20 .
Rev. B
EPC FASILITAS PENGUKURAN GAS
SENORO – PAU
Rev. Date : 18/07/2016

3.5 Wind Load


Wind load dir x Ce.Cq.Cpa.qs.Iw.Afx = 653.11 kg
Wind load dir y Ce.Cq.Cpa.qs.Iw.Afy = 1374.97 kg

where :
Ce (UBC 1997 vol 2, Tabel 16-G, exposure D) = 1.39
CALCULATION FOR EDG & TRAFO
Doc. No.: SNO-C-CC-53-017
SHELTER FOUNDATION
Page 8-3 of 20 .
Rev. B
EPC FASILITAS PENGUKURAN GAS
SENORO – PAU
Rev. Date : 18/07/2016

Cq (UBC 1997 vol 2, Tabel 16-H, for square) = 1.4

Cpa (diameter 78" - 100", “Pressure Vessel Design Manual” by = 1.2


Moss Dennis R.)
V Base on Wind Data Evaluation Report (Basic Wind Speed) Doc = 32.0 m/s
No. SNO-C-TC-53-002 (risk category III & IV)
qs Wind stagnation pressure, V 2 / 16 kg/m2 = 64.0 kg/m2
CALCULATION FOR EDG & TRAFO
Doc. No.: SNO-C-CC-53-017
SHELTER FOUNDATION
Page 9-3 of 20 .
Rev. B
EPC FASILITAS PENGUKURAN GAS
SENORO – PAU
Rev. Date : 18/07/2016

Iw (UBC 1997 vol 2, Tabel 16-K, essential fasilities) = 1.15

Afy =(Le * He) = 8.00 m2


Afx =(We * He) = 3.80 m2

Moment Wind load dir x Wy . Hv = 2062.45 kg


Moment Wind load dir y Wx . Hv = 979.66 kg
CALCULATION FOR EDG & TRAFO
Doc. No.: SNO-C-CC-53-017
SHELTER FOUNDATION
Page 10-3 of 20 .
Rev. B
EPC FASILITAS PENGUKURAN GAS
SENORO – PAU
Rev. Date : 18/07/2016

3.6 Seismic load Load


Seismic load dir x (Sx) 0.7.Ca.I.Wp = 1815.62 kg
Seismic load dir y (Sy) 0.7.Ca.I.Wp = 1815.62 kg

Base on SNI 03-1726-1989, luwuk Sulawesi area shall be zone - 6


CALCULATION FOR EDG & TRAFO
Doc. No.: SNO-C-CC-53-017
SHELTER FOUNDATION
Page 11-3 of 20 .
Rev. B
EPC FASILITAS PENGUKURAN GAS
SENORO – PAU
Rev. Date : 18/07/2016

Ca (Seismic coefficient, SNI 03-1726-1989, zone 6) = 0.83


I (UBC 1997 vol 2, Tabel 16-K, essential fasilities) = 1.25
CALCULATION FOR EDG & TRAFO
Doc. No.: SNO-C-CC-53-017
SHELTER FOUNDATION
Page 12-3 of 20 .
Rev. B
EPC FASILITAS PENGUKURAN GAS
SENORO – PAU
Rev. Date : 18/07/2016
CALCULATION FOR EDG & TRAFO
Doc. No.: SNO-C-CC-53-017
SHELTER FOUNDATION
Page 13-3 of 20 .
Rev. B
EPC FASILITAS PENGUKURAN GAS
SENORO – PAU
Rev. Date : 18/07/2016

Wp (weight of hydrotest) = 2500.00 kg

Moment Seismic load dir x MSx = Sy . Hv = 1815.62 kg


Moment Seismic load dir y MSy = Sx . Hv = 1815.62 kg

4. LOADING COMBINATION
Stabilization of foundation Reinforcement of foundation
LC1 = D+F LC101 = 1.4 D + F
LC2 = D+O LC102 = 1.4 D + O
LC3 = D+F+L LC103 = 1.2 (D + F) + 1.6 L
LC4 = D+O+L LC104 = 1.2 (D + O) + 1.6 L
LC5 = D + F + Wx LC105 = 1.2 D + 0.8 Wx
LC6 = D + F + Wy LC106 = 1.2 D + 0.8 Wy
LC7 = D + O + Wx LC107 = 1.2 D +1.6 Wx + 1.0 L
LC8 = D + O + Wy LC108 = 1.2 D +1.6 Wy + 1.0 L
LC9 = D+F + 0.7Ex + 0.75L LC109 = 1.2 D + 1.0 Ex + 1.0 L
LC10 = D+F + 0.7Ey + 0.75L LC110 = 1.2 D + 1.0 Ey + 1.0 L
LC11 = D+ O + 0.7Ex + 0.75L LC111 = 0.9 D + 1.0 Ex
LC12 = D+ O + 0.7Ey + 0.75L LC112 = 0.9 D + 1.0 Ey

5. SUMMARY OF FORCE AND MOMENT.


5.1 Summary Force and Moment Pedestal
Vertical Horizontal (ton) Moment (ton.m)
Load
(ton) Hx Hy Mx My
Dead Load (D) 13.50
Live Load (L) 4.11
Operasional Load (O) 2.50
Test Load (F) 2.50
Wind Load Dir x (Wx) 0.65 0.98
Wind Load Dir y (Wy) 1.37 2.06
Seismic Load Dir x (Ex) 1.82 1.82
Seismic Load Dir y (Ey) 1.82 1.82
CALCULATION FOR EDG & TRAFO
Doc. No.: SNO-C-CC-53-017
SHELTER FOUNDATION
Page 14-3 of 20 .
Rev. B
EPC FASILITAS PENGUKURAN GAS
SENORO – PAU
Rev. Date : 18/07/2016

5.2 Summary Force and Moment for Stabilization of Foundation


Load Combination Vertical Horizontal (ton) Moment (ton.m)
( ton ) Hx Hz Mx Mz
LC1=D + F 16.00
LC2=D + O 16.00
LC3=D + F + L 20.11
LC4=D + O + L 20.11
LC5=D + F + Wx 16.00 0.65 0.98
LC6=D + F + Wy 16.00 1.37 2.06
LC7=D + O + Wx 16.00 0.65 0.98
LC8=D + O + Wy 16.00 1.37 2.06
LC9=D+F + 0.7Ex + 0.75L 19.08 1.27 1.27
LC10=D+F + 0.7Ey + 0.75L 19.08 1.27 1.27
LC11=D+ O + 0.7Ex + 0.75L 19.08 1.27 1.27
LC12=D+ O + 0.7Ey + 0.75L 19.08 1.27 1.27

5.3 Summary Force and Moment for Reinforcement of Foundation


Vertical Horizontal (ton) Moment (ton.m)
Load Combination
( ton ) Hx Hy Mx Mz
LC101=1.4 D + F 21.40
LC102=1.4 D + O 21.40
LC103=1.2 (D + F) + 1.6 L 25.77
LC104=1.2 (D + O) + 1.6 L 25.77
LC105=1.2 D + 0.8 Wx 16.20 0.52 0.78
LC106=1.2 D + 0.8 Wy 16.20 1.10 1.65
LC107=1.2 D +1.6 Wx + 1.0 L 20.31 1.04 1.57
LC108=1.2 D +1.6 Wy + 1.0 L 20.31 2.20 3.30
LC109=1.2 D + 1.0 Ex + 1.0 L 20.31 1.82 1.82
LC110=1.2 D + 1.0 Ey + 1.0 L 20.31 1.82 1.82
LC111=0.9 D + 1.0 Ex 12.15 1.82 1.82
LC112=0.9 D + 1.0 Ey 12.15 1.82 1.82

6. CHECK BEARING CAPACITY


STATIC ANALYSIS
Condition 1
Direction X
qmax = P/ Af (1+ 6ex/Lf)≤ qall
qmin = P/ Af (1-6ex/Lf) ≥ 0
Direction Z
qmax = P/ Af (1+ 6ez/Bf)≤ qall
qmin = P/ Af (1-6ez/Bf) ≥ 0
CALCULATION FOR EDG & TRAFO
Doc. No.: SNO-C-CC-53-017
SHELTER FOUNDATION
Page 15-3 of 20 .
Rev. B
EPC FASILITAS PENGUKURAN GAS
SENORO – PAU
Rev. Date : 18/07/2016

the formula can be used with condition :


ex = Mz/P < Lf/6 or
ez = Mx/P < Bf/6

Condition 2
Direction X
qmax = 2P/ 3*Bf (Lf/2-ex) ≤ qall
qmin = 0
Direction Z

qmax = 2P/ 3*Lf (Bf/2-ez) ≤ qall


qmin = 0
the formula can be used with condition :
ex = Mz/P >Lf/6 or
ez = Mx/P> Bf/6

Eccentricity
Eccentric-X Eccentric-Z
LOAD TYPE eX= Mz/P Lf/6 ez= MX/P Bf/6 Af
Condition Condition
m m m m m2
LC1=D + F 0.00 0.75 1 0.00 0.42 1 11.25
LC2=D + O 0.00 0.75 1 0.00 0.42 1 11.25
LC3=D + F + L 0.00 0.75 1 0.00 0.42 1 11.25
LC4=D + O + L 0.00 0.75 1 0.00 0.42 1 11.25
LC5=D + F + Wx 0.06 0.75 1 0.00 0.42 1 11.25
LC6=D + F + Wy 0.00 0.75 1 0.13 0.42 1 11.25
LC7=D + O + Wx 0.06 0.75 1 0.00 0.42 1 11.25
LC8=D + O + Wy 0.00 0.75 1 0.13 0.42 1 11.25
LC9=D+F + 0.7Ex + 0.75L 0.07 0.75 1 0.00 0.42 1 11.25
LC10=D+F + 0.7Ey + 0.75L 0.00 0.75 1 0.07 0.42 1 11.25
LC11=D+ O + 0.7Ex + 0.75L 0.07 0.75 1 0.00 0.42 1 11.25
LC12=D+ O + 0.7Ey + 0.75L 0.00 0.75 1 0.07 0.42 1 11.25
CALCULATION FOR EDG & TRAFO
Doc. No.: SNO-C-CC-53-017
SHELTER FOUNDATION
Page 16-3 of 20 .
Rev. B
EPC FASILITAS PENGUKURAN GAS
SENORO – PAU
Rev. Date : 18/07/2016

CHECK MAXIMUM SOIL BEARING IN DIRECTION -X


Bearing Capacity
LOAD TYPE qmax qall max Criteria qmin qall max Criteria
ton/m 2
ton/m 2 qmax≤qall ton/m 2
ton/m 2 qmin≥qall
LC1=D + F 1.42 10.24 PASS 1.42 0 PASS
LC2=D + O 1.42 10.24 PASS 1.42 0 PASS
LC3=D + F + L 1.79 10.24 PASS 1.79 0 PASS
LC4=D + O + L 1.79 10.24 PASS 1.79 0 PASS
LC5=D + F + Wx 1.54 10.24 PASS 1.31 0 PASS
LC6=D + F + Wy 1.42 10.24 PASS 1.42 0 PASS
LC7=D + O + Wx 1.54 10.24 PASS 1.31 0 PASS
LC8=D + O + Wy 1.42 10.24 PASS 1.42 0 PASS
LC9=D+F + 0.7Ex + 0.75L 1.85 10.24 PASS 1.55 0 PASS
LC10=D+F + 0.7Ey + 0.75L 1.70 10.24 PASS 1.70 0 PASS
LC11=D+ O + 0.7Ex + 0.75L 1.85 10.24 PASS 1.55 0 PASS
LC12=D+ O + 0.7Ey + 0.75L 1.70 10.24 PASS 1.70 0 PASS

CHECK MAXIMUM SOIL BEARING IN DIRECTION -Z


Bearing Capacity
LOAD TYPE qmax qall max Criteria qmin qall max Criteria
ton/m2 ton/m2 qmax≤qall ton/m2 ton/m2 qmin≥qall
LC1=D + F 1.42 10.2 PASS 1.42 0 PASS
LC2=D + O 1.42 10.2 PASS 1.42 0 PASS
LC3=D + F + L 1.79 10.2 PASS 1.79 0 PASS
LC4=D + O + L 1.79 10.2 PASS 1.79 0 PASS
LC5=D + F + Wx 1.42 10.2 PASS 1.42 0 PASS
LC6=D + F + Wy 1.86 10.2 PASS 0.98 0 PASS
LC7=D + O + Wx 1.42 10.2 PASS 1.42 0 PASS
LC8=D + O + Wy 1.86 10.2 PASS 0.98 0 PASS
LC9=D+F + 0.7Ex + 0.75L 1.70 10.2 PASS 1.70 0 PASS
LC10=D+F + 0.7Ey + 0.75L 1.97 10.2 PASS 1.42 0 PASS
LC11=D+ O + 0.7Ex + 0.75L 1.70 10.2 PASS 1.70 0 PASS
LC12=D+ O + 0.7Ey + 0.75L 1.97 10.2 PASS 1.42 0 PASS
CALCULATION FOR EDG & TRAFO
Doc. No.: SNO-C-CC-53-017
SHELTER FOUNDATION
Page 17-3 of 20 .
Rev. B
EPC FASILITAS PENGUKURAN GAS
SENORO – PAU
Rev. Date : 18/07/2016

CHECK SLIDING IN DIRECTION -X


Coefficient Resisting Horizontal Stability
LOAD TYPE Friction force Force Ratio Safety Factor Criteria
m1 HR = m1*P Hx SF=HR/Hx
LC1=D + F 0.30 4.80 0.00 0.00 2.00 PASS
LC2=D + O 0.30 4.80 0.00 0.00 2.00 PASS
LC3=D + F + L 0.30 6.03 0.00 0.00 2.00 PASS
LC4=D + O + L 0.30 6.03 0.00 0.00 2.00 PASS
LC5=D + F + Wx 0.30 4.80 0.65 7.35 1.50 PASS
LC6=D + F + Wy 0.30 4.80 0.00 0.00 1.50 PASS
LC7=D + O + Wx 0.30 4.80 0.65 7.35 1.50 PASS
LC8=D + O + Wy 0.30 4.80 0.00 0.00 1.50 PASS
LC9=D+F + 0.7Ex + 0.75L 0.30 5.72 1.27 4.50 1.50 PASS
LC10=D+F + 0.7Ey + 0.75L 0.30 5.72 0.00 0.00 1.50 PASS
LC11=D+ O + 0.7Ex + 0.75L 0.30 5.72 1.27 4.50 1.50 PASS
LC12=D+ O + 0.7Ey + 0.75L 0.30 5.72 0.00 0.00 1.50 PASS

CHECK SLIDING IN DIRECTION -Z


Coefficient Resisting Horizontal Stability
LOAD TYPE Friction force Force Ratio Safety Factor Criteria
m1 HR =m1*P Hz SF=HR/Hz
LC1=D + F 0.30 4.80 0.00 0.00 2.00 PASS
LC2=D + O 0.30 4.80 0.00 0.00 2.00 PASS
LC3=D + F + L 0.30 6.03 0.00 0.00 2.00 PASS
LC4=D + O + L 0.30 6.03 0.00 0.00 2.00 PASS
LC5=D + F + Wx 0.30 4.80 0.00 0.00 1.50 PASS
LC6=D + F + Wy 0.30 4.80 1.37 3.49 1.50 PASS
LC7=D + O + Wx 0.30 4.80 0.00 0.00 1.50 PASS
LC8=D + O + Wy 0.30 4.80 1.37 3.49 1.50 PASS
LC9=D+F + 0.7Ex + 0.75L 0.30 5.72 0.00 0.00 1.50 PASS
LC10=D+F + 0.7Ey + 0.75L 0.30 5.72 1.27 4.50 1.50 PASS
LC11=D+ O + 0.7Ex + 0.75L 0.30 5.72 0.00 0.00 1.50 PASS
LC12=D+ O + 0.7Ey + 0.75L 0.30 5.72 1.27 4.50 1.50 PASS
CALCULATION FOR EDG & TRAFO
Doc. No.: SNO-C-CC-53-017
SHELTER FOUNDATION
Page 18-3 of 20 .
Rev. B
EPC FASILITAS PENGUKURAN GAS
SENORO – PAU
Rev. Date : 18/07/2016

CHECK OVERTURNING FOOTING


CHECK OVERTURNING IN DIRECTION -X
Direct-X
Moment Moment
LOAD TYPE Lf Resisting Moment
Overturning Overturning Safety Factor Criteria
m MR = 0.5*Lf*P MOz SF=MR/MOz
LC1=D + F 4.50 36.00 0.000 0.00 2.00 PASS
LC2=D + O 4.50 36.00 0.000 0.00 2.00 PASS
LC3=D + F + L 4.50 45.24 0.000 0.00 2.00 PASS
LC4=D + O + L 4.50 45.24 0.000 0.00 2.00 PASS
LC5=D + F + Wx 4.50 36.00 0.000 0.00 1.50 PASS
LC6=D + F + Wy 4.50 36.00 2.062 17.45 1.50 PASS
LC7=D + O + Wx 4.50 36.00 0.000 0.00 1.50 PASS
LC8=D + O + Wy 4.50 36.00 2.062 17.45 1.50 PASS
LC9=D+F + 0.7Ex + 0.75L 4.50 42.93 0.000 0.00 1.50 PASS
LC10=D+F + 0.7Ey + 0.75L 4.50 42.93 1.271 33.78 1.50 PASS
LC11=D+ O + 0.7Ex + 0.75L 4.50 42.93 0.000 0.00 1.50 PASS
LC12=D+ O + 0.7Ey + 0.75L 4.50 42.93 1.271 33.78 1.50 PASS

CHECK OVERTURNING IN DIRECTION -Z


Direct-Z
Moment Moment
LOAD TYPE Bf Resisting Moment
Overturning Overturning Safety Factor Criteria
m MR = 0.5*Bf*P MOx SF=MR/MOx
LC1=D + F 2.50 20.00 0.000 0.00 2.00 PASS
LC2=D + O 2.50 20.00 0.000 0.00 2.00 PASS
LC3=D + F + L 2.50 25.13 0.000 0.00 2.00 PASS
LC4=D + O + L 2.50 25.13 0.000 0.00 2.00 PASS
LC5=D + F + Wx 2.50 20.00 0.980 20.41 1.50 PASS
LC6=D + F + Wy 2.50 20.00 0.000 0.00 1.50 PASS
LC7=D + O + Wx 2.50 20.00 0.980 20.41 1.50 PASS
LC8=D + O + Wy 2.50 20.00 0.000 0.00 1.50 PASS
LC9=D+F + 0.7Ex + 0.75L 2.50 23.85 1.271 18.77 1.50 PASS
LC10=D+F + 0.7Ey + 0.75L 2.50 23.85 0.000 0.00 1.50 PASS
LC11=D+ O + 0.7Ex + 0.75L 2.50 23.85 1.271 18.77 1.50 PASS
LC12=D+ O + 0.7Ey + 0.75L 2.50 23.85 0.000 0.00 1.50 PASS
CALCULATION FOR EDG & TRAFO
Doc. No.: SNO-C-CC-53-017
SHELTER FOUNDATION
Page 19-3 of 20 .
Rev. B
EPC FASILITAS PENGUKURAN GAS
SENORO – PAU
Rev. Date : 18/07/2016

FACTORED MAXIMUM SOIL BEARING PRESSURE FOOTING


Eccentricity
Eccentric-X Eccentric-Z
LOAD TYPE eX= Mz/P Lf/6 ez= MX/P Bf/6 Af
Condition Condition
m m m m m2
LC101=1.4 D + F 0.000 0.750 1 0.000 0.417 1 11.25
LC102=1.4 D + O 0.000 0.750 1 0.000 0.417 1 11.25
LC103=1.2 (D + F) + 1.6 L 0.000 0.750 1 0.000 0.417 1 11.25
LC104=1.2 (D + O) + 1.6 L 0.000 0.750 1 0.000 0.417 1 11.25
LC105=1.2 D + 0.8 Wx 0.048 0.750 1 0.000 0.417 1 11.25
LC106=1.2 D + 0.8 Wy 0.000 0.750 1 0.102 0.417 1 11.25
LC107=1.2 D +1.6 Wx + 1.0 L 0.077 0.750 1 0.000 0.417 1 11.25
LC108=1.2 D +1.6 Wy + 1.0 L 0.000 0.750 1 0.163 0.417 1 11.25
LC109=1.2 D + 1.0 Ex + 1.0 L 0.089 0.750 1 0.000 0.417 1 11.25
LC110=1.2 D + 1.0 Ey + 1.0 L 0.000 0.750 1 0.089 0.417 1 11.25
LC111=0.9 D + 1.0 Ex 0.149 0.750 1 0.000 0.417 1 11.25
LC112=0.9 D + 1.0 Ey 0.000 0.750 1 0.149 0.417 1 11.25

FACTORED SOIL BEARING IN DIRECTION -X


Factored Bearing Capacity
LOAD TYPE qumax qumin
ton/m2 ton/m2
LC101=1.4 D + F 1.90 1.90
LC102=1.4 D + O 1.90 1.90
LC103=1.2 (D + F) + 1.6 L 2.29 2.29
LC104=1.2 (D + O) + 1.6 L 2.29 2.29
LC105=1.2 D + 0.8 Wx 1.61 1.35
LC106=1.2 D + 0.8 Wy 1.44 1.44
LC107=1.2 D +1.6 Wx + 1.0 L 2.14 1.62
LC108=1.2 D +1.6 Wy + 1.0 L 1.80 1.80
LC109=1.2 D + 1.0 Ex + 1.0 L 2.19 1.59
LC110=1.2 D + 1.0 Ey + 1.0 L 1.80 1.80
LC111=0.9 D + 1.0 Ex 1.47 0.86
LC112=0.9 D + 1.0 Ey 1.08 1.08
quz max 2.291 ton/m2
CALCULATION FOR EDG & TRAFO
Doc. No.: SNO-C-CC-53-017
SHELTER FOUNDATION
Page 20-3 of 20 .
Rev. B
EPC FASILITAS PENGUKURAN GAS
SENORO – PAU
Rev. Date : 18/07/2016

FACTORED SOIL BEARING IN DIRECTION -Z


Factored Bearing Capacity
LOAD TYPE qumax qumin
ton/m 2
ton/m2
LC101=1.4 D + F 1.90 1.90
LC102=1.4 D + O 1.90 1.90
LC103=1.2 (D + F) + 1.6 L 2.29 2.29
LC104=1.2 (D + O) + 1.6 L 2.29 2.29
LC105=1.2 D + 0.8 Wx 1.44 1.44
LC106=1.2 D + 0.8 Wy 1.79 1.09
LC107=1.2 D +1.6 Wx + 1.0 L 1.80 1.80
LC108=1.2 D +1.6 Wy + 1.0 L 2.51 1.10
LC109=1.2 D + 1.0 Ex + 1.0 L 1.80 1.80
LC110=1.2 D + 1.0 Ey + 1.0 L 2.19 1.42
LC111=0.9 D + 1.0 Ex 1.08 1.08
LC112=0.9 D + 1.0 Ey 1.47 0.69
qux max 2.51 ton/m2

7. REINFORCEMENT DESIGN FOOTING


Concrete Design Strength f'c = 28 MPa
Steel Design Strength fy = 413 MPa
β1 = 0.85
Reduction factor for bending f = 0.9
Concrete cover c = 0.075 m
= 75 mm
Width b = 1.00 m
= 1000 mm
Diameter of Main Bar Dx = 16 mm (X direction)
Diameter of Main Bar Dz = 16 mm (Z direction)
Thickness of footing Hf = 0.50 m
= 500 mm
Effective depth of foundation d = Hf - c- 1.5 D
= 401.00 mm
= 0.40 m
Footing Reinforcement Design Direction X
Maximum ultimate pressure quzmax = 229.1 kN/m2
Moment Ultimate Muz max = (1/8* quzmax*b2)
Muz max = 28.63 kNm
= 28633078 Nmm
Ru = Muzmax / (Φ x b x d2)
= 0.1979 MPa
CALCULATION FOR EDG & TRAFO
Doc. No.: SNO-C-CC-53-017
SHELTER FOUNDATION
Page 21-3 of 20 .
Rev. B
EPC FASILITAS PENGUKURAN GAS
SENORO – PAU
Rev. Date : 18/07/2016

m = fy / ( 0.85 x fc' )
= 17.35
ρrequired = (1/m) x (1 - (1 - 2m Ru/fy) 0.5)
= 0.0005
ρbalanced = β1 x 0.85 f'c x 600
fy 600 + fy
= 0.0290
ρmax = 0.75 ρ balanced
= 0.0218
ρmin = 0.00180 (1.4/fy if 1.33 x r required > 1.4/fy)
(0.18% if 1.33 x rrequired < 1.4/fy)
ρused = 0.0018 < 0.0218……...OK
Asreq = ρxbxd
= 721.80 mm2
Diameter of main bar = 16 mm
As = 201.06 mm2
Number of bar per meter = As req / As
= 3.59 ≈ 4
Spacing Sreq = Width / no. of bars
= 278.55 mm
Spacing used Sused = 200 mm
Asused = As*((b/Sused)+1)
= 1206.37 mm2 OK
Use D16 - 200 for top & bottom flexural reinforcement

Footing Reinforcement Design Direction Z


Width of footing b = 1.00 m
Length of footing = 1000 mm
Maximum ultimate pressure quxmax = 250.90 kN/m2
Moment Ultimate Mux max = (1/8* quxmax*b2)
Moment Ultimate Mux max = 31.36 kNm
= 31362025 Nmm
Ru = Muxmax / (Φ x b x d2)
= 0.217 MPa
m = fy / ( 0.85 x fc' )
= 17.353
ρrequired = (1/m) x (1 - (1 - 2m Ru/fy)0.5)
= 0.0005
ρbalanced = β x 0.85 f'c x 600
fy 600 + fy
CALCULATION FOR EDG & TRAFO
Doc. No.: SNO-C-CC-53-017
SHELTER FOUNDATION
Page 22-3 of 20 .
Rev. B
EPC FASILITAS PENGUKURAN GAS
SENORO – PAU
Rev. Date : 18/07/2016

= 0.0290
CALCULATION FOR EDG & TRAFO
Doc. No.: SNO-C-CC-53-017
SHELTER FOUNDATION
Page 23-3 of 20 .
Rev. B
EPC FASILITAS PENGUKURAN GAS
SENORO – PAU
Rev. Date : 18/07/2016

ρmax = 0.75 ρ balanced


= 0.0218
ρmin = 0.0018 (1.4/fy if 1.33 x r required > 1.4/fy)
(0.18% if 1.33 x rrequired < 1.4/fy)
ρused = 0.0018 < 0.0218……...OK
Asreq = ρxbxd
= 721.8 mm2
Diameter of main bar = 16 mm

Area of main bar As = 201.06 mm2


Number of bar per meter = As req / As
= 3.59 ≈ 4
Spacing required Sreq = Width / no. of bars
= 278.55 mm
Spacing used Sused = 200 mm
Asused = As*((b/Sused)+1)
= 1206.37 mm2 OK
Use D16 - 200 for top & bottom flexural reinforcement

9. SETTLEMENT CHECKING
Immediate Settlement
Poisson Ration of Soil m = 0.30
Modulus elasticity of soil Es = 145.0 kg/cm2
(D + EO)
Net Pressure Applied q= = 14.22 kg/cm2
bf x df
Width of foundation df = 4.50 m
Lenght of foundation bf = 2.50 m

Non Dimension Influence Factor :


m1 = bf/df
m1 = 0.56

Ip =
[ m1 x ln { ( 1 + √ m12 + 1)
m1
} + ln (m1 + √m12 + 1) ]
p
Ip = 0.439
q x B (1-m2) Ip
Settlement Calculation (Si) =
Es
= 0.98 mm
CALCULATION FOR EDG & TRAFO
Doc. No.: SNO-C-CC-53-017
SHELTER FOUNDATION
Page 24-3 of 20 .
Rev. B
EPC FASILITAS PENGUKURAN GAS
SENORO – PAU
Rev. Date : 18/07/2016

Allowable settlement dall = 25.00 mm ...OK


CALCULATION FOR EDG & TRAFO
Doc. No.: SNO-C-CC-53-017
SHELTER FOUNDATION
Page 25-3 of 20 .
Rev. B
EPC FASILITAS PENGUKURAN GAS
SENORO – PAU
Rev. Date : 18/07/2016

10. SUMMARY RESULT


Foundation Dimension : Footing Reinforcement :
Description Unit Size Description Rebar Used
Width m 4.50 Rebar Top D16 - 200
Length m 2.50 Rebar Bottom D16 - 200
Thickness m 0.50

0.20

0.30

D16 - 200 D16 - 200


CALCULATION FOR EDG & TRAFO
Doc. No.: SNO-C-CC-53-017
SHELTER FOUNDATION
Page 4-3 of 20 .
Rev. B
EPC FASILITAS PENGUKURAN GAS
SENORO – PAU
Rev. Date : 18/07/2016

CALCULATION TRAFO FOUNDATION


1. GENERAL

1.1 Quality of Material


No. Name Symbol Value Unit Remarks
1 Concrete fc' 28 MPa
Lean Concrete fc' 17.5 MPa
2 Reinforcing Deformed Bar Fy 413 MPa
Reinforcing Plain Bar Fy 275 MPa
3 Structural Steel or Pipe Fy 240 MPa
4 Anchor Bolt Fy 240 MPa
5 Coefficient Friction of soil m1 0.3

1.2 Unit Weight of Material


No. Name Symbol Value Unit Remarks
1 Structural Concrete gc 23.54 kN/m 3

2 Leveling Concrete gpc 22.54 kN/m3


3 Steel gs 77.00 kN/m3
4 Soil gso 16.39 kN/m3
5 Sand Gravel gg 17.70 kN/m3
6 Water gL 10.00 kN/m3
7 Wall gg 250.0 kg/m3

1.3 Geotechnical Data


Soil Bearing Capacity
Allowable soil bearing capacity for spread footing or mats on natural soil at depth of 1.00 m or more below
as per S-2 shall be : (Appendix-D)
No. Name Symbol Value Unit Remarks
1 Permanent condition ss-perm 0.130 MPa
2 Temporary condition ss-temp 0.172 MPa = 1.33 * ss-perm
3 Allowable settlement ds 25.00 mm

2. EQUIPMENT DATA
2.1 Equipment Data
Based on Data Sheet and GA Drawing for Trafo (Appendix-H)
2.1.1 Weight & Dimension
Weight Operating (O) = 1075.0 kg
Weight Test Load (T) = 1075.0 kg
CALCULATION FOR EDG & TRAFO
Doc. No.: SNO-C-CC-53-017
SHELTER FOUNDATION
Page 5-3 of 20 .
Rev. B
EPC FASILITAS PENGUKURAN GAS
SENORO – PAU
Rev. Date : 18/07/2016

2.1.2 Dimension of Equipment


Length of Equipment (Le) = 1.20 m
Width of Equipment (We) = 0.78 m
Height of Equipment (He) = 1.32 m
Height from top foundation to as equipment (He/2) = 0.66 m
Height from botom foundation to as equipment (He/2) + Hf = 1.16 m
Dimension Skid Length (L) = 1.20 m
Width (W) = 0.78 m

2.2 Data Foundation


2.2.1 Geometry of Foundation
Length of Footing Lf = 1.50 m
Width of footing Bf = 1.00 m
Height of footing Hf = 0.50 m

110

780 1000
Trafo Foundation

110

150 1200 150

1500

(Hv)

200
(Hf)
300
CALCULATION FOR EDG & TRAFO
Doc. No.: SNO-C-CC-53-017
SHELTER FOUNDATION
Page 6-3 of 20 .
Rev. B
EPC FASILITAS PENGUKURAN GAS
SENORO – PAU
Rev. Date : 18/07/2016

3. DESIGN LOAD
3.1 Dead Load
Weight of footing (B x L x H x gc) = 1799.97 kg
1799.97 kg

3.2 Live Load


Maintenance load on equipment (LL) = 365.00 kg/m2
LL x (Le x We) = 547.50 kg

3.3 Operasional Load


Weight of Operasional Load on Filter = 1075.00 kg

3.4 Test Load


Weight of Operasional Load on Filter = 1075.00 kg

3.5 Wind Load


Wind load dir x Ce.Cq.Cpa.qs.Iw.Afx = 176.96 kg
Wind load dir y Ce.Cq.Cpa.qs.Iw.Afy = 272.24 kg

where :
Ce (UBC 1997 vol 2, Tabel 16-G, exposure D) = 1.39
CALCULATION FOR EDG & TRAFO
Doc. No.: SNO-C-CC-53-017
SHELTER FOUNDATION
Page 7-3 of 20 .
Rev. B
EPC FASILITAS PENGUKURAN GAS
SENORO – PAU
Rev. Date : 18/07/2016

Cq (UBC 1997 vol 2, Tabel 16-H, for square) = 1.4

Cpa (diameter 78" - 100", “Pressure Vessel Design Manual” by = 1.2


Moss Dennis R.)
V Base on Wind Data Evaluation Report (Basic Wind Speed) Doc = 32.0 m/s
No. SNO-C-TC-53-002 (risk category III & IV)
qs Wind stagnation pressure, V 2 / 16 kg/m2 = 64.0 kg/m2
CALCULATION FOR EDG & TRAFO
Doc. No.: SNO-C-CC-53-017
SHELTER FOUNDATION
Page 8-3 of 20 .
Rev. B
EPC FASILITAS PENGUKURAN GAS
SENORO – PAU
Rev. Date : 18/07/2016

Iw (UBC 1997 vol 2, Tabel 16-K, essential fasilities) = 1.15

Afy =(Le * He) = 1.58 m2


Afx =(We * He) = 1.03 m2

Moment Wind load dir x Wy . Hv = 315.80 kg


Moment Wind load dir y Wx . Hv = 205.27 kg
CALCULATION FOR EDG & TRAFO
Doc. No.: SNO-C-CC-53-017
SHELTER FOUNDATION
Page 9-3 of 20 .
Rev. B
EPC FASILITAS PENGUKURAN GAS
SENORO – PAU
Rev. Date : 18/07/2016

3.6 Seismic load Load


Seismic load dir x (Sx) 0.7.Ca.I.Wp = 780.72 kg
Seismic load dir y (Sy) 0.7.Ca.I.Wp = 780.72 kg

Base on SNI 03-1726-1989, luwuk Sulawesi area shall be zone - 6


CALCULATION FOR EDG & TRAFO
Doc. No.: SNO-C-CC-53-017
SHELTER FOUNDATION
Page 10-3 of 20 .
Rev. B
EPC FASILITAS PENGUKURAN GAS
SENORO – PAU
Rev. Date : 18/07/2016

Ca (Seismic coefficient, SNI 03-1726-1989, zone 6) = 0.83


I (UBC 1997 vol 2, Tabel 16-K, essential fasilities) = 1.25
CALCULATION FOR EDG & TRAFO
Doc. No.: SNO-C-CC-53-017
SHELTER FOUNDATION
Page 11-3 of 20 .
Rev. B
EPC FASILITAS PENGUKURAN GAS
SENORO – PAU
Rev. Date : 18/07/2016
CALCULATION FOR EDG & TRAFO
Doc. No.: SNO-C-CC-53-017
SHELTER FOUNDATION
Page 12-3 of 20 .
Rev. B
EPC FASILITAS PENGUKURAN GAS
SENORO – PAU
Rev. Date : 18/07/2016

Wp (weight of hydrotest) = 1075.00 kg

Moment Seismic load dir x MSx = Sy . Hv = 515.27 kg


Moment Seismic load dir y MSy = Sx . Hv = 515.27 kg

4. LOADING COMBINATION
Stabilization of foundation Reinforcement of foundation
LC1 = D+F LC101 = 1.4 D + F
LC2 = D+O LC102 = 1.4 D + O
LC3 = D+F+L LC103 = 1.2 (D + F) + 1.6 L
LC4 = D+O+L LC104 = 1.2 (D + O) + 1.6 L
LC5 = D + F + Wx LC105 = 1.2 D + 0.8 Wx
LC6 = D + F + Wy LC106 = 1.2 D + 0.8 Wy
LC7 = D + O + Wx LC107 = 1.2 D +1.6 Wx + 1.0 L
LC8 = D + O + Wy LC108 = 1.2 D +1.6 Wy + 1.0 L
LC9 = D+F + 0.7Ex + 0.75L LC109 = 1.2 D + 1.0 Ex + 1.0 L
LC10 = D+F + 0.7Ey + 0.75L LC110 = 1.2 D + 1.0 Ey + 1.0 L
LC11 = D+ O + 0.7Ex + 0.75L LC111 = 0.9 D + 1.0 Ex
LC12 = D+ O + 0.7Ey + 0.75L LC112 = 0.9 D + 1.0 Ey

5. SUMMARY OF FORCE AND MOMENT.


5.1 Summary Force and Moment Pedestal
Vertical Horizontal (ton) Moment (ton.m)
Load
(ton) Hx Hy Mx My
Dead Load (D) 1.80
Live Load (L) 0.55
Operasional Load (O) 1.08
Test Load (F) 1.08
Wind Load Dir x (Wx) 0.18 0.21
Wind Load Dir y (Wy) 0.27 0.32
Seismic Load Dir x (Ex) 0.78 0.52
Seismic Load Dir y (Ey) 0.78 0.52
CALCULATION FOR EDG & TRAFO
Doc. No.: SNO-C-CC-53-017
SHELTER FOUNDATION
Page 13-3 of 20 .
Rev. B
EPC FASILITAS PENGUKURAN GAS
SENORO – PAU
Rev. Date : 18/07/2016

5.2 Summary Force and Moment for Stabilization of Foundation


Load Combination Vertical Horizontal (ton) Moment (ton.m)
( ton ) Hx Hz Mx Mz
LC1=D + F 2.87
LC2=D + O 2.87
LC3=D + F + L 3.42
LC4=D + O + L 3.42
LC5=D + F + Wx 2.87 0.18 0.21
LC6=D + F + Wy 2.87 0.27 0.32
LC7=D + O + Wx 2.87 0.18 0.21
LC8=D + O + Wy 2.87 0.27 0.32
LC9=D+F + 0.7Ex + 0.75L 3.29 0.55 0.36
LC10=D+F + 0.7Ey + 0.75L 3.29 0.55 0.36
LC11=D+ O + 0.7Ex + 0.75L 3.29 0.55 0.36
LC12=D+ O + 0.7Ey + 0.75L 3.29 0.55 0.36

5.3 Summary Force and Moment for Reinforcement of Foundation


Vertical Horizontal (ton) Moment (ton.m)
Load Combination
( ton ) Hx Hy Mx Mz
LC101=1.4 D + F 3.59
LC102=1.4 D + O 3.59
LC103=1.2 (D + F) + 1.6 L 4.33
LC104=1.2 (D + O) + 1.6 L 4.33
LC105=1.2 D + 0.8 Wx 2.16 0.14 0.16
LC106=1.2 D + 0.8 Wy 2.16 0.22 0.25
LC107=1.2 D +1.6 Wx + 1.0 L 2.71 0.28 0.33
LC108=1.2 D +1.6 Wy + 1.0 L 2.71 0.44 0.51
LC109=1.2 D + 1.0 Ex + 1.0 L 2.71 0.78 0.52
LC110=1.2 D + 1.0 Ey + 1.0 L 2.71 0.78 0.52
LC111=0.9 D + 1.0 Ex 1.62 0.78 0.52
LC112=0.9 D + 1.0 Ey 1.62 0.78 0.52

6. CHECK BEARING CAPACITY


STATIC ANALYSIS
Condition 1
Direction X
qmax = P/ Af (1+ 6ex/Lf)≤ qall
qmin = P/ Af (1-6ex/Lf) ≥ 0
Direction Z
qmax = P/ Af (1+ 6ez/Bf)≤ qall
qmin = P/ Af (1-6ez/Bf) ≥ 0
CALCULATION FOR EDG & TRAFO
Doc. No.: SNO-C-CC-53-017
SHELTER FOUNDATION
Page 14-3 of 20 .
Rev. B
EPC FASILITAS PENGUKURAN GAS
SENORO – PAU
Rev. Date : 18/07/2016

the formula can be used with condition :


ex = Mz/P < Lf/6 or
ez = Mx/P < Bf/6

Condition 2
Direction X
qmax = 2P/ 3*Bf (Lf/2-ex) ≤ qall
qmin = 0
Direction Z

qmax = 2P/ 3*Lf (Bf/2-ez) ≤ qall


qmin = 0
the formula can be used with condition :
ex = Mz/P >Lf/6 or
ez = Mx/P> Bf/6

Eccentricity
Eccentric-X Eccentric-Z
LOAD TYPE eX= Mz/P Lf/6 ez= MX/P Bf/6 Af
Condition Condition
m m m m m2
LC1=D + F 0.00 0.25 1 0.00 0.17 1 1.50
LC2=D + O 0.00 0.25 1 0.00 0.17 1 1.50
LC3=D + F + L 0.00 0.25 1 0.00 0.17 1 1.50
LC4=D + O + L 0.00 0.25 1 0.00 0.17 1 1.50
LC5=D + F + Wx 0.07 0.25 1 0.00 0.17 1 1.50
LC6=D + F + Wy 0.00 0.25 1 0.11 0.17 1 1.50
LC7=D + O + Wx 0.07 0.25 1 0.00 0.17 1 1.50
LC8=D + O + Wy 0.00 0.25 1 0.11 0.17 1 1.50
LC9=D+F + 0.7Ex + 0.75L 0.11 0.25 1 0.00 0.17 1 1.50
LC10=D+F + 0.7Ey + 0.75L 0.00 0.25 1 0.11 0.17 1 1.50
LC11=D+ O + 0.7Ex + 0.75L 0.11 0.25 1 0.00 0.17 1 1.50
LC12=D+ O + 0.7Ey + 0.75L 0.00 0.25 1 0.11 0.17 1 1.50
CALCULATION FOR EDG & TRAFO
Doc. No.: SNO-C-CC-53-017
SHELTER FOUNDATION
Page 15-3 of 20 .
Rev. B
EPC FASILITAS PENGUKURAN GAS
SENORO – PAU
Rev. Date : 18/07/2016

CHECK MAXIMUM SOIL BEARING IN DIRECTION -X


Bearing Capacity
LOAD TYPE qmax qall max Criteria qmin qall max Criteria
ton/m 2
ton/m 2 qmax≤qall ton/m 2
ton/m 2 qmin≥qall
LC1=D + F 1.92 12.96 PASS 1.92 0 PASS
LC2=D + O 1.92 12.96 PASS 1.92 0 PASS
LC3=D + F + L 2.28 12.96 PASS 2.28 0 PASS
LC4=D + O + L 2.28 12.96 PASS 2.28 0 PASS
LC5=D + F + Wx 2.46 12.96 PASS 1.37 0 PASS
LC6=D + F + Wy 1.92 12.96 PASS 1.92 0 PASS
LC7=D + O + Wx 2.46 12.96 PASS 1.37 0 PASS
LC8=D + O + Wy 1.92 12.96 PASS 1.92 0 PASS
LC9=D+F + 0.7Ex + 0.75L 3.15 12.96 PASS 1.23 0 PASS
LC10=D+F + 0.7Ey + 0.75L 2.19 12.96 PASS 2.19 0 PASS
LC11=D+ O + 0.7Ex + 0.75L 3.15 12.96 PASS 1.23 0 PASS
LC12=D+ O + 0.7Ey + 0.75L 2.19 12.96 PASS 2.19 0 PASS

CHECK MAXIMUM SOIL BEARING IN DIRECTION -Z


Bearing Capacity
LOAD TYPE qmax qall max Criteria qmin qall max Criteria
ton/m2 ton/m2 qmax≤qall ton/m2 ton/m2 qmin≥qall
LC1=D + F 1.92 13.0 PASS 1.92 0 PASS
LC2=D + O 1.92 13.0 PASS 1.92 0 PASS
LC3=D + F + L 2.28 13.0 PASS 2.28 0 PASS
LC4=D + O + L 2.28 13.0 PASS 2.28 0 PASS
LC5=D + F + Wx 1.92 13.0 PASS 1.92 0 PASS
LC6=D + F + Wy 3.18 13.0 PASS 0.65 0 PASS
LC7=D + O + Wx 1.92 13.0 PASS 1.92 0 PASS
LC8=D + O + Wy 3.18 13.0 PASS 0.65 0 PASS
LC9=D+F + 0.7Ex + 0.75L 2.19 13.0 PASS 2.19 0 PASS
LC10=D+F + 0.7Ey + 0.75L 3.63 13.0 PASS 0.75 0 PASS
LC11=D+ O + 0.7Ex + 0.75L 2.19 13.0 PASS 2.19 0 PASS
LC12=D+ O + 0.7Ey + 0.75L 3.63 13.0 PASS 0.75 0 PASS
CALCULATION FOR EDG & TRAFO
Doc. No.: SNO-C-CC-53-017
SHELTER FOUNDATION
Page 16-3 of 20 .
Rev. B
EPC FASILITAS PENGUKURAN GAS
SENORO – PAU
Rev. Date : 18/07/2016

CHECK SLIDING IN DIRECTION -X


Coefficient Resisting Horizontal Stability
LOAD TYPE Friction force Force Ratio Safety Factor Criteria
m1 HR = m1*P Hx SF=HR/Hx
LC1=D + F 0.30 0.86 0.00 0.00 2.00 PASS
LC2=D + O 0.30 0.86 0.00 0.00 2.00 PASS
LC3=D + F + L 0.30 1.03 0.00 0.00 2.00 PASS
LC4=D + O + L 0.30 1.03 0.00 0.00 2.00 PASS
LC5=D + F + Wx 0.30 0.86 0.18 4.87 1.50 PASS
LC6=D + F + Wy 0.30 0.86 0.00 0.00 1.50 PASS
LC7=D + O + Wx 0.30 0.86 0.18 4.87 1.50 PASS
LC8=D + O + Wy 0.30 0.86 0.00 0.00 1.50 PASS
LC9=D+F + 0.7Ex + 0.75L 0.30 0.99 0.55 1.80 1.50 PASS
LC10=D+F + 0.7Ey + 0.75L 0.30 0.99 0.00 0.00 1.50 PASS
LC11=D+ O + 0.7Ex + 0.75L 0.30 0.99 0.55 1.80 1.50 PASS
LC12=D+ O + 0.7Ey + 0.75L 0.30 0.99 0.00 0.00 1.50 PASS

CHECK SLIDING IN DIRECTION -Z


Coefficient Resisting Horizontal Stability
LOAD TYPE Friction force Force Ratio Safety Factor Criteria
m1 HR =m1*P Hz SF=HR/Hz
LC1=D + F 0.30 0.86 0.00 0.00 2.00 PASS
LC2=D + O 0.30 0.86 0.00 0.00 2.00 PASS
LC3=D + F + L 0.30 1.03 0.00 0.00 2.00 PASS
LC4=D + O + L 0.30 1.03 0.00 0.00 2.00 PASS
LC5=D + F + Wx 0.30 0.86 0.00 0.00 1.50 PASS
LC6=D + F + Wy 0.30 0.86 0.27 3.17 1.50 PASS
LC7=D + O + Wx 0.30 0.86 0.00 0.00 1.50 PASS
LC8=D + O + Wy 0.30 0.86 0.27 3.17 1.50 PASS
LC9=D+F + 0.7Ex + 0.75L 0.30 0.99 0.00 0.00 1.50 PASS
LC10=D+F + 0.7Ey + 0.75L 0.30 0.99 0.55 1.80 1.50 PASS
LC11=D+ O + 0.7Ex + 0.75L 0.30 0.99 0.00 0.00 1.50 PASS
LC12=D+ O + 0.7Ey + 0.75L 0.30 0.99 0.55 1.80 1.50 PASS
CALCULATION FOR EDG & TRAFO
Doc. No.: SNO-C-CC-53-017
SHELTER FOUNDATION
Page 17-3 of 20 .
Rev. B
EPC FASILITAS PENGUKURAN GAS
SENORO – PAU
Rev. Date : 18/07/2016

CHECK OVERTURNING FOOTING 1


CHECK OVERTURNING IN DIRECTION -X
Direct-X
Moment Moment
LOAD TYPE Lf Resisting Moment
Overturning Overturning Safety Factor Criteria
m MR = 0.5*Lf*P MOz SF=MR/MOz
LC1=D + F 1.50 2.16 0.000 0.00 2.00 PASS
LC2=D + O 1.50 2.16 0.000 0.00 2.00 PASS
LC3=D + F + L 1.50 2.57 0.000 0.00 2.00 PASS
LC4=D + O + L 1.50 2.57 0.000 0.00 2.00 PASS
LC5=D + F + Wx 1.50 2.16 0.000 0.00 1.50 PASS
LC6=D + F + Wy 1.50 2.16 0.316 6.83 1.50 PASS
LC7=D + O + Wx 1.50 2.16 0.000 0.00 1.50 PASS
LC8=D + O + Wy 1.50 2.16 0.316 6.83 1.50 PASS
LC9=D+F + 0.7Ex + 0.75L 1.50 2.46 0.000 0.00 1.50 PASS
LC10=D+F + 0.7Ey + 0.75L 1.50 2.46 0.361 6.83 1.50 PASS
LC11=D+ O + 0.7Ex + 0.75L 1.50 2.46 0.000 0.00 1.50 PASS
LC12=D+ O + 0.7Ey + 0.75L 1.50 2.46 0.361 6.83 1.50 PASS

CHECK OVERTURNING IN DIRECTION -Z


Direct-Z
Moment Moment
LOAD TYPE Bf Resisting Moment
Overturning Overturning Safety Factor Criteria
m MR = 0.5*Bf*P MOx SF=MR/MOx
LC1=D + F 1.00 1.44 0.000 0.00 2.00 PASS
LC2=D + O 1.00 1.44 0.000 0.00 2.00 PASS
LC3=D + F + L 1.00 1.71 0.000 0.00 2.00 PASS
LC4=D + O + L 1.00 1.71 0.000 0.00 2.00 PASS
LC5=D + F + Wx 1.00 1.44 0.205 7.00 1.50 PASS
LC6=D + F + Wy 1.00 1.44 0.000 0.00 1.50 PASS
LC7=D + O + Wx 1.00 1.44 0.205 7.00 1.50 PASS
LC8=D + O + Wy 1.00 1.44 0.000 0.00 1.50 PASS
LC9=D+F + 0.7Ex + 0.75L 1.00 1.64 0.361 4.55 1.50 PASS
LC10=D+F + 0.7Ey + 0.75L 1.00 1.64 0.000 0.00 1.50 PASS
LC11=D+ O + 0.7Ex + 0.75L 1.00 1.64 0.361 4.55 1.50 PASS
LC12=D+ O + 0.7Ey + 0.75L 1.00 1.64 0.000 0.00 1.50 PASS
CALCULATION FOR EDG & TRAFO
Doc. No.: SNO-C-CC-53-017
SHELTER FOUNDATION
Page 18-3 of 20 .
Rev. B
EPC FASILITAS PENGUKURAN GAS
SENORO – PAU
Rev. Date : 18/07/2016

FACTORED MAXIMUM SOIL BEARING PRESSURE FOOTING


Eccentricity
Eccentric-X Eccentric-Z
LOAD TYPE eX= Mz/P Lf/6 ez= MX/P Bf/6 Af
Condition Condition
m m m m m2
LC101=1.4 D + F 0.000 0.250 1 0.000 0.167 1 1.5
LC102=1.4 D + O 0.000 0.250 1 0.000 0.167 1 1.5
LC103=1.2 (D + F) + 1.6 L 0.000 0.250 1 0.000 0.167 1 1.5
LC104=1.2 (D + O) + 1.6 L 0.000 0.250 1 0.000 0.167 1 1.5
LC105=1.2 D + 0.8 Wx 0.076 0.250 1 0.000 0.167 1 1.5
LC106=1.2 D + 0.8 Wy 0.000 0.250 1 0.117 0.167 1 1.5
LC107=1.2 D +1.6 Wx + 1.0 L 0.121 0.250 1 0.000 0.167 1 1.5
LC108=1.2 D +1.6 Wy + 1.0 L 0.000 0.250 1 0.187 0.167 2 1.5
LC109=1.2 D + 1.0 Ex + 1.0 L 0.190 0.250 1 0.000 0.167 1 1.5
LC110=1.2 D + 1.0 Ey + 1.0 L 0.000 0.250 1 0.190 0.167 2 1.5
LC111=0.9 D + 1.0 Ex 0.318 0.250 2 0.000 0.167 1 1.5
LC112=0.9 D + 1.0 Ey 0.000 0.250 1 0.318 0.167 2 1.5

FACTORED SOIL BEARING IN DIRECTION -X


Factored Bearing Capacity
LOAD TYPE qumax qumin
ton/m2 ton/m2
LC101=1.4 D + F 2.40 2.40
LC102=1.4 D + O 2.40 2.40
LC103=1.2 (D + F) + 1.6 L 2.88 2.88
LC104=1.2 (D + O) + 1.6 L 2.88 2.88
LC105=1.2 D + 0.8 Wx 2.10 1.00
LC106=1.2 D + 0.8 Wy 1.44 1.44
LC107=1.2 D +1.6 Wx + 1.0 L 3.12 0.93
LC108=1.2 D +1.6 Wy + 1.0 L 1.80 1.80
LC109=1.2 D + 1.0 Ex + 1.0 L 3.87 0.43
LC110=1.2 D + 1.0 Ey + 1.0 L 1.80 1.80
LC111=0.9 D + 1.0 Ex 3.96 0.00
LC112=0.9 D + 1.0 Ey 1.08 1.08
quz max 3.958 ton/m2
CALCULATION FOR EDG & TRAFO
Doc. No.: SNO-C-CC-53-017
SHELTER FOUNDATION
Page 19-3 of 20 .
Rev. B
EPC FASILITAS PENGUKURAN GAS
SENORO – PAU
Rev. Date : 18/07/2016

FACTORED SOIL BEARING IN DIRECTION -Z


Factored Bearing Capacity
LOAD TYPE qumax qumin
ton/m2 ton/m2
LC101=1.4 D + F 2.40 2.40
LC102=1.4 D + O 2.40 2.40
LC103=1.2 (D + F) + 1.6 L 2.88 2.88
LC104=1.2 (D + O) + 1.6 L 2.88 2.88
LC105=1.2 D + 0.8 Wx 1.44 1.44
LC106=1.2 D + 0.8 Wy 2.45 0.43
LC107=1.2 D +1.6 Wx + 1.0 L 1.80 1.80
LC108=1.2 D +1.6 Wy + 1.0 L 3.84 0.00
LC109=1.2 D + 1.0 Ex + 1.0 L 1.80 1.80
LC110=1.2 D + 1.0 Ey + 1.0 L 3.89 0.00
LC111=0.9 D + 1.0 Ex 1.08 1.08
LC112=0.9 D + 1.0 Ey 3.96 0.00
qux max 3.96 ton/m2

7. REINFORCEMENT DESIGN FOOTING


Concrete Design Strength f'c = 28 MPa
Steel Design Strength fy = 413 MPa
β1 = 0.85
Reduction factor for bending f = 0.9
Concrete cover c = 0.075 m
= 75 mm
Width b = 1.00 m
= 1000 mm
Diameter of Main Bar Dx = 16 mm (X direction)
Diameter of Main Bar Dz = 16 mm (Z direction)
Thickness of footing Hf = 0.50 m
= 500 mm
Effective depth of foundation d = Hf - c- 1.5 D
= 401.00 mm
= 0.40 m
Footing Reinforcement Design Direction X
Maximum ultimate pressure quzmax = 395.8 kN/m2
Moment Ultimate Muz max = (1/8* quzmax*b2)
Muz max = 49.47 kNm
= 49470266 Nmm
Ru = Muzmax / (Φ x b x d2)
= 0.3418 MPa
CALCULATION FOR EDG & TRAFO
Doc. No.: SNO-C-CC-53-017
SHELTER FOUNDATION
Page 20-3 of 20 .
Rev. B
EPC FASILITAS PENGUKURAN GAS
SENORO – PAU
Rev. Date : 18/07/2016

m = fy / ( 0.85 x fc' )
= 17.35
ρrequired = (1/m) x (1 - (1 - 2m Ru/fy) 0.5)
= 0.0008
ρbalanced = β1 x 0.85 f'c x 600
fy 600 + fy
= 0.0290
ρmax = 0.75 ρ balanced
= 0.0218
ρmin = 0.00180 (1.4/fy if 1.33 x r required > 1.4/fy)
(0.18% if 1.33 x rrequired < 1.4/fy)
ρused = 0.0018 < 0.0218……...OK
Asreq = ρxbxd
= 721.80 mm2
Diameter of main bar = 16 mm
As = 201.06 mm2
Number of bar per meter = As req / As
= 3.59 ≈ 4
Spacing Sreq = Width / no. of bars
= 278.55 mm
Spacing used Sused = 200 mm
Asused = As*((b/Sused)+1)
= 1206.37 mm2 OK
Use D16 - 200 for top & bottom flexural reinforcement

Footing Reinforcement Design Direction Z


Width of footing b = 1.00 m
Length of footing = 1000 mm
Maximum ultimate pressure quxmax = 395.76 kN/m2
Moment Ultimate Mux max = (1/8* quxmax*b2)
Moment Ultimate Mux max = 49.47 kNm
= 49470266 Nmm
Ru = Muxmax / (Φ x b x d2)
= 0.342 MPa
m = fy / ( 0.85 x fc' )
= 17.353
ρrequired = (1/m) x (1 - (1 - 2m Ru/fy)0.5)
= 0.0008
ρbalanced = β x 0.85 f'c x 600
fy 600 + fy
CALCULATION FOR EDG & TRAFO
Doc. No.: SNO-C-CC-53-017
SHELTER FOUNDATION
Page 21-3 of 20 .
Rev. B
EPC FASILITAS PENGUKURAN GAS
SENORO – PAU
Rev. Date : 18/07/2016

= 0.0290
CALCULATION FOR EDG & TRAFO
Doc. No.: SNO-C-CC-53-017
SHELTER FOUNDATION
Page 22-3 of 20 .
Rev. B
EPC FASILITAS PENGUKURAN GAS
SENORO – PAU
Rev. Date : 18/07/2016

ρmax = 0.75 ρ balanced


= 0.0218
ρmin = 0.0018 (1.4/fy if 1.33 x r required > 1.4/fy)
(0.18% if 1.33 x rrequired < 1.4/fy)
ρused = 0.0018 < 0.0218……...OK
Asreq = ρxbxd
= 721.8 mm2
Diameter of main bar = 16 mm

Area of main bar As = 201.06 mm2


Number of bar per meter = As req / As
= 3.59 ≈ 4
Spacing required Sreq = Width / no. of bars
= 278.55 mm
Spacing used Sused = 200 mm
Asused = As*((b/Sused)+1)
= 1206.37 mm2 OK
Use D16 - 200 for top & bottom flexural reinforcement

9. SETTLEMENT CHECKING
Immediate Settlement
Poisson Ration of Soil m = 0.30
Modulus elasticity of soil Es = 145.0 kg/cm2
(D + EO)
Net Pressure Applied q= = 19.17 kg/cm2
bf x df
Width of foundation df = 1.50 m
Lenght of foundation bf = 1.00 m

Non Dimension Influence Factor :


m1 = bf/df
m1 = 0.67

Ip =
[ m1 x ln { ( 1 + √ m12 + 1)
m1
} + ln (m1 + √m12 + 1) ]
p
Ip = 0.493
q x B (1-m2) Ip
Settlement Calculation (Si) =
Es
= 0.59 mm
CALCULATION FOR EDG & TRAFO
Doc. No.: SNO-C-CC-53-017
SHELTER FOUNDATION
Page 23-3 of 20 .
Rev. B
EPC FASILITAS PENGUKURAN GAS
SENORO – PAU
Rev. Date : 18/07/2016

Allowable settlement dall = 25.00 mm ...OK


CALCULATION FOR EDG & TRAFO
Doc. No.: SNO-C-CC-53-017
SHELTER FOUNDATION
Page 24-3 of 20 .
Rev. B
EPC FASILITAS PENGUKURAN GAS
SENORO – PAU
Rev. Date : 18/07/2016

10. SUMMARY RESULT


Foundation Dimension : Footing Reinforcement :
Description Unit Size Description Rebar Used
Width m 1.50 Rebar Top D16 - 200
Length m 1.00 Rebar Bottom D16 - 200
Thickness m 0.50

200

300

D16 - 200 D16 - 200


CALCULATION FOR EDG & TRAFO
Doc. No.: SNO-C-CC-53-017
SHELTER FOUNDATION

Rev. B
EPC FASILITAS PENGUKURAN GAS
SENORO – PAU
Rev. Date : 18/07/2016

SOIL BEARING CAPACITY ANALYSIS

Formula by Meyerholf with a reduced allowable 25 mm


(J E Bowles, Foundation Analysis, Page 264)

For B > F4
qc B x F3 2
qa =
50
x ( B )
F factor from J E Bowles :

For Shelter Foundation


B Length of footing foundation = 1.20 m
F3 Factor = 0.30
qc qc for depth -1.0m (S-02) = 48.33 kg/cm2 (Appendix-F)

48.33 1.50 2
qa =
50
x ( 1.20 ) = 1.510 kg/cm2

= 0.151 MPa
For Engine Generator (EDG) Foundation
B Length of footing foundation = 4.50 m
F3 Factor = 0.30
qc qc for depth -0.3m (S-02) = 45.00 kg/cm2 (Appendix-F)

45 4.80 2
qa =
50
x ( 4.50 ) = 1.024 kg/cm2

= 0.102 MPa

For Trafo Foundation


B Length of footing foundation = 1.50 m
F3 Factor = 0.30
qc qc for depth -0.3m (S-02) = 45.00 kg/cm2 (Appendix-F)

45 1.80 2
qa =
50
x ( 1.50 ) = 1.296 kg/cm2

= 0.130 MPa
DIMENSION (mm)
No. TAG NUMBER EQUIPMENT LOCATION
L
1 EP - 5310 Load Break Switch Existing 600
2 EP - 5319 Change Over Switch Existing 600
3 ET - 5310 Trasformer 420/400 V Shelter Trafo 1200
4 ED - 5309 Engine Generator Shelter EDG 1900
5 ES - 5310 LV Switchgear + MCC Subtation Room 3050
6 EP - 5321 Capasitor bank Subtation Room 1050
7 EP - 5309 Unit Control Panel (EDG) Subtation Room 600
8 EU - 5316 Uninterrup Power Supply Subtation Room 4375
9 EB - 5316 Battery and Enclosure Subtation Room 1250
10 EP - 5315 HVAC Panel Subtation Room 800
11 ED - 5309 Distribution Board Indoor Wall Subtation Room 200
12 ED - 5310 Distribution Board Outdoor Wall Subtation Room 200
DIMENSION (mm) WEIGHT
STATUS REMARK
W H (Kg)
300 1000 Estimasi
300 1000 Estimasi
780 1320 1075 Estimasi Trafo 200Kva
4000 2000 2500 Estimasi PO Arbas
750 2050 1540 Estimasi PO Comeca
750 2050 350 Estimasi
600 2267 200 Estimasi PO Arbas
1900 800 1630 Fix PO Gutor
1900 800 1095 Fix PO Gutor
800 2100 200 Estimasi
400 800 50 Estimasi
400 800 50 Estimasi