1. GENERAL
2. DESIGN CRITERIA
- Factored loading combination is used for reinforced concrete design.
- Unfactored loading combination is used for steel design, deflection and support reactions for foundation design.
3. LOAD COMBINATION
3.1 Factored Load Combination
The following factored load combination is used for reinforced concrete design by Load and Resistance Factored
Design method.
LC Description Remarks
11 1.4 D Permanent
12 0.9 D + 1.6 Wx Temporary
13 0.9 D + 1.6 Wz Temporary
14 1.2 D + 1.6 L + 1.0 CR-1 Permanent
15 1.2 D + 1.6 L + 1.0 CR-2 Permanent
16 1.2 D + 1.0 L + 1.0 EQx + 0.3 EQz Temporary
17 1.2 D + 1.0 L + 1.0 EQz + 0.3 EQx Temporary
18 1.2 D + 1.0 L + 1.6 Wx + 1.0 CR-1 Temporary
19 1.2 D + 1.0 L + 1.6 Wz + 1.0 CR-2 Temporary
4. STRUCTURE MODELING
4.1 Plan and Elevation
C1 C1 C1
Trafo 3000
EDG Foundation Foundation
C1 C1 C1
5000 5000
Column Plan
Roof Plan
CALCULATION FOR EDG & TRAFO
Doc. No.: SNO-C-CC-53-017
SHELTER FOUNDATION
Page 7-3 of 20 .
Rev. B
EPC FASILITAS PENGUKURAN GAS
SENORO – PAU
Rev. Date : 18/07/2016
15 °
R1 R1
380
B2
C1 C1
5000
Portal Frame
B2 B1
B3
B1
B1
B3
B1
C1
B2
C1
C1
C1
3D Model
CALCULATION FOR EDG & TRAFO
Doc. No.: SNO-C-CC-53-017
SHELTER FOUNDATION
Page 8-3 of 20 .
Rev. B
EPC FASILITAS PENGUKURAN GAS
SENORO – PAU
Rev. Date : 18/07/2016
Material Properties
Sym. Profile Material Remarks
C1 H 200x200x8x12 Structural Steel A-36 Column
R1 H 200x100x5.5x8 Structural Steel A-36 Rafter
B1 H 200x100x5.5x8 Structural Steel A-36 Beam Span
B2 H 300x150x6.5x9 Structural Steel A-36 Run Way Beam
B3 H 350x175x7x11 Structural Steel A-36 Hoist Beam
BR1 L100x100x10 Structural Steel A-36 Bracing
TR Ø 19 bar With Turn Buckle Tie Rod
5. LOAD DESIGN
5.1 Dead Load (D)
This load is contain of main structure selfweight and secondary structure dead load such as roofing weight,
purlin and ceiling weight.
5.1.1 Structure Selfweight
The weight of beams, columns and other main structure weight are automatically calculated by STAAD
Pro. by using Selfweight Y -1.0 command.
5.1.2 Roof Dead Load
Wr, Roofing weight include ornament electrical = 15.00 kg/m2
Wp, Purlin weight for C 150 x 65 x 20 x 3.2 = 7.51 kg/m2
D, Roof dead load = Wr + Wp = 22.51 kg/m2
Lfa, Half of frame distance center = 5.00 m
Lfb, Half of frame distance edge = 3.50 m
Lp, Purlin distance = 1.00 m
D1, Load at frame = Lf * D = 112.55 kg/m (center)
= 78.79 kg/m (edge)
8 0.93 570.6
9 0.98 601.3
10 1.00 613.6
Wheel Load
Wheel load due to crane dead load
Ncd = P Ht = 500 kg
Impact Load
fv Vertical = 25%
ft Tranversal = 30% lifted load
fl Longitudinal = 10% wheel load
CALCULATION FOR EDG & TRAFO
Doc. No.: SNO-C-CC-53-017
SHELTER FOUNDATION
Page 13-3 of 20 .
Rev. B
EPC FASILITAS PENGUKURAN GAS
SENORO – PAU
Rev. Date : 18/07/2016
Nlt2 l Nvt.2
Runaway
beam Nlt
Ntt.1
Nvt.1
SWL 3000 kg
Soil Type (Refer to Report On-Land Geotechnical Investigation Donggi – Senoro LNG Plant
2008)
N'=
Thickness
Layer N SPT Depth (m) Thickness/ N ∑ N' N'= 30/ ∑N'
(m)
SPT
0 0 0 0 0
1 50 2,5 2,5 0,050
2 41,8 7,5 5,1 0,122
3 13,1 14,7 7,1 0,540
4 33,9 29,8 15,1 0,445 1,189 25,24
5 50 31,37 1,57 0,031
T = Ct . h n x (Tabel 15)
= 0.0724 x 5.38 0.8
= 0.278
Tc = 0.600 (Refer to SNI 03-1726-2002 Section 4.7.6)
If --> T £ Tc
So, C = Am
Am = 2.5 * A0 (Refer to SNI 03-1726-2002 Section 4.7.6)
= 0.900
C = 0.900 Seismic Response Coefficient
CALCULATION FOR EDG & TRAFO
Doc. No.: SNO-C-CC-53-017
SHELTER FOUNDATION
Page 17-3 of 20 .
Rev. B
EPC FASILITAS PENGUKURAN GAS
SENORO – PAU
Rev. Date : 18/07/2016
C x I
V = x SWi
R
= 0.320 x SWi
6. CALCULATION DESIGN
6.1 Secondary Structure Calculation (Purlin Design)
Y
Purlin
Sagrod
X
Px
15 0
Py
P
P
4 Qdl +
4 Qll
m
Purlin
Sagrod
5.00 m
Bending Design
Py = P * cos q = 0.97 kN
CALCULATION FOR EDG & TRAFO
Doc. No.: SNO-C-CC-53-017
SHELTER FOUNDATION
Page 21-3 of 20 .
Rev. B
EPC FASILITAS PENGUKURAN GAS
SENORO – PAU
Rev. Date : 18/07/2016
Member Properties
C150x65x20x3.2
H Height = 150.00 mm
B Width = 65.00 mm
t Thickness = 3.20 mm
A Area = 9.57 cm2
Ix Inertia at X-axis = 332.00 cm4
Iy Inertia at Y-axis = 53.80 cm4
Sx Section modulus at X-axis = 44.30 cm3
Sy Section modulus at Y-axis = 12.20 cm3
Deflection Check
E Elastic modulus = 200000 MPa
= 200000000 kN/m2
Concentrated live load
dall Allowable deflection = Lf / 360 = 13.89 mm
dx Deflection at X-axis
= (Py * Lx3) / (48 * E * Ix) = 0.47 mm < δall OK
dy Deflection at Y-axis
= (Px * Ly3) / (48 * E * Iy) = 6.26 mm < δall OK
dtotal Deflection total = Ö dx + dy
2 2
= 6.28 mm < δall OK
Horizontal Deflection
CALCULATION FOR EDG & TRAFO
Doc. No.: SNO-C-CC-53-017
SHELTER FOUNDATION
Page 28-3 of 20 .
Rev. B
EPC FASILITAS PENGUKURAN GAS
SENORO – PAU
Rev. Date : 18/07/2016
Temporary Condition
CALCULATION FOR EDG & TRAFO
Doc. No.: SNO-C-CC-53-017
SHELTER FOUNDATION
Page 29-3 of 20 .
Rev. B
EPC FASILITAS PENGUKURAN GAS
SENORO – PAU
Rev. Date : 18/07/2016
6.4
V V
T T
M M
A
Elevation
Rmax
n.a
c1
Section A-A b
Output program
Tmax Tension force = 21.39 kN STAAD Pro Output
s3 Bolt distance = 130.00 mm
s4 Bolt distance = 70.00 mm
Endplate dimension
Lp Endplate length = 360.00 mm
bp Endplate width = 100.00 mm
CALCULATION FOR EDG & TRAFO
Doc. No.: SNO-C-CC-53-017
SHELTER FOUNDATION
Page 32-3 of 20 .
Rev. B
EPC FASILITAS PENGUKURAN GAS
SENORO – PAU
Rev. Date : 18/07/2016
Endplate capacity
An = tp * [Lp - n/2 * (db + 1/16 * 25.4)] = 3,686.85 mm2
V1 Shear capacity = 2 * 0.3 * Fup * An = 849.45 kN
Ag = tp * Lp = 4,320.00 mm2
V2 Shear capacity = 0.4 * Fyp * Ag = 414.72 kN
Vall Shear capacity allowable = minimum V1 dan V2 = 414.72 kN > Vmax OK
p Tributary of each bolts = 120.00 mm
d' = db + 1/16 * 25.4 = 17.59 mm
a1 = 25.00 mm
b1 = 0.5 b - a1 - 0.5 tw = 22.25 mm
a' = a1 + db/2 = 33.00 mm
b' = b1 - db/2 = 14.25 mm
B = Ftb * Ab = 60.32 kN
tc Plate thickness to resist bolt tension capacity
= √ [(8 * B * b') / (p * Fy)] = 15.45 mm
ρ = b' / a' = 0.43
δ = 1 - d'/p = 0.85
α = {1 / [δ (1 + ρ)]}{(tc / tp) 2 - 1} = 0.54 0 < α < 1.00
T Tension capacity per 2 bolts
= B (tp / tc)^2 (1 + δ α) = 53.10 kN > Tmax(2) OK
CALCULATION FOR EDG & TRAFO
Doc. No.: SNO-C-CC-53-017
SHELTER FOUNDATION
Page 33-3 of 20 .
Rev. B
EPC FASILITAS PENGUKURAN GAS
SENORO – PAU
Rev. Date : 18/07/2016
SH 200x100x5.5x8 SH 200x100x5.5x8
A WH 200x200x8x12
V M
T
A
Plan
Elevation
bp a
s1
Rmax
s2
c
Lp
s3 M
n.a
s4 c1
Section A-A b
Output program
Tmax Tension force = 21.40 kN STAAD Pro Output
Vmax Shear force = 7.41 kN STAAD Pro Output
Mmax Moment force = 4.91 kNm STAAD Pro Output
Bolt Arrangement
db Bolt diameter M16 = 16 mm
Ab Bolt area = 0.25 * p * db2 = 201.06 mm2
n Total number of bolts = 6 ea
nr Number vertical row of bolts = 2 ea
s1 Bolt distance = 60.00 mm
s2 Bolt distance = 100.00 mm
s3 Bolt distance = 130.00 mm
s4 Bolt distance = 70.00 mm
Endplate dimension
Lp Endplate length = 380.00 mm
bp Endplate width = 120.00 mm
tp Endplate thickness = 12.00 mm
Bolt capacity
T Tension capacity = Ftb * Ab * n = 361.91 kN
V Shear capacity = Fvb * Ab * n = 174.92 kN
p Bolt distance = s2 = 100.00 mm
a = (Ab * nr) / p = 4.02 mm
c1 / c = √ (a / b) = 0.20
c1 = 0.20 c
Lp = c1 + c = 1.20 c
c = Lp / 1.20 = 316.53 mm
c1 = Lp - c = 63.47 mm
I = (a * c3 + b * c13) / 3 = 5.10E+07 mm4
Ftb = Mmax * c / I = 30.45 MPa
Ftt = Tmax / (Ab * n) = 17.74 MPa
Ft = Ftb + Ftt = 48.19 MPa
Tmax(2) Tension load per 2 bolts = Ft * Ab * 2 = 19.38 kN
T Tension capacity per 2 bolts = Ftb * Ab * 2 = 120.64 kN > Tmax(2) OK
Weld capacity
w = 8 mm
te = 0.707 * w = 5.66 mm
Le = (Lp - 3 * tf) * nr + ((b - tw) / 2) * n = 995.50 mm
T Tension capacity = Le * te * Fvw = 810.80 kN > Tmax OK
Le = 2 * (h - 2 * tf) + 2 * b + 2 * (b - tw) = 767.00 mm
V Shear capacity = Le * te * Fvw = 624.69 kN > Vmax OK
Le =2*b = 200.00 mm
CALCULATION FOR EDG & TRAFO
Doc. No.: SNO-C-CC-53-017
SHELTER FOUNDATION
Page 35-3 of 20 .
Rev. B
EPC FASILITAS PENGUKURAN GAS
SENORO – PAU
Rev. Date : 18/07/2016
Ff = Le * te * Fvw = 162.89 kN
M Moment capacity = Ff * (h - tf) = 31.28 kNm > Mmax OK
Endplate capacity
An = tp * [Lp - n/2 * (db + 1/16 * 25.4)] = 3,926.85 mm2
V1 Shear capacity = 2 * 0.3 * Fup * An = 904.75 kN
Ag = tp * Lp = 4,560.00 mm2
V2 Shear capacity = 0.4 * Fyp * Ag = 437.76 kN
Vall Shear capacity allowable = minimum V1 dan V2 = 437.76 kN > Vmax OK
p Tributary of each bolts = 120.00 mm
d' = db + 1/16 * 25.4 = 17.59 mm
a1 = 25.00 mm
b1 = 0.5 b - a1 - 0.5 tw = 22.25 mm
a' = a1 + db/2 = 33.00 mm
b' = b1 - db/2 = 14.25 mm
B = Ftb * Ab = 60.32 kN
tc Plate thickness to resist bolt tension capacity
= √ [(8 * B * b') / (p * Fy)] = 15.45 mm
ρ = b' / a' = 0.43
δ = 1 - d'/p = 0.85
α = {1 / [δ (1 + ρ)]}{(tc / tp) 2 - 1} = 0.54 0 < α < 1.00
T Tension capacity per 2 bolts
= B (tp / tc)^2 (1 + δ α) = 53.10 kN > Tmax(2) OK
A
SH 200x100x5.5x8
WH 200x200x8x12
A
WH 200x200x8x12
- Flange
Lw =b = 100.00 mm
w = = 8.00 mm
te = 0.707 * w = 5.66 mm
Tf = Lw * te * Fvw = 81.45 kN
M Moment capacity = Tf * (h - tf) = 15.64 kNm
CALCULATION FOR EDG & TRAFO
Doc. No.: SNO-C-CC-53-017
SHELTER FOUNDATION
Page 37-3 of 20 .
Rev. B
EPC FASILITAS PENGUKURAN GAS
SENORO – PAU
Rev. Date : 18/07/2016
- Flange
tp Plate thickness = 10.00 mm
Ag = b * tp = 1,000.00 mm2
An = Ag - 2 * db * tp = 680.00 mm2
T1 = 0.5 * Fup * An = 130.56 kN
T2 = 0.6 * Fyp * Ag = 144.00 kN
Tf = 2 * min(T1,T2) = 261.12 kN
M Moment capacity = min(T1,T2) * (h - tf) = 25.07 kNm
T Tension capacity = Tw + Tf = 520.32 kN
Overall capacity
Ta Allowable tension capacity = 162.89 kN > Tmax OK
Va Allowable shear capacity = 55.05 kN > Vmax OK
Ma Allowable moment capacity = 15.64 kNm > Mmax OK
CALCULATION FOR EDG & TRAFO
Doc. No.: SNO-C-CC-53-017
SHELTER FOUNDATION
Page 38-3 of 20 .
Rev. B
EPC FASILITAS PENGUKURAN GAS
SENORO – PAU
Rev. Date : 18/07/2016
SH 300x150x6.5x9 SH 300x150x6.5x9
6.4.4 Run Way Beam to Column
A Connection (End Plate Connection)
WH 200x200x8x12
WH 200x200x8x12
V M T
Plan
A
Elevation
bp a
s1
s2
Rmax
s2 c
Lp
s3 M
n.a
s4 c1
Section A-A b
Bolt capacity
T Tension capacity = Ftb * Ab * n = 482.55 kN
V Shear capacity = Fvb * Ab * n = 233.23 kN
p Bolt distance = s2 = 100.00 mm
a = (Ab * nr) / p = 4.02 mm
c1 / c = √ (a / b) = 0.16
c1 = 0.16 c
Lp = c1 + c = 1.16 c
c = Lp / 1.16 = 429.65 mm
c1 = Lp - c = 70.35 mm
I = (a * c3 + b * c13) / 3 = 1.24E+08 mm4
Ftb = Mmax * c / I = 78.59 MPa
Ftt = Tmax / (Ab * n) = 12.82 MPa
Ft = Ftb + Ftt = 91.41 MPa
Tmax(2) Tension load per 2 bolts = Ft * Ab * 2 = 36.76 kN
T Tension capacity per 2 bolts = Ftb * Ab * 2 = 120.64 kN > Tmax(2) OK
Weld capacity
w = 8 mm
te = 0.707 * w = 5.66 mm
Le = (Lp - 3 * tf) * nr + ((b - tw) / 2) * n = 1,520.00 mm
T Tension capacity = Le * te * Fvw = 1,237.99 kN > Tmax OK
Le = 2 * (h - 2 * tf) + 2 * b + 2 * (b - tw) = 1,161.00 mm
V Shear capacity = Le * te * Fvw = 945.59 kN > Vmax OK
Le =2*b = 300.00 mm
Ff = Le * te * Fvw = 244.34 kN
M Moment capacity = Ff * (h - tf) = 71.10 kNm > Mmax OK
Endplate capacity
An = tp * [Lp - n/2 * (db + 1/16 * 25.4)] = 6,874.40 mm2
V1 Shear capacity = 2 * 0.3 * Fup * An = 1,583.86 kN
Ag = tp * Lp = 8,000.00 mm2
V2 Shear capacity = 0.4 * Fyp * Ag = 768.00 kN
Vall Shear capacity allowable = minimum V1 dan V2 = 768.00 kN > Vmax OK
p Tributary of each bolts = 120.00 mm
CALCULATION FOR EDG & TRAFO
Doc. No.: SNO-C-CC-53-017
SHELTER FOUNDATION
Page 41-3 of 20 .
Rev. B
EPC FASILITAS PENGUKURAN GAS
SENORO – PAU
Rev. Date : 18/07/2016
a1 = 25.00 mm
b1 = 0.5 b - a1 - 0.5 tw = 46.75 mm
a' = a1 + db/2 = 33.00 mm
b' = b1 - db/2 = 38.75 mm
B = Ftb * Ab = 60.32 kN
tc Plate thickness to resist bolt tension capacity
= √ [(8 * B * b') / (p * Fy)] = 25.48 mm
ρ = b' / a' = 1.17
δ = 1 - d'/p = 0.85
α = {1 / [δ (1 + ρ)]}{(tc / tp) 2 - 1} = 0.83 0 < α < 1.00
T Tension capacity per 2 bolts
= B (tp / tc)^2 (1 + δ α) = 40.59 kN > Tmax(2) OK
s1
M s2
V
A A s3
T
Bolt capacity
T Tension capacity = Ftb * Ab * n = 241.27 kN
V Shear capacity = Fvb * Ab * n = 116.62 kN
p Bolt distance = s2 = 80.00 mm
a = (Ab * nr) / p = 5.03 mm
c1 / c = √ (a / b) = 0.17
c1 = 0.17 c
Lp = c1 + c = 1.17 c
c = Lp / 1.17 = 128.26 mm
c1 = Lp - c = 21.74 mm
I = (a * c3 + b * c13) / 3 = 4.13E+06 mm4
Ftb = Mmax * c / I = 17.68 MPa
Ftt = Tmax / (Ab * n) = 59.88 MPa
Ft = Ftb + Ftt = 77.56 MPa
Tmax(2) Tension load per 2 bolts = Ft * Ab * 2 = 31.19 kN
T Tension capacity per 2 bolts = Ftb * Ab * 2 = 120.64 kN > Tmax(2) OK
Weld capacity
w = 8 mm
te = 0.707 * w = 5.66 mm
Le =b*n = 300.00 mm
T Tension capacity = Le * te * Fvw = 244.34 kN > Tmax OK
Le = 2 * (h - 2 * tf) + 2 * b + 2 * (b - tw) = 1,358.00 mm
V Shear capacity = Le * te * Fvw = 1,106.04 kN > Vmax OK
Le =2*b = 350.00 mm
Ff = Le * te * Fvw = 285.06 kN
CALCULATION FOR EDG & TRAFO
Doc. No.: SNO-C-CC-53-017
SHELTER FOUNDATION
Page 44-3 of 20 .
Rev. B
EPC FASILITAS PENGUKURAN GAS
SENORO – PAU
Rev. Date : 18/07/2016
WH 200 x 200 x 8 x 12
150
N
Bp
150
50 200 50
50
B
TENSION CALCULATION
Anchor Rod Tension Resistance
Reduction Factor φt,s = 0.75
Anchor Rod Tension Resistance Nsa = φt,s x n x Ase x futa
= 44548.44 N
= 44.55 kN
Nsa > Nu OK
Check Concrete Tensile Breakout Resistance
l = 1.00
CALCULATION FOR EDG & TRAFO
Doc. No.: SNO-C-CC-53-017
SHELTER FOUNDATION
Page 48-3 of 20 .
Rev. B
EPC FASILITAS PENGUKURAN GAS
SENORO – PAU
Rev. Date : 18/07/2016
Nr > Nu OK
SHEAR CALCULATION
Check Anchor Road Shear Resistance
Reduction Factor φv,s = 0.65
Anchor Rod shear resistance Vsa = φv,s x n x 0.6 x Ase x futa
= 23165.19 N
= 23.17 kN
Vsa > Vu OK
Check Concrete Pryout shear Resistance
Shear reduction factor φv,s = 0.70
Reduction Factor kcp = 2.00
for 1 for hef < 65mm and 2 for hef ≥ 65mm
Concrete Pryout shear Resistance Vcpg = 0.75 x φv,s x kcp x Ncbg
= 192078.47 N
= 192.08 kN
Vcpg > Vu OK
Check Shear breakout Resistance
l = 1.00
load bearing length of the anchor le = min (8*da, hef)
= 128 mm
Vb = 0.66*(le/da)0.2*l * da0.5 * fc0.5 * cmin1.5
= 13752.9 N
= 13.75 kN
Shear reduction factor φv,c = 0.75
Concrete Shear Breakout Resistance Vcbg = n x φv,c x Vb
= 10314.6 N
= 10.31 kN
Vcbg > Vu OK
Govern Shear Resistance Vr = min ( Vsa, Vcbg, Vcpg)
= 10.31 kN
CALCULATION FOR EDG & TRAFO
Doc. No.: SNO-C-CC-53-017
SHELTER FOUNDATION
Page 50-3 of 20 .
Rev. B
EPC FASILITAS PENGUKURAN GAS
SENORO – PAU
Rev. Date : 18/07/2016
6. Vr > Vu OK
6.1
SHELTER FOUNDATION DESIGN
Foundation Specification
Concrete
fc' Compressive strength for structural concrete = 28 MPa
fc' Compressive strength for leveling concrete = 17.5 MPa
gc Unit Weight Structural Concrete = 23.54 kN/m 3
Soil
gso Unit Weight of Soil = 16.39 kN/m
3
Trafo 3000
EDG Foundation Foundation
5000 5000
CALCULATION FOR EDG & TRAFO
Doc. No.: SNO-C-CC-53-017
SHELTER FOUNDATION
Page 51-3 of 20 .
Rev. B
EPC FASILITAS PENGUKURAN GAS
SENORO – PAU
Rev. Date : 18/07/2016
0.30
0.90
0.60
0.40
(Lp) Ft
(Bp) (Bf)
(Lf)
m
Geometry of Foundation m
Length of Footing Lf = 1.20 m
Width of footing Bf = 1.20 m
Height of footing Hf = 0.40 m
Height of pedestal Hp = 0.90 m
Length of pedestal Lp = 0.40 m
Width of pedestal Bp = 0.40
6.3 pedestal distance to the edge of the footing Ft = 0.40
Bearing Capacity
Static Analysis
Condition 1
Direction X
qmax = P/ Af (1+ 6ex/Lf)≤ qall
qmin = P/ Af (1-6ex/Lf) ≥ 0
Direction Z
qmax = P/ Af (1+ 6ez/Bf)≤ qall
qmin = P/ Af (1-6ez/Bf) ≥ 0
the formula can be used with condition :
ex = Mz/P < Lf/6 or
ez = Mx/P < Bf/6
Condition 2
Direction X
qmax = 2P/ 3*Bf (Lf/2-ex) ≤ qall
qmin = 0
Direction Z
qmax = 2P/ 3*Lf (Bf/2-ez) ≤ qall
qmin = 0
the formula can be used with condition :
ex = Mz/P >Lf/6 or
ez = Mx/P> Bf/6
Eccentricity Af
Eccentric-X Eccentric-Z m2
LOAD TYPE eX= Mz/P Lf/6 ez= MX/P Bf/6 1.44
Condition Condition
m m m m
Maximum Load 0.03 0.20 1 0.12 0.20 1
c d '
fs' = 0.003Es b = 0.00
cb MPa
MPa
d cb
fs = 0.003Es = 59900.28 m
cb use fs = 413.00
a = b1 * Cb = 0.0027 cm2
m2
As practical = 0.01 x bx x bz = 16.00 m2
Ag = bx x b z = 0.16
Ac = bx x d = 0.13
rs = 1.0% = 0.01
CALCULATION FOR EDG & TRAFO
Doc. No.: SNO-C-CC-53-017
SHELTER FOUNDATION
Page 56-3 of 20 .
Rev. B
EPC FASILITAS PENGUKURAN GAS
SENORO – PAU
Rev. Date : 18/07/2016
rs = 200 / fy = 0.0033
rs = 3 fc = 0.0032
fy
CALCULATION FOR EDG & TRAFO
Doc. No.: SNO-C-CC-53-017
SHELTER FOUNDATION
Page 57-3 of 20 .
Rev. B
EPC FASILITAS PENGUKURAN GAS
SENORO – PAU
Rev. Date : 18/07/2016
3 fc
fy
rreq = = 0.0100
rmin = = 0.0100
rmax = 0.08 * Ag = 0.0128
rmin > rreg < rmax ( Not Governed!!! ) Used rmin cm2
cm²
As req = rreq.b.h = 16.00
As use = 8 D 16 = 16.09
As use ≥ As req
16.09 > 16.00 ® (OK) kN
Check Axial : kN
Pn = 0.85.fc'.b.a + As'.fs' - As.fs = 6608.03 kN
fPn = 0.65 x Pn = 4295.22
Puk = Axial force due to the load factored column, = 69.46
f Pn ≥ Puk
4295.22 > 69.46 ® (OK)
Check Moment :
f.Mn = 33.04 kNm > Mu
= 33.04 kNm > 11.39 kNm
f.Mn ≥ Mu
33.04 > 11.39 ® (OK)
Stirrups Calculation kN
Vu = Shear = H = 12.65
f Vc = Allowable shear force kN
kN
Vc1 = 1/6 x fc' x b x h = 317.49
Vc2 = 0.3 x fc' x b x h = 571.48
where m
f = reduction factor = 0.60 m
b = width of pedestal = 0.40
h = length of pedestal = 0.90 psi
( no need stirrups )
CALCULATION FOR EDG & TRAFO
Doc. No.: SNO-C-CC-53-017
SHELTER FOUNDATION
Page 59-3 of 20 .
Rev. B
EPC FASILITAS PENGUKURAN GAS
SENORO – PAU
Rev. Date : 18/07/2016
Footing Design
Concrete Design Strength f'c = 28 MPa
Steel Design Strength fy = 413 MPa
β1 = 0.85
Reduction factor for bending f = 0.8
Concrete cover c = 0.075 m
= 75 mm
Width b = 1.00 m
= 1000 mm
Diameter of Main Bar Dx = 16 mm (X direction)
Diameter of Main Bar Dz = 16 mm (Z direction)
Thickness of footing Hf = 0.40 m
= 400 mm
Effective depth of foundation d = Hf - c- 1.5 D
= 301.00 mm
= 0.30 m
Footing Reinforcement Design Direction X
Maximum ultimate pressure quzmax = 1104.1 kN/m2
Moment Ultimate Muz max = 1/2* b* quzmax*ax12)
Muz max = 88.33 kNm
= 88329779 Nmm
Ru = Muzmax / (Φ x b x d2)
= 1.2187 MPa
m = fy / ( 0.85 x fc' )
= 17.35
ρrequired = (1/m) x (1 - (1 - 2m Ru/fy) 0.5)
= 0.0030
ρbalanced = β1 x 0.85 f'c x 600
fy 600 + fy
= 0.0290
ρmax = 0.75 ρ balanced
= 0.0218
ρmin = 0.00339 (1.4/fy if 1.33 x r required > 1.4/fy)
(0.18% if 1.33 x rrequired < 1.4/fy)
ρused = 0.0040 < 0,0218……...OK
Asreq = ρxbxd
= 1213.18 mm2
CALCULATION FOR EDG & TRAFO
Doc. No.: SNO-C-CC-53-017
SHELTER FOUNDATION
Page 60-3 of 20 .
Rev. B
EPC FASILITAS PENGUKURAN GAS
SENORO – PAU
Rev. Date : 18/07/2016
Asused = As*((b/Sused)+1)
CALCULATION FOR EDG & TRAFO
Doc. No.: SNO-C-CC-53-017
SHELTER FOUNDATION
Page 63-3 of 20 .
Rev. B
EPC FASILITAS PENGUKURAN GAS
SENORO – PAU
Rev. Date : 18/07/2016
= 1541.47 mm2 OK
7. Use D16 - 150 for top & bottom flexural reinforcement
SETTLEMENT CHECKING
Immediate Settlement
Poisson Ration of Soil m = 0.30
Modulus elasticity of soil Es = 145.0 kg/cm2
(D + EO) kg/cm2
Net Pressure Applied q= = 70.10
bf x df
Width of foundation df = 1.20 m
Lenght of foundation bf = 1.20 m
]
Ip =
[ m1 x ln { ( 1 + √ m12 + 1)
m1
} + ln (m1 + √m12 + 1)
p
Ip = 0.630
q x B (1-m2) Ip
Settlement Calculation (Si) =
Es
= 3.33 mm
CALCULATION FOR EDG & TRAFO
Doc. No.: SNO-C-CC-53-017
SHELTER FOUNDATION
Page 64-3 of 20 .
Rev. B
EPC FASILITAS PENGUKURAN GAS
SENORO – PAU
Rev. Date : 18/07/2016
3000
5000 5000
Concrete Slab
Base on " Dasar-dasar Perencanaan Beton Bertulang" by Gideon Kusuma, page 90
Dead Load (DL)
slab weight T = 100 mm = 240 kg/m2
Finishing T = 50 mm = 125 kg/m2 +
qDL = 365 kg/m2
Live Load (LL)
1. Live Load qLL = 365 kg/m2
qu = 1.2 qDL + 1.6 qLL
= 1.2 x 365 + 1.6 x 365
= 1022 kg/m2
= 1.022 T/m2
ly 5.0
= = 1.67
lx 3.0
Ly Positive Moment = 49
Mlx = 0.001 x qu x lx2 x 49
= 0.001 x 1.02 x 3.0 2
x
Mlx = 0.45 Tm
Lx 15
Mly = 0.001 x qu x lx 2
x 15
= 0.001 x 1.02 x 3.0 2
x
CALCULATION FOR EDG & TRAFO
Doc. No.: SNO-C-CC-53-017
SHELTER FOUNDATION
Page 65-3 of 20 .
Rev. B
EPC FASILITAS PENGUKURAN GAS
SENORO – PAU
Rev. Date : 18/07/2016
Mly = 0.14 Tm
Negative Moment = 78
Mtx = -0.001 x qu x lx 2
x 78
= -0.001 x 1.022 x 3.0 2
x
Mtx = -0.72 Tm 54
Mty = -0.001 x qu x lx2 x 54
= -0.001 x 1.022 x 3.0 2
x
Mty = -0.50 Tm
`
c Cc a=bc
d h
Cc = b.fc'.a.b
= 0.85 x 28.00 x a x 1000
= 23800 .a
Moment Mn = Cc.(d-a/2)
= 23800 .a ( 50 - a/2 )
5633775 = 1190000 a - 11900 a2
11900 a2 -1190000 a + 5633775 = 0
a = 4.983
Cc = 118583.9697 N
Balance T = Cc
T = Asxfy
As = 287.13 mm2
CALCULATION FOR EDG & TRAFO
Doc. No.: SNO-C-CC-53-017
SHELTER FOUNDATION
Page 66-3 of 20 .
Rev. B
EPC FASILITAS PENGUKURAN GAS
SENORO – PAU
Rev. Date : 18/07/2016
rmin = 0.0018
CALCULATION FOR EDG & TRAFO
Doc. No.: SNO-C-CC-53-017
SHELTER FOUNDATION
Page 67-3 of 20 .
Rev. B
EPC FASILITAS PENGUKURAN GAS
SENORO – PAU
Rev. Date : 18/07/2016
100 mm
f 10 - 150
f 10 - 150
CALCULATION FOR EDG & TRAFO
Doc. No.: SNO-C-CC-53-017
SHELTER FOUNDATION
Page 68-3 of 20 .
Rev. B
EPC FASILITAS PENGUKURAN GAS
SENORO – PAU
Rev. Date : 18/07/2016
9.
5000 5000
Mn = Cc.(d-a/2)
3.45E+07 = 1190000 a-
2380 a2 -1190000 a + 34511746.5 = 0
a = 30.91
Cc = 147144.22 N
` T = Cc
Cc a=bc
c T = As*fy
d h
As = 356.28 mm2
rmin = 0.0035
T Asmin = 175 mm2
Asuse = 356.28 mm2
ruse = 0.00713
used, D 13 A = 132.73 mm2
n = 2.68
= 3 D 13
So, Used Atotal = 398.20 mm2
D 13 A = 132.73 mm2
n = 2.68
= 3 D 13
So, Used Atotal = 398.20 mm2
Stirrups Design
Vu = 1.47 Ton Vc = 1/6*(fc')0.5*bw*d
Vn = 2.45 Ton < = 4.41 Ton No Need Shear Reinforcement
Vs = Vn - Vc
= -1.96 Ton
s =
Av*d*fy f = 10 mm
Vs fy = 400 MPa
157079.63
=
-1955.42
= -80.33 cm
= -803.31 mm
-800 mm
Used, = f 10 - 150
CALCULATION FOR EDG & TRAFO
Doc. No.: SNO-C-CC-53-017
SHELTER FOUNDATION
Page 70-3 of 20 .
Rev. B
EPC FASILITAS PENGUKURAN GAS
SENORO – PAU
Rev. Date : 18/07/2016
CALCULATION FOR EDG & TRAFO
Doc. No.: SNO-C-CC-53-017
SHELTER FOUNDATION
Page 71-3 of 20 .
Rev. B
EPC FASILITAS PENGUKURAN GAS
SENORO – PAU
Rev. Date : 18/07/2016
8.
SUMMARY RESULT
Steel Structure Materials :
No Description Profile Remarks
1 Column H 200x200x8x12 Structural Steel A-36
2 Rafter H 200x100x5.5x8 Structural Steel A-36
3 Beam Span H 200x100x5.5x8 Structural Steel A-36
4 Run Way Beam H 300x150x6.5x9 Structural Steel A-36
5 Hoist Beam H 350x175x7x11 Structural Steel A-36
6 Bracing L100x100x10 Structural Steel A-36
7 Purlin C150x65x20x3.2 Structural Steel A-36
8 Tie Rod Ø 19 bar With Turn Buckle
Connection
Bolt Plate (mm)
No Description Remarks
n dia. L W thk
1 Rafter to Rafter - - 360 100 12 Weld Connection
2 Column to Rafter 6 M16 380 120 12 End Plate
3 Beam to Column 2 M16 180 100 10 Gusset Plate
4 Runway to Column 8 M16 500 170 16 End Plate
5 Runway to Runway 4 M16 - - - Hanging
6 Base Plate - - 300 300 16 End Plate
CALCULATION FOR EDG & TRAFO
Doc. No.: SNO-C-CC-53-017
SHELTER FOUNDATION
Page 72-3 of 20 .
Rev. B
EPC FASILITAS PENGUKURAN GAS
SENORO – PAU
Rev. Date : 18/07/2016
Concrete Result :
Pedestal dimension : Pedestal Reinforcement :
Description Unit Size Description Rebar Used
Width of Pedestal m 0.40 Vertical Rebar 8-D16
Length of Pedestal m 0.40 Stirrups f 10-150
Heigth of Pedestal m 0.90
2. EQUIPMENT DATA
2.1 Equipment Data
Based on Data Sheet and GA Drawing for EDG
2.1.1 Weight & Dimension
Weight Operating (O) (estimated) = 2500.0 kg
Weight Test Load (T) (estimated) = 2500.0 kg
CALCULATION FOR EDG & TRAFO
Doc. No.: SNO-C-CC-53-017
SHELTER FOUNDATION
Page 5-3 of 20 .
Rev. B
EPC FASILITAS PENGUKURAN GAS
SENORO – PAU
Rev. Date : 18/07/2016
Trafo 3000
EDG Foundation Foundation
5000 5000
CALCULATION FOR EDG & TRAFO
Doc. No.: SNO-C-CC-53-017
SHELTER FOUNDATION
Page 6-3 of 20 .
Rev. B
EPC FASILITAS PENGUKURAN GAS
SENORO – PAU
Rev. Date : 18/07/2016
300
1900 2500
EDG Foundation
300
4500
(Hv)
200
(Hf)
300
3. DESIGN LOAD
3.1 Dead Load
Weight of footing (B x L x H x gc) = 13499.81 kg
13499.81 kg
where :
Ce (UBC 1997 vol 2, Tabel 16-G, exposure D) = 1.39
CALCULATION FOR EDG & TRAFO
Doc. No.: SNO-C-CC-53-017
SHELTER FOUNDATION
Page 8-3 of 20 .
Rev. B
EPC FASILITAS PENGUKURAN GAS
SENORO – PAU
Rev. Date : 18/07/2016
4. LOADING COMBINATION
Stabilization of foundation Reinforcement of foundation
LC1 = D+F LC101 = 1.4 D + F
LC2 = D+O LC102 = 1.4 D + O
LC3 = D+F+L LC103 = 1.2 (D + F) + 1.6 L
LC4 = D+O+L LC104 = 1.2 (D + O) + 1.6 L
LC5 = D + F + Wx LC105 = 1.2 D + 0.8 Wx
LC6 = D + F + Wy LC106 = 1.2 D + 0.8 Wy
LC7 = D + O + Wx LC107 = 1.2 D +1.6 Wx + 1.0 L
LC8 = D + O + Wy LC108 = 1.2 D +1.6 Wy + 1.0 L
LC9 = D+F + 0.7Ex + 0.75L LC109 = 1.2 D + 1.0 Ex + 1.0 L
LC10 = D+F + 0.7Ey + 0.75L LC110 = 1.2 D + 1.0 Ey + 1.0 L
LC11 = D+ O + 0.7Ex + 0.75L LC111 = 0.9 D + 1.0 Ex
LC12 = D+ O + 0.7Ey + 0.75L LC112 = 0.9 D + 1.0 Ey
Condition 2
Direction X
qmax = 2P/ 3*Bf (Lf/2-ex) ≤ qall
qmin = 0
Direction Z
Eccentricity
Eccentric-X Eccentric-Z
LOAD TYPE eX= Mz/P Lf/6 ez= MX/P Bf/6 Af
Condition Condition
m m m m m2
LC1=D + F 0.00 0.75 1 0.00 0.42 1 11.25
LC2=D + O 0.00 0.75 1 0.00 0.42 1 11.25
LC3=D + F + L 0.00 0.75 1 0.00 0.42 1 11.25
LC4=D + O + L 0.00 0.75 1 0.00 0.42 1 11.25
LC5=D + F + Wx 0.06 0.75 1 0.00 0.42 1 11.25
LC6=D + F + Wy 0.00 0.75 1 0.13 0.42 1 11.25
LC7=D + O + Wx 0.06 0.75 1 0.00 0.42 1 11.25
LC8=D + O + Wy 0.00 0.75 1 0.13 0.42 1 11.25
LC9=D+F + 0.7Ex + 0.75L 0.07 0.75 1 0.00 0.42 1 11.25
LC10=D+F + 0.7Ey + 0.75L 0.00 0.75 1 0.07 0.42 1 11.25
LC11=D+ O + 0.7Ex + 0.75L 0.07 0.75 1 0.00 0.42 1 11.25
LC12=D+ O + 0.7Ey + 0.75L 0.00 0.75 1 0.07 0.42 1 11.25
CALCULATION FOR EDG & TRAFO
Doc. No.: SNO-C-CC-53-017
SHELTER FOUNDATION
Page 16-3 of 20 .
Rev. B
EPC FASILITAS PENGUKURAN GAS
SENORO – PAU
Rev. Date : 18/07/2016
m = fy / ( 0.85 x fc' )
= 17.35
ρrequired = (1/m) x (1 - (1 - 2m Ru/fy) 0.5)
= 0.0005
ρbalanced = β1 x 0.85 f'c x 600
fy 600 + fy
= 0.0290
ρmax = 0.75 ρ balanced
= 0.0218
ρmin = 0.00180 (1.4/fy if 1.33 x r required > 1.4/fy)
(0.18% if 1.33 x rrequired < 1.4/fy)
ρused = 0.0018 < 0.0218……...OK
Asreq = ρxbxd
= 721.80 mm2
Diameter of main bar = 16 mm
As = 201.06 mm2
Number of bar per meter = As req / As
= 3.59 ≈ 4
Spacing Sreq = Width / no. of bars
= 278.55 mm
Spacing used Sused = 200 mm
Asused = As*((b/Sused)+1)
= 1206.37 mm2 OK
Use D16 - 200 for top & bottom flexural reinforcement
= 0.0290
CALCULATION FOR EDG & TRAFO
Doc. No.: SNO-C-CC-53-017
SHELTER FOUNDATION
Page 23-3 of 20 .
Rev. B
EPC FASILITAS PENGUKURAN GAS
SENORO – PAU
Rev. Date : 18/07/2016
9. SETTLEMENT CHECKING
Immediate Settlement
Poisson Ration of Soil m = 0.30
Modulus elasticity of soil Es = 145.0 kg/cm2
(D + EO)
Net Pressure Applied q= = 14.22 kg/cm2
bf x df
Width of foundation df = 4.50 m
Lenght of foundation bf = 2.50 m
Ip =
[ m1 x ln { ( 1 + √ m12 + 1)
m1
} + ln (m1 + √m12 + 1) ]
p
Ip = 0.439
q x B (1-m2) Ip
Settlement Calculation (Si) =
Es
= 0.98 mm
CALCULATION FOR EDG & TRAFO
Doc. No.: SNO-C-CC-53-017
SHELTER FOUNDATION
Page 24-3 of 20 .
Rev. B
EPC FASILITAS PENGUKURAN GAS
SENORO – PAU
Rev. Date : 18/07/2016
0.20
0.30
2. EQUIPMENT DATA
2.1 Equipment Data
Based on Data Sheet and GA Drawing for Trafo (Appendix-H)
2.1.1 Weight & Dimension
Weight Operating (O) = 1075.0 kg
Weight Test Load (T) = 1075.0 kg
CALCULATION FOR EDG & TRAFO
Doc. No.: SNO-C-CC-53-017
SHELTER FOUNDATION
Page 5-3 of 20 .
Rev. B
EPC FASILITAS PENGUKURAN GAS
SENORO – PAU
Rev. Date : 18/07/2016
110
780 1000
Trafo Foundation
110
1500
(Hv)
200
(Hf)
300
CALCULATION FOR EDG & TRAFO
Doc. No.: SNO-C-CC-53-017
SHELTER FOUNDATION
Page 6-3 of 20 .
Rev. B
EPC FASILITAS PENGUKURAN GAS
SENORO – PAU
Rev. Date : 18/07/2016
3. DESIGN LOAD
3.1 Dead Load
Weight of footing (B x L x H x gc) = 1799.97 kg
1799.97 kg
where :
Ce (UBC 1997 vol 2, Tabel 16-G, exposure D) = 1.39
CALCULATION FOR EDG & TRAFO
Doc. No.: SNO-C-CC-53-017
SHELTER FOUNDATION
Page 7-3 of 20 .
Rev. B
EPC FASILITAS PENGUKURAN GAS
SENORO – PAU
Rev. Date : 18/07/2016
4. LOADING COMBINATION
Stabilization of foundation Reinforcement of foundation
LC1 = D+F LC101 = 1.4 D + F
LC2 = D+O LC102 = 1.4 D + O
LC3 = D+F+L LC103 = 1.2 (D + F) + 1.6 L
LC4 = D+O+L LC104 = 1.2 (D + O) + 1.6 L
LC5 = D + F + Wx LC105 = 1.2 D + 0.8 Wx
LC6 = D + F + Wy LC106 = 1.2 D + 0.8 Wy
LC7 = D + O + Wx LC107 = 1.2 D +1.6 Wx + 1.0 L
LC8 = D + O + Wy LC108 = 1.2 D +1.6 Wy + 1.0 L
LC9 = D+F + 0.7Ex + 0.75L LC109 = 1.2 D + 1.0 Ex + 1.0 L
LC10 = D+F + 0.7Ey + 0.75L LC110 = 1.2 D + 1.0 Ey + 1.0 L
LC11 = D+ O + 0.7Ex + 0.75L LC111 = 0.9 D + 1.0 Ex
LC12 = D+ O + 0.7Ey + 0.75L LC112 = 0.9 D + 1.0 Ey
Condition 2
Direction X
qmax = 2P/ 3*Bf (Lf/2-ex) ≤ qall
qmin = 0
Direction Z
Eccentricity
Eccentric-X Eccentric-Z
LOAD TYPE eX= Mz/P Lf/6 ez= MX/P Bf/6 Af
Condition Condition
m m m m m2
LC1=D + F 0.00 0.25 1 0.00 0.17 1 1.50
LC2=D + O 0.00 0.25 1 0.00 0.17 1 1.50
LC3=D + F + L 0.00 0.25 1 0.00 0.17 1 1.50
LC4=D + O + L 0.00 0.25 1 0.00 0.17 1 1.50
LC5=D + F + Wx 0.07 0.25 1 0.00 0.17 1 1.50
LC6=D + F + Wy 0.00 0.25 1 0.11 0.17 1 1.50
LC7=D + O + Wx 0.07 0.25 1 0.00 0.17 1 1.50
LC8=D + O + Wy 0.00 0.25 1 0.11 0.17 1 1.50
LC9=D+F + 0.7Ex + 0.75L 0.11 0.25 1 0.00 0.17 1 1.50
LC10=D+F + 0.7Ey + 0.75L 0.00 0.25 1 0.11 0.17 1 1.50
LC11=D+ O + 0.7Ex + 0.75L 0.11 0.25 1 0.00 0.17 1 1.50
LC12=D+ O + 0.7Ey + 0.75L 0.00 0.25 1 0.11 0.17 1 1.50
CALCULATION FOR EDG & TRAFO
Doc. No.: SNO-C-CC-53-017
SHELTER FOUNDATION
Page 15-3 of 20 .
Rev. B
EPC FASILITAS PENGUKURAN GAS
SENORO – PAU
Rev. Date : 18/07/2016
m = fy / ( 0.85 x fc' )
= 17.35
ρrequired = (1/m) x (1 - (1 - 2m Ru/fy) 0.5)
= 0.0008
ρbalanced = β1 x 0.85 f'c x 600
fy 600 + fy
= 0.0290
ρmax = 0.75 ρ balanced
= 0.0218
ρmin = 0.00180 (1.4/fy if 1.33 x r required > 1.4/fy)
(0.18% if 1.33 x rrequired < 1.4/fy)
ρused = 0.0018 < 0.0218……...OK
Asreq = ρxbxd
= 721.80 mm2
Diameter of main bar = 16 mm
As = 201.06 mm2
Number of bar per meter = As req / As
= 3.59 ≈ 4
Spacing Sreq = Width / no. of bars
= 278.55 mm
Spacing used Sused = 200 mm
Asused = As*((b/Sused)+1)
= 1206.37 mm2 OK
Use D16 - 200 for top & bottom flexural reinforcement
= 0.0290
CALCULATION FOR EDG & TRAFO
Doc. No.: SNO-C-CC-53-017
SHELTER FOUNDATION
Page 22-3 of 20 .
Rev. B
EPC FASILITAS PENGUKURAN GAS
SENORO – PAU
Rev. Date : 18/07/2016
9. SETTLEMENT CHECKING
Immediate Settlement
Poisson Ration of Soil m = 0.30
Modulus elasticity of soil Es = 145.0 kg/cm2
(D + EO)
Net Pressure Applied q= = 19.17 kg/cm2
bf x df
Width of foundation df = 1.50 m
Lenght of foundation bf = 1.00 m
Ip =
[ m1 x ln { ( 1 + √ m12 + 1)
m1
} + ln (m1 + √m12 + 1) ]
p
Ip = 0.493
q x B (1-m2) Ip
Settlement Calculation (Si) =
Es
= 0.59 mm
CALCULATION FOR EDG & TRAFO
Doc. No.: SNO-C-CC-53-017
SHELTER FOUNDATION
Page 23-3 of 20 .
Rev. B
EPC FASILITAS PENGUKURAN GAS
SENORO – PAU
Rev. Date : 18/07/2016
200
300
Rev. B
EPC FASILITAS PENGUKURAN GAS
SENORO – PAU
Rev. Date : 18/07/2016
For B > F4
qc B x F3 2
qa =
50
x ( B )
F factor from J E Bowles :
48.33 1.50 2
qa =
50
x ( 1.20 ) = 1.510 kg/cm2
= 0.151 MPa
For Engine Generator (EDG) Foundation
B Length of footing foundation = 4.50 m
F3 Factor = 0.30
qc qc for depth -0.3m (S-02) = 45.00 kg/cm2 (Appendix-F)
45 4.80 2
qa =
50
x ( 4.50 ) = 1.024 kg/cm2
= 0.102 MPa
45 1.80 2
qa =
50
x ( 1.50 ) = 1.296 kg/cm2
= 0.130 MPa
DIMENSION (mm)
No. TAG NUMBER EQUIPMENT LOCATION
L
1 EP - 5310 Load Break Switch Existing 600
2 EP - 5319 Change Over Switch Existing 600
3 ET - 5310 Trasformer 420/400 V Shelter Trafo 1200
4 ED - 5309 Engine Generator Shelter EDG 1900
5 ES - 5310 LV Switchgear + MCC Subtation Room 3050
6 EP - 5321 Capasitor bank Subtation Room 1050
7 EP - 5309 Unit Control Panel (EDG) Subtation Room 600
8 EU - 5316 Uninterrup Power Supply Subtation Room 4375
9 EB - 5316 Battery and Enclosure Subtation Room 1250
10 EP - 5315 HVAC Panel Subtation Room 800
11 ED - 5309 Distribution Board Indoor Wall Subtation Room 200
12 ED - 5310 Distribution Board Outdoor Wall Subtation Room 200
DIMENSION (mm) WEIGHT
STATUS REMARK
W H (Kg)
300 1000 Estimasi
300 1000 Estimasi
780 1320 1075 Estimasi Trafo 200Kva
4000 2000 2500 Estimasi PO Arbas
750 2050 1540 Estimasi PO Comeca
750 2050 350 Estimasi
600 2267 200 Estimasi PO Arbas
1900 800 1630 Fix PO Gutor
1900 800 1095 Fix PO Gutor
800 2100 200 Estimasi
400 800 50 Estimasi
400 800 50 Estimasi