National Electric Power Regulatory Authority
Islamic Republic of Pakistan
NEPRA Tower, Attaturk Avenue (East) G-5/1, Islamabad
Phone: 9206500, Fax: 2600026
REGISTRAR Website: www.nepra.orq.pk, Email: infonepra.orq. pk
No. NEPRA/RINMC-3677/ r June 06, 2024
Mr. Tahir Sultan Khan
A-82, Lala Rukh,
Wah Cantt.
Contact No. 0311-40155955
Subject: Distributed Generation Concurrence No. NMC/3677/2024
Concurrence Application No. NMC-3677
Mr. Tahir Sultan Khan, IESCO
Reference: JESCO 's Application No. 5248-52 dated 03.06.2024 (received on 06.06.2024).
Enclosed please find herewith Distributed Generation Concurrence No.
NMC/3677/2024 granted by the National Electric Power Regulatory Authority to Mr. Tahir
Sultan Khan for 66.700 kW photo voltaic solar based distributed generation facility to be set up
at A-82, Lala Rukh, Wah Cantt, pursuant to NEPRA (Alternative & Renewable Energy)
Distributed Generation and Net Metering Regulations, 2015.
2. Please quote above mentioned Distributed Generation Concurrence No. for future
correspondence.
Enclosure: Distributed Generation Concurrence
(NMC/367712024)
(Engr. Mazhar Iqbal Ranjha)
Copy to:
1. Managing Director, Private Power Infrastructure Board (PPIB), Ground & 2 Floor,
Emigration Tower, Sector GIS-1, Islamabad.
2. Chief Executive Officer, Islamabad Electric Supply Company Limited, IESCO Head
Office, Street 40, Sector G-7/4, Islamabad
3. Director General, Pakistan Environmental Protection Agency, Plot No. 41, Street
No. 6, H-8/2, Islamabad
National Electric Power Requlatory Authority
(NEPRA)
Islamabad—Pakistan
DISTRIBUTED GENERATION CONCURRENCE
No. NMC/3677/2024
The Authority in terms of Section 14B (5) of the Regulation of Generation,
Transmission and Distribution of Electric Power Act (XL of 1997) (the "Act'), hereby grants
Concurrence for the Distributed Generation facility to be set up in the name of Mr. Tahir
Sultan Khan having consumer Reference Number 28 14216 2815301 U atA-82 Lala
Rukh Wah Cantt.
2. The beneficiary shall abide by the provisions under the Act and NEPRA
(Alternative & Renewable Energy) Distributed Generation and Net Metering Regulations,
2015, as amended from time to time.
3. The technical parameters of the Net Metering arrangements are as under:-
(i). Source of Generation Solar Energy
(U). Size of Distributed Generation Facility 66.700 KW
Inverter Information
(Hi). Manufacture INVEREX
Model No. INTROX 75}
(iv). Vendor/Installer CAPITAL SOLAR
(v). Generation Type PV SOLAR
4. This Concurrence is issued for a period of seven (07) years and will expire on
day of 2031 and may be renewed as stipulated under the Act or
the relevant Regulations framed thereafter.
C
5. This Concurrence is given under my hand on _____ day of Two
Thousand & Twenty Four.