ITR Project (Web Desinging)
ITR Project (Web Desinging)
DEPARTMENT OF COMPUTER
ENGINEERING
Implant Training on
Computer Engineering
To,
M.S.B.T.E. MUMBAI
By
CERTIFICATE
This is to certify that, Aditya Vijay Mali has successfully completed the
Implant Training work entitled “Web Development & JSP Servlet” under my
supervision, in the partial fulfillment of the requirements for the Diploma in
Computer Engineering, and the report submitted to M.S.B.T.E. MUMBAI for an
academic year 2021-2022.
Date:
Place: S.I.T. Polytechnic, Yadav.
Course Outcomes:
Internship Certificate
I here by certify that Mr. Aditya Vijay Mali joined from 01-AUG-2021 to our company for an
internship program between SparkLab IT Solutions PVT.LTD.
A student of Sharad Institute Of Technology Polytechnic, Yadrav . He has successfully completed
his Academic Internship from 01-AUG-2021 to date 15-SEP-2021 at SparkLab IT Solutions PVT.LTD.
Under the careful guidance of Mr. Prashant S Rajaram.(Director & Technical Head).
During his internship period with SparkLab IT Solutions PVT.LTD we appreciate his dedication &
enthusiasm shown in his work and his performance has been assessed as excellent.
“We wish all best to him for his future endeavors”.
Sincerely,
Evaluation Sheet for ESE of Industrial Training by Mentor and Industry Personnel
Name of Industry:-
Signature- Signature-
SR.NO CONTENT
1 Structure to Industry
2 Introduction to Industry
3 Software Planning Process Model
4 Software Testing Process
5 Safety Procedures
6 Particulars of Practical Experiences
7 Description about project
Chapter No 1-Structure to Industry
Industry Layout:
Training Development
(Head: Rohit Pote) (Head: Prashant Rajaram)
About Industry:
Name of Industry:
Industry Introduction:
Applications:
1) SevaSuvidha Application
2) Online SGM Canteen
3) SGM MR System
4) Online Grocery Shopping
5) Vakratund Event Management
Websites:
1) www.sparklabitsolutions.co.in
Some services provided by company:
2) Web Development
3) Mobile Development
4) Data Science
5) Cloud Computing
6) Java Technology
7) Database Programming
8) .Net Technology
9) Big Data Analytics
No of Employees:
1) Desktop Computers:
2) Laptops:
3.60GHzRAM- 8.00GB
3) Server:
XAMPP Server
4) Printer:
5) Access Point:
Software testing:
Software testing is a set of processes aimed at investigating, evaluating and
ascertaining the completeness and quality of computer software. Software testing
ensures the compliance of a software product in relation with regulatory, business,
technical, functional and user requirements.
Agile testing:
Agile software testing generally starts from when the first module or
component of software is available for review. The results from each
phase/component are shared with the development team, who collaboratively
works on the tests' feedback. The team then prioritizes and eliminates the bugs and
errors. The process is repeated until the software is completely developed and is
testing has shown the software to be free from bugs.
Functional testing
Exploratory testing
Unit testing
Performance load testing
Chapter No 6- Safety Procedures
In the industrial training, we got the skills, which will, help us for our
future life and our professional career also.
Soft Skills:
Communication, Presentation, etc.
Life Skills:
In the time of training we develop our skills like time management, team
building. With the help of this skills we are developing our project task in the
given time, audit’s also helps us for working in team, in this period we are able
to complete our work in given time and understand the opinions of our team
members. Also, we are able to keep our data safefrom the hackers. It’s really a
great achievement for us to working in the group, understanding the ideas of
each other and completing the work in the defined amount of time and keep our
data safe and secure from the stakeholders and hackers.
Hands-On:
In the training we are not just studies the theoretical concepts, also learnt
form it practically by our own way, it helps us for developing our ideas and our
mentality about programming and developing, in this day we are able to remove
the errors occurs in the program and the problems occurred in the time of
developing. Our practical knowledge is increased in that days.
In this training we also experienced the study of industry, its history and
its software developing methods using various programming languages, its
turnover and how teamwork is carried out. In short, we experienced the
completely industrial environment.
Chapter No 8-Description about project
Title:
Online event management system
About Project:
Problems Statement –
In any event many service providers work simultaneously and it is very
hard to manage these providers. It is also important for event organizer that
he has all the contacts details of these service providers so that he can
contact them any time to plan an event at given time. In present system
Event Company has to do all management work manually. They keep all
payment information on papers. There is no system to check the past
expenses on any event. To do this they have to check payment register and
this task is very time consuming and tiresome.
Project Overview-
Event management is the application of project management to the
Creation and Development of large-scale events such as festivals,
Wedding ceremonies, formal parties People that are need to find or book
online event halls and or willing to see the packages and timing slots
online about halls. They will able to get all this information through this
system. To get success in the event management business, user should have
strong network contacts of service provider. These contacts are essentially
providers of specific services who can be mobilized quickly to participate
in any given event. To make an event successful event Manager needs
different service provider like Sound systems services, Lighting providers,
Canteen services, stage construction and so on.
Aim of the project:
In first week of training revised of some basic concepts of C, C++, Java. Initially
we know about HTML language. Then industrial supervisor gave us basic
information of CSS and bootstrap language. While implementing a simple project
we got experience of how to use CSS code in website. In addition, learn about how
to secure our website using validation process; also, we get how to do process wise
implementation of the modules in project.
We studied about the testing and quality assurance processes. Then we practically
implemented validation concept in our modules of project using Sessions, JS and
so on. In addition, we came across some errors while implementing this validation
concept, but we resolve them under the guidance of the project guide. Then we
acknowledged the practical as well as a special experience in testing field by
testing all modules of our project and implementing validation concept.
While developing a project we got various errors and we handle that exceptions,
but sir give preference to solve errors by student so we try to solve errors with our
logic. And that was very helpful for increasing our self confidence