Form Commissioning
Form Commissioning
2. In the cabin
2.1 Radio communication (Two way)
2.2 Seat condition manufacturers standard
2.3 Seat belt installed properly in good working order
ROPS manufactures/international standard (not
2.4
applicable for excavators)
2.5 FOPS manufactures/international standard
2.6 Fire extinguishers fully charged and mounted properly.
2.7 Fire Suppression – Charged and Operational
2.8 Air Conditioner – Operational
2.9 All electrical gauges working
2.10 Horn – Operation
2.11 Fully enclosed canopy for Coal Mining
2.12 Fatigue warning for haul trucks – if applicable
2.13 Front wiper & windshield washer - Operation
2.14 Safety Pin lock/cable for dump body (for Haul truck only)
2.15 First Aid Kit
2.16 Cab Door Locks & Window Functional
2.17 Noise test < 85 dB in the cabin, if > 85 dB
3. Mechanical/Electrical
3.1 All work lamps (head, tail, brake, reverse)
3.2 Reversing alarm/movement alarm
Tyres & Rims/Mounting hardware in good condition and
3.3
secure..
PT SURYA GLOBAL MAKMUR
Commissioning – Heavy Equipment
Comments :
B. COMMISSIONING TEAM :
No Temuan Rekomendasi
1
2
3
4
PT SURYA GLOBAL MAKMUR
Commissioning – Heavy Equipment
Pihak Kontraktor
D. DATA MACHINE
Note: Inspection to consider, but not be limited to, the items listed in the checklist.
Record issues identified onto the non-conformance for
PT SURYA GLOBAL MAKMUR
Commissioning – Dump Truck
BASIC ENGINE
B.
1 Engine Guard (Hood)
2 Turbocharger
3 Air Compressor
4 Crankcase Guard
5 Precleaner
6 Air Cleaner Assembly
7 Inlet Manifold and Piping
8 Exhaust Manifold
9 After Cooler
10 Oil Lines
11 Oil Level
C. FUEL SYSTEM
12 Fuel Injection Pump
13 Fuel Injection Nozzles
14 Fuel Injection Housing and Governor
D. COOLING SYSTEM
15 Radiator and Fan Guard
16 Fan Assembly
17 V- belt Condition
18 Water Pump
19 Oil Cooler
PT SURYA GLOBAL MAKMUR
Commissioning – Dump Truck
E. ELECTRICAL SYSTEM
20 Alternator
21 Battery and Cable
22 Electric Starting Motor
23 Engine Harness Condition
24 Power Train Harness Condition
25 Lights and Back Up Alarm ( general )
F. STEERING SYSTEM
26 Steering Wheel and Shaft Condition
27 Steering Linkages (Turn wheel L&R to test )
28 Steering Lines
29 Steering Pump
30 Breathers
31 Oil Level
32 Cycle Time Left to Right
G. DRIVE TRAIN
33 Retarder
34 Power shift Transmission
35 Transmission Oil Pump
36 Oil Lines
37 Transmission Oil Level
38 Final Drive
39 Final Drive Oil Level
40 Drive Shaft ( Universal Joint Movement )
41 Differential Oil Level
42 Differential Breathers
H. HYDRAULIC SYSTEM
43 Oil Lines
44 Hoist Cylinder (S) Leaking or Scratch
45 Hoist Cylinder Bearing/Bushing Condition
46 Hydraulic Pump
47 Breathers
48 Oil Level
49 Power Take Off Unit
50 Universal Joint Condition
51 Cycle Time Raise & Lower Body
I. BREAKING SYSTEM
52 Parking Brake Test
PT SURYA GLOBAL MAKMUR
Commissioning – Dump Truck
K. SUSPENSION
L. TYRE
M. GREASE SYSTEM
N. OPERATORS STATION
64 Seat Condition
Comments :
No Temuan Rekomendasi
1
2
3
4
COMMISSIONING TEAM:
Pihak Kontraktor
BASIC ENGINE
B.
1 Engine Guard (Hood)
2 Turbocharger
3 Air Compressor
4 Crankcase Guard
5 Precleaner
6 Air Cleaner Assembly
7 Inlet Manifold and Piping
8 Exhaust Manifold
9 After Cooler
10 Oil Lines
11 Oil Level
C. FUEL SYSTEM
12 Fuel Injection Pump
13 Fuel Injection Nozzles
14 Fuel Injection Housing and Governor
D. COOLING SYSTEM
15 Radiator and Fan Guard
16 Fan Assembly
17 V- belt Condition
18 Water Pump
19 Oil Cooler
PT SURYA GLOBAL MAKMUR
Commissioning – Bus
E. ELECTRICAL SYSTEM
20 Alternator
21 Battery and Cable
22 Electric Starting Motor
23 Engine Harness Condition
24 Power Train Harness Condition
25 Lights and Back Up Alarm ( general )
F. STEERING SYSTEM
26 Steering Wheel and Shaft Condition
27 Steering Linkages (Turn wheel L&R to test )
28 Steering Lines
29 Steering Pump
30 Breathers
31 Oil Level
32 Cycle Time Left to Right
G. DRIVE TRAIN
33 Retarder
34 Power shift Transmission
35 Transmission Oil Pump
36 Oil Lines
37 Transmission Oil Level
38 Final Drive
39 Final Drive Oil Level
40 Drive Shaft ( Universal Joint Movement )
41 Differential Oil Level
42 Differential Breathers
H. HYDRAULIC SYSTEM
43 Oil Lines
44 Hoist Cylinder (S) Leaking or Scratch
45 Hoist Cylinder Bearing/Bushing Condition
46 Hydraulic Pump
47 Breathers
48 Oil Level
49 Power Take Off Unit
50 Universal Joint Condition
51 Cycle Time Raise & Lower Body
I. BREAKING SYSTEM
52 Parking Brake Test
PT SURYA GLOBAL MAKMUR
Commissioning – Bus
K. SUSPENSION
L. TYRE
M. GREASE SYSTEM
N. OPERATORS STATION
64 Seat Condition
Comments :
No Temuan Rekomendasi
1
2
3
4
COMMISSIONING TEAM:
Pihak Kontraktor
MACHINE INFORMATION
MACHINE DETAIL
Machine Type :
Machine Model :
Machine SN :
Machine Arr :
Engine Model :
Engine SN :
Engine Arr. No :
Date of Commissioning :
PT SURYA GLOBAL MAKMUR
Commissioning – Support Equipment
2. Mechanical Inspection
Oil and Fuel Leaks/Levels (Kebocoran Oli dan Bahan
2.1
Bakar)
Belt Condition and Tension (Kondisi belt dan
2.2
ketegangannya)
2.3 Linkages and Mountings (Sambungan dan Dudukan)
2.4 All Retaining Bolts (Baut-baut pengencang)
2.5 Fuel Hose Condition (Kondisi Hose Bahan Bakar)
Radiator Hose Condition and Clamps Tighteness
2.6
(Kondisi Hose Radiator dan Kekencangan Clamps)
2.7 Cooling System Condition (Kondisi Cooling System)
2.8 Air Induction System (Sistem Pemasukkan Udara)
2.9 Exhaust System (Sistem Pembuangan Gas)
Hydraulic Oil Leaks (Kebocoran Oli Hydraulic – Lighting
2.10
Plant only)
Tower Cylinder Condition (Kondisi Silinder Tower –
2.11
Lighting Plant only
Linkages, Hoses & Clamps (Sambungan2, Hose dan
2.12
Lamp) – Lighting Plant only
Mounting & Bolts of Pump & Tank (Baut dan Dudukan
2.13
pada Pompa dan Tangki) – Lighting Plant only
Lift Cylinder – Tele Cylinder – Tilt Cylinder (Lighting Plant
2.14
only)
PT SURYA GLOBAL MAKMUR
Commissioning – Support Equipment
3. Electrical Inspection
3.1 Key Switch (Kunci Kontak)
3.2 Switches (Sakelar)
Safety Earth Leakage (Sambungan Peredam tegangan
3.3
tinggi – Ground Cable) – Lighting Plant and Genset only
3.4 Panel Lamp (Lampu Panel)
3.5 Tachnometer (Pengukur Putaran Mesin)
Engine Coolant Temperature Gauge (Pengukur Suhu
3.6
Kerja Mesin)
3.7 Indicator Lamps (Lampu-lampu Peringatan)
3.8 Cable Harness & Terminal (Kabel Harness & Terminal)
3.9 Fuses & Circuit Breaker (Sekering & Pemutus Arus)
Generator, Bolt and Mounting (Generator, Baut serta
3.10
Dudukannya)
Lamps, Mountings & Bolts lamp Bracket (Lampu,
3.11
Dudukan serta baut pengencang lampu)
3.12 Alternator & Belts (Alternator dan Belt nya)
Battery & Electrolyte Level (Battere dan Level Air
3.13
Battere)
Starting Motor Condition & Operation (Kinerja dan
3.14
Kondisi Motor Starter)
4. Operational Testing
Running Engine and Check Unusual Noise (Nyalakan
4.1
Mesin dan Periksa Suara-suara yang tidak biasa)
Make Sure All Lamps is Function when Engine is running
4.2 (Pastikan semua lampu berfungsi pada saat Mesin
menyala)
Comments :
No Temuan Rekomendasi
1
2
3
4
PT SURYA GLOBAL MAKMUR
Commissioning – Support Equipment
COMMISSIONING TEAM:
Pihak Kontraktor
BASIC ENGINE
B.
1 Engine Guard (Hood)
2 Turbocharger
3 Air Compressor
4 Crankcase Guard
5 Precleaner
6 Air Cleaner Assembly
7 Inlet Manifold and Piping
8 Exhaust Manifold
9 After Cooler
10 Oil Lines
11 Oil Level
C. FUEL SYSTEM
12 Fuel Injection Pump
13 Fuel Injection Nozzles
14 Fuel Injection Housing and Governor
D. COOLING SYSTEM
15 Radiator and Fan Guard
16 Fan Assembly
17 V- belt Condition
18 Water Pump
19 Oil Cooler
PT. SURYA GLOBAL MAKMUR
RAYA
Commissioning – LV
E. ELECTRICAL SYSTEM
20 Alternator
21 Battery and Cable
22 Electric Starting Motor
23 Engine Harness Condition
24 Power Train Harness Condition
25 Lights and Back Up Alarm ( general )
F. STEERING SYSTEM
26 Steering Wheel and Shaft Condition
27 Steering Linkages (Turn wheel L&R to test )
28 Steering Lines
29 Steering Pump
30 Breathers
31 Oil Level
32 Cycle Time Left to Right
G. DRIVE TRAIN
33 Retarder
34 Power shift Transmission
35 Transmission Oil Pump
36 Oil Lines
37 Transmission Oil Level
38 Final Drive
39 Final Drive Oil Level
40 Drive Shaft ( Universal Joint Movement )
41 Differential Oil Level
42 Differential Breathers
H. HYDRAULIC SYSTEM
43 Oil Lines
44 Hoist Cylinder (S) Leaking or Scratch
45 Hoist Cylinder Bearing/Bushing Condition
46 Hydraulic Pump
47 Breathers
48 Oil Level
49 Power Take Off Unit
50 Universal Joint Condition
51 Cycle Time Raise & Lower Body
I. BREAKING SYSTEM
52 Parking Brake Test
PT. SURYA GLOBAL MAKMUR
RAYA
Commissioning – LV
K. SUSPENSION
L. TYRE
M. GREASE SYSTEM
N. OPERATORS STATION
64 Seat Condition
Comments :
PIHAK KONTRAKTOR :