0% found this document useful (0 votes)
82 views1 page

Attendance Sheet For Progress Meetings

Uploaded by

adilazam608
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
82 views1 page

Attendance Sheet For Progress Meetings

Uploaded by

adilazam608
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 1

Project: G+P+6 Residential Building On Plot No.

JVC14NEW003 - Al Barsha South Fourth, JVC, Dubai UAE


Attendance Sheet for Weekly Progress Meeting Dated 08 August 2024

S.No. Name Designation Represented Signature

1 Mr. Mustafa Project Manager Samana Group

2 Mr. Jawid Project Manager Samana Group

3 Mr. Nayyar Projects Manager Arec Engineering Consultant

4 Mr Khaled Resident Engineer Arec Engineering Consultant

5 Mr Hussain MEP Arec Engineering Consultant

6 Mr. Anumul MEP Arec Engineering Consultant

7 Mr. Hasan Makia Managing Partner Reliant Contracting L.L.C

8 Mr. Sameer Project Manager Reliant Contracting L.L.C

9 Mr. Ruben MEP Coordinator Reliant Contracting L.L.C

10 Mr. Adil Planning Engineer Reliant Contracting L.L.C

11 Mr. Shafi M.D AK Building Contracting L.L.C

12 Mr. Muhammad Waqas Project Engineer AK Building Contracting L.L.C

13 Mr. Sarfraz Ahmed Project Manager AK Building Contracting L.L.C

14 Mr. Syed Ahmed MEP Engineer Hydrotech Engineering

15 MEP Engineer Hydrotech Engineering

16 Anirudh Sharma Sales Engineer Schindler Elevator

17 Satheesh Development Manager Al Khalidiya Group

18 Arjun Site Enginer Al Khalidiya Group

19 Mohd Saffo Project Manager Jumeirah False Ceiling

20 Site Enginer Lifco Kitchen Cabinets

21 Site Enginer Alia wood

22 Manager Paintwell

23 AEGAN Plunge Pool

24 GRC

25 Ostermier Garbage Chute

You might also like