FR Par10 X ZZ Bwe SD M 55008
FR Par10 X ZZ Bwe SD M 55008
Valve
FT
BP Binder Point Energy Flow Meter
VACCUUM
FUTURE CONNECTION VALVE DETAIL
DEGASSER (DETAIL G)
FIL
PAR10_R1_310_VD01 Strainer Motor with Variable
VSD
(Water Filter) Speed Drive
PT PT FC
NRV Flexible EXPJ Expansion Joint
Connection
AV
Automatic Vent
L5
Note 1
Static expansion vessel to be normally closed during normal LCGM
operation. Vessel to be opened only when LCGM is isolated from ring
main and not connected to live system.
Note 2
Now Future
125Ø
L3 VALV
Spool
Piece
M
750
VALV
CHW - Ø100 mm CHW - Ø100 mm CHW - Ø100 mm
CHW - Ø125 mm Ring
Flowrate - 5.66 l/s Flowrate - 5.66 l/s Flowrate - 5.66 l/s
BP BP BP BP
125Ø
VALV VALV VALV VALV VALV VALV VALV VALV District
Heating
VALV VALV VALV VALV VALV VALV VALV VALV PHE
BP BP BP BP
VALV VALV VALV VALV VALV VALV
REFER TO DETAIL G PT PT
DC DC DC DC DC DC Note 3
CHW - Ø150 mm
VALV VALV The tag numbers shown are non-specific to a single LCGM and the
BP BP BP BP BP BP Normal Flowrate - 16.93 l/s
Customer CDU Connection Customer CDU Connection Customer CDU Connection 'XXX' will be for different room and will therefore require different LCGM
Max. Flowrate - 33.86 l/s
Customer CDU Connection Point No. 2 c/w Temperature Point No. 3 c/w Temperature Point No. 4 c/w Temperature numbers too. See layout drawing FR-PAR10-1-R1-BWE-LA-M-55001
Point No. 1 c/w Temperature and Pressure Sensors and Pressure Sensors and Pressure Sensors for all unique equipment tag numbers.
CHW - Ø150 mm and Pressure Sensors on flow and return. on flow and return. on flow and return.
PT
PT
PT
PT
PT
PT
Normal Flowrate - 16.93 l/s BP BP on flow and return. Note 4
Max. Flowrate - 33.86 l/s
(Refer to Note 6) (Refer to Note 6) (Refer to Note 6) Please note there are 4 connection points per water type on each
REFER TO
single dry cooler. Each dry cooler has 2xDN80 connections.This
DETAIL G
REFER TO DETAIL G means the flow to each dry cooler has 4xDN80 connections and
Flow Control Valve
Temporary works by Aggreko Flow Control Valve Flow Control Valve return flow has 4xDN80 connections.
01
01
01
01
01
01
TI
TI
VALV
TI
TI
TI
TI
COMMISSIONING LOADS (PROVIDED BY MERCURY) (PROVIDED BY MERCURY)
(PROVIDED BY MERCURY) Butterfly Valve Butterfly Valve Butterfly Valve VALV
VALV VALV ELEC - BOILER 20%EG ELEC - BOILER 20%EG Note 5
SYSTEM PRESSURE DROPS @ 100% LOAD 5.66l/s 5.66l/s Customer CDU Connection VALV
Customer CDU Connection Point No. 5 c/w Temperature Contractor to allow for providing temporary bunding arrangement
FLOW RATE (L/S) PRESSURE DROP (KPa) 44°C 44°C
VALV Point No. 12 c/w Temperature 266.67kW 266.67kW and Pressure Sensors below the temporary works required as part of commissioning.
VALV CONNECTION POINT NO. 2 (266.67kW BLR) 5.66 120 on flow and return. VALV
and Pressure Sensors
CHW - Ø100 mm on flow and return. CONNECTION POINT NO. 3 (266.67kW BLR) 5.66 120 VALV Note 6
DRAIN
DRAIN
DRAIN
DRAIN
P03
(Typical) VALV VALV CONNECTION POINT NO. 4 (266.67kW BLR) 5.66 120 VALV PIC valve to be provided for temporary/commissioning works.
EXPANSION VESSEL EXPANSION VESSEL
DC DC
Automatic controls specialist to arrange temporary controls signal to
CONNECTION POINT NO. 7 (266.67kW BLR) 5.66 120 VALV allow for adjustment during commissioning. Valve to be removed
VALV
CONNECTION POINT NO. 8 (266.67kW BLR) 5.66 120 VALV following commissioning.
CONNECTION POINT NO. 9 (266.67kW BLR) 5.66 120 DRAIN DRAIN
VALV
TOTAL (1600kW)
VALV VALV
BP BP PIPEWORK PRESSURE DROPS @ 100% LOAD
20%EG ELEC - BOILER
LENGTH (m) PRESSURE DROP (KPa) 5.66l/s
44°C PAR10
PERMANENT TBC TBC
266.67kW CHW - Ø125 mm Ring
TEMPORARY HOSE TBC TBC
ASSUMPTIONS: DRAIN
DRAIN
CHW - Ø125 mm Ring 6KPA PRESSURE DROP ALLOWANCE THROUGH ELECTRIC BOILERS. FINAL
P03
EXPANSION VESSEL
PRESSURE DROP TO BE CONFIRMED BY SUPPLIER/CONTRACTOR.
COOLING LOAD DISTRIBUTION
(FINAL ARRANGEMENT TBC WITH CLIENT - HYDRAULIC MODEL PROVISION )
DRAIN PT
SYSTEM PRESSURE DROPS @ 100% LOAD
FLOW RATE (L/S) PRESSURE DROP (KPa) KEY PLAN
PT
CONNECTION POINT NO. 3 (300kW CDU) 6.36 120
Rev Date Details By / App
CONNECTION POINT NO. 4 (375kW CDU) 7.92 120
CONNECTION POINT NO. 7 (375kW CDU) PT
7.92 120
CONNECTION POINT NO. 8 (300kW CDU) 6.36 120
PT
CONNECTION POINT NO. 9 (250kW CDU) 5.3 120
TOTAL (1600kW)
Customer CDU Connection EXPANSION VESSEL EXPANSION VESSEL EXPANSION VESSEL Customer CDU Connection VALV
VALV Point No. 11 c/w Temperature Point No. 6 c/w Temperature
VALV Flow Control Valve and Pressure Sensors
and Pressure Sensors
(PROVIDED BY MERCURY) on flow and return. VALV
on flow and return.
DRAIN DRAIN DRAIN
VALV VALV Butterfly Valve Butterfly Valve Butterfly Valve VALV Mercury House, Sandyford Ind. Estate, Dublin 18, Ireland
VALV E: [email protected] | T: +353 1 2163000 | www.mercuryeng.com
Flow Control Valve Flow Control Valve
01
01
01
01
01
01
TI
TI
TI
TI
TI
PT
PT
PT
PT
PT
Point No. 10 c/w Temperature Customer CDU Connection Customer CDU Connection Customer CDU Connection Suite 1, West Wing, Verdant,
and Pressure Sensors Point No. 9 c/w Temperature Point No. 8 c/w Temperature Point No. 7 c/w Temperature 2 Redheughs Rigg, South Gyle,
and Pressure Sensors and Pressure Sensors and Pressure Sensors Edinburgh EH12 9DQ
on flow and return. United Kingdom
on flow and return. on flow and return. on flow and return. BP BP
REFER TO DETAIL G VALV VALV BP BP BP BP BP BP
e: [email protected]
P03 DC DC DC DC DC DC
PT PT
VALV VALV VALV VALV VALV VALV Client:
BP BP BP BP INTERXION
VALV VALV VALV VALV VALV VALV VALV VALV
Project:
JR JB RL
Scale: Date:
NTS @ A0 05/10/2023
Project No. Drawing No. Revision: Status:
P20165 FR-PAR10-X-ZZ-BWE-SD-M-55008 P03 S4
Country - Project - Phase - Level - Originator - Type - Discipline - Number