1. What Is CASE tool?
LAT e use of sotware tools ©
automate software development
(2) The use of software tools to
ipport testing activities
eines ticotnes ols
support design. vis
(4) The use of software tools to
‘support progress tracking
2. What Is the main problem with
requirement analysis in. business
applications?
(2) The tools avaliable are not
advanced enough
(2) The human-computer
Interaction isnot well-defined
27 The requirements are, too
complex to understand
(4) The system size Is too small to
require advanced tools,
How does ‘tool. usage. vary. with
problem size?
(1) It decreases as problem size
increases
(2) Tt remains the samé! for all
roblem sizes
er increases as problem. size
increases
(4) It depends on the type of
problem being solved
The Xplor Alu
The longer a fault exists In software
(1) The more tedious its removal
becomes
(2) The more costly itis to detect
and correct
(3) The less likely itis to be properly
gon
2G) All of the mentioned
Pets eigen vavn
software testing?
(1) Verified Version
See
alle See Vindac
(4) Version Verification
pve er
BEEP etnessiources innkia
Sern
(1) Unit testing
. !) Integration testing
(3)' Acceptance testing
(4) Regression testing7. What are the characteristics of
software?
(1) Software is developed
or engineered; it is) not
manufactured in, the classical
sense
(2) Software doesn't "wear out".
(3). Software can be custom built or
custom build
8. Compilers, Editors software ‘come
under which type of software?
ti system software.
(2)> Application software
(3) Scientific software
(4) None of the above
9. Software is defined:as
(1) Instructions
(2) Data structures
(3) Documents.
al of the above
24123451B\2024 14]
40, Youare working asa project manager.
first step in project planning?
(3) Select the team
(4) None of the above
11, What jis the simplest model of
(1) Spiral model
(2). Big Bang model
(3) Vspedel
a model
12. Which one of the following models is
not suitable for accommodating any
change?
(1) Build & Fix model
*" 2)’ Prototyping medel
(3) R jodel
‘) Waterfall modelcay queda
(2) Coding
Faioripsnre naman
ean prsanaeoee_
14, SDLC stands for
HAT Gena cevespment se | RSE
\ CASE Tools
cycle
(2) System Development Life Cycle
(3) Software Design Life Cycle
(4) System Design Life’Cylce
45, What is the major advantage of
using incremental model?
(1) Customer can respond to each
increment c
(2) Easier to test'and’debus)
(3) It is used when there is @ need
to get a product to the market
eas
+H) Both (1) &(3)
24\2345\B12024
iGOOZ7s
‘TheXplorerAtul
16, ‘The spiral
model was originally
proposed by
(3) Pressman
(4) Royce’
17. The tools that support different
stages of software development life
(2) CAME Tools
(3) CAQE Tools
pict (4) CARE Tools:
48, Find out which phase is not available
In SDLC?
(4) Coding
(2) Testing
(3) Maintenance
8 ‘Abstraction’
19, First level of prototype is evaluated
bya i
(ay Developer
(2) Testing
(3) User
\ Lear System Analyst
151 PTO.20. For the best software model sultable
for the project, in which of the phase
the developers decide a roadmap for
project plan?
(4) Software Design
1-0 System Analysis
(3) Coding,
(4) Testing
21. Where is the prototyping model of
software development well suited?
(1) When requirements) are well
defined
(2) For projects - with: . large
i development teams» 59)
hen a customer cannot define
requirements clearly
(4) None of the above
22. Which of the following is:not defined
in a good software; Regu irement
=15 \Specification,(SRS):document?
(1) Functional Requirement
(2) Non Function Requirement
(3) Goals of implementation
Rigor for |, software
implementation. _
423451812024
23, Requirement engineering process
26
includes which of these steps?
(1) Feasibility study
(2). Requirement Gathering
(3) Software Requirement
specification & Validatioft
Em mentioned above ?
24. Software Requirement Specification
(SRS) Is also known as specification
of
(2) White box testing ’
(2yvAcceptance testing
(3), mi
2423451812024
12)
19, The term Parallel Run refers to
59:
(4) Processing of two different Jobs
pinnie peepee
existing system and a new
system
The same job run on two
different computers to test their
@
speeds
All of these
advantage of using. prewritten
ay
60, The
software packages is
(1) Eliminates writing program
(2) Eliminates program testing
(2)" Saves time and cost
1 LZATAI of these 8 Hee
611) Apperson who writes a programme for
running the hardware of a computer
Is called
) “Programmer
(2). Data processor
(3) System analyst
(4) System designer
62. Software that can control access and
usé’@ compitter system is
(1) Fault tolerant-
(2):-Facttity, controls 5
(3) Software piracy
(4 System security monitor
63,
65.
vu
66.
24=]
=
ig
x
sz
a
a tte or access to and from other
networks by 2 company's networked
commis ore
: oo ace
(2) Audit trade
| (4) Controls for énd user computing
64? Design pastes followed by
(2) Testing
(3) Maintenance
(4) - None of the above
65. Software evolution does not
‘comprise:
(1) Development activities
: oer wth cent
(3) Maintenance activities
(4). Re-engineering activities
66. A system analyst does not need to
consider
(2) Technical feasibility
(2). Economics feasibility
(3). Operational feasibility
eae of these
24\2345\8\2024
113)
67., A feastbty study
(1) Considers a single solution
\@r cludes a statement of the
problem
(3) «Both (1) and (2)
(4) None of these
che core ee edn
and the bottom-up approach may be
referred to as an
(1) Interactive approach
\L2rtitearatve approach
fa )
(4) None of these.
ee
software to the system manager
developed, will look like and get |
(4)" All of these
PTO.70. Which of the following Is not a
factor in the failure of the system
development projects?
(2) Size of the company
(2) Fallure of systems integration
(3) Inadequate user involvement
71. ‘The feasibilities studiesin preliminary
Investigation is (are)
(2)_Technical feasibility
(2) Economic feasibility
(3) Operational feasibility
CT A ofthese +
72. To which phase of SDLC, is file
conversion related?
(1) System design eg
(2)* System analysis
(3) System development
Ver Stem implementation
2zaniai2024
141
role of
7. What Is the software
development tools. M—the
development process?
(ay To automate the software
development process
(2) To support a single activity
(3) support the complete
development process
(4) To reduce the demand for
software personnel
74. How can automation help to address
the shortage of software personnel?
{27 By reducing the demand for
personnel ns
(2) By
development productivity
increasing _software
(3)" By decreasing the availability of
manpower
(4) By improving the quality of
software being developed
75. Which of the following is an example
of software tool used for testing?
(1) UML diagram software
(2)- Compilers
(3) Linkers
Test driyer
wey