0% found this document useful (0 votes)
241 views9 pages

Concrete Rate 30.8.2022

Uploaded by

kotipallisivaji3
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
241 views9 pages

Concrete Rate 30.8.2022

Uploaded by

kotipallisivaji3
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 9

Comparision Concrete Rates

Provisionl
As per PMC AS per AS per MGS/EN/
approved Rates AS per L&T ROB 72B
productivity 3.09 IRUSSOR IRUSSOR ROB GAQ-RFO &
36A i.e Submission 0.75 Chaundauli WDFC CTP-3
Cum per mandays 5.49cum LC43 Khatoli- 302 Ref.Rate 301 Ref.Rate Balance-SEB-
productivity Cum Productivity Majhawar R
based on the case Productivity Mujjaffarnagar MGS/288
0.61 per Man Days dt.10.08.2020
study per Man Days dt.23.11.2020 dt.02.01.2019
Cum/Mandays
Item No. Ref. Description

Rate including Rate including Rate Rate Rate


Rate including Rate including Rate including Rate including Rate including
Cement & Cement & including including including
Unit Cement & Shuttering Cement & Cement & Cement & Cement &
Shuttering Shuttering Cement & Cement & Cement &
INR Shuttering Shuttering Shuttering Shuttering
INR INR Shuttering Shuttering Shuttering

Foundation/Pile Cap

022040 USSOR M25 Rs/Cum 7136 6934 5543 5450 5410 6748 8590
022040 USSOR M30 Rs/Cum 7200 6999 5607 5514 5492 6748 7051 8650
022040 USSOR M35 Rs/Cum 7267 7066 5674 5581 5573 6219 5252 7734 8711
022040 USSOR M35 Piling Rs/Cum 7515 6977 5548 5492 5809 6133 8954
Sub Structure
Providing and laying in position machine
batched, machine mixed and machine
vibrated Design Mix Cement Concrete of
specified grade (Cast in-Situ) using 20mm
graded crushed stone aggregate and
coarse sand of approved quality for the
following Reinforced cement concrete
structural elements up to height of 10 m
from foundation top level, including
finishing, using Admixtures in approved
022050 USSOR proportions (as per IS:9103), to modify
workability & other properties without
impairing strength and durability
complete as per specifications and
direction of the Engineer in charge.
Payment for cement, reinforcement,
shuttering shall be paid extra.

022051/
022052 USSOR Abutment & Pier/ Wing wall and Return wall
M25 Rs/Cum 10152 9931 8629 8298 6874 8079 8590
M30 Rs/Cum 10218 9997 8694 8363 6955 8161 7494 7630 8650
M35 Rs/Cum 10286 10064 8762 8430 7036 7936 5589 8711
Abutment cap, Pier Cap, Inspection
022053 USSOR Platform & Pedestal over Pier cap,
Fender wall, Diaphragm wall etc.
M25 Rs/Cum 10389 10158 8774 8451 6991 8212 8590
M30 Rs/Cum 10455 10224 8840 8516 7073 8294 8195 8650
M35 Rs/Cum 10523 10291 8908 8583 7154 8375 5711 7630 8711
M45 Rs/Cum 11288 11057 9333 9009 7643 8864 9075

022054 USSOR Approach slab at formation level, Dirt


wall/ ballast wall at formation level
M25 Rs/Cum 8523 8312 6994 6753 5764 6065 7739 8590
M30 Rs/Cum 8588 8377 7059 6817 5845 6147 7910 8650
M35 Rs/Cum 8654 8444 7125 6884 6378 6679 5711 8009 8711
M45 Rs/Cum 9386 9175 7546 7305 6867 7168 8104 9075
** Acerage Rate of Concrete including Shuttering 9172 8934 7536 7296 6458 7322 7580 5566 7822 8727
Note Average Lead 37Km X Rs.45 per Cum-KM) 45*37 1665 1665 1665 1665 1665 1665 900 2337
Total Rate 10837 10599 9201 8961 8123 8987 8480 5566 10159 8727
Comparison of Concrete Rates

As per PMC AS per AS per NR NR NR NR


AS per L&T productivity 3.09 IRUSSOR ROB 72B
IRUSSOR ROB Chaundauli CONTRACT CONTRACT CONTRACT CONTRACT L-
Submission 0.75 Cum per mandays 5.49cum LC43 Khatoli- Majhawar 301 Ref.Rate WDFC CTP-3 MGS/EN/GAQ-RFO & Balance-SEB-MGS/288 dt.02.01.2019 ROB LC-75 xing no. AVERAGE RATE
ROB LC-43A L-xing no. 30,42
Cum Productivity based on the case Productivity Mujjaffarnagar dt.10.08.2020 R Dt. Dt. 52 Dt. & 45 (SL NO- D TO O)
per Man Days study per Man Days dt.23.11.2020 25.06.2020 Dt.
10.02.2021 20.02.2020 25.06.2020
Item No. Ref. Description

Rate
Rate including Rate including Rate
Rate including Rate including Rate including Rate including including inclusive Cement Rate Rate Rate Rate Rate
Cement & Cement & Shuttering Cement & Cement & Cement & Cement & of consuptio Rate of Amount of including including including including including
Unit Shuttering Cement & Shuttering cement cement Cement & Cement & Cement & Cement & Cement &
INR INR Shuttering Shuttering Shuttering Shuttering Shuttering with all n per cum Shuttering Shuttering Shuttering Shuttering Shuttering
lead & lifts
B C D F G I J K L M N O
Foundation/Pile Cap

022040 USSOR M25 Rs/Cum 6934 5543 5450 6526 0.34 6069 2063.46 7669 6560
022040 USSOR M30 Rs/Cum 6999 5607 5514 6526 0.35 6069 2124.15 7724 6763
022040 USSOR M35 Rs/Cum 7066 5674 5581 5507 5713 5252 7734 6526 0.36 6069 2184.84 7778 6373 5642 5665 5780 6102
022040 USSOR M35 Piling Rs/Cum 6977 5548 5492 6526 0.4 6069 2427.6 7995 6743
Sub Structure
Providing and laying in position machine
batched, machine mixed and machine
vibrated Design Mix Cement Concrete of
specified grade (Cast in-Situ) using 20mm
graded crushed stone aggregate and
coarse sand of approved quality for the
following Reinforced cement concrete
structural elements up to height of 10 m
from foundation top level, including
finishing, using Admixtures in approved
022050 USSOR proportions (as per IS:9103), to modify
workability & other properties without
impairing strength and durability
complete as per specifications and
direction of the Engineer in charge.
Payment for cement, reinforcement,
shuttering shall be paid extra.

tt
022051/ USSOR Abutment & Pier/ Wing wall and Return wall
022052
M25 Rs/Cum 9931 8629 8298 6526 0.34 6069 2063 7669 7984
M30 Rs/Cum 9997 8694 8363 7630 6526 0.35 6069 2124 7724 7803
M35 Rs/Cum 10064 8762 8430 6816 6874 5589 6526 0.36 6069 2185 7778 6415 5717 6803
Abutment cap, Pier Cap, Inspection
022053 USSOR Platform & Pedestal over Pier cap,
Fender wall, Diaphragm wall etc.
M25 Rs/Cum 10158 8774 8451 6526 0.34 6069 2063 7669 8060
M30 Rs/Cum 10224 8840 8516 6526 0.35 6069 2124 7724 8145
M35 Rs/Cum 10291 8908 8583 7062 7218 5711 7630 6526 0.36 6069 2185 7778 6605 5858 7056
M45 Rs/Cum 11057 9333 9009 6526 0.42 6069 2549 8103 8556

022054 USSOR Approach slab at formation level, Dirt


wall/ ballast wall at formation level
M25 Rs/Cum 8312 6994 6753 7739 6526 0.34 6069 2063 7669 5738 5642 5757 6550
M30 Rs/Cum 8377 7059 6817 7910 6526 0.35 6069 2124 7724 7484
M35 Rs/Cum 8444 7125 6884 6238 6563 5711 8009 6526 0.36 6069 2185 7778 6864
M45 Rs/Cum 9175 7546 7305 8104 6526 0.42 6069 2549 8103 7837
** Acerage Rate of Concrete including Shuttering 8934 7536 7296 6406 6592 5566 7822 7792 6464 5739 5654 5768
Note Average Lead 37Km X Rs.45 per Cum-KM) 45*37 1665 1665 1665 1665 1665 2337
Total Rate 10599 9201 8961 8071 8257 5566 10159 7792 6464 5739 5654 5768
Comparison of Concrete Rates

Provisionl As per PMC AS per AS per NR NR NR NR


approved Rates AS per L&T productivity 3.09 IRUSSOR IRUSSOR ROB ROB 72B CONTRACT CONTRACT CONTRACT CONTRACT L-
36A i.e Submission 0.75 Cum per mandays 5.49cum LC43 Khatoli- Chaundauli ROB LC-75 ROB LC-43A L-xing no. xing no. AVERAGE RATE
productivity Cum Productivity 301 Ref.Rate
based on the case Productivity Mujjaffarnagar Majhawar Dt. Dt. 52 Dt. 30,42 & 45 (SL NO- F TO M)
0.61 per Man Days study per Man Days dt.23.11.2020 dt.10.08.2020 22.06.2020 10.02.2021 20.02.2020 Dt.
Cum/Mandays 25.06.2020
Item No. Ref. Description

Rate
Including Rate including Rate including Rate including Rate including Rate including Rate including Rate including Rate Rate Rate Rate
Cement & Cement & Cement & Cement & Shuttering Cement & Cement & Cement & Cement & including including including including
Unit Shuttering Shuttering Cement & Cement & Cement & Cement &
Excluding INR Shuttering Shuttering Shuttering Shuttering
Shuttering INR INR Shuttering Shuttering Shuttering Shuttering

A B C D F G I J K L M
Foundation/Pile Cap

022040 USSOR M25 Rs/Cum 7136 6934 5543 5450


022040 USSOR M30 Rs/Cum 7200 6999 5607 5514
022040 USSOR M35 Rs/Cum 12153 7267 7066 5674 5581 5507 5713 5252 6469 5727 5750 5866 5704
022040 USSOR M35 Piling Rs/Cum 11636 7515 6977 5548 5492
Sub Structure
Providing and laying in position machine
batched, machine mixed and machine
vibrated Design Mix Cement Concrete of
specified grade (Cast in-Situ) using 20mm
graded crushed stone aggregate and
coarse sand of approved quality for the
following Reinforced cement concrete
structural elements up to height of 10 m
from foundation top level, including
finishing, using Admixtures in approved
022050 USSOR proportions (as per IS:9103), to modify
workability & other properties without
impairing strength and durability
complete as per specifications and
direction of the Engineer in charge.
Payment for cement, reinforcement,
shuttering shall be paid extra.

022051/
022052 USSOR Abutment & Pier/ Wing wall and Return wall
M25 Rs/Cum 10152 9931 8629 8298
M30 Rs/Cum 10218 9997 8694 8363
M35 Rs/Cum 12153 10286 10064 8762 8430 6816 6874 5589 7721 6869 6282
Abutment cap, Pier Cap, Inspection
022053 USSOR Platform & Pedestal over Pier cap,
Fender wall, Diaphragm wall etc.
M25 Rs/Cum 10389 10158 8774 8451
M30 Rs/Cum 10455 10224 8840 8516
M35 Rs/Cum 12153 10523 10291 8908 8583 7062 7218 5711 7911 8315 6752
M45 Rs/Cum 11288 10717 9333 9009

USSOR Approach
slab at formation level, Dirt
022054 wall/ ballast wall at formation level
M25 Rs/Cum 8523 8312 6994 6753 6744 6112 6236 5890
M30 Rs/Cum 14751 8588 8377 7059 6817
M35 Rs/Cum 8654 8444 7125 6884 6238 6563 5711 6171
M45 Rs/Cum 9386 8864 7546 7305
** Acerage Rate of Concrete including Shuttering 9172 8890 7536 7296 6406 6592 5566 7367 6914 5931 6051
Comparison of Concrete Rates

AS per AS per NR NR NR NR
IRUSSOR ROB 72B
IRUSSOR ROB Chaundauli CONTRACT CONTRACT CONTRACT CONTRACT L-
5.49cum LC43 Khatoli- Majhawar 301 Ref.Rate ROB LC-75 xing no. AVERAGE RATE
ROB LC-43A L-xing no. 30,42
AS per L&T Submission 0.75 Cum Productivity per Man Days As per PMC productivity 3.09 Cum per mandays based on the case study & 45 (SL NO- F TO M)
Productivity Mujjaffarnagar dt.10.08.2020 Dt. Dt. 52 Dt. Dt.
per Man Days dt.23.11.2020 22.06.2020 10.02.2021 20.02.2020 25.06.2020
Item No. Ref. Description

Rate Exlusive Rate Shuttering Rate including Rate Exlusive Cement Total Rate Shuttering Rate of Amount of Rate including Rate
Rate including Rate including Rate including Rate including including Rate Rate Rate
cement & Cement Cement Total Cement including Qty. /Cum Rate of Amount of Cement & Cement
cement & Consumptio rate/MT Cement including Qty. /Cum Shuttering Shuttering Cement & Shuttering Cement & Cement & Cement & Cement & including including including
Unit Manpower Machinery Material Shuttering Consumption rate/MT Rate Shuttering Shuttering Shuttering Manpower Machinery Material Cement Cement & Cement & Cement & Cement &
(INR) Cement Qty. INR Shuttering n Rate only Qty. INR Shuttering Shuttering Shuttering Shuttering Shuttering Shuttering Shuttering Shuttering

B C D F G I J K L M
Foundation/Pile Cap

022040 USSOR M25 Rs/Cum 1530 650 2354 4534 0.34 6069 2063.46 6597 0.46 733 337.18 6934 226 561 2354 3142 0.34 6069 2063.46 5205 0.46 733 337.18 5543 5450
022040 USSOR M30 Rs/Cum 1530 650 2359 4538 0.35 6069 2124.15 6662 0.46 733 337.18 6999 226 561 2359 3146 0.35 6069 2124.15 5270 0.46 733 337.18 5607 5514
022040 USSOR M35 Rs/Cum 1530 650 2365 4544 0.36 6069 2184.84 6729 0.46 733 337.18 7066 226 561 2365 3152 0.36 6069 2184.84 5337 0.46 733 337.18 5674 5581 5507 5713 5252 6469 5727 5750 5866 5704
022040 USSOR M35 Piling Rs/Cum 1530 650 2370 4549 0.4 6069 2427.6 6977 0 733 0 6977 189 561 2370 3120 0.4 6069 2427.6 5548 0 733 0 5548 5492
Sub Structure
Providing and laying in position machine
batched, machine mixed and machine
vibrated Design Mix Cement Concrete of
specified grade (Cast in-Situ) using 20mm
graded crushed stone aggregate and
coarse sand of approved quality for the
following Reinforced cement concrete
structural elements up to height of 10 m
from foundation top level, including
finishing, using Admixtures in approved
022050 USSOR proportions (as per IS:9103), to modify
workability & other properties without
impairing strength and durability
complete as per specifications and
direction of the Engineer in charge.
Payment for cement, reinforcement,
shuttering shall be paid extra.

022051/
022052 USSOR Abutment & Pier/ Wing wall and Return wall
M25 Rs/Cum 1683 715 2590 4987 0.34 6069 2063 7051 3.93 733 2880.69 9931 478 617 2590 3685 0.34 6069 2063 5748 3.93 733 2880.69 8629 8298
M30 Rs/Cum 1683 715 2595 4992 0.35 6069 2124 7116 3.93 733 2880.69 9997 478 617 2595 3689 0.35 6069 2124 5813 3.93 733 2880.69 8694 8363
M35 Rs/Cum 1683 715 2601 4998 0.36 6069 2185 7183 3.93 733 2880.69 10064 478 617 2601 3696 0.36 6069 2185 5881 3.93 733 2880.69 8762 8430 6816 6874 5589 7721 6869 6282
Abutment cap, Pier Cap, Inspection
022053 USSOR Platform & Pedestal over Pier cap,
Fender wall, Diaphragm wall etc.
M25 Rs/Cum 1759 747 2708 5214 0.34 6069 2063 7277 3.93 733 2880.69 10158 478 645 2708 3830 0.34 6069 2063 5893 3.93 733 2880.69 8774 8451
M30 Rs/Cum 1759 747 2713 5219 0.35 6069 2124 7343 3.93 733 2880.69 10224 478 645 2713 3835 0.35 6069 2124 5959 3.93 733 2880.69 8840 8516
M35 Rs/Cum 1759 747 2719 5226 0.36 6069 2185 7410 3.93 733 2880.69 10291 478 645 2719 3842 0.36 6069 2185 6027 3.93 733 2880.69 8908 8583 7062 7218 5711 7911 8315 6752
M45 Rs/Cum 1759 747 2780 5287 0.42 6069 2549 7836 3.93 733 2880.69 10716 478 645 2780 3903 0.42 6069 2549 6452 3.93 733 2880.69 9333 9009

022054 USSOR Approach slab at formation level, Dirt


wall/ ballast wall at formation level
M25 Rs/Cum 1606 682 2472 4760 0.34 6069 2063 6824 1.61 924 1487.64 8312 381 589 2472 3443 0.34 6069 2063 5506 1.61 924 1487.64 6994 6753 6744 6112 6236 5890
M30 Rs/Cum 1606 682 2477 4765 0.35 6069 2124 6889 1.61 924 1487.64 8377 381 589 2477 3447 0.35 6069 2124 5571 1.61 924 1487.64 7059 6817
M35 Rs/Cum 1606 682 2483 4771 0.36 6069 2185 6956 1.61 924 1487.64 8444 381 589 2483 3453 0.36 6069 2185 5638 1.61 924 1487.64 7125 6884 6238 6563 5711 6171
M45 Rs/Cum 1606 682 2539 4827 0.42 6069 2549 7376 1.61 924 1487.64 8864 381 589 2539 3509 0.42 6069 2549 6058 1.61 924 1487.64 7546 7305
** Acerage Rate of Concrete including Shuttering 8890 7536 7296 6406 6592 5566 7367 6914 5931 6051
Comparison of Concrete Rates

AS per L&T Submission 0.75 Cum Productivity per Man Days As per PMC productivity 3.09 Cum per mandays based on the case study

Item No. Ref. Description


Rate Rate
Exlusive of Amount Rate including Rate including Amount Rate including
cement & Total Rate of Cement & Exlusive Total Cement of Cement &
Unit Manpower Machinery Material Shuttering Cement including Shutterin Shuttering Manpower Machinery Material cement & Cement only Shutterin Shuttering
(INR) Rate Cement INR inclusive Rate inclusive INR inclusive
including g CPOH @15% Shuttering CPOH g CPOH @15%
CPOH@ 15% @15%
B C
Foundation/Pile Cap
022040 USSOR M25 Rs/Cum 1530 650 2354 4534 2063.46 6597 337.18 6934 226 561 2354 3142 2063.46 5205 337.18 5543
022040 USSOR M30 Rs/Cum 1530 650 2359 4538 2124.15 6662 337.18 6999 226 561 2359 3146 2124.15 5270 337.18 5607
022040 USSOR M35 Rs/Cum 1530 650 2365 4544 2184.84 6729 337.18 7066 226 561 2365 3152 2184.84 5337 337.18 5674
022040 USSOR M35 Piling Rs/Cum 1530 650 2370 4549 2427.6 6977 0 6977 189 561 2370 3120 2427.6 5548 0 5548
Sub Structure
Providing and laying in position
machine batched, machine mixed
and machine vibrated Design Mix
Cement Concrete of specified grade
(Cast in-Situ) using 20mm graded
crushed stone aggregate and coarse
sand of approved quality for the
following Reinforced cement
concrete structural elements up to
022050 USSOR height of 10 m from foundation top
level, including finishing, using
Admixtures in approved proportions
(as per IS:9103), to modify
workability & other properties
without impairing strength and
durability complete as per
specifications and direction of the
Engineer in charge. Payment for
022051/ USSOR cement, reinforcement, shuttering
Abutment & Pier/ Wing wall and Return wall
022052
M25 Rs/Cum 1683 715 2590 4987 2063 7051 2880.69 9931 478 617 2590 3685 2063 5748 2880.69 8629
M30 Rs/Cum 1683 715 2595 4992 2124 7116 2880.69 9997 478 617 2595 3689 2124 5813 2880.69 8694
M35 Rs/Cum 1683 715 2601 4998 2185 7183 2880.69 10064 478 617 2601 3696 2185 5881 2880.69 8762
Abutment cap, Pier Cap, Inspection
022053 USSOR Platform & Pedestal over Pier cap,
Fender wall, Diaphragm wall etc.
M25 Rs/Cum 1759 747 2708 5214 2063 7277 2880.69 10158 478 645 2708 3830 2063 5893 2880.69 8774
M30 Rs/Cum 1759 747 2713 5219 2124 7343 2880.69 10224 478 645 2713 3835 2124 5959 2880.69 8840
M35 Rs/Cum 1759 747 2719 5226 2185 7410 2880.69 10291 478 645 2719 3842 2185 6027 2880.69 8908
M45 Rs/Cum 1759 747 2780 5287 2549 7836 2880.69 10716 478 645 2780 3903 2549 6452 2880.69 9333
Approach slab at formation level, Dirt
022054 USSOR wall/ ballast wall at formation level

M25 Rs/Cum 1606 682 2472 4760 2063 6824 1487.64 8312 381 589 2472 3443 2063 5506 1487.64 6994
M30 Rs/Cum 1606 682 2477 4765 2124 6889 1487.64 8377 381 589 2477 3447 2124 5571 1487.64 7059
M35 Rs/Cum 1606 682 2483 4771 2185 6956 1487.64 8444 381 589 2483 3453 2185 5638 1487.64 7125
M45 Rs/Cum 1606 682 2539 4827 2549 7376 1487.64 8864 381 589 2539 3509 2549 6058 1487.64 7546
** Acerage Rate of Concrete including Shuttering 8890 7536
AS per L&T Submission 0.75 Cum Productivity per Man Days

Item No. Ref. Description


Rate
Rate Exlusive of Rate including
Including cement & Cement Cement Total Rate Shuttering Rate of Amount
of Cement &
Unit Cement & Manpower Machinery Material Shuttering Consumptio rate/MT Cement including Qty. /Cum Shutterin Shutterin Shuttering Manpower Machinery
Excluding (INR) n Rate Cement Qty. g g INR inclusive
Shuttering including CPOH @15%
CPOH@ 15%
B
Foundation/Pile Cap
022040 USSOR M25 Rs/Cum 1530 620 2354 4504 0.34 6069 2063.46 6567 0.46 733 337.18 6904 226 620
022040 USSOR M30 Rs/Cum 1530 620 2359 4508 0.35 6069 2124.15 6632 0.46 733 337.18 6969 226 620
022040 USSOR M35 Rs/Cum 12153 1530 620 2365 4514 0.36 6069 2184.84 6699 0.46 733 337.18 7036 226 620
022040 USSOR M35 Piling Rs/Cum 11636 1530 620 2370 4519 0.4 6069 2427.6 6947 0 733 0 6947 189 620
Sub Structure
Providing and laying in position
machine batched, machine mixed
and machine vibrated Design Mix
Cement Concrete of specified grade
(Cast in-Situ) using 20mm graded
crushed stone aggregate and coarse
sand of approved quality for the
following Reinforced cement
concrete structural elements up to
022050 USSOR height of 10 m from foundation top
level, including finishing, using
Admixtures in approved proportions
(as per IS:9103), to modify
workability & other properties
without impairing strength and
durability complete as per
specifications and direction of the
Engineer in charge. Payment for
022051/ USSOR cement,
Abutment
reinforcement, shuttering
& Pier/ Wing wall and Return wall
022052
M25 Rs/Cum 1683 682 2590 4954 0.34 6069 2063 7017 3.93 733 2880.69 9898 478 682
M30 Rs/Cum 1683 682 2595 4959 0.35 6069 2124 7083 3.93 733 2880.69 9964 478 682
M35 Rs/Cum 12153 1683 682 2601 4965 0.36 6069 2185 7150 3.93 733 2880.69 10031 478 682
Abutment cap, Pier Cap, Inspection
022053 USSOR Platform & Pedestal over Pier cap,
Fender wall, Diaphragm wall etc.
M25 Rs/Cum 1759 713 2708 5179 0.34 6069 2063 7243 3.93 733 2880.69 10123 478 713
M30 Rs/Cum 1759 713 2713 5184 0.35 6069 2124 7308 3.93 733 2880.69 10189 478 713
M35 Rs/Cum 12153 1759 713 2719 5191 0.36 6069 2185 7376 3.93 733 2880.69 10256 478 713
M45 Rs/Cum 1759 713 2780 5252 0.42 6069 2549 7801 3.93 733 2880.69 10682 478 713

022054 USSOR Approach slab at formation level, Dirt


wall/ ballast wall at formation level

M25 Rs/Cum 1606 651 2472 4729 0.34 6069 2063 6792 1.61 924 1487.64 8280 381 651
M30 Rs/Cum 14751 1606 651 2477 4733 0.35 6069 2124 6858 1.61 924 1487.64 8345 381 651
M35 Rs/Cum 1606 651 2483 4740 0.36 6069 2185 6924 1.61 924 1487.64 8412 381 651
M45 Rs/Cum 1606 651 2539 4795 0.42 6069 2549 7344 1.61 924 1487.64 8832 381 651
** Acerage Rate of Concrete including Shuttering 8858
Comparison of Concrete Rates with Revised Machinery Rate

AS per
IRUSSOR
As per PMC productivity 3.09 Cum per mandays based on the case study 5.49cum AS per IRUSSOR ROB LC43 Khatoli-Mujjaff
Productivity
per Man
Item No. Ref. Description Days
Rate
Rate including Shutterin Amount Rate including Rate Rate
Cement Cement Total
Exlusive Consumpt Cement Rate of
g Qty. Shutterin of Cement & Exlusive Cement Cement
including cement & Consumpt Total Rate
Unit Material cement & rate/MT Cement only /Cum Shuttering
Shutterin INR inclusive Cement & rate/MT Cement including
Shuttering ion Rate inclusive Qty. g g Shuttering Shutterin ion Rate Cement
CPOH CPOH @15% g
@15%
C D
Foundation/Pile Cap
022040 USSOR M25 Rs/Cum 2354 3201 0.34 6069 2063.46 5264 0.46 733 337.18 5601 5450
022040 USSOR M30 Rs/Cum 2359 3205 0.35 6069 2124.15 5329 0.46 733 337.18 5666 5514
022040 USSOR M35 Rs/Cum 2365 3211 0.36 6069 2184.84 5396 0.46 733 337.18 5733 5581 2406 0.36 7515.25 2705.49 5112
022040 USSOR M35 Piling Rs/Cum 2370 3178 0.4 6069 2427.6 5606 0 733 0 5606 5492
Sub Structure
Providing and laying in position
machine batched, machine mixed
and machine vibrated Design Mix
Cement Concrete of specified grade
(Cast in-Situ) using 20mm graded
crushed stone aggregate and coarse
sand of approved quality for the
following Reinforced cement
concrete structural elements up to
022050 USSOR height of 10 m from foundation top
level, including finishing, using
Admixtures in approved proportions
(as per IS:9103), to modify
workability & other properties
without impairing strength and
durability complete as per
specifications and direction of the
Engineer in charge. Payment for
022051/ USSOR cement,
Abutment
reinforcement, shuttering
& Pier/ Wing wall and Return wall
022052
M25 Rs/Cum 2590 3749 0.34 6069 2063 5813 3.93 733 2880.69 8693 8298
M30 Rs/Cum 2595 3754 0.35 6069 2124 5878 3.93 733 2880.69 8759 8363
M35 Rs/Cum 2601 3760 0.36 6069 2185 5945 3.93 733 2880.69 8826 8430 2526 0.36 7515.25 2705 5232
Abutment cap, Pier Cap, Inspection
022053 USSOR Platform & Pedestal over Pier cap,
Fender wall, Diaphragm wall etc.
M25 Rs/Cum 2708 3898 0.34 6069 2063 5961 3.93 733 2880.69 8842 8451
M30 Rs/Cum 2713 3903 0.35 6069 2124 6027 3.93 733 2880.69 8908 8516
M35 Rs/Cum 2719 3910 0.36 6069 2185 6094 3.93 733 2880.69 8975 8583 2767 0.36 7515.25 2705 5473
M45 Rs/Cum 2780 3971 0.42 6069 2549 6520 3.93 733 2880.69 9400 9009

022054 USSOR Approach slab at formation level, Dirt


wall/ ballast wall at formation level

M25 Rs/Cum 2472 3504 0.34 6069 2063 5568 1.61 924 1487.64 7055 6753
M30 Rs/Cum 2477 3509 0.35 6069 2124 5633 1.61 924 1487.64 7121 6817
M35 Rs/Cum 2483 3515 0.36 6069 2185 5700 1.61 924 1487.64 7187 6884 2887 0.36 7515.25 2705 5593
M45 Rs/Cum 2539 3571 0.42 6069 2549 6120 1.61 924 1487.64 7607 7305
** Acerage Rate of Concrete including Shuttering 7599 7296
ison of Concrete Rates with Revised Machinery Rate

AS per IRUSSOR ROB LC43 Khatoli-Mujjaffarnagar dt.23.11.2020 ROB 72B Chaundauli Majhawar dt.10.08.2020 302 301 NR CONTRACT ROB LC-75 Dt. 22.06.2020
Ref.Rate Ref.Rate

Item No. Ref. Description


Rate
Shutterin Rate of Amount Rate Exlusive Cement Rate Shutterin Rate of Amount Rate Rate Rate Rate
Unit g Qty. Shutterin of including cement Consump Cement including g Qty. Shutterin of including including including Concrete Shuttering Shuttering including
/Cum g Shutterin Cement & & rate/MT Cement /Cum Shutterin Cement & Cement & Cement & Rate Qty Rate Cement &
Qty. g Shuttering Shutterin tion Qty. g g Shuttering Shuttering Shuttering Shuttering
g
F G H I L J
Foundation/Pile Cap
022040 USSOR M25 Rs/Cum
022040 USSOR M30 Rs/Cum 7051
022040 USSOR M35 Rs/Cum 0.46 181.4957 83.488 5507 3693 0.36 7279 6312.889 0.46 186.52 85.80093 5713 5252 6373 0.46 210 6469
022040 USSOR M35 Piling Rs/Cum
Sub Structure
Providing and laying in position
machine batched, machine mixed
and machine vibrated Design Mix
Cement Concrete of specified grade
(Cast in-Situ) using 20mm graded
crushed stone aggregate and coarse
sand of approved quality for the
following Reinforced cement
concrete structural elements up to
022050 USSOR height of 10 m from foundation top
level, including finishing, using
Admixtures in approved proportions
(as per IS:9103), to modify
workability & other properties
without impairing strength and
durability complete as per
specifications and direction of the
Engineer in charge. Payment for
022051/ USSOR cement,
Abutment
reinforcement, shuttering
& Pier/ Wing wall and Return wall
022052
M25 Rs/Cum
M30 Rs/Cum 7494
M35 Rs/Cum 3.93 304.907 1198.285 6816 3877 0.36 7279 6497.516 3.93 305.8075 1201.824 6874 5589 6415 3.93 332 7721
Abutment cap, Pier Cap, Inspection
022053 USSOR Platform & Pedestal over Pier cap,
Fender wall, Diaphragm wall etc.
M25 Rs/Cum
M30 Rs/Cum 8195
M35 Rs/Cum 3.93 302.6206 1189.299 7062 4246 0.36 7279 6866.758 3.93 309.68 1217.045 7218 5711 6605 3.93 332 7911
M45 Rs/Cum

022054 USSOR Approach slab at formation level, Dirt


wall/ ballast wall at formation level

M25 Rs/Cum 1.61


M30 Rs/Cum 1.61
M35 Rs/Cum 1.61 181.4957 292.208 6238 4431 0.36 7279 7051.386 1.61 185.9858 299.4372 6563 5711
M45 Rs/Cum
** Acerage Rate of Concrete including Shuttering 6406 6592 7580 5566 7367
AVERAGE
NR CONTRACT ROB LC-43A Dt. 10.02.2021 NR CONTRACT L-xing no. 52 Dt. NR CONTRACT L-xing no. 30,42 & 45 Dt. RATE
20.02.2020 25.06.2020 (SL NO- F TO
M)
Item No. Ref. Description

Rate Rate Rate


including
Concrete Shuttering Shuttering including Concrete Shutterin Shutterin Cement & Concrete Shuttering Shuttering including
Unit Rate Qty Rate Cement & Rate g Qty g Rate Shutterin Rate Qty Rate Cement &
Shuttering g Shuttering

M K N L O M
Foundation/Pile Cap
022040 USSOR M25 Rs/Cum
022040 USSOR M30 Rs/Cum
022040 USSOR M35 Rs/Cum 5642 0.46 186 5727 5665 0.46 184 5750 5780 0.46 188 5866 5704
022040 USSOR M35 Piling Rs/Cum
Sub Structure
Providing and laying in position
machine batched, machine mixed
and machine vibrated Design Mix
Cement Concrete of specified grade
(Cast in-Situ) using 20mm graded
crushed stone aggregate and coarse
sand of approved quality for the
following Reinforced cement
concrete structural elements up to
022050 USSOR height of 10 m from foundation top
level, including finishing, using
Admixtures in approved proportions
(as per IS:9103), to modify
workability & other properties
without impairing strength and
durability complete as per
specifications and direction of the
Engineer in charge. Payment for
022051/ USSOR cement,
Abutment
reinforcement, shuttering
& Pier/ Wing wall and Return wall
022052
M25 Rs/Cum
M30 Rs/Cum
M35 Rs/Cum 5717 3.93 293 6869 6282
Abutment cap, Pier Cap, Inspection
022053 USSOR Platform & Pedestal over Pier cap,
Fender wall, Diaphragm wall etc.
M25 Rs/Cum
M30 Rs/Cum
M35 Rs/Cum 7164 3.93 293 8315 6752
M45 Rs/Cum

022054 USSOR Approach slab at formation level, Dirt


wall/ ballast wall at formation level

M25 Rs/Cum 6272 1.61 293 6744 5642 1.61 291 6112 5757 1.61 297 6236 5890
M30 Rs/Cum
M35 Rs/Cum 6171
M45 Rs/Cum
** Acerage Rate of Concrete including Shuttering 6914 5931 6051