Construction of the Loskop Regional Bulk Water Supply Project No: 150362/2
Scheme in Thembisile Hani Local Municipality – Work Package 2
SCHEDULE 6 : RESERVOIR CONCRETE WORK
ITEM
REF DESCRIPTION UNIT QUANT RATE AMOUNT
NO.
SABS
6 1200G CONCRETE WORK
Concrete
8.4.2 Blinding layer in class 15MPa/19mm to a minimum thickness of
50mm underneath structures
6.1 i) Reservoir m² 1425
PSG 6.4 No fines concrete (NF19) to a minimum thickness of 80mm
underneath structures, complete with mortar seal
6.2 i) Reservoir m² 1425
8.4.3 Strength concrete - class 35MPa/19mm
6.3 i) Reservoir floor slabs and footings m³ 600
6.4 ii) Reservoir walls m³ 400
6.5 iii) Reservoir roof slabs and columns m³ 750
6.6 iv) Valve chamber floor slabs and footings m³ 6
8.4.3 Strength concrete - Class 25 MPa/19mm
6.7 i) Reservoir apron slab m³ 20
6.8 iii) Valve chamber walls m³ 15
8.4.3 Strength concrete - class 15MPa/10mm Mass concrete to:
6.9 i) All structures (provisional) m³ 5
8.4.3 Screed to:
6.10 i) All structures m³ 100
SABS
1200G CONCRETE: Formwork
8.2.2 Formwork - Smooth:
b) Horizontal plane - elevated to walkways and slabs
6.11 i) Reservoir m² 1750
8.2.5 d) Narrow widths (up to 300mm wide) to:
6.12 i) Reservoir m 80
8.2.2 e) Vertical plane (curved)
6.13 i) Reservoir walls & footings(curved) m² 2100
6.14 ii) 300 mm diam. columns (reservoir) m² 750
8.2.5 e) Narrow widths (up to 300mm wide) curved to:
6.15 i) Reservoir m 160
Box-out holes for pipes
8.2.6 Box-out holes, rectangular through concrete 200 to 500 mm thick:
for pipework supplied and installed by the Mechanical Contractor :
Reservoir: 10Ml
6.16 a) 850 x 850mm box-out for 500mm flanged steel pipe no 4
TOTAL CARRIED FORWARD
152 C2.2: Bill of Quantities
Construction of the Loskop Regional Bulk Water Supply Project No: 150362/2
Scheme in Thembisile Hani Local Municipality – Work Package 2
ITEM
REF DESCRIPTION UNIT QUANT RATE AMOUNT
NO.
TOTAL BROUGHT FORWARD
6.17 b) 950 x 950mm box-out for 600mm flanged steel pipe no 1
6.18 c) 1100 x 1100mm box-out for 800mm flanged steel pipe no 2
REINFORCEMENT
8.3.1 Reinforcement, high tensile steel
6.19 i) Reservoir t 220
8.3.1 Reinforcement, mild steel
6.20 i) Reservoir t 22
8.3.2 High tensile welded mesh - Ref No 395 (Provisional)
6.21 i) Reservoir m² 24
8.4.4 Unformed surface finish
a) Wood floated finish
6.22 i) Reservoir m² 1450
b) Steel floated finish
6.23 i) Reservoir m² 1450
Grouting / casting in of pipes and specials
PSG6.1 a) Grouting/casting in of pipe pieces in the following pipe
diameters (Refer also PSG2.6.4)
Reservoir: 10ML
6.24 a) 850 x 850mm box-out for 500mm flanged steel pipe no 4
6.25 b) 950 x 950mm box-out for 600mm flanged steel pipe no 1
6.26 c) 1100 x 1100mm box-out for 800mm flanged steel pipe no 2
SABS
1200G MISCELLANEOUS
PSG6.3 Watertight testing of structures
6.27 i) Reservoir no 1
PSG6.2 Subsoil drain (provisional)
Subsoil drainage as detailed on drawing
6.28 i) Reservoir m 360
8.5 Joints
Reservoir:
6.29 Joint type A1 as detailed m 940
6.30 Joint type B1 as detailed m 145
6.31 Roof joint incl. silicone bearing m 145
PSG 6.5 Items cast into concrete
Supply and install the following sleeves (including draw wires) to be
cast into concrete
i) 110 dia. uPVC telemetry pipe at Reservoir
6.32 (5950mm long) no 1
ii) 40mm dia. HDPE sleeve in Reservoir roof
6.33 (500mm long) no 4
TOTAL CARRIED FORWARD
153 C2.2: Bill of Quantities
Construction of the Loskop Regional Bulk Water Supply Project No: 150362/2
Scheme in Thembisile Hani Local Municipality – Work Package 2
ITEM
REF DESCRIPTION UNIT QUANT RATE AMOUNT
NO.
TOTAL BROUGHT FORWARD
iii) 40mm dia. HDPE sleeve in Reservoir wall
6.34 (5500mm long) no 4
Supply and install the following outlet pipes to be cast into
concrete:
6.35 iv) 50mm diameter uPVC pipe 350mm long for roof drainage no 50
PSG 6.7 Disinfection of reservoir
6.36 i) Disinfection and cleaning of reservoir no 1
PSG 6.6 19mm stone on reservoir roof
Supply and install 19mm stone on top of reservoir roof:
6.37 i) Reservoir m³ 250
PSG 6.8 Step irons
6.38 i) Step irons (Calcamite or similar approved) no 19
TOTAL SCHEDULE 6 CARRIED FORWARD TO SUMMARY
154 C2.2: Bill of Quantities