0% found this document useful (0 votes)
52 views

Vishnu Prakash R Punglia Limited: Railways, Highways & Bridges Projects

Uploaded by

Dixit Jain
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
52 views

Vishnu Prakash R Punglia Limited: Railways, Highways & Bridges Projects

Uploaded by

Dixit Jain
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

VISHNU PRAKASH R PUNGLIA LIMITED

RAILWAYS, HIGHWAYS & BRIDGES PROJECTS


S. No. NAME DETAILS STATE CLIENT
Construction Of Rob Including Approaches At Chainage 122626 Between
Khilchipur -Jirapur Of Span 3 X 30.0m ( Composite Steel Girder) And Rob At
Construction Of Rob Including
Chainage 162343 Between Biyavara-Chata Of Span 1 X 36.0m ( Composite Steel
Approaches At Chainage
1 Girder) Along With All Other Civil Engineering Works Ancillay In The State Of Rajasthan WCR
122626 Between Khilchipur -
Madhaya Pradesh In Connection With Ramganjmandi bhopal New BG Rail Line
Jirapur
Project.

Construction of Two lane Road Over Bridge having railway span of Bow String
Construction of Two lane ROB Girder with Two lane RUB in lieu of existing Level Crossing no 18 at KM -23/2-3
2 Rajasthan NWR
at Nasirabad at Nasirabad of AII-COR Section of Ajmer Division
EARTH WORK IN FORMATION IN BANK AND CUTTING, CONTRUCTION OF
RAMGANJMANDI- BHOPAL MINOR BRIDGES AND OTHER ANCILLARY WORKS BETWEEN CHAINAGE 50000
3 Rajasthan WCR
NEW BG RAIL LINE PROJECT. TO 57000 IN CONNECTION WITH RAMGANJMANDI- BHOPAL NEW BG RAIL LINE
PROJECT.
Construction of 04 Nos Road Over Bridge ( 7x36m + 2x30m + 1x18m + 1x 24m
span over Railway tracks) with RCC deck slab on composite girder super structure
Construction of 04 Nos Road /PSC girder with RCC substructure & pile foundation alongwith Limited Height
Over Bridge on Hisar- Subway in lieu of Level Crossing No 54-A at Km 85/2-3, 76-A at Km 115/3-4,123
4 Rajasthan NWR
Sadulpur section of Bikaner at Km 189/3-4 on Rewari Hisar - Bathinda section and level crossing no C-4-A at
division. km 3/7-8 on Hisar- Sadulpur section of Bikaner division.

Construction of 04 Nos Road Over Bridge ( 7x36m + 2x30m + 1x18m + 1x 24m


span over Railway tracks) with RCC deck slab on composite girder super structure
Construction of 04 Nos Road /PSC girder with RCC substructure & pile foundation alongwith Limited Height
Over Bridge on Hisar- Subway in lieu of Level Crossing No 54-A at Km 85/2-3, 76-A at Km 115/3-4,123
5 Rajasthan NWR
Sadulpur section of Bikaner at Km 189/3-4 on Rewari Hisar - Bathinda section and level crossing no C-4-A at
division. km 3/7-8 on Hisar- Sadulpur section of Bikaner division.

Construction to 2 lane with paved shoulder realignment/Bypass from Km (21.700


Construction to 2 lane with to24.350) & Km (42.700 to 50.600) & Km (59.460 to 62.900) & Km (73.120
paved shoulder to75.920) &Km (82.650 to 85,300) & Km (91.600 to 105.612) & Km (114.327 to
6 118.700)& Km(151.100 to 154.730) Balotra to Sanderao via Jalore Section Rajasthan MORTH
realignment/Bypass Balotra
to Sanderao via Jalore Package-lV(Bypass package) on EPC Mode in the State of Rajasthan

Strengthening/ Reconstruction from Km 0/0 to 1/200,1/800 to 42/400, 43/900


Strengthening/ to 44/100, 7/400 to 59/100, 64/450 to 72/080, 72/680 to 78/750, 79/050 to
7 Reconstruction of NH-752 88/330 of NH-752 in the state of Rajasthan for the year 2021-22 Baran Aklera Rajasthan MORTH
Baran Aklera (Total Length 76.680 Km) Tender ID: 2022_MoRTH_689727_1

Construction of 4-lane ROB and its approaches in lieu of existing level crossing no.
Construction of 4-lane ROB C-328A at km. 0/500 on NH-25E on Barmer–Jasai road crossing Barmer Munabao
8 railway line in district Barmer on EPC mode in the state of Rajasthan-Regarding Rajasthan MORTH
NH-25E on Barmer–Jasai

Construction of 4-Lane Road Over Bridge from Design Chainage at Km 0.000 (Km.
Construction of 4-Lane ROB 102 of NH - 325) to Design Chainage at Km 1.060 in a length of 1.060 Kms on EPC
9 Rajasthan MORTH
(Km. 102 of NH - 325) mode in the state of Rajasthan