0% found this document useful (0 votes)
77 views

Drawing

Uploaded by

Ajay Pandey
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
77 views

Drawing

Uploaded by

Ajay Pandey
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 25

MAJOR BRIDGE

LONGITUDINAL SECTION A-A

ORGING

PONGO
HALF TOP HALF BOTTOM

LEGEND
REFERENCE DRAWINGS:-

CLIENT: PROJECT: DPR CONSULTANTS: TITLE:


DRAWN BY MANISH
R7 JULY 2023 AS PER NHIDCL SUGGESTION
National Highways & Infrastructure GENERALARRANGEMENTDRAWINGFOR
Development Corporation Limited. Shweta Technophile Consultants Pvt.Ltd. MAJOR BRIDGE AT CH-3+708
R6 JAN 2023
MODIFIED DPR Consultancy Services for Preparation of Feasibility Study and Detailed Project Report (222-223, 313, Rajhans Plaza, Ahinsa Khand-1, DESIGN BY AMIT SPAN (3 X 20 M)
INCORPORATION OBSERVATION 3rd Floor, PTI building, 4-Parliament
MODIFIED DPR
Street, New Delhi-110001 for Two laning of Pango to Jorging Road (Length: 90 km) for execution on EPC Mode in Indirapuram, Ghaziabad-201014)
R5 JULY 2022 INCORPORATION OBSERVATION
the State of Arunachal Pradesh under SARDP-NE Phase'B' CHECKED BY A.G.
R4 AUG 2019 MODIFIED DPR
DRAWING NO.
R3 JULY 2018 DPR NHIDCL/PANGO-JORGING/STC/MJB/ A3
REV. DATE DESCRIPTION OF REVISIONS GAD/DDE-101 SHEET 01 of 02
NOTES

G.L. G.L.
N.G.L. N.G.L.

SECTION AT "B-B"

SECTION AT "C-C"

REFERENCE DRAWINGS:-

AT SUPPORT AT MID

DETAIL-`Y' GIRDER SECTION DETAILS OF RCC GIRDER

CLIENT: PROJECT: DPR CONSULTANTS: TITLE:


DRAWN BY MANISH
R7 JULY 2023 AS PER NHIDCL SUGGESTION
National Highways & Infrastructure GENERALARRANGEMENTDRAWINGFOR
Development Corporation Limited. Shweta Technophile Consultants Pvt.Ltd. MAJOR BRIDGE AT CH-3+708
R6 JAN 2023
MODIFIED DPR Consultancy Services for Preparation of Feasibility Study and Detailed Project Report (222-223, 313, Rajhans Plaza, Ahinsa Khand-1, DESIGN BY AMIT SPAN (3 X 20 M)
INCORPORATION OBSERVATION 3rd Floor, PTI building, 4-Parliament
MODIFIED DPR
Street, New Delhi-110001 for Two laning of Pango to Jorging Road (Length: 90 km) for execution on EPC Mode in Indirapuram, Ghaziabad-201014)
R5 JULY 2022 INCORPORATION OBSERVATION
the State of Arunachal Pradesh under SARDP-NE Phase'B' CHECKED BY A.G.
R4 AUG 2019 MODIFIED DPR
DRAWING NO.
R3 JULY 2018 DPR NHIDCL/PANGO-JORGING/STC/MJB/ A3
REV. DATE DESCRIPTION OF REVISIONS GAD/DDE-101 SHEET 02 of 02
NOTES

SECTIONAL ELEVATION

REFERENCE DRAWINGS:-

TOP PLAN
LEGEND

CLIENT: PROJECT: DPR CONSULTANTS: TITLE:


DRAWN BY MANISH
R7 JULY 2023 AS PER NHIDCL SUGGESTION
National Highways & Infrastructure GENERALARRANGEMENTDRAWINGFOR
MAJOR BRIDGE AT CH-4+033
Development Corporation Limited. Shweta Technophile Consultants Pvt.Ltd. SPAN (1 X 80 M)
R6 JAN 2023
MODIFIED DPR Consultancy Services for Preparation of Feasibility Study and Detailed Project Report (222-223, 313, Rajhans Plaza, Ahinsa Khand-1, DESIGN BY AMIT
INCORPORATION OBSERVATION 3rd Floor, PTI building, 4-Parliament
MODIFIED DPR
Street, New Delhi-110001 for Two laning of Pango to Jorging Road (Length: 90 km) for execution on EPC Mode in Indirapuram, Ghaziabad-201014)
R5 JULY 2022 INCORPORATION OBSERVATION
the State of Arunachal Pradesh under SARDP-NE Phase'B' CHECKED BY A.G.
R4 AUG 2019 MODIFIED DPR
DRAWING NO.
R3 JULY 2018 DPR NHIDCL/PANGO-JORGING/STC/MJB/ A3
REV. DATE DESCRIPTION OF REVISIONS GAD/DDE-101 SHEET 01 of 02
SECTION B-B

SECTION A-A

REFERENCE DRAWINGS:-

DETAIL-A

CLIENT: PROJECT: DPR CONSULTANTS: TITLE:


DRAWN BY MANISH
R7 JULY 2023 AS PER NHIDCL SUGGESTION
National Highways & Infrastructure GENERALARRANGEMENTDRAWINGFOR
MAJOR BRIDGE AT CH-4+033
Development Corporation Limited. Shweta Technophile Consultants Pvt.Ltd. SPAN (1 X 80 M)
R6 JAN 2023
MODIFIED DPR Consultancy Services for Preparation of Feasibility Study and Detailed Project Report (222-223, 313, Rajhans Plaza, Ahinsa Khand-1, DESIGN BY AMIT
INCORPORATION OBSERVATION 3rd Floor, PTI building, 4-Parliament
MODIFIED DPR
Street, New Delhi-110001 for Two laning of Pango to Jorging Road (Length: 90 km) for execution on EPC Mode in Indirapuram, Ghaziabad-201014)
R5 JULY 2022 INCORPORATION OBSERVATION
the State of Arunachal Pradesh under SARDP-NE Phase'B' CHECKED BY A.G.
R4 AUG 2019 MODIFIED DPR
DRAWING NO.
R3 JULY 2018 DPR NHIDCL/PANGO-JORGING/STC/MJB/ A3
REV. DATE DESCRIPTION OF REVISIONS GAD/DDE-101 SHEET 02 of 02
"X"

SECTIONAL ELEVATION

B C

B C PLAN

REFERENCE DRAWINGS:-

CLIENT: PROJECT: DPR CONSULTANTS: TITLE:


DRAWN BY MANISH
R7 JULY 2023 AS PER NHIDCL SUGGESTION
National Highways & Infrastructure GENERALARRANGEMENTDRAWINGFOR
MAJOR BRIDGE AT CH-5+790
Development Corporation Limited. Shweta Technophile Consultants Pvt.Ltd. SPAN (1 X 100 M)
R6 JAN 2023
MODIFIED DPR Consultancy Services for Preparation of Feasibility Study and Detailed Project Report (222-223, 313, Rajhans Plaza, Ahinsa Khand-1, DESIGN BY AMIT
INCORPORATION OBSERVATION 3rd Floor, PTI building, 4-Parliament
MODIFIED DPR
Street, New Delhi-110001 for Two laning of Pango to Jorging Road (Length: 90 km) for execution on EPC Mode in Indirapuram, Ghaziabad-201014)
R5 JULY 2022 INCORPORATION OBSERVATION
the State of Arunachal Pradesh under SARDP-NE Phase'B' CHECKED BY A.G.
R4 AUG 2019 MODIFIED DPR
DRAWING NO.
R3 JULY 2018 DPR NHIDCL/PANGO-JORGING/STC/MJB/ A3
REV. DATE DESCRIPTION OF REVISIONS GAD/DDE-101 SHEET 01 of 02
SECTION B-B

NOTES

SECTION C-C

LEGEND

REFERENCE DRAWINGS:-
DETAIL-`X'

ϒ ³
CLIENT: PROJECT: DPR CONSULTANTS: TITLE:
DRAWN BY MANISH
R7 JULY 2023 AS PER NHIDCL SUGGESTION
National Highways & Infrastructure GENERALARRANGEMENTDRAWINGFOR
MAJOR BRIDGE AT CH-5+790
Development Corporation Limited. Shweta Technophile Consultants Pvt.Ltd. SPAN (1 X 100 M)
R6 JAN 2023
MODIFIED DPR Consultancy Services for Preparation of Feasibility Study and Detailed Project Report (222-223, 313, Rajhans Plaza, Ahinsa Khand-1, DESIGN BY AMIT
INCORPORATION OBSERVATION 3rd Floor, PTI building, 4-Parliament
MODIFIED DPR
Street, New Delhi-110001 for Two laning of Pango to Jorging Road (Length: 90 km) for execution on EPC Mode in Indirapuram, Ghaziabad-201014)
R5 JULY 2022 INCORPORATION OBSERVATION
the State of Arunachal Pradesh under SARDP-NE Phase'B' CHECKED BY A.G.
R4 AUG 2019 MODIFIED DPR
DRAWING NO.
R3 JULY 2018 DPR NHIDCL/PANGO-JORGING/STC/MJB/ A3
REV. DATE DESCRIPTION OF REVISIONS GAD/DDE-101 SHEET 02 of 02
"X"

SECTIONAL ELEVATION

B C

B C PLAN

REFERENCE DRAWINGS:-

CLIENT: PROJECT: DPR CONSULTANTS: TITLE:


DRAWN BY MANISH
R7 JULY 2023 AS PER NHIDCL SUGGESTION
National Highways & Infrastructure GENERALARRANGEMENTDRAWINGFOR
MAJOR BRIDGE AT CH-9+266
Development Corporation Limited. Shweta Technophile Consultants Pvt.Ltd. SPAN (1 X 100 M)
R6 JAN 2023
MODIFIED DPR Consultancy Services for Preparation of Feasibility Study and Detailed Project Report (222-223, 313, Rajhans Plaza, Ahinsa Khand-1, DESIGN BY AMIT
INCORPORATION OBSERVATION 3rd Floor, PTI building, 4-Parliament
MODIFIED DPR
Street, New Delhi-110001 for Two laning of Pango to Jorging Road (Length: 90 km) for execution on EPC Mode in Indirapuram, Ghaziabad-201014)
R5 JULY 2022 INCORPORATION OBSERVATION
the State of Arunachal Pradesh under SARDP-NE Phase'B' CHECKED BY A.G.
R4 AUG 2019 MODIFIED DPR
DRAWING NO.
R3 JULY 2018 DPR NHIDCL/PANGO-JORGING/STC/MJB/ A3
REV. DATE DESCRIPTION OF REVISIONS GAD/DDE-101 SHEET 01 of 02
SECTION B-B

NOTES

SECTION C-C

LEGEND

REFERENCE DRAWINGS:-
DETAIL-`X'

ϒ ³
CLIENT: PROJECT: DPR CONSULTANTS: TITLE:
DRAWN BY MANISH
R7 JULY 2023 AS PER NHIDCL SUGGESTION
National Highways & Infrastructure GENERALARRANGEMENTDRAWINGFOR
MAJOR BRIDGE AT CH-9+266
Development Corporation Limited. Shweta Technophile Consultants Pvt.Ltd. SPAN (1 X 100 M)
R6 JAN 2023
MODIFIED DPR Consultancy Services for Preparation of Feasibility Study and Detailed Project Report (222-223, 313, Rajhans Plaza, Ahinsa Khand-1, DESIGN BY AMIT
INCORPORATION OBSERVATION 3rd Floor, PTI building, 4-Parliament
MODIFIED DPR
Street, New Delhi-110001 for Two laning of Pango to Jorging Road (Length: 90 km) for execution on EPC Mode in Indirapuram, Ghaziabad-201014)
R5 JULY 2022 INCORPORATION OBSERVATION
the State of Arunachal Pradesh under SARDP-NE Phase'B' CHECKED BY A.G.
R4 AUG 2019 MODIFIED DPR
DRAWING NO.
R3 JULY 2018 DPR NHIDCL/PANGO-JORGING/STC/MJB/ A3
REV. DATE DESCRIPTION OF REVISIONS GAD/DDE-101 SHEET 02 of 02
NOTES

SECTIONAL ELEVATION

REFERENCE DRAWINGS:-

TOP PLAN
LEGEND

CLIENT: PROJECT: DPR CONSULTANTS: TITLE:


DRAWN BY MANISH
R7 JULY 2023 AS PER NHIDCL SUGGESTION
National Highways & Infrastructure GENERALARRANGEMENTDRAWINGFOR
MAJOR BRIDGE AT CH-11+473
Development Corporation Limited. Shweta Technophile Consultants Pvt.Ltd. SPAN (1 X 80 M)
R6 JAN 2023
MODIFIED DPR Consultancy Services for Preparation of Feasibility Study and Detailed Project Report (222-223, 313, Rajhans Plaza, Ahinsa Khand-1, DESIGN BY AMIT
INCORPORATION OBSERVATION 3rd Floor, PTI building, 4-Parliament
MODIFIED DPR
Street, New Delhi-110001 for Two laning of Pango to Jorging Road (Length: 90 km) for execution on EPC Mode in Indirapuram, Ghaziabad-201014)
R5 JULY 2022 INCORPORATION OBSERVATION
the State of Arunachal Pradesh under SARDP-NE Phase'B' CHECKED BY A.G.
R4 AUG 2019 MODIFIED DPR
DRAWING NO.
R3 JULY 2018 DPR NHIDCL/PANGO-JORGING/STC/MJB/ A3
REV. DATE DESCRIPTION OF REVISIONS GAD/DDE-101 SHEET 01 of 02
SECTION B-B

SECTION A-A

REFERENCE DRAWINGS:-

DETAIL-A

CLIENT: PROJECT: DPR CONSULTANTS: TITLE:


DRAWN BY MANISH
R7 JULY 2023 AS PER NHIDCL SUGGESTION
National Highways & Infrastructure GENERALARRANGEMENTDRAWINGFOR
MAJOR BRIDGE AT CH-11+473
Development Corporation Limited. Shweta Technophile Consultants Pvt.Ltd. SPAN (1 X 80 M)
R6 JAN 2023
MODIFIED DPR Consultancy Services for Preparation of Feasibility Study and Detailed Project Report (222-223, 313, Rajhans Plaza, Ahinsa Khand-1, DESIGN BY AMIT
INCORPORATION OBSERVATION 3rd Floor, PTI building, 4-Parliament
MODIFIED DPR
Street, New Delhi-110001 for Two laning of Pango to Jorging Road (Length: 90 km) for execution on EPC Mode in Indirapuram, Ghaziabad-201014)
R5 JULY 2022 INCORPORATION OBSERVATION
the State of Arunachal Pradesh under SARDP-NE Phase'B' CHECKED BY A.G.
R4 AUG 2019 MODIFIED DPR
DRAWING NO.
R3 JULY 2018 DPR NHIDCL/PANGO-JORGING/STC/MJB/ A3
REV. DATE DESCRIPTION OF REVISIONS GAD/DDE-101 SHEET 02 of 02
NOTES

SECTIONAL ELEVATION

REFERENCE DRAWINGS:-

TOP PLAN
LEGEND

CLIENT: PROJECT: DPR CONSULTANTS: TITLE:


DRAWN BY MANISH
R7 JULY 2023 AS PER NHIDCL SUGGESTION
National Highways & Infrastructure GENERALARRANGEMENTDRAWINGFOR
MAJOR BRIDGE AT CH-12+411
Development Corporation Limited. Shweta Technophile Consultants Pvt.Ltd. SPAN (1 X 80 M)
R6 JAN 2023
MODIFIED DPR Consultancy Services for Preparation of Feasibility Study and Detailed Project Report (222-223, 313, Rajhans Plaza, Ahinsa Khand-1, DESIGN BY AMIT
INCORPORATION OBSERVATION 3rd Floor, PTI building, 4-Parliament
MODIFIED DPR
Street, New Delhi-110001 for Two laning of Pango to Jorging Road (Length: 90 km) for execution on EPC Mode in Indirapuram, Ghaziabad-201014)
R5 JULY 2022 INCORPORATION OBSERVATION
the State of Arunachal Pradesh under SARDP-NE Phase'B' CHECKED BY A.G.
R4 AUG 2019 MODIFIED DPR
DRAWING NO.
R3 JULY 2018 DPR NHIDCL/PANGO-JORGING/STC/MJB/ A3
REV. DATE DESCRIPTION OF REVISIONS GAD/DDE-101 SHEET 01 of 02
SECTION B-B

SECTION A-A

REFERENCE DRAWINGS:-

DETAIL-A

CLIENT: PROJECT: DPR CONSULTANTS: TITLE:


DRAWN BY MANISH
R7 JULY 2023 AS PER NHIDCL SUGGESTION
National Highways & Infrastructure GENERALARRANGEMENTDRAWINGFOR
MAJOR BRIDGE AT CH-12+411
Development Corporation Limited. Shweta Technophile Consultants Pvt.Ltd. SPAN (1 X 80 M)
R6 JAN 2023
MODIFIED DPR Consultancy Services for Preparation of Feasibility Study and Detailed Project Report (222-223, 313, Rajhans Plaza, Ahinsa Khand-1, DESIGN BY AMIT
INCORPORATION OBSERVATION 3rd Floor, PTI building, 4-Parliament
MODIFIED DPR
Street, New Delhi-110001 for Two laning of Pango to Jorging Road (Length: 90 km) for execution on EPC Mode in Indirapuram, Ghaziabad-201014)
R5 JULY 2022 INCORPORATION OBSERVATION
the State of Arunachal Pradesh under SARDP-NE Phase'B' CHECKED BY A.G.
R4 AUG 2019 MODIFIED DPR
DRAWING NO.
R3 JULY 2018 DPR NHIDCL/PANGO-JORGING/STC/MJB/ A3
REV. DATE DESCRIPTION OF REVISIONS GAD/DDE-101 SHEET 02 of 02
LONGITUDINAL SECTION A-A

ORGING

PONGO
HALF TOP HALF BOTTOM
LEGEND
REFERENCE DRAWINGS:-

CLIENT: PROJECT: DPR CONSULTANTS: TITLE:


DRAWN BY MANISH
R7 JULY 2023 AS PER NHIDCL SUGGESTION
National Highways & Infrastructure GENERALARRANGEMENTDRAWINGFOR
Development Corporation Limited. Shweta Technophile Consultants Pvt.Ltd. MAJOR BRIDGE AT CH-15+659
R6 JAN 2023
MODIFIED DPR Consultancy Services for Preparation of Feasibility Study and Detailed Project Report (222-223, 313, Rajhans Plaza, Ahinsa Khand-1, DESIGN BY AMIT SPAN (3 X 20 M)
INCORPORATION OBSERVATION 3rd Floor, PTI building, 4-Parliament
MODIFIED DPR
Street, New Delhi-110001 for Two laning of Pango to Jorging Road (Length: 90 km) for execution on EPC Mode in Indirapuram, Ghaziabad-201014)
R5 JULY 2022 INCORPORATION OBSERVATION
the State of Arunachal Pradesh under SARDP-NE Phase'B' CHECKED BY A.G.
R4 AUG 2019 MODIFIED DPR
DRAWING NO.
R3 JULY 2018 DPR NHIDCL/PANGO-JORGING/STC/MJB/ A3
REV. DATE DESCRIPTION OF REVISIONS GAD/DDE-101 SHEET 01 of 02
NOTES

G.L. G.L.
N.G.L. N.G.L.

SECTION AT "B-B"

SECTION AT "C-C"

REFERENCE DRAWINGS:-

AT SUPPORT AT MID

DETAIL-`Y' GIRDER SECTION DETAILS OF RCC GIRDER

CLIENT: PROJECT: DPR CONSULTANTS: TITLE:


DRAWN BY MANISH
R7 JULY 2023 AS PER NHIDCL SUGGESTION
National Highways & Infrastructure GENERALARRANGEMENTDRAWINGFOR
Development Corporation Limited. Shweta Technophile Consultants Pvt.Ltd. MAJOR BRIDGE AT CH-15+659
R6 JAN 2023
MODIFIED DPR Consultancy Services for Preparation of Feasibility Study and Detailed Project Report (222-223, 313, Rajhans Plaza, Ahinsa Khand-1, DESIGN BY AMIT SPAN (3 X 20 M)
INCORPORATION OBSERVATION 3rd Floor, PTI building, 4-Parliament
MODIFIED DPR
Street, New Delhi-110001 for Two laning of Pango to Jorging Road (Length: 90 km) for execution on EPC Mode in Indirapuram, Ghaziabad-201014)
R5 JULY 2022 INCORPORATION OBSERVATION
the State of Arunachal Pradesh under SARDP-NE Phase'B' CHECKED BY A.G.
R4 AUG 2019 MODIFIED DPR
DRAWING NO.
R3 JULY 2018 DPR NHIDCL/PANGO-JORGING/STC/MJB/ A3
REV. DATE DESCRIPTION OF REVISIONS GAD/DDE-101 SHEET 02 of 02
"X"

SECTIONAL ELEVATION

B C

B C PLAN

REFERENCE DRAWINGS:-

CLIENT: PROJECT: DPR CONSULTANTS: TITLE:


DRAWN BY MANISH
R7 JULY 2023 AS PER NHIDCL SUGGESTION
National Highways & Infrastructure GENERALARRANGEMENTDRAWINGFOR
MAJOR BRIDGE AT CH-16+959
Development Corporation Limited. Shweta Technophile Consultants Pvt.Ltd. SPAN (1 X 100 M)
R6 JAN 2023
MODIFIED DPR Consultancy Services for Preparation of Feasibility Study and Detailed Project Report (222-223, 313, Rajhans Plaza, Ahinsa Khand-1, DESIGN BY AMIT
INCORPORATION OBSERVATION 3rd Floor, PTI building, 4-Parliament
MODIFIED DPR
Street, New Delhi-110001 for Two laning of Pango to Jorging Road (Length: 90 km) for execution on EPC Mode in Indirapuram, Ghaziabad-201014)
R5 JULY 2022 INCORPORATION OBSERVATION
the State of Arunachal Pradesh under SARDP-NE Phase'B' CHECKED BY A.G.
R4 AUG 2019 MODIFIED DPR
DRAWING NO.
R3 JULY 2018 DPR NHIDCL/PANGO-JORGING/STC/MJB/ A3
REV. DATE DESCRIPTION OF REVISIONS GAD/DDE-101 SHEET 01 of 02
SECTION B-B

NOTES

SECTION C-C

LEGEND

REFERENCE DRAWINGS:-
DETAIL-`X'

ϒ ³
CLIENT: PROJECT: DPR CONSULTANTS: TITLE:
DRAWN BY MANISH
R7 JULY 2023 AS PER NHIDCL SUGGESTION
National Highways & Infrastructure GENERALARRANGEMENTDRAWINGFOR
MAJOR BRIDGE AT CH-16+959
Development Corporation Limited. Shweta Technophile Consultants Pvt.Ltd. SPAN (1 X 100 M)
R6 JAN 2023
MODIFIED DPR Consultancy Services for Preparation of Feasibility Study and Detailed Project Report (222-223, 313, Rajhans Plaza, Ahinsa Khand-1, DESIGN BY AMIT
INCORPORATION OBSERVATION 3rd Floor, PTI building, 4-Parliament
MODIFIED DPR
Street, New Delhi-110001 for Two laning of Pango to Jorging Road (Length: 90 km) for execution on EPC Mode in Indirapuram, Ghaziabad-201014)
R5 JULY 2022 INCORPORATION OBSERVATION
the State of Arunachal Pradesh under SARDP-NE Phase'B' CHECKED BY A.G.
R4 AUG 2019 MODIFIED DPR
DRAWING NO.
R3 JULY 2018 DPR NHIDCL/PANGO-JORGING/STC/MJB/ A3
REV. DATE DESCRIPTION OF REVISIONS GAD/DDE-101 SHEET 02 of 02
"X"

SECTIONAL ELEVATION

B C

B C PLAN

REFERENCE DRAWINGS:-

CLIENT: PROJECT: DPR CONSULTANTS: TITLE:


DRAWN BY MANISH
R7 JULY 2023 AS PER NHIDCL SUGGESTION
National Highways & Infrastructure GENERALARRANGEMENTDRAWINGFOR
MAJOR BRIDGE AT CH-19+018
Development Corporation Limited. Shweta Technophile Consultants Pvt.Ltd. SPAN (1 X 100 M)
R6 JAN 2023
MODIFIED DPR Consultancy Services for Preparation of Feasibility Study and Detailed Project Report (222-223, 313, Rajhans Plaza, Ahinsa Khand-1, DESIGN BY AMIT
INCORPORATION OBSERVATION 3rd Floor, PTI building, 4-Parliament
MODIFIED DPR
Street, New Delhi-110001 for Two laning of Pango to Jorging Road (Length: 90 km) for execution on EPC Mode in Indirapuram, Ghaziabad-201014)
R5 JULY 2022 INCORPORATION OBSERVATION
the State of Arunachal Pradesh under SARDP-NE Phase'B' CHECKED BY A.G.
R4 AUG 2019 MODIFIED DPR
DRAWING NO.
R3 JULY 2018 DPR NHIDCL/PANGO-JORGING/STC/MJB/ A3
REV. DATE DESCRIPTION OF REVISIONS GAD/DDE-101 SHEET 01 of 02
SECTION B-B

NOTES

SECTION C-C

LEGEND

REFERENCE DRAWINGS:-
DETAIL-`X'

ϒ ³
CLIENT: PROJECT: DPR CONSULTANTS: TITLE:
DRAWN BY MANISH
R7 JULY 2023 AS PER NHIDCL SUGGESTION
National Highways & Infrastructure GENERALARRANGEMENTDRAWINGFOR
MAJOR BRIDGE AT CH-19+018
Development Corporation Limited. Shweta Technophile Consultants Pvt.Ltd. SPAN (1 X 100 M)
R6 JAN 2023
MODIFIED DPR Consultancy Services for Preparation of Feasibility Study and Detailed Project Report (222-223, 313, Rajhans Plaza, Ahinsa Khand-1, DESIGN BY AMIT
INCORPORATION OBSERVATION 3rd Floor, PTI building, 4-Parliament
MODIFIED DPR
Street, New Delhi-110001 for Two laning of Pango to Jorging Road (Length: 90 km) for execution on EPC Mode in Indirapuram, Ghaziabad-201014)
R5 JULY 2022 INCORPORATION OBSERVATION
the State of Arunachal Pradesh under SARDP-NE Phase'B' CHECKED BY A.G.
R4 AUG 2019 MODIFIED DPR
DRAWING NO.
R3 JULY 2018 DPR NHIDCL/PANGO-JORGING/STC/MJB/ A3
REV. DATE DESCRIPTION OF REVISIONS GAD/DDE-101 SHEET 02 of 02
"X"

SECTIONAL ELEVATION

B C

B C PLAN

REFERENCE DRAWINGS:-

CLIENT: PROJECT: DPR CONSULTANTS: TITLE:


DRAWN BY MANISH
R7 JULY 2023 AS PER NHIDCL SUGGESTION
National Highways & Infrastructure GENERALARRANGEMENTDRAWINGFOR
MAJOR BRIDGE AT CH-22+122
Development Corporation Limited. Shweta Technophile Consultants Pvt.Ltd. SPAN (1 X 100 M)
R6 JAN 2023
MODIFIED DPR Consultancy Services for Preparation of Feasibility Study and Detailed Project Report (222-223, 313, Rajhans Plaza, Ahinsa Khand-1, DESIGN BY AMIT
INCORPORATION OBSERVATION 3rd Floor, PTI building, 4-Parliament
MODIFIED DPR
Street, New Delhi-110001 for Two laning of Pango to Jorging Road (Length: 90 km) for execution on EPC Mode in Indirapuram, Ghaziabad-201014)
R5 JULY 2022 INCORPORATION OBSERVATION
the State of Arunachal Pradesh under SARDP-NE Phase'B' CHECKED BY A.G.
R4 AUG 2019 MODIFIED DPR
DRAWING NO.
R3 JULY 2018 DPR NHIDCL/PANGO-JORGING/STC/MJB/ A3
REV. DATE DESCRIPTION OF REVISIONS GAD/DDE-101 SHEET 01 of 02
SECTION B-B

NOTES

SECTION C-C

LEGEND

REFERENCE DRAWINGS:-
DETAIL-`X'

ϒ ³
CLIENT: PROJECT: DPR CONSULTANTS: TITLE:
DRAWN BY MANISH
R7 JULY 2023 AS PER NHIDCL SUGGESTION
National Highways & Infrastructure GENERALARRANGEMENTDRAWINGFOR
MAJOR BRIDGE AT CH-22+122
Development Corporation Limited. Shweta Technophile Consultants Pvt.Ltd. SPAN (1 X 100 M)
R6 JAN 2023
MODIFIED DPR Consultancy Services for Preparation of Feasibility Study and Detailed Project Report (222-223, 313, Rajhans Plaza, Ahinsa Khand-1, DESIGN BY AMIT
INCORPORATION OBSERVATION 3rd Floor, PTI building, 4-Parliament
MODIFIED DPR
Street, New Delhi-110001 for Two laning of Pango to Jorging Road (Length: 90 km) for execution on EPC Mode in Indirapuram, Ghaziabad-201014)
R5 JULY 2022 INCORPORATION OBSERVATION
the State of Arunachal Pradesh under SARDP-NE Phase'B' CHECKED BY A.G.
R4 AUG 2019 MODIFIED DPR
DRAWING NO.
R3 JULY 2018 DPR NHIDCL/PANGO-JORGING/STC/MJB/ A3
REV. DATE DESCRIPTION OF REVISIONS GAD/DDE-101 SHEET 02 of 02
"X"

SECTIONAL ELEVATION

B C

B C PLAN

REFERENCE DRAWINGS:-

CLIENT: PROJECT: DPR CONSULTANTS: TITLE:


DRAWN BY MANISH
R7 JULY 2023 AS PER NHIDCL SUGGESTION
National Highways & Infrastructure GENERALARRANGEMENTDRAWINGFOR
MAJOR BRIDGE AT CH-27+151
Development Corporation Limited. Shweta Technophile Consultants Pvt.Ltd. SPAN (1 X 100 M)
R6 JAN 2023
MODIFIED DPR Consultancy Services for Preparation of Feasibility Study and Detailed Project Report (222-223, 313, Rajhans Plaza, Ahinsa Khand-1, DESIGN BY AMIT
INCORPORATION OBSERVATION 3rd Floor, PTI building, 4-Parliament
MODIFIED DPR
Street, New Delhi-110001 for Two laning of Pango to Jorging Road (Length: 90 km) for execution on EPC Mode in Indirapuram, Ghaziabad-201014)
R5 JULY 2022 INCORPORATION OBSERVATION
the State of Arunachal Pradesh under SARDP-NE Phase'B' CHECKED BY A.G.
R4 AUG 2019 MODIFIED DPR
DRAWING NO.
R3 JULY 2018 DPR NHIDCL/PANGO-JORGING/STC/MJB/ A3
REV. DATE DESCRIPTION OF REVISIONS GAD/DDE-101 SHEET 01 of 02
SECTION B-B

NOTES

SECTION C-C

LEGEND

REFERENCE DRAWINGS:-
DETAIL-`X'

ϒ ³
CLIENT: PROJECT: DPR CONSULTANTS: TITLE:
DRAWN BY MANISH
R7 JULY 2023 AS PER NHIDCL SUGGESTION
National Highways & Infrastructure GENERALARRANGEMENTDRAWINGFOR
MAJOR BRIDGE AT CH-27+151
Development Corporation Limited. Shweta Technophile Consultants Pvt.Ltd. SPAN (1 X 100 M)
R6 JAN 2023
MODIFIED DPR Consultancy Services for Preparation of Feasibility Study and Detailed Project Report (222-223, 313, Rajhans Plaza, Ahinsa Khand-1, DESIGN BY AMIT
INCORPORATION OBSERVATION 3rd Floor, PTI building, 4-Parliament
MODIFIED DPR
Street, New Delhi-110001 for Two laning of Pango to Jorging Road (Length: 90 km) for execution on EPC Mode in Indirapuram, Ghaziabad-201014)
R5 JULY 2022 INCORPORATION OBSERVATION
the State of Arunachal Pradesh under SARDP-NE Phase'B' CHECKED BY A.G.
R4 AUG 2019 MODIFIED DPR
DRAWING NO.
R3 JULY 2018 DPR NHIDCL/PANGO-JORGING/STC/MJB/ A3
REV. DATE DESCRIPTION OF REVISIONS GAD/DDE-101 SHEET 02 of 02
"X"

SECTIONAL ELEVATION

B C

B C PLAN

REFERENCE DRAWINGS:-

CLIENT: PROJECT: DPR CONSULTANTS: TITLE:


DRAWN BY MANISH
R7 JULY 2023 AS PER NHIDCL SUGGESTION
National Highways & Infrastructure GENERALARRANGEMENTDRAWINGFOR
MAJOR BRIDGE AT CH-35+674
Development Corporation Limited. Shweta Technophile Consultants Pvt.Ltd. SPAN (1 X 100 M)
R6 JAN 2023
MODIFIED DPR Consultancy Services for Preparation of Feasibility Study and Detailed Project Report (222-223, 313, Rajhans Plaza, Ahinsa Khand-1, DESIGN BY AMIT
INCORPORATION OBSERVATION 3rd Floor, PTI building, 4-Parliament
MODIFIED DPR
Street, New Delhi-110001 for Two laning of Pango to Jorging Road (Length: 90 km) for execution on EPC Mode in Indirapuram, Ghaziabad-201014)
R5 JULY 2022 INCORPORATION OBSERVATION
the State of Arunachal Pradesh under SARDP-NE Phase'B' CHECKED BY A.G.
R4 AUG 2019 MODIFIED DPR
DRAWING NO.
R3 JULY 2018 DPR NHIDCL/PANGO-JORGING/STC/MJB/ A3
REV. DATE DESCRIPTION OF REVISIONS GAD/DDE-101 SHEET 01 of 02
SECTION B-B

NOTES

SECTION C-C

LEGEND

REFERENCE DRAWINGS:-
DETAIL-`X'

ϒ ³
CLIENT: PROJECT: DPR CONSULTANTS: TITLE:
DRAWN BY MANISH
R7 JULY 2023 AS PER NHIDCL SUGGESTION
National Highways & Infrastructure GENERALARRANGEMENTDRAWINGFOR
MAJOR BRIDGE AT CH-35+674
Development Corporation Limited. Shweta Technophile Consultants Pvt.Ltd. SPAN (1 X 100 M)
R6 JAN 2023
MODIFIED DPR Consultancy Services for Preparation of Feasibility Study and Detailed Project Report (222-223, 313, Rajhans Plaza, Ahinsa Khand-1, DESIGN BY AMIT
INCORPORATION OBSERVATION 3rd Floor, PTI building, 4-Parliament
MODIFIED DPR
Street, New Delhi-110001 for Two laning of Pango to Jorging Road (Length: 90 km) for execution on EPC Mode in Indirapuram, Ghaziabad-201014)
R5 JULY 2022 INCORPORATION OBSERVATION
the State of Arunachal Pradesh under SARDP-NE Phase'B' CHECKED BY A.G.
R4 AUG 2019 MODIFIED DPR
DRAWING NO.
R3 JULY 2018 DPR NHIDCL/PANGO-JORGING/STC/MJB/ A3
REV. DATE DESCRIPTION OF REVISIONS GAD/DDE-101 SHEET 02 of 02