0% found this document useful (0 votes)
11 views

FAQ Views and Interpretations 2021 07 12

Uploaded by

Hugo MorenoL
Copyright
© © All Rights Reserved
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
11 views

FAQ Views and Interpretations 2021 07 12

Uploaded by

Hugo MorenoL
Copyright
© © All Rights Reserved
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 4

VIEWS AND INTERPRETATIONS (2021 07 12)

Views and interpretations are issued via AAR QA Newsletter. All views and interpretations issued since
1985 have been reviewed and, where appropriate, have been added to Specification M-1003. Other
interpretations are specific to a type of facility and do not affect all M-1003 Certified facilities; therefore
they are issued here for reference. QA Newsletters will continue to contain pertinent views and
interpretations between printings of M-1003 or issuance of AAR Circular Letter changes to M-1003.

Following is a summary, by program element, of the interpretations that have been rendered by the QA
Committee. Please refer to these interpretations for guidance if questions arise. When new questions
arise, please direct them to the QA Program Coordinator’s attention for further handling.

1.0 ADMINISTRATIVE PROVISIONS (REFERENCE PARAGRAPH 2.1 IN THE SPECIFICATION)

Intentionally left blank

2.0 APPLICABILITY AND SCOPE (REFERENCE PARAGRAPH 2.2 IN THE SPECIFICATION)

Intentionally left blank

3.0 QA PROGRAM AND MANUAL REQUIREMENTS (REFERENCE PARAGRAPH 2.3 IN THE


SPECIFICATION)

The internal audit is a systematic review of the facility’s compliance to its QA manual and procedures.

The manual review is a systematic review of the facility’s QA manual for compliance to the specifications
(e.g., M-1003 and any technical requirements).

The program review is a systematic review of all aspects of the quality program for compliance to all
specifications—for example, customer requirements, technical requirements, nonconformance and
corrective actions, preventive maintenance requirements.

Reviews noted above must be documented to comply with the M-1003 requirements.

4.0 MANAGEMENT RESPONSIBILITY (REFERENCE PARAGRAPH 2.4 IN THE SPECIFICATION)

Intentionally left blank

5.0 PRODUCTION INSPECTION AND TEST PLAN (REFERENCE PARAGRAPH 2.5 IN THE SPECIFICATION)

Intentionally left blank

6.0 CORRECTIVE AND PREVENTATIVE ACTIONS (REFERENCE PARAGRAPH 2.6 IN THE SPECIFICATION)

Intentionally left blank

7.1 DOCUMENT CONTROL (REFERENCE PARAGRAPH 2.7 IN THE SPECIFICATION)

7.2 M-1003 Certified companies are required to maintain current English language versions
of applicable standards, internal procedures, and forms used in the quality program. With
respect to completed forms, inspection and test results need not be translated into both English
and the appropriate language; however a blank form in English must be available for use by the
auditor.
8.1 MEASURING AND TESTING EQUIPMENT (REFERENCE PARAGRAPH 2.8 IN THE SPECIFICATION)

8.2 Shelf life of gauges: The facility must determine and document the shelf life of
measuring and testing equipment based on the nature and use of the equipment, storage
conditions, and all applicable specifications, technical requirements, contract requirements or
manufacturers’ recommendations.

8.3 Placed-in-service dates are permissible on measuring and testing equipment provided
the gauge calibration procedures support the practice and either

• there is evidence that the gauge is in the same condition when placed in service that it
was when last calibrated; or

• the gauge meets the requirements of paragraph 8.1 above.

8.4 Placed-in-service dates are not permissible when technical requirements state
otherwise.

8.5 In-service dates: Once a gauge is placed in service, the recalibration cycle or due date, as
noted in the calibration procedure, is calculated from the date placed in service. Taking a gauge
out of service and then placing it back in service with a new due date but without recalibrating it
is not acceptable.

8.6 Welding machine output (amperage and/or voltage) must be verified using nationally
recognized/traceable standards. Wire feed speed must be verified using nationally
recognized/traceable standards or by verifying amperage and voltage when the facility’s
equipment simultaneously controls wire feed speed and amperage. Records must be
maintained to satisfy the requirements of paragraph 2.8 in the specification.

8.7 Shielding gas-flow devices do not require nationally recognized verification/calibration


unless the product specification, contract, design requirements, or facility’s quality assurance
program specifies verification/calibration.

8.8 Welding rod ovens: The facility must specify the method for verifying the oven
temperature (temperature-indicating crayons are acceptable), provide documentation of the
verification, and ensure that the AWS requirement or product specification for proper rod
storage is satisfied. Verification methods other than the use of temperature-indicating crayons
must satisfy the requirements of paragraph 2.8 in the specification.

8.9 – Cell Phone / Stop-Watch Calibration - Time measurement devices do not need to be
calibrated. They must be in good working condition and have an appropriate scale for intended
use.

8.10 Facilities are encouraged to request before-and-after readings on gauges sent in for
calibration.

8.11 The user of a gauge must be aware of its calibration status. Access to the status should
be at or near the work area.
8.12 When gauge tolerances are not specified in a technical specification, follow the
manufacturer’s suggestion as a minimum.

8.13 In general, ‘reference’ gauges do not require calibration. This depends on the
application of the gauge.

8.14 Paint-thickness gauges: Dry-film paint-thickness gauges must be calibrated using NIST or
nationally recognized traceable standards. Wet-film paint-thickness gauges normally do not
require calibration. These gauges are normally used as a guide or reference for the operator. If a
contract requires that the wet-film thickness be verified as a quality characteristic, NIST or other
nationally recognized traceable calibration may be required.

9.0 PURCHASING AND CONTRACTING (REFERENCE PARAGRAPH 2.9 IN THE SPECIFICATION)

Intentionally left blank

10.0 INCOMING INSPECTION (REFERENCE PARAGRAPH 2.10 IN THE SPECIFICATION)

Intentionally left blank

11.0 IN-PROCESS INSPECTION (REFERENCE PARAGRAPH 2.11 IN THE SPECIFICATION)

Intentionally left blank

12.0 FINAL INSPECTION (REFERENCE PARAGRAPH 2.12 IN THE SPECIFICATION)

Intentionally left blank

13.0 INSPECTION STATUS (REFERENCE PARAGRAPH 2.13 IN THE SPECIFICATION)

Intentionally left blank

14.0 IDENTIFICATION AND TRACEABILITY (REFERENCE PARAGRAPH 2.14 IN THE SPECIFICATION)

Intentionally left blank

15.0 PROCESS CONTROL (REFERENCE PARAGRAPH 2.15 IN THE SPECIFICATION)

Intentionally left blank

16.0 PRESERVATION, PACKAGING, AND SHIPPING (REFERENCE PARAGRAPH 2.16 IN THE


SPECIFICATION)

Intentionally left blank

17.0 QUALITY RECORDS (REFERENCE PARAGRAPH 2.17 IN THE SPECIFICATION)

Intentionally left blank

18.0 NONCONFORMANCE CONTROL (REFERENCE PARAGRAPH 2.18 IN THE SPECIFICATION)

Intentionally left blank

19.0 QUALITY PROGRAM REVIEW AND MANUAL REVISION (REFERENCE PARAGRAPH 2.19 IN THE
SPECIFICATION)
Intentionally left blank

20.0 PROCESS CAPABILITY/STATISTICAL METHODS (REFERENCE PARAGRAPH 2.20 IN THE


SPECIFICATION)

Intentionally left blank

21.0 INTERNAL AUDIT (REFERENCE PARAGRAPH 2.21 IN THE SPECIFICATION)

21.2 An AAR auditor may write an adverse audit finding report, even if the nonconformance
was found in the internal audit, if the auditor also found the nonconformance and it has not
been corrected.

21.3 Auditing internal audits should be done in such a manner as to not give the perception
that the auditor is using the internal audit results to conduct his or her audit.

21.4 A completed checklist is one that has checkmarks (or other notations) that indicate an
element was audited and notes that describe what you looked at and what you found. The
notes do not have to be on the checklist but they need to exist and should be filed with the
checklist.

22.1 TRAINING (REFERENCE PARAGRAPH 2.22 IN THE SPECIFICATION)

Evaluate the effectiveness of the people trained. This may be done in a variety of ways, including but not
limited to the following:

• written or oral examination

• observation of work being performed

• documented lack of problems with the work

• verification of a nonconformance corrective action where training was the root cause of the
nonconformance

23.0 CONTRACT REVIEW (REFERENCE PARAGRAPH 2.23 IN THE SPECIFICATION)

Intentionally left blank

24.1 DESIGN CONTROL (REFERENCE PARAGRAPH 2.24 IN THE SPECIFICATION)

24.2 If a function within the design control process is performed at a different location (e.g.,
“headquarters”), the QA manual shall clearly describe which criteria of the design control
process are performed at the different location.

You might also like