We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 7
NAMA PROGRAM : PEMASANGAN DAN PENYELENGGARAAN ELEKTRIK TIGA FASA
PROGRAM : [F432-005-3:2019]
SALINAN KAD PENGENALAN (1 SALINAN – BY WHATSAPP)
CARTA ORGANISASI TEMPAT KERJA (1 SALINAN – BY WHATSAPP) GAMBAR BERUKURAN PASPORT (BY WHASAPP) SETIAP BUKTI PERLU ADA TERTULIS NAMA FAUZI ARAHAN DALAM WS DAN TERTERA NAMA FAUZI BOLEH DITERIMA SEBAGAI BUKTI (SCREENSHORT WS) / SIJIL YANG BERKAITAN BOLEH RUJUK JENIS-JENIS BUKTI DI BAHAGIAN PAGES AKHIR SILA TANDAKAN NOTA, CONTOH CU1.1 UNTUK SETIAP BUKTI GAMBAR
BIL. PERKARA BUKTI
1. THREE PHASE DRAWING 1 Prepare Three Phase Drawing Requirements. (2 BUKTI) Gambar @ - Carry out site survey. laporan @ - Calculate Total Connected Load (TCL). memo - Calculate current diversity value. arahan/arahan - Determine maximum demand. bertulis @ * pilih 2 point yang dokumen/bukti sedia ada dengan fauzi senarai semak
2 Perform Three Phase Drawing. (2 BUKTI) Laporan @
- Draw layout plan. senarai semak @ - Determine final circuit distribution. plan lukisan - Draw three line schematic diagram. * pilih 2 point yang dokumen/bukti sedia ada dengan fauzi
3 Propose Three Phase Drawing Paperwork. (2 BUKTI) Contoh lukisan
- Sample of three phase drawing paperwork. @ gambar @ - Compile three phase drawing paperwork. memo arahan @ - Check drawing for error. senarai semak @ - Check drawing for error. laporan * pilih 2 point yang dokumen/bukti sedia ada dengan fauzi
2. THREE PHASE WIRING
1 Prepare Three Phase Wiring Requirements. (2 BUKTI) Senarai semak @ - Interpret wiring requirements. surat berkaitan - Select wiring and earthing work tools and equipment. @ laporan @ - Select wiring and earthing materials. gambar - Determine location of wiring route. * pilih 2 point yang dokumen/bukti sedia ada dengan fauzi
2 Perform Three Phase Wiring Activities. (2 BUKTI) Gambar @
- Setup safe working area. senarai semak @ - Conduct three phase framework installation (surface, conceal, conduit, laporan @ ducting, trunking, casing, cable tray and underground). memo arahan - Lay and mark cable. - Determine location for fitting and accessories installation. - Carry out cables and accessories termination. - Check all fitting & accessories connected to earthing. - Check all fitting & accessories connected to earthing. - Determine earthing location. - Test earthing system using earth tester. - Connect earth point busbar to earth rod. - Execute electrical testing on wiring system. - Execute visual check on wiring system finishing. * pilih 2 point yang dokumen/bukti sedia ada dengan fauzi
3 Carry Out Three Phase Distribution Board Installation. (2 BUKTI) Gambar @
- Mark distribution board installation location. senarai semak @ - Install distribution board. laporan - Install protection device in distribution board. - Connect wiring cable and earthing cable onto distribution board. - Execute insulation resistance test on wiring system. * pilih 2 point yang dokumen/bukti sedia ada dengan fauzi
3. THREE PHASE SYSTEM MAINTENANCE
1 Prepare Maintenance Work Requirement. (2 BUKTI) Senarai - Maintenance procedure which include: • Work order. • Maintenance kerja/tugas @ schedule. • Work specification (schematic plan, layout plan, checklist). • laporan @ Safety (PPE). gambar - Maintenance checklist format. - Interpret system maintenance requirements. - Select maintenance work tools and equipment. - Determine location of maintenance. * pilih 2 point yang dokumen/bukti sedia ada dengan fauzi
2 Perform Maintenance Work. (2 BUKTI) Gambar @
- Troubleshooting procedure. senarai semak @ - Maintenance technique which include: • Service. • Repair. • Replace. laporan - Types of faulty which include: • Electrical fault. • Mechanical fault. - Functionality test. - Inspect system functionality and condition. - Execute parts maintenance. - Identify parts faulty - Rectify faulty parts. - Utilise testing tools and equipment. * pilih 2 point yang dokumen/bukti sedia ada dengan fauzi 3 Prepare Maintenance Work Report. (2 BUKTI) Laporan @ - Update maintenance checklist and logbook. senarai semak @ - Produce maintenance report. surat berkaitan - Submit maintenance report. @ gambar - File maintenance report. * pilih 2 point yang dokumen/bukti sedia ada dengan fauzi
4. THREE PHASE MOTOR SYSTEM INSTALLATION Gambar @
1 Prepare Three Phase Motor System Installation Requirements. senarai semak @ (2 BUKTI) laporan @ - Interpret motor system installation requirements. memo arahan - Select motor system installation tools and equipment. - Select motor system installation materials. - Select motor system testing equipment. - Determine motor and motor control installation location. * pilih 2 point yang dokumen/bukti sedia ada dengan fauzi
2 Carry Out Three Phase Motor Installation And Termination. Gambar @
(2 BUKTI) laporan @ - Setup safe working area. senarai semak - Mark motor installation location. - Install motor. - Execute motor winding resistance test. - Execute motor winding resistance test. - Record motor name plate. * pilih 2 point yang dokumen/bukti sedia ada dengan fauzi
3 Carry Out Three Phase Motor Control Installation. (2 BUKTI) Gambar @
- Determine location for fitting and accessories installation. senarai semak @ - Execute wiring and marking cable. memo arahan @ - Execute motor control installation (Direct Online (DOL) starter, Star surat berkaitan Delta (SD) starter, Auto Transformer (AT) starter, Rotor Resistance @ laporan starter). - Execute motor and motor control termination including grounding. * pilih 2 point yang dokumen/bukti sedia ada dengan fauzi
4 Test Three Phase Motor And Motor Control Functionalities. Gambar @
(2 BUKTI) senarai semak @ - Execute dead circuit test (insulation, continuity, polarity). laporan @ - Execute live circuit test (on load and off load, rotation direction). memo arahan - Analyse test result. - Record test data. * pilih 2 point yang dokumen/bukti sedia ada dengan fauzi
5. THREE PHASE WIRING TESTING AND COMMISSIONING
1 Prepare Three Phase Electrical System Testing And Senarai semak @ Commissioning Requirements. (2 BUKTI) gambar @ - Apply work permission and Permit to Work (PTW). senarai semak @ - Interpret work information from safety briefing. memo arahan @ - Request Permit to Work (PTW) approval. laporan - Select testing and commissioning work tools and equipment. * pilih 2 point yang dokumen/bukti sedia ada dengan fauzi
2 Perform Three Phase Electrical System Testing. (2 BUKTI) Gambar @
- Prepare safe working area (Notice, PTW, shutdown, LOTO, PCD, CME). senarai semak @ - Execute continuity test. laporan @ - Execute polarity test. memo arahan - Execute insulation resistance test. - Execute phase sequence test. - Execute earthing resistance test. - Execute Residual Current Device (RCD) test. - Execute earth loop impedance test. - Execute illumination test. - Execute motor and motor control testing (on load and off load). - Apply PTW closure. - Carry out housekeeping work. * pilih 2 point yang dokumen/bukti sedia ada dengan fauzi
3 Perform Three Phase Electrical System Commissioning. Gambar @
(2 BUKTI) laporan @ - Prepare safe working area (Notice, PTW, shutdown, LOTO, PCD, CME). senarai semak @ - Update inspection check sheet. memo arahan - Compile testing result. - Compare test result (electrical installation guideline). - Obtain competent personnel endorsement. - Obtain owner acceptance. - Apply Permit to Work (PTW) closure. * pilih 2 point yang dokumen/bukti sedia ada dengan fauzi
6. ELECTRICAL BUILDING AUTOMATION SYSTEM INSTALLATION
1 Prepare Electrical BAS Installation Requirement. (2 BUKTI) Gambar @ - Interpret wiring schematic drawing. senarai semak @ - Interpret layout plan. memo arahan @ - Carry out site visit and evaluation. surat berkaitan - Identify types of load. @ laporan - Determine appropriate BAS devices (sensor and actuator). - Check location of the wiring route. * pilih 2 point yang dokumen/bukti sedia ada dengan fauzi
2 Produce Electrical BAS Schematic Drawing. (2 BUKTI)
- Interpret BAS blueprint. Contoh plan @ - Plan BAS topology. senarai semak @ - Address BAS device. gambar @ - Produce electrical BAS schematic drawing. memo arahan - Layout plan elements which include: • Symbols. • Loads. • Accessories. • Legends. * pilih 2 point yang dokumen/bukti sedia ada dengan fauzi
3 Install Electrical BAS System. (2 BUKTI) Gambar @
- Setup safe working area. senarai semak @ - Determine location for BAS device installation. memo arahan @ - Conduct BAS framework installation (hacking, drilling, levelling, laporan plastering and painting). - Lay and mark AC load cable. - Lay BAS cable. - Interpret BAS devices technical manual. - Execute BAS devices installation. - Carry out AC load and BAS cables termination - Inspect BAS installation * pilih 2 point yang dokumen/bukti sedia ada dengan fauzi
4 Perform Electrical BAS Device Programming. (2 BUKTI) Gambar @
- Import BAS device database. laporan @ - Create BAS project. memo arahan @ BAS project: • Building view (building structure, BAS device). • Group senarai semak address view (organised main group, middle group & group addresses). - Identify device functionality. - Assign group address. * pilih 2 point yang dokumen/bukti sedia ada dengan fauzi
5 Perform Electrical BAS System Testing And Commissioning. Gambar @
(2 BUKTI) memo arahan @ - Connect BAS software and BAS system. senarai semak @ - Test BAS software and BAS system interface. laporan - Download BAS program to device. - Carry out BAS device functionality test and commissioning. - Carry out diagnostics. - Prepare BAS functionality form. - Carry out housekeeping work. * pilih 2 point yang dokumen/bukti sedia ada dengan fauzi
1 Prepare Project Costing. (2 BUKTI) Gambar @ - Determine operation cost. memo arahan @ Types of operation cost which include: • Materials. • Tools and laporan @ equipment. • Labour cost. senarai semak - Calculate project cost. - Propose project costing estimation. Materials costing requirements which include: • Cable (size, cable type, quantity). • Fitting (conduit, trunking, casing). • Accessories (types of accessories and quantity). • Sundry items. Tools and equipment which include: • Hand tools. • Power tools. • Test and measurement equipment. Labour cost: • Competency. • Work duration. * pilih 2 point yang dokumen/bukti sedia ada dengan fauzi
2 Supervise Safety And Health Practice. (2 BUKTI) Gambar @
- Conduct safety and health briefing. memo arahan @ - Convey information to staff. surat berkaitan - Monitor PPE usage among workers. @ laporan - Conform working process to Standard Operating Procedure (SOP). * pilih 2 point yang dokumen/bukti sedia ada dengan fauzi
3 Supervise Work Progress. (2 BUKTI) Senarai semak @
- Conduct project briefing. senarai tugas/ - Convey information to staff. kerja @ memo - Determine work completion date. arahan @ - Arrange manpower requirement. laporan @ - Check work performance against work schedule. gambar - Compile project progress and commissioning report. - Recommend improvement for the project - Present progress report. * pilih 2 point yang dokumen/bukti sedia ada dengan fauzi
JENIS-JENIS BUKTI SUMBER DIPEROLEHI /SYARAT
KATEGORI BUKTI KUKUH KATEGORI BUKTI SEDERHANA
1. Memo/Surat 1. Hasil Kerja - Dihasilkan sebelum permohonan Lantikan/Arahan kerja dikemukakan. - Disahkan secara bertulis oleh ▪ Majikan, Pusat Bertauliah(PB) atau agensi pelanggan/majikan atau pihak ketiga* awam/swasta 2. Perakuan PP-PPT - Laporan hasil lawatan di yang berkenaan tempat kerja calon - Laporan temuduga ▪ Disahkan oleh pegawai atasan [Laporan Penilaian Bukti-Bukti Keterampilan 2. Senarai Tugas ▪ Disahkan oleh pegawai Pengiktirafan Pencapaian Terdahulu (PPT)] atasan atau majikan. 3. Testimonial (Pelanggan) - Merupakan 3. Lesen pelanggan kepada calon ▪ Dikeluarkan oleh Badan Pelesenan yang 4. Keratan Akhbar - Dokumen asal dan disahkan diiktiraf. oleh majikan atau pihak ketiga* 4. Buku Log/Buku 5. Artikel - Dokumen asal dan bertarikh serta Catatan ▪ Rujuk kepada dokumen asal buku disahkan oleh majikan atau pihak ketiga* log/buku catatan. 6. Bil/Resit/Inbois - Salinan bukti perlu ▪ Disahkan oleh pegawai atasan. disertakan bersama dokumen asal bagi tujuan 5. Surat Akuan semakan PP-PPT dan PPL-PPT ▪ Majikan, Pusat Bertauliah atau agensi 7. Sampel - Dilihat dan disahkan oleh PP-PPT awam/swasta dan PPL-PPT. 8. ROC/ROB/ROS ▪ Suruhanjaya Syarikat 8. Video/CD - Salinan bukti perlu disertakan Malaysia (SSM) bersama dokumen asal bagi tujuan semakan 7. Keputusan Penilaian PP-PPT dan PPL-PPT / Ujian/ Peperiksaan 9. Dokumen ISO - Salinan bukti perlu disertakan ▪ Dikeluarkan oleh badan/agensi yang diiktiraf bersama dokumen asal bagi tujuan semakan ▪ Salinan bukti perlu disertakan bersama PP-PPT dan PPL-PPT dokumen asal 10. Fail Meja - Salinan bukti perlu disertakan 8. Kertas Kerja ▪ Telah diluluskan oleh majikan bersama dokumen asal bagi tujuan semakan atau pihak ketiga* PP-PPT dan PPL-PPT 9. Laporan ▪ Telah diluluskan oleh majikan atau 11. Gambar - Diambil sebelum permohonan pihak ketiga* dikemukakan. - Disahkan secara bertulis oleh 10. Rekabentuk/ majikan/rakan sekerja/pihak ketiga*. Blueprint ▪ Bukti disediakan oleh calon Nota : *Pihak Ketiga adalah Pesuruhjaya ▪ Salinan bukti yang disahkan oleh majikan atau Sumpah, Jaksa Pendamai, Ketua Kampung, pihak ketiga* Penghulu atau Pegawai Pengurusan & 11. Sijil Kursus Professional ▪ Daripada agensi yang diiktiraf sama ada institut awam/swasta ▪ Disertakan dengan transkrip, jadual waktu atau isi kandungan kursus yang berkaitan 12. . Anugerah ▪ Diiktiraf oleh badan atau agensi di peringkat kebangsaan atau antarabangsa
Nota : *Pihak Ketiga adalah Pesuruhjaya
Sumpah, Jaksa Pendamai, Ketua Kampung, Penghulu atau Pegawai Pengurusan & Professional