0% found this document useful (0 votes)
20 views

Form Works, Steel Fixing & Concreting

Uploaded by

sathishkumar
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
20 views

Form Works, Steel Fixing & Concreting

Uploaded by

sathishkumar
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 5

JOB SAFETY ANALYSIS (JSA)

Title of Activity / Work: Concreting (RCC & PCC)


Name of Project Site: JSA No

Location of Project Site: Date of JSA preparation

Name of Contractor: JSA Rev No

Name of Field Contractor Administrator:

Persons responsible
Hazard Risk control Who will make sure it
Sl. No. Work activity Remarks
Break the job down into What could harm someone ? What can be done to make the job safe ? happens ?
steps

Approved JSA should be made available for all construction


Non availability of JSA
activities, prior to starting of the activities
Working without Permit to Valid and approved Permit to work should be made available at
Work System job location, prior to starting the activities Job Supervisor

TBT should be conducted on daily/shift basis, prior to starting


Working without TBT
the activities

Planning& Job
1 Ensure all workers attend SAC EHS Orientation and Contractor
Preparation Deployment of untrained Supervisor/Contr
Safety Supervisor should impart job specific training as per
workers actor Safety
approved JSA
Supervisor

Working without Job Job supervisor should supervise the activities personally and
Supervisor should availabe at work location
Job Supervisor

1 of 5
Preparation

Persons responsible
Hazard Risk control Who will make sure it
Sl. No. Work activity Remarks
Break the job down into What could harm someone ? What can be done to make the job safe ? happens ?
steps
Job Supervisor
Mandator PPEs (Blue Helmet, Reflective Jackets, Goggles and
Working without proper
Safety Shoes) and Job Specific PPEs as per JSA should be worn
PPEs
all times
Only Inspected and road worthy vehicles are allowed in SAC.
Vehicles should be available with RC, PUC and Insurance
Drivers should posses valid license
Driver/Job
Toppling of vehicle Should maintain speed limit of 20 KMPH Supervisor
Vehicle movement area should be inspected and should be
Transporting, leveled and compacted if any undulation/pot holes that can
Loading & make vehicle topple
2
Unloading of All lifting tools and tackles should have valid TPI certified (Form
materials (Steel) 10) Job Supervisor
Failure of lifting tools and Tools and tackles should be inspected for any damage, before and Contractor
tackles use Safety
Standard rigging arrangements should be used. Supervisor

Wear cut resistant handgloves when handling rebars


Finger Injury Job Supervisor
Be cautious and avoid placing fingers under the load
Stack steel bundles on wooden batten, for safe stacking and
retrieval
Stacking of steels & Fall of steels & Ply woods
3 Job Supervisor
Plywoods Finger Injury Stack steels and plywoods on separate area, away from the
walkways and barricade it properly

If steel is more than 1 m, handle the steel with atleast two


workmen
Personnel injury while
handling with steel, Manual Wear shoulder pad for shifting steel from one place to another
Handling, Sharp Edges
Shifting and Fixing
4 Job Supervisor
Steel 2 of 5
Persons responsible
Personnel injury
Hazardwhile Risk control Who will make sure it
Sl. No. Work activity Remarks
Break the job down into What could
handling withharm someone
steel, ?
Manual What can be done to make the job safe ? happens ?
steps Handling, Sharp Edges
Shifting and Fixing Wear cut resistant handgloves when handling steels
4 Job Supervisor
Steel
Ensure walkways free from obstructions
Slip and Trip while shifting
steel Maintain good housekeeping. Stack materails away from
walkways
Use only plywood cutting machine with retractable gaurds for
cutting plywoods
Wrong tools, Cut Injury
Provide proper work bench & vise for plywood cutting
Use standard hammers with fixed handles
Electrical Tools provide Earthling , ELCB And Check Cable
conduction And Electrical tools physical condition, (Electrical
5 Formworks Electrocution when using tools inspection by electrical department) Job Supervisor
portable electrical tools
Double Insulated portable electrical tools to be provided

Use magnets to remove nails from the ground


Nail Piercing
Wear IS 15298 certified safety shoes

Rebars for walls, piers, columns and small vertical structures


Fall of vertical rebars
must be properly guyed and suppported to prevent collapse
Exposed vertical and horizontal rebars should be provided with
Fall on protruding rebars rebar caps or protected by suitable method or barricaded to
prevent access
Pinch /Piercing Points Wear cut resistant handgloves
Install Forms, and Slip and trip hazard Provide proper access and egress while working at height
6 Job Supervisor
Rebar

3 of 5
Persons responsible
Hazard Risk control Who will make sure it
Sl. No. Work activity Remarks
Break the job down into What could harm someone ? What can be done to make the job safe ? happens ?
Install Forms, and
steps
6 Job Supervisor
Rebar
Provide lifeline for anchoring te full body harness, while
working at height
Maintain 100% tie-off at height
Fall of person
Vertigo test for all workers working at height
Wear full body harness with shock absorber when working
more than 6m height

Finger Injury Wear cut resistant handgloves

Avoid throwing of materials from height. If throwing of


materials is inevitable due to practical constraint, hard
Fall of material /Dropped
barricade the ground level to prevent unauthorised entry.
Object
Provide safety nets for catchment of any accidental fall of
Shuttering &
7 Providelashing for hand tools (Hammer etc) Job Supervisor
Deshuttering
Provide safe access and working platform for shuttering and
deshuttering activities
Ensure minimum two jallies used for working platform
Fall of person Provide lifeline for anchoring te full body harness, while
Maintain 100% tie-off at height
Vertigo test for all workers working at height
Wear full body harness with shock absorber when working
Use PPE such as Safety Shoes/Gum boot with steel toe, safety
Eye/Skin Iritation gloves, safety goggles, Safety Helmet & dust mask
8 Concrete handling Job Supervisor
Hand Injury Use standard plastic suites for extension
Overturning of concrete Set up concrete pump on firm & leveled ground, keep away
pump due to Uneven from excavations/pits. If required ground to be compacted.
ground level, presence of While using the outriggers, extend it fully .
soft ground, Excavation
Setting up of a near the concrete pump,
4 of 5
9 concrete pump / Unsafe placement of Job Supervisor
Persons responsible
Sl. No. Work activity
OverturningHazard
of concrete Risk control Who will make sure it
Remarks
Break the job down into What could harm
pump due to Uneven someone ? What can be done to make the job safe ? happens ?
steps ground level, presence of
soft ground, Excavation Supply adequate support for the purpose of packing the base
Setting up of a near the concrete pump, plate.
9 concrete pump / Unsafe placement of Job Supervisor
boom placer outriggers Not fully
extended Barricade concrete pump operation area .

Secure the hose .


Hose of boom placer hit
Guide ropes must be used during concreting.
may cause injury
Keep away personnel from swing area.
Concrete should not be poured too rapidly or from such a
height that will overload / impact the form work.
Concrete spillage should not be allowed to accumulate on the
Collapse of formworks due form work
10 Concreting to rapid pouring of Ensure proper fastening & securing of concrete pouring chute
concrete Job Supervisor
Inspection of transit mixer.
Barricade concreting area.
Electrocution Connection through 30mA ELCB.
11 Use of Vibrator
Vibration Avoid prolonged exposure. Insist on shift pattern.

Note: If any incident happened during the work, then work will be stopped and JSA will be reviewed. Work will be restarted after implementing safety measures mentioned in revised JSA."

Prepared by (Contractor): Reviwed By (SAC):


Name and sign. Name and sign.

5 of 5

You might also like