0% found this document useful (0 votes)
41 views12 pages

WTP Detail Design

Uploaded by

omarkhafi
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
41 views12 pages

WTP Detail Design

Uploaded by

omarkhafi
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 12

Appendix E

Drg. Ref : Job Ref :


Consulting Engineers Calc. By : AHA Calc. Sheet No :
Checked by:AK
LSG Date : 17/7/2024
Project
Part of Structure : n/a
Member CALCULATION
Treatment Plant

Plant Capacity Insert

Normal Condition
Plant's raw water inflow = 20 MLD
WTP operating hours per day = 20 hr/day
Plant's raw water inflow = 1000 m3/hr
Plant's raw water inflow = 0.278 m3/s

Overload Condition
Percentage of overloading = 25 %
Plant's raw water inflow = 25.00 MLD
WTP operating hours per day = 20 hr/day
Plant's raw water inflow = 1250 m3/hr
Plant's raw water inflow = 0.347 m3/s

Aerator

Height of Fall assume


Dissolved oxygen content of raw water = 4 mg/l

Dissolved oxygen content at saturation point = 8.2 mg/l


80% of DO at saturation point = 6.56 mg/l (Equilibrium)

Gameson's formula : r = 1 + 0.5(a x b x h)

a (moderately polluted) = 1.00


b (stepped weir) = 1.30
r= Oxygen ratio
r= (8.2-4.5) / (8.2 - 6.56)
r= 2.6
h= 2.4 m

Size of Aerator
Surface loading = 32 m3/(m2/hr)
Surface area required = 31.3 m2 (Inflow/Loading Rate)
Overall diameter of aerator = 4.6 m
Surface area tray 1 = 1.13 m2
Surface area tray 2 = 3.39 m2
Surface area tray 3 = 6.79 m2
Surface area tray 4 = 9.83 m2
Total surface area = 21.15 m2

Aerator Size Adopted in Design;


Height = 2.4 m
Diameter = 4.6 m
Appendix E

Drg. Ref : Job Ref :


Consulting Engineers Calc. By : AHA Calc. Sheet No :
Checked by:AK
LSG Date : 17/7/2024
Project
Part of Structure : n/a
Member CALCULATION
Treatment Plant

Mixing Chambers

Ultimate raw water inflow (normal) = 9.54 MLD


Ultimate raw water inflow (overload) = 11.93 MLD
Ultimate raw water inflow (normal) = 0.110 m3/s
Ultimate raw water inflow (overload) = 0.138 m3/s

Mixing Chamber
Size of mixing chamber:
Number of chamber = 1
Retention time = 60 s
Required retention volume (normal) = Qxt = 6.63 m3
SWD = 1.5 m
Width of tank = 2.1 m
Length of tank = 2.3 m
Chamber volume = 7.2 m3

Check for initial loading (45 Mld): `


Initial raw water inflow = 9.54 Mld
Initial raw water inflow = 0.278 m3/s
Volume of mixing chambers per tank = 7.25 m3
Retention time for initial loading = 26 sec

Check for over loading (59.6 Mld):


Initial raw water inflow = 11.93 Mld
Initial raw water inflow = 0.347 m3/s
Volume of mixing chambers per tank = 7.25 m3
Retention time for over loading = 21 sec

Mixing Chamber Size Adopted in Design;


Length = 2.3 m
Width = 2.1 m
SWD = 1.5 m

Flocculation and Clarifier Tanks

Flocculation Tanks

Sizing of Flocculation Tanks


Required retention time = 25 min
Required retention volume = 416.67 m3
No. of tanks = 5
Required retention volume per tank = 83.3333 m3
SWD = 3.3 m
Width of tank = 7.2 m
Length of tank = 3.5 m
Proposed retention volume per tank = 83.3 m3
Appendix E

Drg. Ref : Job Ref :


Consulting Engineers Calc. By : AHA Calc. Sheet No :
Checked by:AK
LSG Date : 17/7/2024
Project
Part of Structure : n/a
Member CALCULATION
Treatment Plant

Check for over loading (59.6 Mld):


Initial raw water inflow = 11.93 Mld
Initial raw water inflow = 0.069 m3/s
Volume of mixing chambers per tank = 83.33 m3
Retention time for over loading = 20 min

Flocculation Tank Size Adopted in Design;


Length = 7.0 m
Width = 7.2 m
SWD = 3.3 m

Stilling Tanks

Sizing of Stilling Tanks


Required retention time = 18 min
Required retention volume = 300 m3
No. of tanks = 5
Required retention volume per tank = 60 m3
SWD = 3.3 m
Width of tank = 7.2 m
Length of tank = 2.5 m

Stilling Tank Size Adopted in Design;


Length = 5.9 m
Width = 7.2 m
SWD = 3.3 m

Sedimentation Tanks

Sizing of Sed Tank


Required retention time = 45 min
Required retention volume = 750 m3
No. of tanks = 5
Required retention volume per tank = 150 m3
SWD = 3.5 m
Width of tank = 7.2 m
Length of tank = 5.95 m

Sed Tank Size Adopted in Design;


Length = 11.9 m
Width = 7.2 m
SWD = 3.5 m
Appendix E

Drg. Ref : Job Ref :


Consulting Engineers Calc. By : AHA Calc. Sheet No :
Checked by:AK
LSG Date : 17/7/2024
Project
Part of Structure : n/a
Member CALCULATION
Treatment Plant

Filters

Sizing of Filter
Filtration flow rate = 3.6 m3/m2/hr
No of filter = 7
Inflow per tank (normal) = 142.86 m3/hr
Filtration area required = 39.49 m2
Total width of filter bed = 4.05 m
Length of filter = 9.75 m

Filter Size Adopted in Design;


Length = 9.75 m (size of filter bed)
Width of filter bed = 4.05 m (size of filter bed)

One (1) filter out of service;

No of filter = 6
Inflow per tank (normal) = 166.67 m3/hr
Filtration area = 39.49 m2
Filtration flow rate = 4.22 m3/m2/hr

Two (2) filter out of service;

No of filter = 5
Inflow per tank (normal) = 200.00 m3/hr
Filtration area = 39.49 m2
Filtration flow rate = 5.06 m3/m2/hr

Chlorine Contact Tanks

Sizing of Chlorine Contact Tanks


Retention time = 30 mins
No of tank = 2
Inflow per tank = 0.139 m3/s
Required volume per tank = 250 m3
Add channel and baffle walls volume = 10 m3
SWD = 4 m
Width of tank = 7.0 m
Length of each tank = 9.3 m

CCT Size Adopted in Design;


Length = 18.75 m
Width = 7 m
SWD = 4.2 m
Appendix E

Drg. Ref : Job Ref :


Consulting Engineers Calc. By : AHA Calc. Sheet No :
Checked by:AK
LSG Date : 17/7/2024
Project
Part of Structure : n/a
Member CALCULATION
Treatment Plant

Clear Water Tanks

Clear Water Tanks

No of tank = 1
Lenght of tank = 35 m
Width of tank = 23 m
Depth of tank = 6 m
Volume per tank = 4830 m3
Inflow per tank = 0.278 m3/s
Retention time = 4.830 hrs

Backwash tank

Assumption: That the washing of filters consist of two stages, where


the first stage is slow rate washing and the 2nd stage is high rate washing.

Backwashing rate - slow rate washing = 8.00 cu m/sq m/hr


Backwashing rate - high rate washing = 20.00 cu m/sq m/hr
Period of slow rate washing = 6 min
Period of high rate washing = 9 min
Filtration area per filter = 39.49 sq m
Total volume of washwater per wash = {[8 x (6/60)] + [20 x (9/60)]} x 40
Total volume of washwater per wash = 150.053 cu m
For two filter bed wash = 300.1 cu m

Chemical mixing
Lime = 25.0 cu m
Flouride = 10.0 cu m
Polymer = 3.1 cu m

Total = 338.2 cu m

Capacity of Backwash Tank = 360 cum


Appendix E

Drg. Ref : Job Ref :


Consulting Engineers Calc. By : AHA Calc. Sheet No :
Checked by:AK
LSG Date : 17/7/2024
Project
Part of Structure : n/a
Member CALCULATION
Treatment Plant
Appendix E

standart value for atmosphere pressure

r = ratio of oxygen deficit just above a weir to that just below.

standard value for atmosphere pressure

r = 0.600
r = 1.200
r = 1.80
r = 2.30