Normal Condition
Plant's raw water inflow = 20 MLD
WTP operating hours per day = 20 hr/day
Plant's raw water inflow = 1000 m3/hr
Plant's raw water inflow = 0.278 m3/s
Overload Condition
Percentage of overloading = 25 %
Plant's raw water inflow = 25.00 MLD
WTP operating hours per day = 20 hr/day
Plant's raw water inflow = 1250 m3/hr
Plant's raw water inflow = 0.347 m3/s
Aerator
Size of Aerator
Surface loading = 32 m3/(m2/hr)
Surface area required = 31.3 m2 (Inflow/Loading Rate)
Overall diameter of aerator = 4.6 m
Surface area tray 1 = 1.13 m2
Surface area tray 2 = 3.39 m2
Surface area tray 3 = 6.79 m2
Surface area tray 4 = 9.83 m2
Total surface area = 21.15 m2
Mixing Chambers
Mixing Chamber
Size of mixing chamber:
Number of chamber = 1
Retention time = 60 s
Required retention volume (normal) = Qxt = 6.63 m3
SWD = 1.5 m
Width of tank = 2.1 m
Length of tank = 2.3 m
Chamber volume = 7.2 m3
Flocculation Tanks
Stilling Tanks
Sedimentation Tanks
Filters
Sizing of Filter
Filtration flow rate = 3.6 m3/m2/hr
No of filter = 7
Inflow per tank (normal) = 142.86 m3/hr
Filtration area required = 39.49 m2
Total width of filter bed = 4.05 m
Length of filter = 9.75 m
No of filter = 6
Inflow per tank (normal) = 166.67 m3/hr
Filtration area = 39.49 m2
Filtration flow rate = 4.22 m3/m2/hr
No of filter = 5
Inflow per tank (normal) = 200.00 m3/hr
Filtration area = 39.49 m2
Filtration flow rate = 5.06 m3/m2/hr
No of tank = 1
Lenght of tank = 35 m
Width of tank = 23 m
Depth of tank = 6 m
Volume per tank = 4830 m3
Inflow per tank = 0.278 m3/s
Retention time = 4.830 hrs
Backwash tank
Chemical mixing
Lime = 25.0 cu m
Flouride = 10.0 cu m
Polymer = 3.1 cu m
Total = 338.2 cu m
r = 0.600
r = 1.200
r = 1.80
r = 2.30
Appendix E
Appendix E
Appendix E
Appendix E
Appendix E