0% found this document useful (0 votes)
51 views

SELDB-3B - 6 May 2024

Uploaded by

ikhsanul islah
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
51 views

SELDB-3B - 6 May 2024

Uploaded by

ikhsanul islah
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 18

1.

BHCP1-0-BMC-SL-E-6015 Single Line Diagram for Main


Distribution Board
2. BHCP1-0-BJJ-SL-E-6013 Single Line Diagram for 400/230V System -
Overall Lighting
3. BHCP1-0-YYY-DC-E-6810 Lighting System Design Basis (Indoor & Outdoor)
4. BHCP1-00-BJD-SL-E-6009 Single Line Diagram For 400V Common
LV Switchgear
5. BHCP1-00-YYY-SL-E-6002 Key Single Line Diagram
6. BHCP1-0-YYY-GA-E-6813 LIGHTING & POWER SOCKET LAYOUT-
ADMINISTRATION CENTRAL CONTROL BUILDING

1. ALL DIMENSIONS ARE IN mm UNLESS OTHERWISE INDICATED.


2. THE LOCATION OF PANEL FIXTURES SHALL BE MODIFIED MARGINALLY
AT SITE TO SUIT SITE CONDITIONS.
3. ALL INSTALLATIONS IN OFFICESARE TO BE CONCEALED.
4. ELEVATION & POSITION OF PANEL SHALL BE ADJUSTED
AS PER SITE CONDITIONS.
5. FOR ROOM WITH FALSE CEILING, INBOW WALL INSTALLATION ARE USING PVC
CONDUIT OUTBOW CEILING ROUTING WILL USE EMT CONDUIT.
6. FOR ROOM WITHOUT FALSE CEILING, EXPOSED WALL WILL USE RGS CONDUIT
7. THE INSTALLATION OF THIS PANEL IS USING WALL MOUNTING TYPE

0 06-MAY-24 ISSUED FOR CONSTRUCTION IKSAN ARIE AFI DNG

C 04-APR-24 ISSUED FOR APPROVAL IKSAN ARIE AFI DNG

B 04-MAR-24 ISSUED FOR APPROVAL IKSAN ARIE AFI DNG

A 08-JAN-24 ISSUED FOR APPROVAL IKSAN ARIE AFI DNG

REV. DATE DESCRIPTION DRAWN DESIGNED CHECKED APPROVED

PT AMMAN MINERAL NUSA TENGGARA

TATA CONSULTING ENGINEERS LIMITED

EPC CONSORTIUM :

Jurong Engineering Limited PT Jurong Engineering Lestari

VENDOR :

PT. CHAKRA SARANA SENTOSA

NFS BATU HIJAU CCPP-1

Power & Lighting Schematic Drawing (SELDB-3B)


DOCUMENT LIST
PROJECT DRAWING NO. : PO NO. : REV SHT

BHCP1-00-BJJ-CD-E-6612 0 1/2
1. BHCP1-0-BMC-SL-E-6015 Single Line Diagram for Main
Distribution Board
2. BHCP1-0-BJJ-SL-E-6013 Single Line Diagram for 400/230V System -
Overall Lighting
3. BHCP1-0-YYY-DC-E-6810 Lighting System Design Basis (Indoor & Outdoor)
4. BHCP1-00-BJD-SL-E-6009 Single Line Diagram For 400V Common
LV Switchgear
5. BHCP1-00-YYY-SL-E-6002 Key Single Line Diagram
6. BHCP1-0-YYY-GA-E-6813 LIGHTING & POWER SOCKET LAYOUT-
ADMINISTRATION CENTRAL CONTROL BUILDING

1. ALL DIMENSIONS ARE IN mm UNLESS OTHERWISE INDICATED.


2. THE LOCATION OF PANEL FIXTURES SHALL BE MODIFIED MARGINALLY
AT SITE TO SUIT SITE CONDITIONS.
3. ALL INSTALLATIONS IN OFFICESARE TO BE CONCEALED.
4. ELEVATION & POSITION OF PANEL SHALL BE ADJUSTED
AS PER SITE CONDITIONS.
5. FOR ROOM WITH FALSE CEILING, INBOW WALL INSTALLATION ARE USING PVC
CONDUIT OUTBOW CEILING ROUTING WILL USE EMT CONDUIT.
6. FOR ROOM WITHOUT FALSE CEILING, EXPOSED WALL WILL USE RGS CONDUIT
7. THE INSTALLATION OF THIS PANEL IS USING WALL MOUNTING TYPE

0 06-MAY-24 ISSUED FOR CONSTRUCTION IKSAN ARIE AFI DNG

C 04-APR-24 ISSUED FOR APPROVAL IKSAN ARIE AFI DNG

B 04-MAR-24 ISSUED FOR APPROVAL IKSAN ARIE AFI DNG

A 08-JAN-24 ISSUED FOR APPROVAL IKSAN ARIE AFI DNG

REV. DATE DESCRIPTION DRAWN DESIGNED CHECKED APPROVED

PT AMMAN MINERAL NUSA TENGGARA

TATA CONSULTING ENGINEERS LIMITED

EPC CONSORTIUM :

Jurong Engineering Limited PT Jurong Engineering Lestari

VENDOR :

PT. CHAKRA SARANA SENTOSA

NFS BATU HIJAU CCPP-1

Power & Lighting Schematic Drawing (SELDB-3B)


DOCUMENT LIST
PROJECT DRAWING NO. : PO NO. : REV SHT

BHCP1-00-BJJ-CD-E-6612 0 2/2
1. BHCP1-0-BMC-SL-E-6015 Single Line Diagram for Main
Distribution Board
2. BHCP1-0-BJJ-SL-E-6013 Single Line Diagram for 400/230V System -
Overall Lighting
3. BHCP1-0-YYY-DC-E-6810 Lighting System Design Basis (Indoor & Outdoor)
4. BHCP1-00-BJD-SL-E-6009 Single Line Diagram For 400V Common
LV Switchgear
5. BHCP1-00-YYY-SL-E-6002 Key Single Line Diagram
6. BHCP1-0-YYY-GA-E-6813 LIGHTING & POWER SOCKET LAYOUT-
ADMINISTRATION CENTRAL CONTROL BUILDING

100
7 4

7
PANEL BOARD NAME SELDB-3B (00BNA03B)
MANUFACTURING DATE 06 MAY 2024
RATED VOLTAGE 400/230 VAC
RATED FREQUENCY 50 Hz
IP 41 INDOOR TYPE 1. ALL DIMENSIONS ARE IN mm UNLESS OTHERWISE INDICATED.

63
2. THE LOCATION OF PANEL FIXTURES SHALL BE MODIFIED MARGINALLY
AT SITE TO SUIT SITE CONDITIONS.
INTERRUPTING CAPACITY 25 kA FOR 1 SEC.
3. ALL INSTALLATIONS IN OFFICESARE TO BE CONCEALED.
4. ELEVATION & POSITION OF PANEL SHALL BE ADJUSTED
REFERENCE STANDARD IEC 61439-1 (FORM 2b) AS PER SITE CONDITIONS.
5. FOR ROOM WITH FALSE CEILING, INBOW WALL INSTALLATION ARE USING PVC
CONDUIT OUTBOW CEILING ROUTING WILL USE EMT CONDUIT.
6. FOR ROOM WITHOUT FALSE CEILING, EXPOSED WALL WILL USE RGS CONDUIT
7. THE INSTALLATION OF THIS PANEL IS USING WALL MOUNTING TYPE
PT. LINGGA MEKAR ENGINEERING
MECHANICAL ELECTRICAL - FACTORY AUTOMATION - PANEL MAKER
MADE IN INDONESIA

7
0 06-MAY-24 ISSUED FOR CONSTRUCTION IKSAN ARIE AFI DNG

C 04-APR-24 ISSUED FOR APPROVAL IKSAN ARIE AFI DNG

B 04-MAR-24 ISSUED FOR APPROVAL IKSAN ARIE AFI DNG

A 08-JAN-24 ISSUED FOR APPROVAL IKSAN ARIE AFI DNG

REV. DATE DESCRIPTION DRAWN DESIGNED CHECKED APPROVED

PT AMMAN MINERAL NUSA TENGGARA

TATA CONSULTING ENGINEERS LIMITED

EPC CONSORTIUM :

Jurong Engineering Limited PT Jurong Engineering Lestari

VENDOR :

PT. CHAKRA SARANA SENTOSA

NFS BATU HIJAU CCPP-1

Power & Lighting Schematic Drawing (SELDB-3B)


NAME PLATE
PROJECT DRAWING NO. : PO NO. : REV SHT

BHCP1-00-BJJ-CD-E-6612 0 1/1
1. BHCP1-0-BMC-SL-E-6015 Single Line Diagram for Main
Distribution Board
2. BHCP1-0-BJJ-SL-E-6013 Single Line Diagram for 400/230V System -
Overall Lighting
3. BHCP1-0-YYY-DC-E-6810 Lighting System Design Basis (Indoor & Outdoor)
No. DEVICE CODE NAME OF COMPONENT TYPE SPECIFICATION MAKER QUANTITY 4. BHCP1-00-BJD-SL-E-6009 Single Line Diagram For 400V Common
LV Switchgear
5. BHCP1-00-YYY-SL-E-6002 Key Single Line Diagram
PANEL : SUB LIGHTING DISTRIBUTION BOARD 3B (SELDB-3B) 6. BHCP1-0-YYY-GA-E-6813 LIGHTING & POWER SOCKET LAYOUT-
ADMINISTRATION CENTRAL CONTROL BUILDING

INCOMING SECTION

1. ALL DIMENSIONS ARE IN mm UNLESS OTHERWISE INDICATED.


2. THE LOCATION OF PANEL FIXTURES SHALL BE MODIFIED MARGINALLY
AT SITE TO SUIT SITE CONDITIONS.
3. ALL INSTALLATIONS IN OFFICESARE TO BE CONCEALED.
4. ELEVATION & POSITION OF PANEL SHALL BE ADJUSTED
AS PER SITE CONDITIONS.
5. FOR ROOM WITH FALSE CEILING, INBOW WALL INSTALLATION ARE USING PVC
CONDUIT OUTBOW CEILING ROUTING WILL USE EMT CONDUIT.
6. FOR ROOM WITHOUT FALSE CEILING, EXPOSED WALL WILL USE RGS CONDUIT
7. THE INSTALLATION OF THIS PANEL IS USING WALL MOUNTING TYPE

FEEDER SECTION

0 06-MAY-24 ISSUED FOR CONSTRUCTION IKSAN ARIE AFI DNG

C 04-APR-24 ISSUED FOR APPROVAL IKSAN ARIE AFI DNG

B 04-MAR-24 ISSUED FOR APPROVAL IKSAN ARIE AFI DNG

A 08-JAN-24 ISSUED FOR APPROVAL IKSAN ARIE AFI DNG

REV. DATE DESCRIPTION DRAWN DESIGNED CHECKED APPROVED

PT AMMAN MINERAL NUSA TENGGARA

TATA CONSULTING ENGINEERS LIMITED

EPC CONSORTIUM :

Jurong Engineering Limited PT Jurong Engineering Lestari

VENDOR :

PT. CHAKRA SARANA SENTOSA

NFS BATU HIJAU CCPP-1

Power & Lighting Schematic Drawing (SELDB-3B)


EQUIPMENT LIST
PROJECT DRAWING NO. : PO NO. : REV SHT

BHCP1-00-BJJ-CD-E-6612 0 1/1
1. BHCP1-0-BMC-SL-E-6015 Single Line Diagram for Main
Distribution Board
2. BHCP1-0-BJJ-SL-E-6013 Single Line Diagram for 400/230V System -
Overall Lighting
3. BHCP1-0-YYY-DC-E-6810 Lighting System Design Basis (Indoor & Outdoor)
4. BHCP1-00-BJD-SL-E-6009 Single Line Diagram For 400V Common
LV Switchgear
No. NAME PLATE NO. NAME OF COMPONENT LEGEND SIZE (MM) QUANTITY 5. BHCP1-00-YYY-SL-E-6002 Key Single Line Diagram
6. BHCP1-0-YYY-GA-E-6813 LIGHTING & POWER SOCKET LAYOUT-
ADMINISTRATION CENTRAL CONTROL BUILDING
PANEL : SUB EMERGENCY LIGHTING DISTRIBUTION BOARD 3B (SELDB-3B) DOOR SECTION

1. ALL DIMENSIONS ARE IN mm UNLESS OTHERWISE INDICATED.


2. THE LOCATION OF PANEL FIXTURES SHALL BE MODIFIED MARGINALLY
AT SITE TO SUIT SITE CONDITIONS.
3. ALL INSTALLATIONS IN OFFICESARE TO BE CONCEALED.
4. ELEVATION & POSITION OF PANEL SHALL BE ADJUSTED
AS PER SITE CONDITIONS.
5. FOR ROOM WITH FALSE CEILING, INBOW WALL INSTALLATION ARE USING PVC
CONDUIT OUTBOW CEILING ROUTING WILL USE EMT CONDUIT.
6. FOR ROOM WITHOUT FALSE CEILING, EXPOSED WALL WILL USE RGS CONDUIT
7. THE INSTALLATION OF THIS PANEL IS USING WALL MOUNTING TYPE

0 06-MAY-24 ISSUED FOR CONSTRUCTION IKSAN ARIE AFI DNG

C 04-APR-24 ISSUED FOR APPROVAL IKSAN ARIE AFI DNG

B 04-MAR-24 ISSUED FOR APPROVAL IKSAN ARIE AFI DNG

A 08-JAN-24 ISSUED FOR APPROVAL IKSAN ARIE AFI DNG

REV. DATE DESCRIPTION DRAWN DESIGNED CHECKED APPROVED

PT AMMAN MINERAL NUSA TENGGARA

TATA CONSULTING ENGINEERS LIMITED

EPC CONSORTIUM :

Jurong Engineering Limited PT Jurong Engineering Lestari

VENDOR :

PT. CHAKRA SARANA SENTOSA

NFS BATU HIJAU CCPP-1

Power & Lighting Schematic Drawing (SELDB-3B)


NAME PLATE LIST
PROJECT DRAWING NO. : PO NO. : REV SHT

BHCP1-00-BJJ-CD-E-6612 0 1/3
1. BHCP1-0-BMC-SL-E-6015 Single Line Diagram for Main
Distribution Board
2. BHCP1-0-BJJ-SL-E-6013 Single Line Diagram for 400/230V System -
Overall Lighting
3. BHCP1-0-YYY-DC-E-6810 Lighting System Design Basis (Indoor & Outdoor)

No. NAME PLATE NO. NAME OF COMPONENT LEGEND SIZE (MM) QUANTITY 4. BHCP1-00-BJD-SL-E-6009 Single Line Diagram For 400V Common
LV Switchgear
5. BHCP1-00-YYY-SL-E-6002 Key Single Line Diagram
6. BHCP1-0-YYY-GA-E-6813 LIGHTING & POWER SOCKET LAYOUT-
PANEL : SUB EMERGENCY LIGHTING DISTRIBUTION BOARD 3B (SELDB-3B) INCOMING & FEEDER SECTION
ADMINISTRATION CENTRAL CONTROL BUILDING

1. ALL DIMENSIONS ARE IN mm UNLESS OTHERWISE INDICATED.


2. THE LOCATION OF PANEL FIXTURES SHALL BE MODIFIED MARGINALLY
AT SITE TO SUIT SITE CONDITIONS.
3. ALL INSTALLATIONS IN OFFICESARE TO BE CONCEALED.
4. ELEVATION & POSITION OF PANEL SHALL BE ADJUSTED
AS PER SITE CONDITIONS.
5. FOR ROOM WITH FALSE CEILING, INBOW WALL INSTALLATION ARE USING PVC
CONDUIT OUTBOW CEILING ROUTING WILL USE EMT CONDUIT.
6. FOR ROOM WITHOUT FALSE CEILING, EXPOSED WALL WILL USE RGS CONDUIT
7. THE INSTALLATION OF THIS PANEL IS USING WALL MOUNTING TYPE

0 06-MAY-24 ISSUED FOR CONSTRUCTION IKSAN ARIE AFI DNG

C 04-APR-24 ISSUED FOR APPROVAL IKSAN ARIE AFI DNG

B 04-MAR-24 ISSUED FOR APPROVAL IKSAN ARIE AFI DNG

A 08-JAN-24 ISSUED FOR APPROVAL IKSAN ARIE AFI DNG

REV. DATE DESCRIPTION DRAWN DESIGNED CHECKED APPROVED

PT AMMAN MINERAL NUSA TENGGARA

TATA CONSULTING ENGINEERS LIMITED

EPC CONSORTIUM :

Jurong Engineering Limited PT Jurong Engineering Lestari

VENDOR :

PT. CHAKRA SARANA SENTOSA

NFS BATU HIJAU CCPP-1

Power & Lighting Schematic Drawing (SELDB-3B)


NAME PLATE LIST
PROJECT DRAWING NO. : PO NO. : REV SHT

BHCP1-00-BJJ-CD-E-6612 0 2/3
1. BHCP1-0-BMC-SL-E-6015 Single Line Diagram for Main
Distribution Board
2. BHCP1-0-BJJ-SL-E-6013 Single Line Diagram for 400/230V System -
Overall Lighting
3. BHCP1-0-YYY-DC-E-6810 Lighting System Design Basis (Indoor & Outdoor)

No. NAME PLATE NO. NAME OF COMPONENT LEGEND SIZE (MM) QUANTITY 4. BHCP1-00-BJD-SL-E-6009 Single Line Diagram For 400V Common
LV Switchgear
5. BHCP1-00-YYY-SL-E-6002 Key Single Line Diagram
6. BHCP1-0-YYY-GA-E-6813 LIGHTING & POWER SOCKET LAYOUT-
PANEL : SUB EMERGENCY LIGHTING DISTRIBUTION BOARD 3B (SELDB-3B) CONTROL SECTION
ADMINISTRATION CENTRAL CONTROL BUILDING

1. ALL DIMENSIONS ARE IN mm UNLESS OTHERWISE INDICATED.


2. THE LOCATION OF PANEL FIXTURES SHALL BE MODIFIED MARGINALLY
AT SITE TO SUIT SITE CONDITIONS.
3. ALL INSTALLATIONS IN OFFICESARE TO BE CONCEALED.
4. ELEVATION & POSITION OF PANEL SHALL BE ADJUSTED
AS PER SITE CONDITIONS.
5. FOR ROOM WITH FALSE CEILING, INBOW WALL INSTALLATION ARE USING PVC
CONDUIT OUTBOW CEILING ROUTING WILL USE EMT CONDUIT.
6. FOR ROOM WITHOUT FALSE CEILING, EXPOSED WALL WILL USE RGS CONDUIT
7. THE INSTALLATION OF THIS PANEL IS USING WALL MOUNTING TYPE

0 06-MAY-24 ISSUED FOR CONSTRUCTION IKSAN ARIE AFI DNG

C 04-APR-24 ISSUED FOR APPROVAL IKSAN ARIE AFI DNG

B 04-MAR-24 ISSUED FOR APPROVAL IKSAN ARIE AFI DNG

A 08-JAN-24 ISSUED FOR APPROVAL IKSAN ARIE AFI DNG

REV. DATE DESCRIPTION DRAWN DESIGNED CHECKED APPROVED

PT AMMAN MINERAL NUSA TENGGARA

TATA CONSULTING ENGINEERS LIMITED

EPC CONSORTIUM :

Jurong Engineering Limited PT Jurong Engineering Lestari

VENDOR :

PT. CHAKRA SARANA SENTOSA

NFS BATU HIJAU CCPP-1

Power & Lighting Schematic Drawing (SELDB-3B)


NAME PLATE LIST
PROJECT DRAWING NO. : PO NO. : REV SHT

BHCP1-00-BJJ-CD-E-6612 0 3/3
1. BHCP1-0-BMC-SL-E-6015 Single Line Diagram for Main
Distribution Board
2. BHCP1-0-BJJ-SL-E-6013 Single Line Diagram for 400/230V System -
Overall Lighting
3. BHCP1-0-YYY-DC-E-6810 Lighting System Design Basis (Indoor & Outdoor)
4. BHCP1-00-BJD-SL-E-6009 Single Line Diagram For 400V Common
LV Switchgear
5. BHCP1-00-YYY-SL-E-6002 Key Single Line Diagram
6. BHCP1-0-YYY-GA-E-6813 LIGHTING & POWER SOCKET LAYOUT-
ADMINISTRATION CENTRAL CONTROL BUILDING

1. ALL DIMENSIONS ARE IN mm UNLESS OTHERWISE INDICATED.


2. THE LOCATION OF PANEL FIXTURES SHALL BE MODIFIED MARGINALLY
AT SITE TO SUIT SITE CONDITIONS.
3. ALL INSTALLATIONS IN OFFICESARE TO BE CONCEALED.
4. ELEVATION & POSITION OF PANEL SHALL BE ADJUSTED
AS PER SITE CONDITIONS.
5. FOR ROOM WITH FALSE CEILING, INBOW WALL INSTALLATION ARE USING PVC
CONDUIT OUTBOW CEILING ROUTING WILL USE EMT CONDUIT.
6. FOR ROOM WITHOUT FALSE CEILING, EXPOSED WALL WILL USE RGS CONDUIT
7. THE INSTALLATION OF THIS PANEL IS USING WALL MOUNTING TYPE

0 06-MAY-24 ISSUED FOR CONSTRUCTION IKSAN ARIE AFI DNG

C 04-APR-24 ISSUED FOR APPROVAL IKSAN ARIE AFI DNG

B 04-MAR-24 ISSUED FOR APPROVAL IKSAN ARIE AFI DNG

A 08-JAN-24 ISSUED FOR APPROVAL IKSAN ARIE AFI DNG

REV. DATE DESCRIPTION DRAWN DESIGNED CHECKED APPROVED

PT AMMAN MINERAL NUSA TENGGARA

TATA CONSULTING ENGINEERS LIMITED

EPC CONSORTIUM :

Jurong Engineering Limited PT Jurong Engineering Lestari

VENDOR :

PT. CHAKRA SARANA SENTOSA

NFS BATU HIJAU CCPP-1

Power & Lighting Schematic Drawing (SELDB-3B)


PANEL SPECIFICATION
PROJECT DRAWING NO. : PO NO. : REV SHT

BHCP1-00-BJJ-CD-E-6612 0 1/1
1. BHCP1-0-BMC-SL-E-6015 Single Line Diagram for Main
Distribution Board
2. BHCP1-0-BJJ-SL-E-6013 Single Line Diagram for 400/230V System -
Overall Lighting
3. BHCP1-0-YYY-DC-E-6810 Lighting System Design Basis (Indoor & Outdoor)
4. BHCP1-00-BJD-SL-E-6009 Single Line Diagram For 400V Common
LV Switchgear
5. BHCP1-00-YYY-SL-E-6002 Key Single Line Diagram
6. BHCP1-0-YYY-GA-E-6813 LIGHTING & POWER SOCKET LAYOUT-
ADMINISTRATION CENTRAL CONTROL BUILDING
600

70 120
SELDB-3B (00BNA03B)

80
L2 L5

60 60
FUSE
L6 L7 L8 HOLDER
(CONTAINS NP-1
F1 - F2)

NP-2, NP-3

260 NP-4, NP-5, 1. ALL DIMENSIONS ARE IN mm UNLESS OTHERWISE INDICATED.


NP-6 2. THE LOCATION OF PANEL FIXTURES SHALL BE MODIFIED MARGINALLY
AT SITE TO SUIT SITE CONDITIONS.
3. ALL INSTALLATIONS IN OFFICESARE TO BE CONCEALED.
900

PB1
4. ELEVATION & POSITION OF PANEL SHALL BE ADJUSTED
AS PER SITE CONDITIONS.
o 5. FOR ROOM WITH FALSE CEILING, INBOW WALL INSTALLATION ARE USING PVC
P CONDUIT OUTBOW CEILING ROUTING WILL USE EMT CONDUIT.
6. FOR ROOM WITHOUT FALSE CEILING, EXPOSED WALL WILL USE RGS CONDUIT
7. THE INSTALLATION OF THIS PANEL IS USING WALL MOUNTING TYPE

NP-7

0 06-MAY-24 ISSUED FOR CONSTRUCTION IKSAN ARIE AFI DNG

C 04-APR-24 ISSUED FOR APPROVAL IKSAN ARIE AFI DNG

B 04-MAR-24 ISSUED FOR APPROVAL IKSAN ARIE AFI DNG

A 08-JAN-24 ISSUED FOR APPROVAL IKSAN ARIE AFI DNG

REV. DATE DESCRIPTION DRAWN DESIGNED CHECKED APPROVED

PT AMMAN MINERAL NUSA TENGGARA

TATA CONSULTING ENGINEERS LIMITED

EPC CONSORTIUM :

Jurong Engineering Limited PT Jurong Engineering Lestari

VENDOR :

PT. CHAKRA SARANA SENTOSA

NFS BATU HIJAU CCPP-1

Power & Lighting Schematic Drawing (SELDB-3B)


LAYOUT PANEL DRAWING
PROJECT DRAWING NO. : PO NO. : REV SHT

BHCP1-00-BJJ-CD-E-6612 0 1/4
1. BHCP1-0-BMC-SL-E-6015 Single Line Diagram for Main
Distribution Board
2. BHCP1-0-BJJ-SL-E-6013 Single Line Diagram for 400/230V System -
Overall Lighting
3. BHCP1-0-YYY-DC-E-6810 Lighting System Design Basis (Indoor & Outdoor)
4. BHCP1-00-BJD-SL-E-6009 Single Line Diagram For 400V Common
LV Switchgear
600 5. BHCP1-00-YYY-SL-E-6002 Key Single Line Diagram
6. BHCP1-0-YYY-GA-E-6813 LIGHTING & POWER SOCKET LAYOUT-
ADMINISTRATION CENTRAL CONTROL BUILDING
520 600
180 210

130
130
1. ALL DIMENSIONS ARE IN mm UNLESS OTHERWISE INDICATED.
2. THE LOCATION OF PANEL FIXTURES SHALL BE MODIFIED MARGINALLY
AT SITE TO SUIT SITE CONDITIONS.
3. ALL INSTALLATIONS IN OFFICESARE TO BE CONCEALED.
900

820

900
4. ELEVATION & POSITION OF PANEL SHALL BE ADJUSTED
AS PER SITE CONDITIONS.

130
5. FOR ROOM WITH FALSE CEILING, INBOW WALL INSTALLATION ARE USING PVC
CONDUIT OUTBOW CEILING ROUTING WILL USE EMT CONDUIT.
6. FOR ROOM WITHOUT FALSE CEILING, EXPOSED WALL WILL USE RGS CONDUIT
7. THE INSTALLATION OF THIS PANEL IS USING WALL MOUNTING TYPE

230

CABLE
SUPPORT
0 06-MAY-24 ISSUED FOR CONSTRUCTION IKSAN ARIE AFI DNG

C 04-APR-24 ISSUED FOR APPROVAL IKSAN ARIE AFI DNG

B 04-MAR-24 ISSUED FOR APPROVAL IKSAN ARIE AFI DNG

A 08-JAN-24 ISSUED FOR APPROVAL IKSAN ARIE AFI DNG

REV. DATE DESCRIPTION DRAWN DESIGNED CHECKED APPROVED

PT AMMAN MINERAL NUSA TENGGARA

TATA CONSULTING ENGINEERS LIMITED

EPC CONSORTIUM :

Jurong Engineering Limited PT Jurong Engineering Lestari

VENDOR :

PT. CHAKRA SARANA SENTOSA

NFS BATU HIJAU CCPP-1

Power & Lighting Schematic Drawing (SELDB-3B)


LAYOUT PANEL DRAWING
PROJECT DRAWING NO. : PO NO. : REV SHT

BHCP1-00-BJJ-CD-E-6612 0 2/4
1. BHCP1-0-BMC-SL-E-6015 Single Line Diagram for Main
Distribution Board
2. BHCP1-0-BJJ-SL-E-6013 Single Line Diagram for 400/230V System -
Overall Lighting
3. BHCP1-0-YYY-DC-E-6810 Lighting System Design Basis (Indoor & Outdoor)
4. BHCP1-00-BJD-SL-E-6009 Single Line Diagram For 400V Common
LV Switchgear
5. BHCP1-00-YYY-SL-E-6002 Key Single Line Diagram
6. BHCP1-0-YYY-GA-E-6813 LIGHTING & POWER SOCKET LAYOUT-
ADMINISTRATION CENTRAL CONTROL BUILDING

230 20 230 20 230 20

1. ALL DIMENSIONS ARE IN mm UNLESS OTHERWISE INDICATED.


2. THE LOCATION OF PANEL FIXTURES SHALL BE MODIFIED MARGINALLY
AT SITE TO SUIT SITE CONDITIONS.
3. ALL INSTALLATIONS IN OFFICESARE TO BE CONCEALED.
900

900

900
4. ELEVATION & POSITION OF PANEL SHALL BE ADJUSTED
AS PER SITE CONDITIONS.
5. FOR ROOM WITH FALSE CEILING, INBOW WALL INSTALLATION ARE USING PVC
CONDUIT OUTBOW CEILING ROUTING WILL USE EMT CONDUIT.
6. FOR ROOM WITHOUT FALSE CEILING, EXPOSED WALL WILL USE RGS CONDUIT
7. THE INSTALLATION OF THIS PANEL IS USING WALL MOUNTING TYPE
ACRYLIC
COVER
CABLE
SUPPORT

0 06-MAY-24 ISSUED FOR CONSTRUCTION IKSAN ARIE AFI DNG

C 04-APR-24 ISSUED FOR APPROVAL IKSAN ARIE AFI DNG

B 04-MAR-24 ISSUED FOR APPROVAL IKSAN ARIE AFI DNG

A 08-JAN-24 ISSUED FOR APPROVAL IKSAN ARIE AFI DNG

REV. DATE DESCRIPTION DRAWN DESIGNED CHECKED APPROVED

PT AMMAN MINERAL NUSA TENGGARA

TATA CONSULTING ENGINEERS LIMITED

EPC CONSORTIUM :

Jurong Engineering Limited PT Jurong Engineering Lestari

VENDOR :

PT. CHAKRA SARANA SENTOSA

NFS BATU HIJAU CCPP-1

Power & Lighting Schematic Drawing (SELDB-3B)


LAYOUT PANEL DRAWING
PROJECT DRAWING NO. : PO NO. : REV SHT

BHCP1-00-BJJ-CD-E-6612 0 3/4
1. BHCP1-0-BMC-SL-E-6015 Single Line Diagram for Main
Distribution Board
2. BHCP1-0-BJJ-SL-E-6013 Single Line Diagram for 400/230V System -
Overall Lighting
3. BHCP1-0-YYY-DC-E-6810 Lighting System Design Basis (Indoor & Outdoor)
4. BHCP1-00-BJD-SL-E-6009 Single Line Diagram For 400V Common
LV Switchgear
5. BHCP1-00-YYY-SL-E-6002 Key Single Line Diagram
6. BHCP1-0-YYY-GA-E-6813 LIGHTING & POWER SOCKET LAYOUT-
ADMINISTRATION CENTRAL CONTROL BUILDING

230 600

600 1. ALL DIMENSIONS ARE IN mm UNLESS OTHERWISE INDICATED.


2. THE LOCATION OF PANEL FIXTURES SHALL BE MODIFIED MARGINALLY
500 AT SITE TO SUIT SITE CONDITIONS.
3. ALL INSTALLATIONS IN OFFICESARE TO BE CONCEALED.
4. ELEVATION & POSITION OF PANEL SHALL BE ADJUSTED
460 AS PER SITE CONDITIONS.
5. FOR ROOM WITH FALSE CEILING, INBOW WALL INSTALLATION ARE USING PVC
CONDUIT OUTBOW CEILING ROUTING WILL USE EMT CONDUIT.
6. FOR ROOM WITHOUT FALSE CEILING, EXPOSED WALL WILL USE RGS CONDUIT
7. THE INSTALLATION OF THIS PANEL IS USING WALL MOUNTING TYPE

115
230
130
90
45 30303030 45
20

0 06-MAY-24 ISSUED FOR CONSTRUCTION IKSAN ARIE AFI DNG

C 04-APR-24 ISSUED FOR APPROVAL IKSAN ARIE AFI DNG

B 04-MAR-24 ISSUED FOR APPROVAL IKSAN ARIE AFI DNG

A 08-JAN-24 ISSUED FOR APPROVAL IKSAN ARIE AFI DNG

REV. DATE DESCRIPTION DRAWN DESIGNED CHECKED APPROVED

PT AMMAN MINERAL NUSA TENGGARA

TATA CONSULTING ENGINEERS LIMITED

EPC CONSORTIUM :

Jurong Engineering Limited PT Jurong Engineering Lestari

VENDOR :

PT. CHAKRA SARANA SENTOSA

NFS BATU HIJAU CCPP-1

Power & Lighting Schematic Drawing (SELDB-3B)


LAYOUT PANEL DRAWING
PROJECT DRAWING NO. : PO NO. : REV SHT

BHCP1-00-BJJ-CD-E-6612 0 4/4
1. BHCP1-0-BMC-SL-E-6015 Single Line Diagram for Main
Distribution Board
2. BHCP1-0-BJJ-SL-E-6013 Single Line Diagram for 400/230V System -
Overall Lighting
3. BHCP1-0-YYY-DC-E-6810 Lighting System Design Basis (Indoor & Outdoor)
4. BHCP1-00-BJD-SL-E-6009 Single Line Diagram For 400V Common
LV Switchgear
5. BHCP1-00-YYY-SL-E-6002 Key Single Line Diagram
6. BHCP1-0-YYY-GA-E-6813 LIGHTING & POWER SOCKET LAYOUT-
ADMINISTRATION CENTRAL CONTROL BUILDING

1. ALL DIMENSIONS ARE IN mm UNLESS OTHERWISE INDICATED.


2. THE LOCATION OF PANEL FIXTURES SHALL BE MODIFIED MARGINALLY
AT SITE TO SUIT SITE CONDITIONS.
3. ALL INSTALLATIONS IN OFFICESARE TO BE CONCEALED.
4. ELEVATION & POSITION OF PANEL SHALL BE ADJUSTED
E
E E
AS PER SITE CONDITIONS.
E
E E
5. FOR ROOM WITH FALSE CEILING, INBOW WALL INSTALLATION ARE USING PVC
E
E E CONDUIT OUTBOW CEILING ROUTING WILL USE EMT CONDUIT.
E
E E
6. FOR ROOM WITHOUT FALSE CEILING, EXPOSED WALL WILL USE RGS CONDUIT
7. THE INSTALLATION OF THIS PANEL IS USING WALL MOUNTING TYPE

E E

CONTROL DIMMER

0 06-MAY-24 ISSUED FOR CONSTRUCTION IKSAN ARIE AFI DNG

C 04-APR-24 ISSUED FOR APPROVAL IKSAN ARIE AFI DNG

B 04-MAR-24 ISSUED FOR APPROVAL IKSAN ARIE AFI DNG

A 08-JAN-24 ISSUED FOR APPROVAL IKSAN ARIE AFI DNG

REV. DATE DESCRIPTION DRAWN DESIGNED CHECKED APPROVED

PT AMMAN MINERAL NUSA TENGGARA

TATA CONSULTING ENGINEERS LIMITED

EPC CONSORTIUM :

Jurong Engineering Limited PT Jurong Engineering Lestari

VENDOR :

PT. CHAKRA SARANA SENTOSA

NFS BATU HIJAU CCPP-1

Power & Lighting Schematic Drawing (SELDB-3B)


SINGLE LINE DIAGRAM
PROJECT DRAWING NO. : PO NO. : REV SHT

BHCP1-00-BJJ-CD-E-6612 0 1/1
1. BHCP1-0-BMC-SL-E-6015 Single Line Diagram for Main
Distribution Board
2. BHCP1-0-BJJ-SL-E-6013 Single Line Diagram for 400/230V System -
Overall Lighting
3. BHCP1-0-YYY-DC-E-6810 Lighting System Design Basis (Indoor & Outdoor)
4. BHCP1-00-BJD-SL-E-6009 Single Line Diagram For 400V Common
LV Switchgear
5. BHCP1-00-YYY-SL-E-6002 Key Single Line Diagram
6. BHCP1-0-YYY-GA-E-6813 LIGHTING & POWER SOCKET LAYOUT-
ADMINISTRATION CENTRAL CONTROL BUILDING

1. ALL DIMENSIONS ARE IN mm UNLESS OTHERWISE INDICATED.


2. THE LOCATION OF PANEL FIXTURES SHALL BE MODIFIED MARGINALLY
AT SITE TO SUIT SITE CONDITIONS.
3. ALL INSTALLATIONS IN OFFICESARE TO BE CONCEALED.
4. ELEVATION & POSITION OF PANEL SHALL BE ADJUSTED
AS PER SITE CONDITIONS.
5. FOR ROOM WITH FALSE CEILING, INBOW WALL INSTALLATION ARE USING PVC
CONDUIT OUTBOW CEILING ROUTING WILL USE EMT CONDUIT.
6. FOR ROOM WITHOUT FALSE CEILING, EXPOSED WALL WILL USE RGS CONDUIT
7. THE INSTALLATION OF THIS PANEL IS USING WALL MOUNTING TYPE

0 06-MAY-24 ISSUED FOR CONSTRUCTION IKSAN ARIE AFI DNG

C 04-APR-24 ISSUED FOR APPROVAL IKSAN ARIE AFI DNG

B 04-MAR-24 ISSUED FOR APPROVAL IKSAN ARIE AFI DNG

A 08-JAN-24 ISSUED FOR APPROVAL IKSAN ARIE AFI DNG

REV. DATE DESCRIPTION DRAWN DESIGNED CHECKED APPROVED

PT AMMAN MINERAL NUSA TENGGARA

TATA CONSULTING ENGINEERS LIMITED

EPC CONSORTIUM :

Jurong Engineering Limited PT Jurong Engineering Lestari

VENDOR :

PT. CHAKRA SARANA SENTOSA

NFS BATU HIJAU CCPP-1

Power & Lighting Schematic Drawing (SELDB-3B)


THREE LINE DIAGRAM
PROJECT DRAWING NO. : PO NO. : REV SHT

BHCP1-00-BJJ-CD-E-6612 0 1/2
1. BHCP1-0-BMC-SL-E-6015 Single Line Diagram for Main
Distribution Board
2. BHCP1-0-BJJ-SL-E-6013 Single Line Diagram for 400/230V System -
Overall Lighting
3. BHCP1-0-YYY-DC-E-6810 Lighting System Design Basis (Indoor & Outdoor)
4. BHCP1-00-BJD-SL-E-6009 Single Line Diagram For 400V Common
LV Switchgear
5. BHCP1-00-YYY-SL-E-6002 Key Single Line Diagram
6. BHCP1-0-YYY-GA-E-6813 LIGHTING & POWER SOCKET LAYOUT-
ADMINISTRATION CENTRAL CONTROL BUILDING

1. ALL DIMENSIONS ARE IN mm UNLESS OTHERWISE INDICATED.


2. THE LOCATION OF PANEL FIXTURES SHALL BE MODIFIED MARGINALLY
AT SITE TO SUIT SITE CONDITIONS.
3. ALL INSTALLATIONS IN OFFICESARE TO BE CONCEALED.
4. ELEVATION & POSITION OF PANEL SHALL BE ADJUSTED
AS PER SITE CONDITIONS.
5. FOR ROOM WITH FALSE CEILING, INBOW WALL INSTALLATION ARE USING PVC
CONDUIT OUTBOW CEILING ROUTING WILL USE EMT CONDUIT.
6. FOR ROOM WITHOUT FALSE CEILING, EXPOSED WALL WILL USE RGS CONDUIT
7. THE INSTALLATION OF THIS PANEL IS USING WALL MOUNTING TYPE

0 06-MAY-24 ISSUED FOR CONSTRUCTION IKSAN ARIE AFI DNG

C 04-APR-24 ISSUED FOR APPROVAL IKSAN ARIE AFI DNG

B 04-MAR-24 ISSUED FOR APPROVAL IKSAN ARIE AFI DNG

A 08-JAN-24 ISSUED FOR APPROVAL IKSAN ARIE AFI DNG

REV. DATE DESCRIPTION DRAWN DESIGNED CHECKED APPROVED

PT AMMAN MINERAL NUSA TENGGARA

TATA CONSULTING ENGINEERS LIMITED

EPC CONSORTIUM :

Jurong Engineering Limited PT Jurong Engineering Lestari

VENDOR :

PT. CHAKRA SARANA SENTOSA

NFS BATU HIJAU CCPP-1

Power & Lighting Schematic Drawing (SELDB-3B)


THREE LINE DIAGRAM
PROJECT DRAWING NO. : PO NO. : REV SHT

BHCP1-00-BJJ-CD-E-6612 0 2/2
1. BHCP1-0-BMC-SL-E-6015 Single Line Diagram for Main
Distribution Board
2. BHCP1-0-BJJ-SL-E-6013 Single Line Diagram for 400/230V System -
Overall Lighting
3. BHCP1-0-YYY-DC-E-6810 Lighting System Design Basis (Indoor & Outdoor)
4. BHCP1-00-BJD-SL-E-6009 Single Line Diagram For 400V Common
LV Switchgear
5. BHCP1-00-YYY-SL-E-6002 Key Single Line Diagram
6. BHCP1-0-YYY-GA-E-6813 LIGHTING & POWER SOCKET LAYOUT-
ADMINISTRATION CENTRAL CONTROL BUILDING

1. ALL DIMENSIONS ARE IN mm UNLESS OTHERWISE INDICATED.


2. THE LOCATION OF PANEL FIXTURES SHALL BE MODIFIED MARGINALLY
AT SITE TO SUIT SITE CONDITIONS.
3. ALL INSTALLATIONS IN OFFICESARE TO BE CONCEALED.
4. ELEVATION & POSITION OF PANEL SHALL BE ADJUSTED
AS PER SITE CONDITIONS.
5. FOR ROOM WITH FALSE CEILING, INBOW WALL INSTALLATION ARE USING PVC
CONDUIT OUTBOW CEILING ROUTING WILL USE EMT CONDUIT.
6. FOR ROOM WITHOUT FALSE CEILING, EXPOSED WALL WILL USE RGS CONDUIT
7. THE INSTALLATION OF THIS PANEL IS USING WALL MOUNTING TYPE

0 06-MAY-24 ISSUED FOR CONSTRUCTION IKSAN ARIE AFI DNG

C 04-APR-24 ISSUED FOR APPROVAL IKSAN ARIE AFI DNG

B 04-MAR-24 ISSUED FOR APPROVAL IKSAN ARIE AFI DNG

A 08-JAN-24 ISSUED FOR APPROVAL IKSAN ARIE AFI DNG

REV. DATE DESCRIPTION DRAWN DESIGNED CHECKED APPROVED

PT AMMAN MINERAL NUSA TENGGARA

TATA CONSULTING ENGINEERS LIMITED

EPC CONSORTIUM :

Jurong Engineering Limited PT Jurong Engineering Lestari

VENDOR :

PT. CHAKRA SARANA SENTOSA

NFS BATU HIJAU CCPP-1

Power & Lighting Schematic Drawing (SELDB-3B)


CONTROL LINE DIAGRAM
PROJECT DRAWING NO. : PO NO. : REV SHT

BHCP1-00-BJJ-CD-E-6612 0 1/1
1. BHCP1-0-BMC-SL-E-6015 Single Line Diagram for Main
Distribution Board
2. BHCP1-0-BJJ-SL-E-6013 Single Line Diagram for 400/230V System -
Overall Lighting
3. BHCP1-0-YYY-DC-E-6810 Lighting System Design Basis (Indoor & Outdoor)
4. BHCP1-00-BJD-SL-E-6009 Single Line Diagram For 400V Common
LV Switchgear
5. BHCP1-00-YYY-SL-E-6002 Key Single Line Diagram
6. BHCP1-0-YYY-GA-E-6813 LIGHTING & POWER SOCKET LAYOUT-
ADMINISTRATION CENTRAL CONTROL BUILDING

1. ALL DIMENSIONS ARE IN mm UNLESS OTHERWISE INDICATED.


2. THE LOCATION OF PANEL FIXTURES SHALL BE MODIFIED MARGINALLY
AT SITE TO SUIT SITE CONDITIONS.
3. ALL INSTALLATIONS IN OFFICESARE TO BE CONCEALED.
4. ELEVATION & POSITION OF PANEL SHALL BE ADJUSTED
AS PER SITE CONDITIONS.
5. FOR ROOM WITH FALSE CEILING, INBOW WALL INSTALLATION ARE USING PVC
CONDUIT OUTBOW CEILING ROUTING WILL USE EMT CONDUIT.
6. FOR ROOM WITHOUT FALSE CEILING, EXPOSED WALL WILL USE RGS CONDUIT
7. THE INSTALLATION OF THIS PANEL IS USING WALL MOUNTING TYPE

0 06-MAY-24 ISSUED FOR CONSTRUCTION IKSAN ARIE AFI DNG

C 04-APR-24 ISSUED FOR APPROVAL IKSAN ARIE AFI DNG

B 04-MAR-24 ISSUED FOR APPROVAL IKSAN ARIE AFI DNG

A 08-JAN-24 ISSUED FOR APPROVAL IKSAN ARIE AFI DNG

REV. DATE DESCRIPTION DRAWN DESIGNED CHECKED APPROVED

PT AMMAN MINERAL NUSA TENGGARA

TATA CONSULTING ENGINEERS LIMITED

EPC CONSORTIUM :

Jurong Engineering Limited PT Jurong Engineering Lestari

VENDOR :

PT. CHAKRA SARANA SENTOSA

NFS BATU HIJAU CCPP-1

Power & Lighting Schematic Drawing (SELDB-3B)


LAYOUT TERMINAL BLOCK
PROJECT DRAWING NO. : PO NO. : REV SHT

BHCP1-00-BJJ-CD-E-6612 0 1/1
1. BHCP1-0-BMC-SL-E-6015 Single Line Diagram for Main
Distribution Board
2. BHCP1-0-BJJ-SL-E-6013 Single Line Diagram for 400/230V System -
Overall Lighting
3. BHCP1-0-YYY-DC-E-6810 Lighting System Design Basis (Indoor & Outdoor)
4. BHCP1-00-BJD-SL-E-6009 Single Line Diagram For 400V Common
LV Switchgear
5. BHCP1-00-YYY-SL-E-6002 Key Single Line Diagram
6. BHCP1-0-YYY-GA-E-6813 LIGHTING & POWER SOCKET LAYOUT-
ADMINISTRATION CENTRAL CONTROL BUILDING

1. ALL DIMENSIONS ARE IN mm UNLESS OTHERWISE INDICATED.


2. THE LOCATION OF PANEL FIXTURES SHALL BE MODIFIED MARGINALLY
AT SITE TO SUIT SITE CONDITIONS.
3. ALL INSTALLATIONS IN OFFICESARE TO BE CONCEALED.
4. ELEVATION & POSITION OF PANEL SHALL BE ADJUSTED
AS PER SITE CONDITIONS.
5. FOR ROOM WITH FALSE CEILING, INBOW WALL INSTALLATION ARE USING PVC
CONDUIT OUTBOW CEILING ROUTING WILL USE EMT CONDUIT.
6. FOR ROOM WITHOUT FALSE CEILING, EXPOSED WALL WILL USE RGS CONDUIT
7. THE INSTALLATION OF THIS PANEL IS USING WALL MOUNTING TYPE

0 06-MAY-24 ISSUED FOR CONSTRUCTION IKSAN ARIE AFI DNG

C 04-APR-24 ISSUED FOR APPROVAL IKSAN ARIE AFI DNG

B 04-MAR-24 ISSUED FOR APPROVAL IKSAN ARIE AFI DNG

A 08-JAN-24 ISSUED FOR APPROVAL IKSAN ARIE AFI DNG

REV. DATE DESCRIPTION DRAWN DESIGNED CHECKED APPROVED

PT AMMAN MINERAL NUSA TENGGARA

TATA CONSULTING ENGINEERS LIMITED

EPC CONSORTIUM :

Jurong Engineering Limited PT Jurong Engineering Lestari

VENDOR :

PT. CHAKRA SARANA SENTOSA

NFS BATU HIJAU CCPP-1

Power & Lighting Schematic Drawing (SELDB-3B)


PILOT LAMP COLOUR
PROJECT DRAWING NO. : PO NO. : REV SHT

BHCP1-00-BJJ-CD-E-6612 0 1/1