Dineshkumar File
Dineshkumar File
JOB DESCRIPTION:
JOB DESCRIPTION:
JOB DESCRIPTION:
Fuel gas Mechanical base steel platform from gas area to GT connection.
GT interconnection Structure and enclosure structure like Cooling Water
System, N2 system, H2 system, CO2 system, fuel oil system, oily water
drain system
STG interconnection platform steel structure and their stair, enclosures
for lube oil system, seal oil system, control oil system, cooling water
system
Pipe Rack from Boiler to STG connection steel racks for Hp steam, Ip
steam, LP steam, Auxiliary steam, Steam drains HRH and CRH system.
BALANCE OF PLANT Pipe Rack for ASL oil system, Distillate oil system,
Raw water system, Fire water system, Potable water system,Demin
water system, service air system, Instrument air system, Service water
system, N2,H2 system, CO2 system.
UF permeate water system, first pass Ro system, and second pass Ro
system skid structure Fabrication and Assembly.
Oily water drain, Chemical drains underground tank Base structure and
Platform, stair, railing work.
Non-Destructive test, pneumatic, Hydro test and EOT Crane Girder Load
test.
JOB DESCRIPTION:
JOB DESCRIPTION:
.
Coordinate with the implementation of projects, ensuring that the
performance is in accordance with their respective scope of services and
conditions of contract.
Provide any reports update to the projects design managers and project
managers including clients when needed.
Coordinate aspects of projects submittal and deliverables, reviews and
approvals against contract requirements. Report and advice on
deviations from the same.
Preparing QA/QC reports & Testing documents as per the client
requirement & company policy.
Coordinate with the NDT technicians.
Conducting welder qualifications as per the client requirement.
Coordinate with the production team to maintain good quality.
PREVIOUS EXPERIENCE
JOB DESCRIPTION:
Currently working in Total Floating production storage offloading
Kaombo-norte & sul project.
Past worked in Exxon-Mobils Floating Storage offloading vessel BANYU-
URIP Project.
Perform QA responsibility such as ensuring quality in the processes,
prevent defects from occurring, establish a good quality management
system and assessing the adequacy.
Preview, review and verify documents of as built drawing, isometric
drawing, P&ID drawing and any supporting documents based on
updating latest revision.
To execute third-party walk down with client inspector, client operation,
commissioning engineer and qc inspector to close out the piping
completion for handover to commissioning team.
Had commissioned Bilge, Boiler, Fuel Oil & cargo oil and misc. systems.
Carry out inspection such as material inspection, fit-up, Visual,
dimensional with sub-contractors, clients/suppliers.
UT thickness of pressure vessels, process piping and plates for
lamination. Radiography of tanks, vessels, pressure parts, prefabricated
weld joints of pipes using gamma ray. Inspected materials for boiler
components, piping, structural.
Inspected edge preparation before welding. Prepared reports like UT,
radiography (Film evaluation), Carried out UT, PT for raw materials. To
calibrate the equipment’s periodically. A scan ultrasonic flaw detection of
butt-welded joints of process piping systems.
Personal Profile
Father’s Name : Ravi L
Date of Birth : 23.06.1991
Nationality : Indian
Gender : Male
Language Known : Tamil, English, Telugu
Passport Details
Passport Number : J3607624
Date of Issue : 01.02.2012
Date of Expiry : 01.02.2022
Declaration
I hereby declare that the information furnished above are true and correct to
the best of my knowledge and belief.
Place : Trichy Signature
Date :
(R. Dinesh kumar)