Company Name: LISTENLIGHTS PVT LTD Company Address: BHIVE WORKSPACE , INDIRANAGAR, BANGALORE
Description of work : FAS (Fire detection and Alarm system) installaton works
√ Coring / Chasing / Cutting (no electrical power in the area) Х Works involving asbestos. √ Demolition of a load-bearing element of a structure.
√ Roof Access √ Working at heights (risk of falling more than 2 metres). Х Works in or near a 1.5+ metre shaft / trench (excavation).
Х Shop Front Works (including glazing) √ Works near to or use of moving mobile plant. Х Works in areas exposed to extreme temperature.
√ Fire Services √ Works in or near a confined space. Х Works in or near water or other liquids with a risk of drowning.
√ Structural Work (all structural works including steel posts, beams and
concrete works) Х Tilt-up or precast concrete work. √ Construction diving work.
Х Works in contaminated or flammable atmospheres / areas. Х Works involving traffic corridors or other non-pedestrian traffic. Х Use of explosives.
√ Hydraulics work (all mains, waste water, sewerage, storm water and
hydraulic supply) Х Works carried out on a tower. Х Works on or near pressurised gas / piping.
√ Mechanical Work (all works related to air conditioning and lift services; pumps, pipes and ductwork related to other services structural work) √ Other (specify)
Tick the additional Personal protective equipment (PPE) requirements for the job apart from Safety shoe, Hard hat, Hi-Vis Jacket. Emergency arrangement details
Mention other Job Specific PPE if any;
Safety Goggles Hearing Fall arrest Hand Gloves Welding Helmet Coverall Suit Fire/evacuation First Aid Pollution/spill
Hazardous materials: Paint Are hazardous materials to be used(Yes/No)? Yes Is MSDS Available Yes
Mention Specific controls required as per MSDS: Job Specific training to the personnel who handle with paint material referring to MSDS
Permit required (tick below)
Permit to work √ Confined spaces Excavation Permit √ LOTO
Hot-work permit √ Night work permit √ Height Work Permit √ Other
Person responsible for ensuring compliance with SWMS: SRINIDHI Date of SWMS review:
What measures are in place to ensure compliance with the SWMS? Specific training to the personnel who handle with paint material referring to MSDS
Person responsible for reviewing the SWMS control measures: SRINIDHI Date SWMS received by reviewer:
2. Fall, slip, and trips And material falling while 1. Access & egress should be clear.
2. Shifting work to be carried out with authorized persons with
manual lifting. continuous supervision.
3.The area shall be made clear for any obstruction to the material.
4.Good Standards of Housekeeping will be maintained in order to
prevent Slips, Trips, and fall.
Possible Major High 5.Follow the buddy system to share the load. Possible Insignificant Medium
6.Trained and experienced workers.
7.Wear appropriate PPE.
3. Ergonomic Hazard and Fall of person 1. One manpower should lift around 30kg.
2. will be trained in manual handling techniques.
3. Job-specific training should be conducted.
4. Personnel will be trained in manual handling techniques.
5. Use trolley to shift the paint bottle from unload area to store
6.Keep the load as close to the body as possible, this will reduce
the strain on the lower back.
7.Ergonomic related training should be given
8. TBT should be conducted before starting work.
9. Use Shoulder pads and required PPEs.
10.Mechanical shifting
Possible Moderate High 11.Head load is not permitted Possible Insignificant Medium
1. Back strain while loading/unloading on trolley 1. Ensure person should lift/carry maximum 30kg at a time.
2. Use trolley/mechanical shifting to shift the paint bottle from
the paint bottle/muscle strain / sprain. unload area to store
3.Keep the load as close to the body as possible, this will reduce the
strain on the lower back.
4.Ergonomic related training should be given
3.Mobilization of Paints to Possible Moderate Medium 5.All appropriate PPE Must be used
Possible Minor Low
Store
3.Spillage of Paints on the floor. 1. Ensure all the Tins/containers are seal packed.
2. Secondary Container for paint storage to ensured
3. job specific training should be given.
4. MSDS should be available at location.
5. All Required PPE Must be used.
4. Eyes and skin irritations 1. Follow the MSDS for the concern chemical.
2. job specific training should be given.
3.Full sleeve cloth to wear avoid exposure from chemical
4.All appropriate PPE Must be used. Like ( Nose Mask, Goggles)
2. Eyes and skin irritations 1. Follow the MSDS for the concern chemical.
2. job specific training should be given.
3.Full sleeve or cloths to wear fully to avoid exposure
4.All Required PPE Must be used. Like ( Nose Mask, Goggles)
3.Inhalation of dust or Vapour 1. Follow the MSDS for the concern chemical.
2. job specific training should be given.
3.All Required PPE Must be used. Like ( Nose Mask)
4.Fall of Man or material due to topple of scaffold 1.Scaffold must be inspected and tagged before use
2.Work platform and toe guard to be fitted to mobile scaffold.
3.Castor brakes must be locked when the scaffold is in use.
4.Equipment and materials must be either removed from the
scaffold or secured to prevent falling from the scaffold during the
move.
5.Barricade the work area properly
6.Housekeeping of area
Possible Moderate Medium 6.Ensure job specific PPEs Possible Insignificant Medium
7.PTW to be obtained
2. Ergonomic Hazard and Fall from Height 1.Job-specific training should be conducted.
2. Personnel will be trained in manual handling techniques.
3. TBT should be conducted before starting work.
4. Use Shoulder pads and required PPEs.
5. Change workers to shift-wise for those activities that have a bad
posture to avoid ergonomics hazards.
Possible Major High 6.will be trained in manual handling techniques. Possible Insignificant Medium
5. Improper Scaffold.
7.Inhalation of dust or Vapour 1. Follow the MSDS for the concern chemical.
2. job specific training should be given.
3.All Required PPE Must be used. Like ( Nose Mask)
1. Damage cables and Damage Power tools 1. Damage cables should not be used at the site.
2. Use only ELCB/RCCB base power supply.
3. Power tools/Hand tools and Electrical Supply DB Must be
inspected monthly and tag should be displayed, and visual
inspection should be done on days before work starts.
4. A trained person should use power tools.
7. Thread rod and pipes cutting by using Possible Major High
5. First aider Shall be available on site
Possible Insignificant Medium
cutting machine
2. Cut/Burn injury due to hot surface 1.Face the machine towards the wall.
2. Wear face shield for cutting activities to avid sparks
3. Wear job related PPEs
4.First-Aider should available
3. Electrocution 1. Use the approved drilling machine & cutting machine of 3 core
cable tagged by the P&M Engineer.
2. Use the correct type and size of drilling bit and get P&M
Engineer approval before the start of drilling.
3. Ensure the drill is not powered while mounting and
dismounting the mobile platform
4.All distribution boards should have ELCB with 30mA sensitivity
Possible Major High 5. Check the tools for malfunction. Use Plug top. Possible Insignificant Medium
5. Non-insulated power tools and hand tools 1. Damage cables should not be used at the site.
2. Use only ELCB/RCCB base power supply.
and Non-inspected power & hand tools. 3. Power tools/Hand tools and Electrical Supply DB Must be
inspected weekly and tag should be displayed, and visual
inspection should be done.
4. 3 core cable to be used
5. A trained person should use power tools.
6. First aider Shall be available on site for any emergency
Possible Major High Possible Insignificant Medium
1. Fall of personnel /Fall of materials while 1.Scaffold must be inspected and tagged before use
2.Work platform and toe guard to be fitted to mobile scaffold.
lifting. 3.Castor brakes must be locked when the scaffold is in use.
4.Equipment and materials must be either removed from the
scaffold or secured to prevent falling from the scaffold during the
move.
5. Provision of A catch net should be available to close the upper
side of the shaft and lower side of the shaft to avoid any type of
material falling.
6. The open shaft shall be closed with a chakkar plate.
7. The shaft should be closed with Chakkar plates properly.
8.Barricade the work area properly with signages
9. Install of guardrail system (Handrail, midtrial & toe boards) and
09. FAS Pipe Installation Possible Major High Install of safety net in lower levels. Safe use Safety harness with
double lanyard..
Possible Moderate Medium
2. Electrocution 1. Use the approved drilling machine & cutting machine of 3 core
cable tagged by the P&M Engineer.
2. Use the correct type and size of drilling bit and get P&M
Engineer approval before the start of drilling.
3. Ensure the drill is not powered while mounting and
dismounting the mobile platform
4.All distribution boards should have ELCB with 30mA sensitivity
5. Check the tools for malfunction. Use Plug top.
Possible Major High Possible Insignificant Medium
4.Inhalation of dust or Vapour 1. Follow the MSDS for the concern chemical.
2. job specific training should be given.
3.All appropriate PPE Must be used. Like ( Nose Mask)
6. Defective PPEs 1. All personnel will wear the appropriate PPE for their work
activity base.
2. Use leather gloves, safety shoes, and a Hard hat.
3. Wear a hard long long-sleeved shirt and long trousers to
prevent the catching of fire.
4. The leather apron is to be used to avoid scattering of sparks.
5. Use of leather gloves, face shield safety shoes, and apron /
protective clothing.
6. Close the work area to prevent the entrance of others.
7.Use black film goggles/face shields.
Likely Moderate High 8.Training should be provided to the workmen. Possible Minor Medium
9.All the appropriate/approved PPEs must be worn.
4.Inhalation of dust or Fume 1. Follow the MSDS for the concern chemical.
2. job specific training should be given.
3.Adequate ventillation to be provided
4.All Required PPE Must be used. Like ( Nose Mask)
Possible Moderate Medium Possible Minor Low
1. Flanges & bolts under pressure 1. Tighten / Loosen the bolts only when no pressure in the system.
2. Check flange bolts for adequate strength & size.
3.Operator should be authorized and experienced
12. Tightening flange bolts under high Possible Moderate High
4.Ensure dedicaded supervision
5.TBT to be ensured Possible Moderate Medium
pressure for hydro testing
2. Collapse of tanks. 1.Provide safety relief valve.( set at pressure slightly higher than
test pressure ) while testing with air/ nitrogen.
2.Ensure necessary precautions, stepwise increase in pressure ,
tightening of bolts/nuts, grouting, etc before and during testing.
3. Keep the vents open before opening any valve while draining
out of water used for hydrotesting of tanks
1.Unskilled workers and Fall of material and 1. A competent Scaffolder should errect the scaffold.
2. Ensure scaffold was installed as per the standard design and
manpower also as per the safe working requirement.
3.Scaffold inspection needs to be done after erection and a
scaffold tag should be displayed to identify scaffold is safe to use
15. Scaffold Erection, Dismantling. Possible Moderate High 4.Errection done by competent person Possible Moderate Medium
2. Improper Access and Damage scaffold 1.Provide safe access like a staircase on the scaffold to avoid falls.
component. 2. Supervision should available while errection and dismantle of
scaffold.
3. Trained workers to be deployed for working at height on
mobile scaffolding.
4.Adequate Supports/ out riggers shall be provided to the
scaffolding
5.Only two workers at a time shall be permitted in the working
platform.
Possible Moderate High 6.Scaffolding Third party inspection certificates shall be Possible Moderate Medium
submitted.
7. The task must be supervised by a competent supervisor
1. Slip and Trip , Fall Hazard and Cuts 1. All materials must be properly stacked after completion of
work.
2. Adequate access and egress are to be maintained at the
workplace.
3. All cut pieces, debris, and scrap are to be stored at the
designated scrap yard.
4. The floor must be cleaned after completion of work.
5. A dedicated housekeeping team is to be engaged on a daily
basis for housekeeping.
6. The competent person must be engaged in the work
7. The area must be inspected prior to work start.
16. Housekeeping Possible Moderate Medium 8. Maintained hygiene on site. Possible Minor Low
Company Name: LISTENLIGHTS PVT LTD Company Address: BHIVE WORKSPACE , INDIRANAGAR, BANGALORE
Description of work : FAS (Fire detection and Alarm system) installaton works
√ Coring / Chasing / Cutting (no electrical power in the area) Х Works involving asbestos. √ Demolition of a load-bearing element of a structure.
√ Roof Access √ Working at heights (risk of falling more than 2 metres). Х Works in or near a 1.5+ metre shaft / trench (excavation).
Х Shop Front Works (including glazing) √ Works near to or use of moving mobile plant. Х Works in areas exposed to extreme temperature.
√ Fire Services √ Works in or near a confined space. Х Works in or near water or other liquids with a risk of drowning.
√ Structural Work (all structural works including steel posts, beams and
concrete works) Х Tilt-up or precast concrete work. √ Construction diving work.
Х Works in contaminated or flammable atmospheres / areas. Х Works involving traffic corridors or other non-pedestrian traffic. Х Use of explosives.
√ Hydraulics work (all mains, waste water, sewerage, storm water and
hydraulic supply) Х Works carried out on a tower. Х Works on or near pressurised gas / piping.
√ Mechanical Work (all works related to air conditioning and lift services; pumps, pipes and ductwork related to other services structural work) √ Other (specify)
Tick the additional Personal protective equipment (PPE) requirements for the job apart from Safety shoe, Hard hat, Hi-Vis Jacket. Emergency arrangement details
Mention other Job Specific PPE if any;
Safety Goggles Hearing Fall arrest Hand Gloves Welding Helmet Coverall Suit Fire/evacuation First Aid Pollution/spill
Hazardous materials: Paint Are hazardous materials to be used(Yes/No)? Yes Is MSDS Available Yes
Mention Specific controls required as per MSDS: Job Specific training to the personnel who handle with paint material referring to MSDS
Permit required (tick below)
Permit to work √ Confined spaces Excavation Permit √ LOTO
Hot-work permit √ Night work permit √ Height Work Permit √ Other
Person responsible for ensuring compliance with SWMS: SRINIDHI Date of SWMS review:
What measures are in place to ensure compliance with the SWMS? Specific training to the personnel who handle with paint material referring to MSDS
Person responsible for reviewing the SWMS control measures: SRINIDHI Date SWMS received by reviewer:
2.Mobilization of Paints to
Store
3. Eyes and skin irritations 1. Follow the MSDS for the concern chemical.
2. job specific training should be given.
3.Full sleeve or cloths to wear fully to avoid exposure
4.All Required PPE Must be used. Like ( Nose Mask, Goggles)
Possible Moderate Medium Possible Minor Low
2. Eyes and skin irritations 1. Follow the MSDS for the concern chemical.
2. job specific training should be given.
3.Full sleeve or cloths to wear fully to avoid exposure
4.All Required PPE Must be used. Like ( Nose Mask, Goggles)
3.Inhalation of dust or Fume 1. Follow the MSDS for the concern chemical.
2. job specific training should be given.
3.All Required PPE Must be used. Like ( Nose Mask)
4.Fall of Man or material due to topple of scaffold 1.Scaffold must be inspected and tagged before use
2.Work platform and toe guard to be fitted to mobile scaffold.
3.Castor brakes must be locked when the scaffold is in use.
4.Equipment and materials must be either removed from the
scaffold or secured to prevent falling from the scaffold during the
move.
5.Barricade the work area properly
Possible Moderate Medium 6.Ensure job specific PPEs Possible Insignificant Medium
2. Electrocution 1. Use the approved drilling machine & cutting machine tagged by
the P&M Engineer.
2. Use the correct type and size of drilling bit and get P&M
Engineer approval before the start of drilling.
3. Ensure the drill is not powered while mounting and
dismounting the mobile platform
4.All distribution boards should have ELCB with 30mA sensitivity
Possible Major High 5. Check the tools for malfunction. Use Plug top. Possible Insignificant Medium
5. Improper Scaffold.
2. Cut/Burn injury due to hot surface 1.Face the machine towards the wall.
2. Wear face shield for cutting activities to avid sparks
3. Wear job related PPEs
3. Non-insulated power tools and hand tools 1. Damage cables should not be used at the site.
2. Use only ELCB/RCCB base power supply.
and Non-inspected power & hand tools. 3. Power tools/Hand tools and Electrical Supply DB Must be
inspected monthly and tag should be displayed, and visual
inspection should be done on days before work starts.
4. A trained person should use power tools.
5. First aider Shall be available on site for any emergency
Possible Major High Possible Insignificant Medium
1. Fall of personnel /Fall of materials. 1.Scaffold must be inspected and tagged before use
2.Work platform and toe guard to be fitted to mobile scaffold.
3.Castor brakes must be locked when the scaffold is in use.
4.Equipment and materials must be either removed from the
scaffold or secured to prevent falling from the scaffold during the
move.
5. Provision of A catch net should be available to close the upper
side of the shaft and lower side of the shaft to avoid any type of
material falling.
6. The open shaft shall be closed with a chakkar plate.
7. The shaft should be closed with Chakkar plates properly.
8.Barricade the work area properly
9. Install of guardrail system (Handrail, midtrial & toe boards) and
09. FAS Pipe Installation Possible Major High Install of safety net in lower levels. Safe use Safety harness with
double lanyard..
Possible Moderate Medium
1. Falling of sparks / hot metals and Vision 1. while welding and cutting work on height ensure cover the
floor with a fire blanket
problems due to the viewing of flames 2.proper Fire blanket booth in case specific hot work area
3.Welding machine fitness/calibration certificate to kept available
4. Signages and fire prevention control measures should be near
the area.
5. Isolate cobustible materials from the work area
6.Fire watcher to ensure the area free from movement
10. Arc Welding [Hot work] Possible Major High 7. Fire extinguishers to be kept avaialble.
8.Welder shall be a competent person
Possible Moderate Medium
9.All Required PPE Must be used
1. Eyes and skin irritations 1. Follow the MSDS for the concern chemical.
2. job specific training should be given.
3.Full sleeve or cloths to wear fully to avoid exposure
4.Eye wash bottle to kept available in case eye burning sensation
5.All Required PPE Must be used. Like ( Nose Mask, Hand gloves,
Goggles)
11. Painting primer for MS fire pipes Possible Moderate Medium Possible Minor Low
3.Inhalation of dust or Fume 1. Follow the MSDS for the concern chemical.
2. job specific training should be given.
3.Adequate ventillation to be provided
4.All Required PPE Must be used. Like ( Nose Mask)
Possible Moderate Medium Possible Minor Low
1. Flanges & bolts under pressure 1. Tighten / Loosen the bolts only when no pressure in the system.
2. Check flange bolts for adequate strength & size.
3.Operator should be authorized and experienced
12. Tightening flange bolts under high Possible Moderate High Possible Moderate Medium
pressure for hydro testing
2. Collapse of tanks. 1.Provide safety relief valve.( set at pressure slightly higher than
test pressure ) while testing with air/ nitrogen.
2.Ensure necessary precautions, stepwise increase in pressure ,
tightening of bolts/nuts, grouting, etc before and during testing.
3. Keep the vents open before opening any valve while draining
out of water used for hydrotesting of tanks
4. Unauthorised entry 1.Work area to be cordoned off with barricading tapes to avoid
entry of unauthorized persons.
2.Permit system will be ensured for hand-over and take-over
procedures
3.Signages to be displayed for unauthorised entry
1.Unskilled workers and Fall of material and 1. A competent Scaffolder should errect the scaffold.
2. Ensure scaffold was installed as per the standard design and
manpower also as per the safe working requirement.
3.Scaffold inspection needs to be done after erection and a
scaffold tag should be displayed to identify scaffold is safe to use
16. Scaffold Erection, Dismantling. Possible Moderate High Possible Moderate Medium
2. Improper Access and Damage scaffold 1.Provide safe access like a staircase on the scaffold to avoid falls.
component. 2. Supervision should available while errection and dismantle of
scaffold.
3. Trained workers to be deployed for working at height on
mobile scaffolding.
4.Adequate Supports/ out riggers shall be provided to the
scaffolding
5.Only two workers at a time shall be permitted in the working
platform.
Possible Moderate High 6.Scaffolding Third party inspection certificates shall be Possible Moderate Medium
submitted.
7. The task must be supervised by a competent supervisor
1. Slip and Trip , Fall Hazard and Cuts 1. All materials must be properly stacked after completion of
work.
2. Adequate access and egress are to be maintained at the
workplace.
3. All cut pieces, debris, and scrap are to be stored at the
designated scrap yard.
4. The floor must be cleaned after completion of work.
5. A dedicated housekeeping team is to be engaged on a daily
basis for housekeeping.
6. The competent person must be engaged in the work
7. The area must be inspected prior to work start.
17. Housekeeping Possible Moderate Medium 8. Maintained hygiene on site. Possible Minor Low