0% found this document useful (0 votes)
62 views

Ispe Gpg26-Processval Toc

Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
62 views

Ispe Gpg26-Processval Toc

Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 2

ISPE Good Practice Guide: Page 5

Practical Implementation of the Lifecycle Approach to Process Validation

Table of Contents
1 Introduction.......................................................................................................................7
1.1 Foundation for the Good Practice Guide...................................................................................................... 8
1.2 Global Acceptance/Authorization.................................................................................................................. 9
1.3 Scope.......................................................................................................................................................... 12
1.4 Purpose....................................................................................................................................................... 12
1.5 Benefits....................................................................................................................................................... 13

2 Basic Terms Used in the Process Validation Lifecycle............................................... 15


2.1 Process Validation Lifecycle Stages........................................................................................................... 15
2.2 Stage 1 Process Design/Pharmaceutical Development............................................................................. 16
2.3 Stage 2 Key Terms and Substages............................................................................................................. 17
2.4 Stage 3 Continued (Ongoing) Process Verification and Substages........................................................... 18
2.5 Key Statistical Terms................................................................................................................................... 19

3 Design Development Phase (Stage 1).......................................................................... 21


3.1 Apply Statistics in PV Stage 1.................................................................................................................... 22
3.2 Assess Variability in Stage 1....................................................................................................................... 24
3.3 Leverage Stage 1 Data............................................................................................................................... 28
3.4 Determine Design Space and Control Strategy.......................................................................................... 31
3.5 Validation Master Plan................................................................................................................................ 44
3.6 Readiness for Stage 2 (Process Performance Qualification)..................................................................... 45

4 Design and Qualification of Facility, Utilities, and Equipment (Stage 2.1)........... 49


4.1 Overview and Background.......................................................................................................................... 49
4.2 Review of Establishing Equipment Qualification Ranges........................................................................... 50
4.3 Impact of Product and Process on Facilities, Utilities, and Systems.......................................................... 50

5 Initial Process Qualification Activities (Stage 2.2)................................................... 53


5.1 Determine an Appropriate Number of Initial Process Validation Batches and
Inter-Batch Variability Assessment.............................................................................................................. 53
5.2 Determine Science and Statistically-Based Process Validation Acceptance Criteria and Sampling Plans.... 58
5.3 Process Validation (Process Performance Qualification) Acceptance Criteria........................................... 67
5.4 Stage 2.2 Process Review.......................................................................................................................... 73

6 Continued Process Verification (Stage 3).................................................................. 77


6.1 Determine the Continued Process Verification Plan................................................................................... 77
6.2 Determine which Variability to Include in the Continued Process Verification Plan.................................... 79
6.3 Determining Statistically-based Routine Sampling and Testing for Continued Process Verification........... 82
6.4 Dissolution.................................................................................................................................................. 91
6.5 Evaluate Legacy Products for Heightened Monitoring/Testing Need.......................................................... 93
6.6 Periodic Review and Revalidation.............................................................................................................. 95
6.7 Report: Frequency, Recommendations for Further Actions, Relevance with Annual Product Review....... 97

7 Contract Manufacturing................................................................................................ 99
7.1 Contract Development, Manufacturing, and Packaging Organizations and License Holder Relationship..... 99
7.2 Maintaining Compliance while Ensuring Flexibility..................................................................................... 99
7.3 Best Practices in Stage 1............................................................................................................................ 99
7.4 Best Practices in Stage 2.......................................................................................................................... 101
7.5 Best Practices in Stage 3.......................................................................................................................... 102
7.6 Stage Gate Processes.............................................................................................................................. 102
7.7 Regulatory Audit Expectations.................................................................................................................. 105
7.8 Contract Development, Manufacturing, and Packaging Organizations – Specialized
versus One Source Models...................................................................................................................... 105
ISPE GPG: Process Validation – TOC ©2019 ISPE. All rights reserved. www.ISPE.org
Page 6 ISPE Good Practice Guide:
Practical Implementation of the Lifecycle Approach to Process Validation

8 Change Management....................................................................................................107
8.1 Change Management Principles............................................................................................................... 107
8.2 Changing Manufacturing Sites.................................................................................................................. 109

9 Appendix 1 – Case Study: Legacy Products............................................................... 111


9.1 Executive Summary...................................................................................................................................111
9.2 Case Study Overview and Background.....................................................................................................111
9.3 Critical Quality Attributes Operating Characteristic Curves...................................................................... 114
9.4 Estimate the Number of Samples for the Process Validation Stage 2.2 Protocol..................................... 118
9.5 Assess Stage 2.2 Data............................................................................................................................. 119
9.6 Product Risk Evaluation and Enhanced Controlled Strategy for Continued Process
Verification (Stage 3.1)............................................................................................................................. 122

10 Appendix 2 – NDA Products Case Studies: Small Molecules..................................125


10.1 Case Study 1: Selection of CQAs and PPs for CPV – Applying Risk-based Approach
to CPV Determination to a New Small Molecule Drug Product, Utilizing Data from
the ISPE PQLI® Guide Part 2 – Illustrative Example [35].......................................................................... 125
10.2 Case Study 2: Batch Size Reduction Process Performance Qualification............................................... 132

11 Appendix 3 – NDA Products Case Studies: Large Molecules or


Bio-derived Products....................................................................................................143
11.1 Case Study 1: Large Molecule Example Column Chromatography Step –
Parameter Selection for CPV [35]............................................................................................................. 143
11.2 Case Study 2: Process Validation of a Cell Culture Product..................................................................... 149

12 Appendix 4 – Contract Manufacturing Product Case Studies................................159


12.1 Case Study 1: Insufficient Information Transfer in Design........................................................................ 159
12.2 Case Study 2: Allowing Flexibility............................................................................................................. 160

13 Appendix 5 – Additional Information on Determining the Number of


Process Performance Qualification Batches..............................................................161
13.1 Further Explanation of Risk Assessment in Preparation for Determining the Number of
PPQ Batches [34]..................................................................................................................................... 161
13.2 Determining the Number of PPQ Batches Based on a Risk-based Approach Utilizing
the ISPE PQLI® Guide Part 2 – Illustrative Example [8] [34]..................................................................... 165

14 Appendix 6 – Statistical Detail.................................................................................... 173


14.1 Operating Characteristic Curves of Sampling Plans and Acceptance Criteria......................................... 173
14.2 k Value Approximation for Two-Sided Tolerance Interval.......................................................................... 175
14.3 Generation of Acceptance Limit Table for Two-Sided Tolerance Interval Approach.................................. 175
14.4 OC Curves for USP UDU <905> Test [46] Based on 85% – 115% Coverage.......................................... 176
14.5 “Exact” Method – Statistical Details.......................................................................................................... 176
14.6 R Program to Generate Acceptance Limit Tables for the Exact Method................................................... 179
14.7 Approximation to Exact Acceptance Limits Using a Polygon.................................................................... 180
14.8 Graphical Comparison of Acceptance Limit Tables................................................................................... 182
14.9 Operating Characteristic Curves to Help Select Sampling Plan............................................................... 183
14.10 Formula for Calculating the Tolerance Interval Endpoints [54]................................................................. 185
14.11 Dissolution Acceptance Limit Tables......................................................................................................... 186

15 Appendix 7 – References............................................................................................. 191


16 Appendix 8 – Glossary..................................................................................................195
16.1 Acronyms and Abbreviations.................................................................................................................... 195
16.2 Definitions................................................................................................................................................. 199

ISPE GPG: Process Validation – TOC ©2019 ISPE. All rights reserved. www.ISPE.org

You might also like