0% found this document useful (0 votes)
40 views4 pages

BoQ Loading Ramp - Blank

Uploaded by

BATO ALAM UTAMA
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
40 views4 pages

BoQ Loading Ramp - Blank

Uploaded by

BATO ALAM UTAMA
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 4

RECAPITULATION

No Description

A. PREPARATION WORK
B. STRUCTURE WORK

GRAND TOTAL
PPN (10%)
GRAND TOTAL
ROUNDED TOTAL
Jakarta, 18 November 2021
Created by, Checked by, Checked by,

Satrya A. P Sukarno Thomas Nicholas


Quantity Surveyor Civil Engineer Operation Manager
ULATION
UNIT : IDR
Rev : 2
Date : 18 November 2021

Total Price (IDR) Remark

Checked by, Review by,

Thomas Nicholas Wisma Bharuna


Operation Manager Director
BILL OF QUANTITY
Proyek : Loading Ramp

Lokasi : Morosi, Sulawesi Tenggara


Luas : 30,5 m x 10 m

Qty Material Cost Labor & Equipment


No Description
Owner Contractor Unit Rate Total Unit Rate
A. PREPARATION WORK
1 Land preparatian 1.00 - -
2 Water & electicity work 1.00 - -
3 HSE Equipment 1.00 - -

TOTAL A

B. STRUCTURE WORK

1 Retaining wall, W=500~2500mm, H=2500mm

- Dolken dia. 10cm, H=6m point 246.00

- Excavation soil m3 80.64

- Back fill soil m3 10.52


- Disposal m3 70.13
- Sand bedding thk. 100mm m3 6.72
- Lean concrete thk. 50mm m3 3.36
- Boulder stone, 1:5 m3 126.00
- Pipe PVC 2", AW class (include acessories filtration ) ea 32.00

2 Retaining wall, W=300~1500mm, H=0~2500mm


- Dolken dia. 10cm, H=6m point 148.00
- Excavation soil m3 80.52
- Back fill soil m3 32.77
- Disposal m3 47.75
- Sand bedding thk. 100mm m3 6.71
- Lean concrete thk. 50mm m3 3.36
- Boulder stone, 1:5 m3 90.04
- Pipe PVC 2", AW class (include acessories filtration ) ea 30.00

3 Filling
- Landfill, include compaction m3 416.25

TOTAL B

Jakarta, 18 November 2021

Created by Checked by, Checked by,

Satrya A.P Sukarno Thomas Nicholas


Quantity Surveyor Civil Engineer Operation Manager
UNIT : IDR

Rev : 2
Date : 18 November 2021

Labor & Equipment Total Unit Rate


Total Price Remark
Total

GRAND TOTAL 297,025,828

Checked by, Approved by,

omas Nicholas Wisma Bharuna


eration Manager Director