0% found this document useful (0 votes)
42 views3 pages

Jit Gurung

jit estimation

Uploaded by

mjenish99
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
42 views3 pages

Jit Gurung

jit estimation

Uploaded by

mjenish99
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 3

Construction Cost Estimation Summary

CLIENT'S NAME: Jit Gurung


Address:
S.N Description Unit Quantity Rate Amount Cum Sum
A Section 1: Design And Drawing
1 Municipal Work Ls 72,500.00 72,500.00
B Section 2: Levelling and Excavation Works
2 Excavation works cft 3,144.96 23.34 73,391.31
138,112.29
3 Back Fill In Excavated Area cft 1,589.76 23.34 37,098.90
3 Levelling Works cft 1200.960 23.00 27,622.08

C Section 3: Foundation Protection and Preparation Works


1 Brick Soiling in Footing and GF Level cft 1124.640 78.63 88,432.69
186,838.69
2 PCC Works in Footing and GF Level cft 281.160 350.00 98,406.00

D Section 4: RCC, Reinforcement and Shuttering Works


1 M20 concrete cft 1,635.96 550.00 899,775.25
2 Reinforcement kg 6,182.12 155.00 958,228.03 1,982,013.37
3 Shuttering Works sqft 3263.42 38.00 124,010.09

E Section 5: Opening Schedule


1 Main Door 1 Nos 1.00 40,000.00 40,000.00
a. Main Door 3"x4" Frame (wooden) cuft 0.00 8,000.00 8,000.00
b. Main Door Lock+Handel Nos 0.00 4,000.00 4,000.00
2 Internal Doors
a. 3"x4" Frame(wooden) Frame Nos 5.00 7,000.00 35,000.00 198,226.00

b. Shutter ReadyMade Nos 5.00 6,500.00 32,500.00

Client Name : Company Stamp


Signature : 1 Company Name:
198,226.00

c. Lock,With Necessary Installation Nos 5.00 3,000.00 15,000.00


3 Windows (UPVC) sqft 76.00 750.00 57,000.00
a. Metal Work in Window Ground Floor only sqft 76.00 265.50 6,726.00

F Section 6: Walls / Plasters/Painting


1 Brick Masonary cft 1,964.22 465.00 913,364.07
2 Plaster Works sqft 5,057.28 85.00 429,869.08
3 Painting Works sqft 5,057.28 25.00 126,432.08 1,507,746.31
a. Internal Wall Putting sqft 3137.71 10.00 31,377.07
b. Enamel Paint in Door Shutter and Metal Work sqft 209.50 32.00 6,704.00

G Section 7: Tiles ,Marble,Screeding ,Punning and Granite


1 Screeding sqft 244.61 80.00 19,568.80
2 Granite Work sqft 0.00 500.00 -
218,767.89
2 Granite work in Staircase sqft 253.87 500.00 126,933.33
5 Tile in Kitchen,Terrace And Varahanda, Sqft 344.12 210.00 72,265.76

I Section 8 : Exterior Design Section

14,212.80
7 Parking Tile work Sqft 67.68 210.00 14,212.80
H Section 9: Skill Special treatment and waterproofing works
1 Membrane Sheet layering sqft 140.24 - -
2 PMM insertion sqft 541.14 - -
3 Skill's DPC Bitumenous coating sqft 299.40 - - 0.00
4 2K Coating Treatment sqft 140.24 - -
5 Zero Side Polymer Coating Treatment sqft 541.14 - -

J Others Items

Client Name : Company Stamp


Signature : 2 Company Name:
1 Overhead Watertank and Metal Stand
a. Tank 1000 Ltr-2 Nos Nos 2 15,000.00 30,000.00
b. Metal Stand Nos 1 28,000.00 28,000.00
2 Underground Water tank (8000 Ltr) TS 150,000.00
3 Railling (Stairs) SS Steel Rft 16.97 1,250.00 21,212.50
4 Railling (Verandah) SS Steel Rft 0.00 1,250.00 - 465,470.39
5 Railing on L.Terrace and upper terrace (SS Steel) Rft 174.40 700.00 122,080.00
6 Metal Staircase LS 1 30,000.00
7 Boundary Wall (Excluding) TS 1 -
8 Main Gate LS 1 45,000.00
9 Septic Tank and Soak Pit TS 1 39,177.89
Internal Furnishing -
Sub - Total 4,783,887.74
Electrical fittings 143,516.63
Sanitary pipes and fittings 102,150.00
Total including Management Charge 5,281,032.09
Contract Agreement Amount

Client Name : Company Stamp